Tender For Renovation Of Bhograi Lock To Barmania Nallah With Construction Of Structures Near Pantei Village In Bhograi Block Of Balasore District.
Tender Value
83.13 Lakhs
Estimated cost
Bid Submission
03 Dec 2026
14 days left
EMD
83139
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Baleshwar → Odisha
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Renovation Of Bhograi Lock To Barmania Nallah With Construction Of Structures Near Pantei Village In Bhograi Block Of Balasore District.
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation of foundation of structures by mechanical means in all kinds of soil including stoney earth and gravel in both wet and dry condition including shoring, shuttering, propping, bullah, dewatering the foundation, diverting the water away from the structure, dressing, leveling and ramming the foundation bed and sides with pneumatic tampers/ fuel operated compactors as per the drawing and specification and removing the excavated materials with all lead, lifts and delifts and all shifts of excavator & depositing the excavated materials in the embankment with watering and disposing the excess materials in spoil bank or any other specified areas by manual means with all leads, lifts and delifts complete with all taxes excluding GST , Labour charges,T&P, Labour Cess etc. complete including mobilization and demobilization of men and machineries etc. complete with all cost incidental to the work as per the drawing, specification and direction of the Engineer in Charge. |
| 2 | Providing Cast in Situ 300 mm dia Double under reamed R.C.C. piles with RCC M 20 grade 5.00 m. depth using 20mm down graded size black hard granite crusher broken stone chips of approved quality from approved quarry and and placing the concrete using tremmie pipe and funnel including cost of boring with betonite slurry including curring excluding cost of HYSD bar Tor steel Fe 550, labour charges for cutting, bending, binding, straightening and tying the grills and placing in position, cost of binding wires etc. , with cost, conveyance, royalty and taxes excluding GST , cess of all materials with cost of quality control testing charges etc. complete as per the approved drawing and specification and direction of the Engineer in charge. |
| 3 | Providing Cast in Situ 375 mm dia Double under reamed R.C.C. piles with RCC M 25 grade 7.00 m. depth using 20mm down graded size black hard granite crusher broken stone chips of approved quality from approved quarry and and placing the concrete using tremmie pipe and funnel including cost of boring with betonite slurry including curring excluding cost of HYSD bar Tor steel Fe 550, labour charges for cutting, bending, binding, straightening and tying the grills and placing in position, cost of binding wires etc. , with cost, conveyance, royalty and taxes excluding GST , cess of all materials with cost of quality control testing charges etc. complete as per the approved drawing and specification and direction of the Engineer in charge. |
| 4 | Providing Cast in Situ 375 mm dia Single under reamed R.C.C. piles with RCC M 25 grade 5.00 m. depth using 20mm down graded size black hard granite crusher broken stone chips of approved quality from approved quarry and and placing the concrete using tremmie pipe and funnel including cost of boring with betonite slurry including curring excluding cost of HYSD bar Tor steel Fe 550, labour charges for cutting, bending, binding, straightening and tying the grills and placing in position, cost of binding wires etc. , with cost, conveyance, royalty and taxes excluding GST , cess of all materials with cost of quality control testing charges etc. complete as per the approved drawing and specification and direction of the Engineer in charge. |
| 5 | Providing and laying cement concrete M 15 grade using 40 mm and down graded hard granite well graded crusher broken stone aggregates free from weathered skin surface and any other deleterious materials, using sharp sand of approved grading and quality conforming to the specifications, using water of approved quality and using cement as per approved specification with all leads. lifts, delifts and transportation by mechanical manual means including cost, carriage, royalties, Labour cess and taxes excluding GST of all other materials including dewatering by suitable means with all cost, weighing all materials using weigh batcher, mixing the concrete mix ingredients in all mechanical mixer, vibration of concrete by mechanical means, supplying T&P, watering, curing for specified days by suitable means including cost and carriage of water, mobilization and demobilization of men and machineries etc. including quality control testing charges as per approved drawings & specifications & direction of the Engineer in charge |
| 6 | Providing & laying reinforced cement concrete M 25 grade in approved surface using 20mm & down graded hard granite well graded crusher broken stone aggregates free from weathered skins surface and any other deleterious materials, using sharp sand of approved grading & quality confirming to the specifications, using water of approved quality & using cement as per approved specification with all leads & delifts & transportation by mechanical manual means including cost, carriage, royalties, Labour cess & taxes excluding GST of all materials using weigh batcher, mixing the ingredients in a mechanical mixer, vibration of concrete by mechanical means supplying T & P, watering, curing for specified days by suitable means including cost & carriage of water, mobilisation & demobilisation of men & machineries etc. including quality control testing charges as per approved drawing & specification & direction of the Engineer in Charge. Excluding labour charges for cutting, bending, binding & straightening etc and cost of reinforcement and binding wire. |
| 7 | Providing HYSD bars confirming to grade Fe 550 of steel and approved quality including labour charges for straightening, cutting, bending, binding lapping, welding, etc. & conforming to IS specification and tying the grills and placing in position with ties, charges and spacers including lapping by binding wires welding wherever necessary and fixing of reinforcement for RCC works as per the approved design with all leads, lifts and de lifts from bending yard to placement spot including cost, quality control testing charge and conveyance of HYSD bars and binding wire of 18 to 20 gauge including cost of all labour, T & P and supervision charges,Labour Cess & all taxes excluding GST etc. complete as per design, drawing, specification and direction of the Engineer in Charge. Standard co efficient of different sizes of steel shall be considered for payment & welding and lapping shall confirm to relevant clause of IS code |
| 8 | Providing rigid and smooth form works for Cement Concrete or RCC work including false work & dismantling thereafter casting for all heights in all types of structures including pier, abutment, trough slab, road slab etc. complete using steel shutters or plywood shutters efficiently propped and braced using required number of pylons for vertical support, scaffolding, gangway etc. complete and applying the finish for surfaces prominently exposed to public view or flow areas subjected to high velocity as per IS 457 and dismantling after allowing required support time and stacking the same for reuse including greasing, oiling etc. including cost, carriage, royalty and taxes excluding GST of all materials, labour and T&P and supervision charges complete as per approved design and direction of the Engineer in Charge. Foundation & Plinth |
| 9 | Providing rigid and smooth form works for Cement Concrete or RCC work including false work & dismantling thereafter casting for all heights in all types of structures including pier, abutment, trough slab, road slab etc. complete using steel shutters or plywood shutters efficiently propped and braced using required number of pylons for vertical support, scaffolding, gangway etc. complete and applying the finish for surfaces prominently exposed to public view or flow areas subjected to high velocity as per IS 457 and dismantling after allowing required support time and stacking the same for reuse including greasing, oiling etc. including cost, carriage, royalty and taxes excluding GST of all materials, labour and T&P and supervision charges complete as per approved design and direction of the Engineer in Charge.Columns & Beams |
| 10 | Providing rigid and smooth form works for Cement Concrete or RCC work including false work & dismantling thereafter casting for all heights in all types of structures including pier, abutment, trough slab, road slab etc. complete using steel shutters or plywood shutters efficiently propped and braced using required number of pylons for vertical support, scaffolding, gangway etc. complete and applying the finish for surfaces prominently exposed to public view or flow areas subjected to high velocity as per IS 457 and dismantling after allowing required support time and stacking the same for reuse including greasing, oiling etc. including cost, carriage, royalty and taxes excluding GST of all materials, labour and T&P and supervision charges complete as per approved design and direction of the Engineer in Charge. Walls & Fins |
| 11 | Providing rigid and smooth form works for Cement Concrete or RCC work including false work & dismantling thereafter casting for all heights in all types of structures including pier, abutment, trough slab, road slab etc. complete using steel shutters or plywood shutters efficiently propped and braced using required number of pylons for vertical support, scaffolding, gangway etc. complete and applying the finish for surfaces prominently exposed to public view or flow areas subjected to high velocity as per IS 457 and dismantling after allowing required support time and stacking the same for reuse including greasing, oiling etc. including cost, carriage, royalty and taxes excluding GST of all materials, labour and T&P and supervision charges complete as per approved design and direction of the Engineer in Charge. Deck Slab |
| 12 | Providing and laying cement concrete M 20 grade using 20 mm and down graded hard granite well graded crusher broken stone aggregates free from weathered skin surface and any other deleterious materials, using sharp sand of approved grading and quality conforming to the specifications, using water of approved quality and using cement as per approved specification with all leads. lifts, delifts and transportation by mechanical manual means including cost, carriage, royalties, Labour cess and taxes excluding GST of all other materials including dewatering by suitable means with all cost, weighing all materials using weigh batcher, mixing the concrete mix ingredients in all mechanical mixer, vibration of concrete by mechanical means, supplying T&P, watering, curing for specified days by suitable means including cost and carriage of water, mobilization and demobilization of men and machineries etc. including quality control testing charges as per approved drawings & specifications & direction of the Engineer in charge |
| 13 | Rough Stone Dry Packing including Quarrying, Collection & Supplying hard stone boulders of size 15cm to 30 cm in length.in any direction, not less than 0.028 Cum in volume free from weather skin surface and other deleterious materials and packing in aprons, revetments, slope packing as per Design and Drawing including filling the interstices with small stones, wedging and hammering etc. including cost, conveyance, royalty, Labour Cess, taxes excluding GST of all materials from approved quarry of approved quality of uniform color and texture with all leads, lifts, delift, handling and re handling with cost of labour charges and other incidentals charges required to complete the work and quality control testing charges etc. complete as per specification and direction of the Engineer in Charge |
| 14 | Providing weep holes in Brick Masonry, plain, Reinforced concrete abutment, wing walls return walls with 100mm. Dia AC pipe extending through the full width of the structure with slope of 1V 20H towards drawing force, complete excluding GST as per drawing and technical specification etc. complete as per the specification & direction of the Engineer in Charge. |
| 15 | Filling behind abutment, wing wall and return wall with excavated earth including cost carriage and royalty etc. complete and as per Technical specification including watering and consolidation with plate compactor/ power rammer excluding GST as per approved design, quality control testing charges etc. complete as per specification and direction of the Engineer in Charge. |
| 16 | Filling foundation and plinth with sand in layers not exceeding 22.50 cm. thick watering and ramming with full compaction etc. complete in all leads, lifts & de lifts with cost of all materials, labour cess, T & P, labour charges, excluding GST with cost of quality control testing charges etc. complete as per the approved drawing and specification and direction of the Engineer in charge as per the direction of the Engineer in charge. |
| 17 | Back filling behind abutment, wing wall and return wall with admixture of sand and morrum and as per Technical specification including watering and consolidation with plate compactor power rammer including cost, carriage, royalty and taxes excluding GST of all materials, labour and T&P and supervision charges complete as per approved design, quality control testing charges etc. complete as per specification and direction of the Engineer in Charge. |
| 18 | Excavation of any approved type of soil in approved borrow area by mechanical means including stripping of borrow area and clearing of all stumps, roots, bushes, rubies and other objectionable materials, laying on prepared surface, breaking clods to maximum 5cm to 7cm size and leveling earth in 22.50cm layers including carriage of earth by mechanical means , re handling the soil with all cost of labour , supervision charges, materials, T & P and machineries, royalty of the earth,Labour Cess, taxes excluding GST etc if any with all leads , lifts & de lifts with all cost of incidental charges to work as per drawing and specification etc complete as per the direction of the Engineer in charge. Earth will be arranged by the contractor at his own cost and responsibility and Measurement will be taken on finished level section . |
| 19 | Providing and laying sub base including collecting , conveying, stacking, admixing sand and moorum and laying in layers not exceeding 22.50 cm. in depth including spreading, leveling, watering, ramming etc complete including cost of labourers, hire charges of machineries, T & P materials, etc. required for the work including cost , conveyance and royalty of all materials, Labour Cess excluding GST , quality control testing charges etc. complete as per the specification & direction of the Engineer in Charge |
| 20 | Excavation of canal drain in both wet & dry condition by mechanical means in all kinds of soil including stony earth, gravel, morrum etc. inter spread with boulders up to half cum size with all lead, lifts and delifts and all shift of excavator including trimming the slopes and bed to design section and depositing the excavated materials away from worksite in banks, spoil bank and any other area beyond berm of the drain to be arranged by the Agency at his own cost & responsibility including levelling and rough dressing with all leads, lifts, delift, handling, rehandling etc. complete with all taxes ( excluding GST , Labour Cess, T&P etc. including mobilization and 'demobilization of men and machineries etc. complete with all cost incidental to the work as per the drawing, specification and direction of the Engineer in Charge Measurement will be made as per finished level section. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 18, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 03, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysDec 04, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender