Tender For Establishment Of Inspection & Certification (I&C) Centre /Automated Testing Station (Ats) And Its Operation & Maintenance At Rishikesh
Tender Overview
Project Description
Tender for Establishment Of Inspection & Certification (I&C) Centre /Automated Testing Station (Ats) And Its Operation & Maintenance At Rishikesh
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 17-Nov-2026 | Corrigendum | Fee | 25-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | SCHEDULE I : COST OF EQUIPMENT & UTILITIES |
| 2 | Heavy Vehicle (HD) ATS Test Lane |
| 3 | Roller Brake Tester (HD) with Axle Load Measurement System |
| 4 | Side Slip Tester (HD) |
| 5 | Speedometer Tester (HD) |
| 6 | Free Wheel Trolley (Portable) |
| 7 | Bogie / Free Roller Set |
| 8 | Joint Play Detector (HD) |
| 9 | Semi-Automatic Head Lamp Aligner |
| 10 | Automatic Electronic Steering Gear Play |
| 11 | HD Test Floor Console with Computer |
| 12 | Light Vehicle (LD) ATS Test Lane |
| 13 | Roller Brake Tester (HD) with Axle Load Measurement System |
| 14 | Side Slip Tester (HD) |
| 15 | Speedometer Tester (HD) |
| 16 | Free Wheel Trolley (Portable) |
| 17 | Bogie / Free Roller Set |
| 18 | Joint Play Detector (HD) |
| 19 | Semi-Automatic Head Lamp Aligner |
| 20 | Automatic Electronic Steering Gear Play |
| 21 | HD Test Floor Console with Computer |
| 22 | Emission & Safety Testing Equipment |
| 23 | Opacimeter & Exhaust Gas Analyzer (Combo)/Separate |
| 24 | Sound Level Meter with Data Logger |
| 25 | EV Test Fingers & Insulation Tester |
| 26 | OBD Scanner |
| 27 | Emission & Safety Testing Equipment |
| 28 | Lane Management Software |
| 29 | Token Generation Software |
| 30 | Database |
| 31 | Reporting Module |
| 32 | Government Interface |
| 33 | IT Infrastructure |
| 34 | ATS Application Server |
| 35 | Token Computer |
| 36 | Office Computer |
| 37 | Laser Printer |
| 38 | Structured Cabling (For whole facility) |
| 39 | CCTV, Surveillance & ANPR System |
| 40 | Fixed IP Cameras |
| 41 | PTZ Camera |
| 42 | ANPR Camera |
| 43 | Storage HDD |
| 44 | Monitoring Workstation |
| 45 | Monitoring Display |
| 46 | Network Switches |
| 47 | Electrical Infrastructure |
| 48 | Servo Stabilizer – (3ɸ.) |
| 49 | PDP for Floor |
| 50 | LT Changeover Panel |
| 51 | Copper Cables for Underfloor cabling |
| 52 | Copper Cable |
| 53 | Heavy Industrial Fan |
| 54 | Pneumatic & Hydraulics System |
| 55 | Air Compressor |
| 56 | Star Delta Starter |
| 57 | Pressure Control AUTO Cut-Off unit |
| 58 | Pneumatic Pipe – 8mm × 12 mm |
| 59 | Connectors (I, T, X Valves, Couplers, Caps) |
| 60 | Air Dryer & Moisture Filter (FRL) |
| 61 | Pressure Regulators with Gauges |
| 62 | Quick-Release Couplers |
| 63 | Safety Relief Valve |
| 64 | Mounting & Support Fixtu |
| 65 | Hydraulic Hose Pipe |
| 66 | Hose Pie connectors |
| 67 | Hydraulic Oil for side slip tester (in litters) |
| 68 | Hydraulic Pump Bases |
| 69 | Fabricaiton Work (for Whole Facility) |
| 70 | Pit Framing |
| 71 | Operator Barricades |
| 72 | Safety Railings |
| 73 | Equipment Support Structures |
| 74 | Cable Tray Supports |
| 75 | Protective Guards |
| 76 | Miscellaneous |
| 77 | Epoxy Flooring & Markings (for whole Facility) |
| 78 | Surface Preparation |
| 79 | Epoxy Flooring |
| 80 | Lane Markings |
| 81 | Safety Markings |
| 82 | Equipment Demarcation |
| 83 | Utilities System |
| 84 | UPS & Battery Set |
| 85 | Diesel Generator Set |
| 86 | RO Water Purifier Unit |
| 87 | Water Cooler |
| 88 | Tools & Safety Gear |
| 89 | Digital Multimeter (Fluke) |
| 90 | Insulated Screwdriver Set (8 pcs) |
| 91 | Wire Stripper / Cutter |
| 92 | Wire Crimping Tool |
| 93 | RJ45 Crimping & LAN Tester Set |
| 94 | Cable Jointers – LAN (RJ45)/ Power (sleeve) |
| 95 | Voltage Tester Pen (Non-contact) |
| 96 | Electric Drill Machine |
| 97 | Chain Pulley |
| 98 | Heavy-Duty Adjustable Wrench (12”) |
| 99 | Pipe Wrench (large – 14”) |
| 100 | Ring Spanner Set (12 pcs, heavy-duty) |
| 101 | Allen Key Set – Ball Type |
| 102 | Torque Wrench – Medium Capacity |
| 103 | Hammer Set (Claw, Rubber) |
| 104 | Plier Set – Nose + Cutter + Grip |
| 105 | Grease Gun / Oil Can |
| 106 | Digital Laser Distance Meter (30 m) |
| 107 | Steel Measuring Tape – 5m-50m combo |
| 108 | Spirit Level (12” standard) |
| 109 | Clamp Meter (for current testing) |
| 110 | Industrial Ladder – 6-10 ft, foldable |
| 111 | Extension Boards – 5 sockets |
| 112 | Toolbox – Lockable (steel, medium) |
| 113 | Drawers Tool Trolley/wall mount |
| 114 | Safety Gloves – Electric Grade |
| 115 | Safety Goggles – Dust & Arc Shield |
| 116 | Industrial Safety Helmet (ISI certified) |
| 117 | Safety Shoes – Steel Toe, ISI Grade |
| 118 | Reflective Safety Jackets – Fluorescent |
| 119 | Printed Signage Boards |
| 120 | Equipment Data Boards |
| 121 | Room & Office Name Boards |
| 122 | Officer Name Plates |
| 123 | ATS Flow & Fee Charts |
| 124 | Caution & Instruction Boards |
| 125 | Parking & Directional Boards |
| 126 | Shed Top ATS Name |
| 127 | Main Entry Gate Signage |
| 128 | Helpline Boards |
| 129 | Road Signage & Traffic Rules |
| 130 | Schedule II : COST OF INSTALLATION & COMMISSIONING OF ALL EQUIPMENT & UTILITIES(TOTAL LUMP SUM CHARGES) |
| 131 | Installation & Commissioning of all elements (TOTAL LUMP SUM CHARGES) |
| 132 | Schedule III : COST OF DESIGN AND CONSTRUCTION OF CIVIL WORK OF EQUIPMENT FOUNDATION(TOTAL LUMP SUM CHARGES) |
| 133 | Modification & civil work of equipment foundations including allied services like test shed trimix flooring on exiting flooring, epoxy coating for the flooring, conduiting for cables including 3-phase & Single phase cables & drainage, compressor piping.(TOTAL LUMP SUM CHARGES) |
| 134 | SCHEDULE IV: COST OF OPERATION AND MANPOWER COST AS PER SCOPE OF WORK GIVEN IN SECTION 4 OF THE RFB(OPERATION COST PER MONTH IN ₹) |
| 135 | 1st Year Operation cost (Consumable and allied works for operations) for 12 months as per RFB scope of work |
| 136 | 2nd Year Operation cost (Consumable and allied works for operations) for 12 months as per RFB scope of work |
| 137 | 3rd Year Operation cost (Consumable and allied works for operations) for 12 months as per RFB scope of work |
| 138 | 4th Year Operation cost (Consumable and allied works for operations) for 12 months as per RFB scope of work |
| 139 | 5th Year Operation cost (Consumable and allied works for operations) for 12 months as per RFB scope of work |
| 140 | 6th Year Operation cost (Consumable and allied works for operations) for 12 months as per RFB scope of work |
| 141 | 7th Year Operation cost (Consumable and allied works for operations) for 12 months as per RFB scope of work |
| 142 | 8th Year Operation cost (Consumable and allied works for operations) for 12 months as per RFB scope of work |
| 143 | 9th Year Operation cost (Consumable and allied works for operations) for 12 months as per RFB scope of work |
| 144 | 10th Year Operation cost (Consumable and allied works for operations) for 12 months as per RFB scope of work |
| 145 | Total Salary of manpower (1st Year) |
| 146 | Total Salary of manpower (2nd Year) |
| 147 | Total Salary of manpower (3rd Year) |
| 148 | Total Salary of manpower (4th Year) |
| 149 | Total Salary of manpower (5th Year) |
| 150 | Total Salary of manpower (6th Year) |
| 151 | Total Salary of manpower (7th Year) |
| 152 | Total Salary of manpower (8thYear) |
| 153 | Total Salary of manpower (9th Year) |
| 154 | Total Salary of manpower (10th Year) |
| 155 | SCHEDULE V: COST OF COMPREHENSIVE AMC OF THE EQUIPMENT AND UTILITIES AT ATS |
| 156 | Total Cost of Comprehensive AMC for Third year after initial two years of warranty (of Equipment, Utilities & IT Equipment) |
| 157 | Total Cost of Comprehensive AMC for Fourth year after initial two years of warranty (of Equipment, Utilities & IT Equipment) |
| 158 | Total Cost of Comprehensive AMC for Fifth year after initial two years of warranty (of Equipment, Utilities & IT Equipment) |
| 159 | Total Cost of Comprehensive AMC for Sixth year after initial two years of warranty (of Equipment, Utilities & IT Equipment) |
| 160 | Total Cost of Comprehensive AMC for Seventh year after initial two years of warranty (of Equipment, Utilities & IT Equipment) |
| 161 | Total Cost of Comprehensive AMC for Eighth year after initial two years of warranty (of Equipment, Utilities & IT Equipment) |
| 162 | Total Cost of Comprehensive AMC for Ninth year after initial two years of warranty (of Equipment, Utilities & IT Equipment) |
| 163 | Total Cost of Comprehensive AMC for Tenth year after initial two years of warranty (of Equipment, Utilities & IT Equipment) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 5 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender