Power Government Departments Closing in 27 days TDR #58578303

Tender For Work Of Aoh Of Boiler Non Pressure Parts Of Unit No. 11, 250Mw Stps ,Mppgcl, Sarni

Issued by Government Departments · Betul, Madhya Pradesh
Tender Value
1.52 Crore
Estimated cost
Bid Submission
18 Dec 2026
27 days left
EMD
2 Lakhs
Bank guarantee accepted
Document Fee
5000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Betul → Madhya Pradesh
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Work Of Aoh Of Boiler Non Pressure Parts Of Unit No. 11, 250Mw Stps ,Mppgcl, Sarni

BOQ

Name of Work:- Work of AOH of Boiler Non Pressure Parts of Unit No. 11, 250MW STPS ,MPPGCL, SARNI
Sl. No. Item Description
1SECTION-A
2ANNUAL OVERHAULING OF FANS
3OVERHAULING MAINTENANCE OF ID FANS
4INSPECTION & SERVICING OF RTL DODGE SLEEVE BEARING
5INTERNAL, INSPECTION AND CLEANING OF FANS
6SERVICING OF OIL SYSTEM OF HYDRAULIC COUPLING/ Flexible coupling INCLUDING COOLING WATER LINE VALVES AND COOLERS.
7SERVICING /REPLACEMENT OF I.G.V. SYSTEM.
8REPLACEMENT/CHECKING & SERVICING OF SCOOP TUBE OF HYDRAULIC COUPLING.
9REPLACEMENT OF SHAFT, IMPELLER & SET OF FAN BEARING.
10REPLACEMENT OF SET OF ID FAN IMPELLER LINERS.
11REPLACEMENT OF SET OF ID FAN CASING WEAR LINERS.
12REPLACEMENT OF FAN BEARING
13ALIGNMENT OF HYDRAULIC COUPLING TO FAN
14ALIGNMENT OF MOTOR TO HYDRAULIC COUPLING
15REMOVING OF MOTOR COUPLING
16PROVIDING ASSISTANCE FOR SERVICING OF HYDRAULIC COUPLING
17MAINTENANCE OF SEAL AIR FANS
18SERVICING/ REPLACEMENT OF FAN BEARING & COUPLING
19SERVICING/ REPLACEMENT OF FAN DISCHARGE VALVE
20REPLACEMENT OF IMPELLER.
21REPLACEMENT OF EXPANSION JOINTS
22REPLACEMENT/ REPAIRING OF SEALS.
23COMPLETE ALIGNMENT OF MOTOR & FAN ALONGWITH COUPLING.
24REMOVING OF MOTOR COUPLING
25CLEANING OF DYNO VANE FILTERS
26OVERHAULING MAINTENANCE OF F.D. FANS
27SERVICING/REPLACEMENT OF FAN ROTOR ASSEMBLY
28SERVICING OF BLADE BEARING ASSEMBLY
29IN-SITU REPLACEMENT OF COUNTERWEIGHT & LEVER ASSEMBLY OF BLADE BEARING ASSEMBLY.
30CHECKING & SERVICING / REPLACEMENT OF SET OF FAN BRGS.
31SERVICING/REPLACEMENT OF SERVO MOTOR
32COMPLETE ALIGNMENT OF MOTOR AND FAN ALONGWITH COUPLING.
33REMOVING OF MOTOR/FAN COUPLING
34OVERHAULING MAINTENANCE OF PA FANS
35SERVICING/REPLACEMENT OF FAN ROTOR ASSEMBLY
36SERVICING OF BLADE BEARING ASSEMBLY
37IN-SITU REPLACEMENT OF COUNTERWEIGHT & LEVER ASSEMBLY OF BLADE BEARING ASSEMBLY.
38CHECKING & SERVICING / REPLACEMENT OF SET OF FAN BRGS.
39SERVICING/REPLACEMENT OF SERVO MOTOR
40COMPLETE ALIGNMENT OF MOTOR AND FAN ALONGWITH COUPLING.
41REMOVING OF MOTOR/FAN COUPLING
42CLEANING & SERVICINGOF FD & PA FAN COMPONENTS
43REMOVAL OF TOP HALF OF FAN CASING AND OGV
44CLEANING OF COMPLETE FAN INCLUDING BLADES / SILENCER
45SECTION B
46OVERHAULING OF ROTARY AIR HEATER
47SERVICING/REPLACEMENT OF 5APC GEAR BOX.
48REPLACEMENT OF WORN OUT PLATES OF CENTRE SECTION BY 10/12/16 MM PLATE.
49INSPECTION / CLEANING / REPAIRING OF SCAPH SYSTEM
50GUIDE BEARING CHECKING / SERVICING
51CHANGING OF EXISTING GUIDE BRG. BY NEW BRG.
52SUPPORT BEARING CHECKING / SERVICING
53REPLACEMENT OF SUPPORT BEARING
54CHECKING OF ROTOR RUNOUT
55ROTOR LEVELING
56MAINTENANCE OF SPOOL PIECE
57SERVICING & REPLACEMENT OF TRUNION/SPOOL SEAL ASSY
58REPLACEMENT OF TRUNION SHAFT AND ADAPTOR SLEEVE
59REPAIR/REPLACEMENT OF APH GUIDE BEARING AIR SEALING COVER ASSEMBLY
60REPAIR/ REPLACEMENT OF SPOOL ASSEMBLY
61MAINTENANCE OF SEALING SYSTEM OF AIR PREHEATER
62LEVELING OF HE RADIAL SECTOR PLATE
63LEVELING OF CE RADIAL SECTOR PLATE
64LEVELING OF AXIAL SECTOR PLATE
65REPAIR / REPLACEMENT OF RADIAL SEALS & ROTOR POST SEALS OF HE OR CE SIDE AND SETTING THEREAFTER
66AXIAL SEAL REPAIR/ REPLACEMENT & SETTING
67BY PASS SEAL REPAIR/ REPLACEMENT & SETTING
68IN-SITU CONDITION REPAIR OF SECTOR PLATES
69REPLACEMENT OF HOT END SECTOR PLATES IN APH WITH NEW ONE ( 1 Set = 1 APH )
70REPLACEMENT OF COLD END SECTOR PLATES IN APH WITH NEW ONE ( 1 Set = 1 APH )
71MODIFICATION OF TRACKING ARRANGEMENT OF HOT END SECTOR PLATES OF APH AS PER SITE REQUIREMENTS ( 1 Set = 1 APH )
72REPAIR/ REPLACEMENT OF DAMAGED, COVER PLATES & SEALS BETWEEN SECTOR PLATES & CENTER SECTION
73REPAIR OF RADIAL SECTOR PLATES
74OVERHAULING OF AXIAL SECTOR PLATES & ITS MECHANISM
75REPLACEMENT/REPAIROF ‘T’-BARS/ROTOR ANGLE AT HE OR CE SIDE
76MAINTENANCE OF HEATING ELEMENTS SYSTEM OF AIR PREHEATERS
77HIGH PRESSURE WATER JET CLEANING OF HOT/INTERMIDEATE/COLD ENE HEATING ELEMENTS (THROUGH MORE THAN 100 KG/SQ. CM PRESSURE)
78REPLACEMENT OF HOT/INTERMIDEATE END HEATING ELEMENT
79REVERSAL OF HOT & INTERMEDIATE END ELEMENTS.
80REPLACEMENT OF COLD END HEATING ELEMENT
81REVERSAL OF COLD END HEATING ELEMENTS.
82REPAIR/ REPLACMENT OF COLD END SUPPORT LATTICE
83REPLACEMENT/REPAIR OF STATIC SEAL ASSEMBLY (COLD END)
84REPLACEMENT/REPAIR OF STATIC SEAL ASSEMBLY (HOT END)
85REPLACEMENT/REPAIR OF BY PASS SEAL ANGLE ASSEMBLY HE/CE
86REPAIR/REPLACEMENT OF APH DIAPHRAGMS
87MAINTENANCE OF DRIVE SYSTEM OF AIR PREHEATERS
88OVERHAULING OF FLUID COUPLING
89COG RIM ALIGNMENT ETC.
90ALIGNMENT OF DRIVE MOTORS, FLUID COUPLING & GEARBOXES
91REPAIR/ REPLACEMENT OF COG RIM PINS (SECTORS)
92OVERHAULING OF SOOT BLOWING SYSTEM OF AIR PREHEATERS
93OVERHAULING OF SOOT BLOWER GEAR-BOX
94MAINTENANCE WORKS OF LOP SYSTEM OF ID, FD & PA FANS & AIR PREHEATERS
95DECOUPLING, ALIGNMENT & COUPLING OF LUBE OIL PUMPS
96CLEANING OF LUBE OIL TANK & REPLACEMENT OF LUBE OIL OF FANS & AIR PREHEATERS
97CLEANING / SERVICING OF LUBE OIL COOLERS & COOLING WATER LINE VALVES
98SECTION C
99REPAIR/ MAINTENANCE OF DUCTINGS
100CLEANING OF ASH FROM INSIDE THE DUCT
101REPLACEMENT OF DIVERSION PLATES/ FLUE GAS SPLITTER INSIDE THE DUCT & I/L OF ESP
102REPAIR OF DUCTS BY PATCHING/WELDING
103DISMANTLING OF STEEL STRUCTURES
104WELDING OF STEEL (06 MM TO 20 MM) STEEL PLATE
105REPLACEMENT OF BRACING PIPES / PROTECTIVE ANGLES INSIDE DUCT
106REPLACEMENT OF BEAMS / CHANNELS INSIDE DUCTS
107REPLACEMENT OR, REFIXING OF C&I TAPPING POINTS
108REPAIRING OF APH HOPPER AND DUCT HOPPER
109REPAIRING OF ECONOMISER HOPPER
110REPAIR OF BOF FLUE GAS PATH
111LIFTING & TRANSPORTATION OF COAL DUST, ASH DEBRIS AND WASTE MATERIAL
112SECTION D
113MAINTENANCE OF DAMPERS & GATES
114CLEANING AND INSPECTION OF MILL HOT/COLD PA DAMPERS/GUILLOTINE GATES
115REPAIRING/REPLACEMENT OF MILL HOT/COLD PA DAMPERS FLAPS
116CLEANING, INSPECTION & SEAL REPLACEMENT OF FLUE GAS/AIR PATH DAMPERS/GUILLOTINE GATES
117REPAIRING/REPLACEMENT OF FLUE GAS/AIR PATH DAMPERS FLAPS ASSEMBLY
118REPAING OF DAMAGED DAMPER FRAMES OF FLUE GAS/AIR PATH DUCTING SYSTEM
119FABRICATION AND REPLACEMENT OF DAMPERS SEAL.
120INSTALLATION/ REPLACEMENT/REPAIR OF METALLIC EXPANSION JOINT (MEJ)
121REPLACEMENT/REPAIR OF DAMAGED MEJ OF COLD SECONDARY AIR DUCTS.
122REPLACEMENT/REPAIR OF DAMAGED MEJ COLD PRIMARY AIR DUCTS.
123REPLACEMENT /REPAIR OF DAMAGED MEJ HOT SECONDARY AIR DUCTS.
124REPLACEMENT/REPAIR OF DAMAGED MEJ HOT PRIMARY AIR DUCTS AND FLUE GASES DUCTS
125REPLACEMENT/REPAIR OF DAMAGED MEJ HOT/COLD PRIMARY AIR(LOCAL TO MILL)
126FABRICATION OF SUPPORT STRUCTURE FOR MOUNTING OF NMEJ/DIVERSION PLATE
127ERECTION OF SUPPORT STRUCTURE FOR MOUNTING OF NMEJ/DIVERSION PLATE
128Hard facing of Flue Gas Duct by Hard Facing welding electrodes
129SECTION E
130OVERHAULING MAINTENANCE OF COAL CIRCUIT
131COMPLETE SERVICING OF GRAVIMETRIC RAW COAL FEEDER INCLUDING REPLACEMENT OF HEAD PULLEY & TAIL PULLEY & COC SYSTEM.
132REPAIRING/REPLACEMENT OF CENTRE FEED PIPE & SLEEVE COUPLING
133P.F. DISCHARGE PIPE
134REPLACEMENT / REPAIRING OF P.F. BENDS.
135REPAIRING OF P.F. BEND, CENTRE FEED PIPES & STRAIGHT PIPE BY PATCH WELDING.
136REVERSAL OF COAL PIPE BENDS AFTER DUE REPAIRING
137REPLACEMENT OF STRAIGHT COAL PIPE.
138ROTATION OF STRAIGHT COAL PIPE BY 180 DEGREE ETC.
139CHANGING OF COAL PIPE VICTAULIC COUPLING GASKET ETC.
140SERVICING OF COAL PIPE HANGER INCLUDING REPAIRING.
141SERVICING/ REPLACEMENT OF SLEEVE COUPLING OF COAL PIPES.
142REPAIRING/REPLACEMENT OF COAL BURNER
143REPAIRING/ REPLACEMENT OF COAL NOZZLE ASSEMBLY AND FUEL INLET ELBOW.
144REPAIRING OF COAL NOZZLE ASSEMBLY AND FUEL INLET ELBOW AND REFITTING INCLUDING WELDING.
145SERVICING & REFITTING OF OIL GUNS
146REMOVAL & REPAIRING OF AUXILIARY AIR/ OIL GUN BUCKET
147SERVICING OF BURNER TILT MECHANISM & ARRANGEMENT OF ALL FOUR CORNERS COAL NOZZLES.
148MILLS
149PAINTING OF COAL MILL (06 Nos.), PAINTING OF AIR RECEIVER TANK (AIR HEATER 04 NOS. + MILL REJECT HANLDING SYSTEM 02 NOS.), PAINTING OF LUBE OIL SYSTEM OF COAL MILL (06 NOS.), PAINTING OF ESP INLET & OUTLET GUILLOTINE GATES (08 NOS.) & THEIR SUPPORT STRUCTURE, PAINTING OF ID FAN INLET & OUTLET GUILLOTINE GATES (04 NOS.) & THEIR SUPPORT STRUCTURE and other location as per instruction of EIC.
150ALIGNMENT OF MILL MOTOR WITH GEAR BOX.
151REPLACEMENT OF BULL RING SEGMENT AND REPLACEMENT OF ALL THE 3 GRINDING ROLLS.
152REPLACEMENT OF BULL RING SEGMENTS INCLUDING BOWL EXTN. RING.
153REPLACEMENT OF GRINDING ROLLS WITH NEW BRGS.
154REPLACEMENT/REPAIRING OF BOWL EXTENSION RING
155SERVICING OF PINION SHAFT ASSEMBLY
156REMOVAL,DISMENTLING,SERVICING ALIGNMENT AND RE-INSTALLATION OF ROLLER JOURNAL ASSLY.
157REPAIRING/REPLACEMENT OF MPO, MDV, OUTLET VENTURI, MPO PLATE, SERVICING OF CLASSIFIER VANES ETC
158REPLACEMENT/ REVERSAL OF ORIFICE AND VICTAULIC COUPLING GASKETS OF MILL TOP.
159REPAIRING AND RESETTING OF BOTTOM INSULATION COVER PLATE.
160REPAIRING/REPLACEMENT OF AIR DIVERSION PLATE.
161REPAIRING/REPLACEMENT OF MILL BODY SIDE LINER BY PROVIDING PATCHING OF SIZE 300 X 300MM
162SERVICING OF LUB OIL SYSTEM OF MILL.
163REPAIRING OF AIR PORT ASSEMBLY
164REPLACEMENT OF AIR PORT ASSEMBLY
165REPLACEMENT OF SET OF LABYRINTH SEALS
166REPLACEMENT/REPAIRING OF UPPER SKIRT, LOWER SKIRT & SCRAPER
167REPLACEMENT/REPAIRING OF LOWER SKIRT AND SCRAPER
168REPLACEMENT OF SCRAPER ASSLY.
169REPLACEMENT OF PLANETARY GEAR BOX OF MILL WITH NEW ONE/SERVICED
170SERVICING & REPAIRING OF SECONDARY AIR DAMPER AND AIR COMPARTMENT.
171SECTION-F
172OVERHAULING OF ESP (TYPE - FAA-9X37.5-2X116150.2)
173CLEANING, INSPECTION & ALIGNMENT RECTIFICATION OF ESP PASSES
174INTERNAL CLEANING OF ESP FIELDS & HOPPERS
175CLEANING & INSPECTION OF SUPPORT INSULATOR
176CLEANING & INSPECTION OF SHAFT INSULATOR
177ALIGNMENT OF EMITTING FRAME
178REPLACEMENT OF DAMAGED COMPONENTS OF ESP
179INSPECTION & RECTIFICATION OF PLAIN BEARING OR, BUSH BEARINGS & BUSH BEARING HOUSINGS
180REPLACEMENT / REPAIRING OF RAPPING HAMMERS OF CERM / EERM /GDRM
181REPAIR / REPLACEMENT OF SHOCK BAR
182REPAIR / REPLACEMENT / REFIXING OF SHOCK BAR GUIDE (RAPPING END)
183REPAIR / REPLACEMENT / REFIXING OF SHOCK BAR GUIDE (NON-RAPPING END)
184REPAIR / REPLACEMENT OF SHAFT INSULATORS
185REPAIR / REPLACEMENT OF SUPPORT INSULATORS
186REPAIR / REPLACEMENT OF EMITTING FRAME
187REPAIRING OF SUPPORT ANGLES
188REPAIR / REPLACEMENT OF G.D. SCREEN
189REPAIRING & ALIGNMENT OF COLLECTING ELECTRODE
190REPLACEMENT & ALIGNMENT OF EMITTING ELECTRODES
191REPAIRING/REPLACEMENT OF RAPPING SHAFTS OF CERM/ EERM/ GDRM.
192REPLACEMENT / REPAIR OF VERTICAL SHAFT OF EERM.
193RECLAMATION & REPLACEMENT OF JAW COUPLINGS OF CERM /EERM/ GDRM
194REPLACEMENT OF OIL OF CERM/ EERM/ GDRM GEAR-BOX
195REPLACEMENT OF GLAND PACKING OF CERM/ EERM/ GDRM
196REPAIR OF SHOCK- BAR PADS
197REPLACEMENT OF SHOCK- BAR PADS
198REPAIR / REPLACEMENT OF GEAR WHEELS OF EERM
199REPAIR & RECLAMATION OF ESP COMPONENTS
200RECLAMATION OF INNER / OUTER ARMS OF CERM/EERM/GDRM
201REPAIR OF ESP MANHOLE DOOR
202REPAIR OF ESP HOPPERS
203REPAIR OF ESP CASING :-
204WITHOUT STEEL
205SERVICING & REPLACEMENT OF RAPPING GEAR BOXES
206REPAIRING STRENGTHNING OF BOTTOM SUPPORT STRUCTURE OF CERM, GUIDE BAR & SHOCK BAR ASSEMBLY OF FIELD
207REPLACEMENT & ALIGNMENT OF COLLECTING ELECTRODES Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58578303
AUTHORITY Government Departments
TENDER VALUE 1.52 Crore
LAST DATE 18-12-2026
Authority
Authority Name Madhya Pradesh Power Generating Company Limited
Work Description Tender for Work Of Aoh Of Boiler Non Pressure Parts Of Unit No. 11, 250Mw Stps ,Mppgcl, Sarni
Basic Detail
Tender No WT-5278
Bidding Type Tender
Location
City Betul
State Madhya Pradesh
Key Dates
Publish Date 17 Nov 2026
Submission Date 18 Dec 2026
Open Date 24 Dec 2026
Finance
Tender Value 1.52 Crore
Tender Fee 5000
EMD 2 Lakhs
Exemption Available
Document List
35763a7e-7c91-496b-aefd-0b2959dc8e77.html
5278schedule.pdf
AffidavitInsolvencyBankruptcy200.pdf
Annexures5278.pdf
BOQ_661641.xls
SBDworksAmended.pdf
Techbid5278.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 17, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 18, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 27 days
Dec 24, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 33 days

Tender Documents

Download All (ZIP) ↓
html

35763a7e-7c91-496b-aefd-0b2959dc8e77.html

pdf

5278schedule.pdf

pdf

AffidavitInsolvencyBankruptcy200.pdf

pdf

Annexures5278.pdf

xls

BOQ_661641.xls

pdf

SBDworksAmended.pdf

xls

Techbid5278.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender