Power Government Departments Closing in 8 days TDR #58577739

Tender For Work For Construction Of New 33/11Kv (2×10 Mva) Substation Bankapur, Jewar & Associacted With Construction Of New 33 Kv Link Line For New Bankapur Substation From Existing Additional Source From Jewar Town And Emanating 11Kv Feeders In Dis

Issued by Government Departments · Meerut, Uttar Pradesh
Tender Value
2 Crore
Estimated cost
Bid Submission
01 Dec 2026
8 days left
EMD
2 Lakhs
Bank guarantee accepted
Document Fee
5900
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Meerut → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Work For Construction Of New 33/11Kv (2×10 Mva) Substation Bankapur, Jewar & Associacted With Construction Of New 33 Kv Link Line For New Bankapur Substation From Existing Additional Source From Jewar Town And Emanating 11Kv Feeders In Distirct G.B. Nagar Under Deposit Scheme.

BOQ

Name of Work:- Work for Construction of New 33/11KV (2×10 MVA) Substation Bankapur, Jewar & Associacted with Construction of new 33 KV link line for New Bankapur Substation from existing additional source from Jewar Town and Emanating 11KV Feeders in Distirct G.B. Nagar under Deposit Scheme.
Sl. No. Item Description
1Item Wise BoQ BoQ_Ver3.0 Item Wise Normal INR Only INR Select, Excess (+), Less (-) Tender Inviting Authority: Superintending Engineer, Electricity Construction & Work Circle-I, P.V.V.N.L., Meerut Bought Out Name of Work: Work for Construction of New 33/11KV (2×10 MVA) Substation Bankapur, Jewar & Associacted with Construction of new 33 KV link line for New Bankapur Substation from existing additional source from Jewar Town and Emanating 11KV Feeders in Distirct G.B. Nagar under Deposit Scheme. Direct Tender Reference No : 39/ECWC-I/MRT/2026-27 Quote for Supply Portion only Bidder Name : Quote for Erection Portion only PRICE BID1. This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns after validating the sheet, else the bidder is liable to be rejected for this tender.2. Bidders are allowed to enter the Bidder Name and Unit Ex-Works Price and GST in %age only.3. All the material and erection practices shall be as per tender specification.4. Above Schedule Structure and quantities is provisional and may vary as per site requirement with due approval.5. Indicative scope of works and quantity of Items/Materials required for above work shall be as per the Price Bid. Any other material if required to complete the job and not mentioned above, shall have to be provided by the bidder without additional cost.6. The work (i.e. shifting and erection/installation etc.) of new 10/20 MVA transformer(s) is under the scope of manufacturing/supplier firm as per the L.No. 2040/PVVNL-MT/MM/22-23, Dated 10.06.2022 of S.E. (MM-1), PVVNL, Meerut. The quoted rates by bidder for this item will be applicable only if this work is not carried out by the manufacturing/supplier firm for any reason.7. Financial evaluation and selection of 'L1 Bidder' shall be done on the basis of total amount. The rates received in the tender will be final after the approval of the Competent Authority/Committee and the competent Authority/committee will have the right to negotiate in tender rate/amount.8. Tenderer must be fill-up the enclosed terms & conditions sheet and attached with 1st Part of Tender as well as scanned copy of same will be uploaded on NIC Website alongwith other documents.9. Bidders must be filled up the GST in %age, Otherwise it is assumed G.S.T. rates are included in the given ex-works price (Rs./Unit). NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Description of Works Item Code Tender Qty. Unit Estimated Rate Bought-out/Direct Specify Bought-out/Direct Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Unit Ex-Works Price(Rs./unit) Excise Duty(Rs/Unit) CST/VAT(Rs/Unit) Other Taxes & Duties(Rs/Unit) Freight & Insurance Charges(in Rs./Unit) Unit FOR Dest. Supply Price incl. all Taxes and Duties(in Rs./Unit)(F+G+H+I+J) Total Value for Supply or Erection (In Rs.)(C x F) GST (in Rs.) in %age Total Value for GST (in Rs.) (F*M/100) Total Unit Price incl. GST (in Rs.) Total Amount excl. GST (in Rs.) (4×13) Total Amount incl. GST (in Rs.) (4×26) TOTAL AMOUNT In Words
21. Supply of following Material Supply for neutral link L type Structurei) M.S.Channel (100x50x6)mm
3ii) M.S. Angle (50x50x6)mm
42. Supply for cable support Structurei) M.S. Channel (100x50x6)mm
5ii) M.S. Angle (50x50x6)mm
63. Supply for copper bus bar support T-type Structurei) M.S. Channel (100x50x6)mm
7ii) M.S. Angle (50x50x6)mm
84. M.S.Round 32mm Dia for Delta/ Bridge, Indoor & Outdoor earthing.
95. Water level earthingi) G.I. pipe size 40 mm inner dia & thickness 2mm
10ii) Solid copper cone Approx 225 mm long and 750 gm in weight
11iii) Copper wire 6 SWG
12iv) Copper flexible earthing strip of size 500x50x6mm for neutral
136. Supply of ready mixed primer & ISI mark Aluminium Paint & ISI mark synthetic enaimel green paint for painting of installed all Structure & G.I.Strip.
147. Structure for 33 KV Line/Bus Isolator as per specification (03 No.)i) M.S. Channel (125x65x6)mm 3.5Mtr long for Vertical Structure.
15ii) M.S. Angle (75x75x6)mm 2.8Mtr long for Horigental Structure.
16iii) M.S. Angle (50x50x6)mm 0.81Mtr long for Bracing.
178. Structure for 33 KV Fuse set/P.I/C.T/L.I as per specification (12 No.)i) M.S.Channel (125x65x6)mm 3.5Mtr long for Vertical Structure.
18ii) M.S. Angle (75x75x6)mm 2.6Mtr long for Horizontal Structure.
199. Top channel (MS Channel 100x50x2240mm long.) (41 Nos.)
2010. Dropper channel (MS Channel 100x50x2000mm long.) (22 Nos.)
2111. ACSR Panther Conductor
2212. 90Lbs rail pieces
2313. Supply of M.S.Angle 50x50x6mm for T/F Plinth surrounding
2414. Structure for 33 KV Terminal Gantryi) M.S.Channel (125x65x6)mm 3.2Mtr long for Vertical Structure.
25ii) R.S.Joist 100x116mm 9.3Mtr long
26iii) M.S.Angle (50x50x6)mm 1.5M. long for Bracing.
2715. Structure for 33 KV Bus Bar Gantryi) M.S. Channel (125x65x6)mm 3.2Mtr long for Vertical Structure.
28ii) R.S.Joist 150x150mm 6.4 MtrLong
29iii) M.S. Angle (50x50x6)mm 2.5M long for Bracing.
3016. 2x2.5mm2 copper control cables (Armoured)
3117. 4x2.5mm2 copper control cables (Armoured)
3218. Copper bus bar of size (2500x50x6)mm
3319. Carriage of following material from any PVVNL store i) 33KV Disc insulator 70KN for Panther
34ii) 33KV Disc Fitting 70KN for Panther
35iii) 33 KV line Isolator
36iv) 33 KV Bus Isolator
37v) 33 KV Post insulators
38vi) 33 KV VCB1250 MVA
39vii) 33KV Control Panel for single feeder
40viii) 33KV Control Panel for Double Transformer
41ix) 33KV CT 200/100/1-1-1A
42x) 33KV CT 400/200/1-1-1A for main Bus.
43xi) 33 KV PT, 33 KV/110V-1 Phase
44xii) 33 KV Fuse Set
45xiii) 33 KV Lightning Arrestors
46xiv) 11 KV VCB (Incoming) 600/300/5A 350 MVA 11 KV Switch Gear
47xv) 11 KV VCB (Out going) 200/100/5A 350 MVA 11 KV Switch Gear
48xvi) Bus Coupler, 350 MVA
49xvii) 11 KV XLPE Cable 3×300 mm2 XLPE
50xviii) 11 KV XLPE Cable 3×185 mm2 XLPE
51xix) 11 KV cable jointing kit shrinkable 3×300 mm outdoor type
52xx) 11 KV cable jointing kit shrinkable 3×300mm indoor Type
53xxi) 11 KV cable jointing kit shrinkable 3×185 mm2 outdoor Type
54xxii) 11 KV cable jointing kit shrinkable 3×185 mm2 indoor Type
55xxiii) 24 Volt Battery & Battery Charger with cabinet
56xxiv) Weasal Conductor for Jumpring of D/P
57xxv) ACSR Dog Conductor for bay & jumpering in switchyard equipment.
58xxvi) G.I.wire 6 No. swg for Earthing of D/P
59xxvii) 11Mtr,STP-SP-55 Pole
60xxviii) Disc insulator Polymeric type
61xxix) Disc fitting B&S type
62xxx) 11KV composite Polymeric Pin insulator.
63xxxi) Earthing complete
64xxxii) Stay Rod Complete
65xxxiii) 11KV Fuse Set
66xxxiv) 11KV TPMO
67xxxv) 11KV/0.433 KV, 3 Phase, 63 KVA Transformer (BEE standard, 3 star rating self protected type), Al. wound
68xxxvi) PCC Poles, 9 M Long
69xxxvii) HT Aluminium XLPE insulated Cable of size 3x120 Sq.mm. (for HT jumpering)
70xxxviii) indoor termination kit for 11kV XLPE 3x120 Sq.mm. cable size
71xxxix) Outdoor termination kit for 11kV XLPE 3x120 Sq.mm. cable size
72xxxx) LT PVC Aluminium XLPE insulated armoured Cable of size 3.5x150 sqmm.
73xxxxi) 11 KV 3x185 sqmm Straight Through
74xxxxii) 33 KV 3x300 XLPE Cable
75xxxxiii) H/S O/D 33 KV 3x300 sqmm J/kit
761. Terminal Gantry Construction of terminal gantry as per details:-i) Excavation of earth for making 2 Nos. pits of size (1.4x0.75x2.2)M.
77ii) Fabrication of Terminal Gantry by using 4 Nos. of 9.3 M long (100x116)mm, 23.1 kg/meter R.S. Joist with bracing of the same by 60Mtr M.S. Angle of size (50x50x6) mm & fixing 3 Nos. of 3.2 m long pieces of M.S. Channel of size (125x65x6)mm for Top as well as Dropper channel & Composite Polymeric Pin insulator. The work also includes cutting, drilling and welding with alignment etc. for proper completion of work.
78iii) C.C. work in ratio of 1:3:6 (cement, fine sand and brick ballast) of size (1.40x0.75x0.15)m for 2 Nos. pits for making bed. Work includes proper ramming etc. & C.C. work of ratio 1:3:6 (cement, coarse sand & 20 mm size stone grit) for the structure of 02 Nos. of pre-fabricated legs of terminal gantry (9.3m long) as per drawing No. RES-38 size of plinth (1.4x0.75x2.7)m. All civil material provided by the Contractor on his own cost.
79iv) 12mm thick plaster with cement mortar ratio 1:4 (cement & fine sand) of plinth of 0.45 m upper side, All civil material provided by the Contractor on his own cost.
80v) Supply & fixing of stone pad (Size 300x300x75mm)
812. Bus Bar Gantry as per detail:-i) Excavation of earth for making 4 Nos. pits of size (0.75x0.75x1.7)M
82ii) Fabrication of Bus Bar Gantry by using 04 Nos. 6.4 m long (37Kgs/Mtr) 150mmx150mm R.S.Joist and M.S.Angle (50x50x6) mm (4.5Kgs/Mtr 2.5Mtr each) for cross bracing of Bus-Bar and using top channel of size (125x65x6)mm (13.1Kg./Mtr) (3.2Mtr each) as per drawing RES-40. The work includes cutting, drilling, bolting and alignment of the same for proper completion of work. All civil material Must be provided by the Contractor on his own cost.
83iii) C.C. work of ratio 1:3:6 (cement, coarse sand and 02 Nos. structure, pre-fabricated Bus-bar Gantry size of Plinth (0.75x0.75x2.10)m, 4 Nos. after proper ramming over stone pad.
84iv) 12mm thick plaster with cement mortar ratio 1:4 (cement & fine sand) or plinth of 0.4 m upper side.
85v) Supply & fixing of stone pad
863. Isolator Structure (For 03 Nos. Isolators)Erection of Isolator structure (Line and Bus) 03 Nos. size of plinth (0.9x0.30x1.0) m as per drawing No. RES-41i) Excavation of earth for making 04 Nos. pits of size (0.9x0.30x1.075)m.
87ii) Fabrication of Isolator structure (Bus & Line) by using 4.0 m long 04 Nos. of M.S.Channel of size (125x65x6)mm with bracing by M.S.Angle (40x40x5)mm/ (50x50x6)mm size and using 02 Nos. top channel of M.S. Angle (75x75x6)mm and 2.6m long on both side of Isolator. The work also includes cutting, drilling, welding and proper alignment of the same for completion of work. All civil material provided by the Contractor on his own cost.
88iii) C.C. work in ratio of 1:3:6 (cement, fine sand and brick ballast) of size (0.90x0.30x0.15)m for 12 Nos. pits for making bed. Work includes proper ramming etc & C.C. work of ratio 1:3:6 (cement, coarse sand and 25 mm stone grit) for pre-fabricated structure of Line and Bus isolator size of plinth (0.90x0.3x1.5)m for 12 Nos. All civil material provided by the Contractor on his own cost.
89iv) 12mm thick plaster with cement mortar ratio 1:4 (cement & fine sand) of plinth of 0.4m upper side. All civil material provided by the Contractor on his own cost.
90v) Supply & fixing of stone pad.
914. L.A.’s P.I.’s, C.T’s, Fuse Set and PT structure:-Febrication & Erection of Lightening Arrestors, Post Insulators/Fuse Set, C.T.’s, P.T's structure and Plinth for the same as per drawing No. RES-42 details:-i) Excavation of earth (0.30x0.30x1.075)m for 02 Nos. Pits of above structures.
92ii) Fabrication of L.A.’s, P.I.’s, C.T.’s, P.T and Fuse Set structure by using M.S. Channel (125x65x6) mm size and 3.5 m minimum height with 2 Nos. M.S. Angle (75x75x6)mm 2.6mm size on top of structure for installation L.A.’s, P.I.’s & Fuse Set.
93iii) C.C. work in ratio of 1:3:6 (cement, fine sand and brick ballast) of size (0.30×0.30×0.15)m for 24 Nos. pits for making bed for each structure. Work including proper ramming etc & C.C. work of ratio 1:3:6 (cement, coarse sand and 25 mm size stone grit) for the above plinths for structure of L.A.’s, P.I.’s, C.T.’s & Fuse Set 24 Nos. after ramming of earth of size (0.3x0.3x1.5)m. Over stone pad. All civil material provided by the Contractor on his own cost.
94iv) 12mm thick plaster with cement mortar ratio 1:4 (cement & fine sand) of plinth of 0.4m upper side.
955. Plinth for 10 MVA TransformerConstruction of plinth for 10 MVA, 33/11 KV Transformer of (3.46x4.46x1.0)m (0.50m below ground level and 0.5 m above ground level) or as per site availablity as per details & drawing attached (All required matrials provided/Supply by the contractor which are not taken in supply head for Plinth work at his cost cost):-i) Excavation of earth (3.7x4.7x0.75)m
96ii) Flooring of plinth in C.C. 1:4:8 (cement, sand & brick ballast) for making foundation bed. Size (3.7x4.7x0.15)m.
97iii) 1st Class brick work for side walls size 0.345 m wide upto 0.3m height and 0.23 m wide upto 0.35 m height cm C.C. ratio of 1:4 (cement & fine sand)
98iv) Filling of brick ballast in plinth in ratio 1:4:8 (cement, coarse sand & brick ballast) with proper ramming. Size (4.0x3.0x0.65)m.
99v) R.C.C. work on the top of plinth in ratio 1:2:4 in (4.46x3.46)m size and 0.20m in thickness by using M.S.Tor of 12 mm dia. around 240Kgs making jal in two layers for reinforcement of plinth. The work also includes cutting, bending of M.S.Tor etc. Quantity of M.S.Tor of size 12 mm dia required for reinforcement of plinth in R.C.C. work for making jal in two layers. Work also includes cutting, bending and laying etc. in the T/F plinth.
100vi) Grouting of 02 Nos. 90/105 lb. Rail pieces of 3.46m long and (50x50x6)mm Angle in R.C.C. work at the top of plinth work and also for making groove along rail piece & confining the edges of plinth which includes cutting of rail and angles pieces etc.
101vii) 12mm thick plaster with cement mortar ratio 1:4 (cement & fine sand) of plinth of 0.5m upper side (Top & side walls).
1026. Plinth for 33 KV V.C.B. (03 Nos.)Construction of plinth for the structure of 33 KV VCB as per details for 03 No. i) Excavation of earth of size (1.5x1.5x1.0)m pits for construction of plinth.
103ii) Brick Ballast ratio (1:3:6) (cement, sand & brick ballast) for foundation work (1.5x1.5x0.15)m plinth. & R.C.C. work in ratio 1:2:4 (cement, coarse sand & stone grit) of 20m size for making plinth of size (1.5x1.5x1.0)m and grouting of foundation bolts 04 Nos. for 33 KV VCB. All civil material provided by the Contractor on his own cost.
104iii) 12mm thick plaster with cement mortar in ratio 1:4 (cement & fine sand) of plinth. All civil material provided by the Contractor on his own cost.
1057. Earth Mat WorkM.S.Round 32mm Dia approval make & Fabrication of earth mat.ii) Excavation of earth of size (0.5x0.75)m in switchyard area as per drawing for laying of 32 mm dia M.S.Round and 50x6mm size G.I. strip and refilling & ramming of the same earth into the trenches after completion of work.
106ii) Laying of 32 mm dia M.S. Round Bar in 0.75m deep trenches as excavated .
107iii) Welding with lap joint minimum length 150mm over lapping on both side of item , shall be done so that all the edges may fill completely with high quality Arc welding. All joints shall be painted with black bituminous paint.
108iv) Jointing of 32mm dia M.S.Round in earth mat at cross joint using high quality Arc welding 75mm piece of 32 mm dia M.S.Round shall also be welded to make the joints strong for transfer the fault current. Work also included cutting welding and painting with black bituminous paint of joint etc.
109v) Fabrication of 32mm dia for 3.0 m long electrodes and driving them into ground so that the top of M.S. Round/Electrode remains at least 0.75 m below the ground level and jointing of earth electrode with the Earth Mat by using 75mm long piece of M.S.Round using high quality Arc welding and paints of joints with black bituminous paint.
110vi) Providing & Laying of G.I.Earth strip of size 50x6mm for connecting the Earth Mat with steel structure & chain link fencing’s posts. The work also includes cutting, bending, straight-tening, over-lapping and welding the Earth Strip with Earth Mat and various steel structures by using high quality Arc welding in already digged trenches.
111vii) Painting of G.I.Earth Strip of size (50x6) mm with one coat of ready mixed primer with two coats of ISI mark synthetic channel green paint.
112viii) Providing & Erection of Chemical pipe earthing including electrode, chemical with 3mtr. Long, 80mm dia and 3mm thick G.I. Pipe & G.I. strip of 25x3mm must be used for feeder double Pole, Substation T/F, L.A & Substation (All required matrials provided/Supply by the contractor own his cost).
113ix) Earthing of 11KV VCB, Control Panel, L.A's, & Transforer neutral : Making of delta with 03 No.for neutral or 04 Nos. for LA 03mtr. 32mm dia M.S.Round bar electrode and Fabrication of 32 mm dia bar for 3.0 m long electrodes and digging them into ground so that the top of M.S.Round/Electrode remains at least 0.75m in air and jointing of earth electrode with the delta by using 75mm long piece of M.S. Round using high quality Arc welding and paints of joints with black bituminious paint.
114x) Earthing of 63KVA T/F by making Delta of M.S.Round including all work.
1159. Construction of Control cable trench (60Mtr) as per details (All Material supply by the Contractor).i) Excavation of earth in size 0.650x0.40m.
116ii) C.C. work in foundation in ratio 1:3:6 (cement, sand & brick ballast) with proper ramming in size 0.65x0.15 mtr.) & First Class Brick work in cement mortar in ratio 1:4 in size 0.23x0.32 Mtr. Along with 25mm thick C.C. in floor of Cable Trench in ratio 1:2:4 (cement, coarse sand and stone ballast) 20mm gauge in size 0.3 mtr. Width.
117iii) Grouting of G.I.Strip of size 450x25x6mm in cable trench 100mm above floor level and at equal space distance 300mm.
118iv) Grouting of M.S.Angle Iron of size 50x50x6mm in upper edge of trench.
119v) Plastering of Trench in Cement, Mortar in ratio 1:4, 12mm thick in cable trench.
120vi) Fabrication and fixing cable trench cover of M.S.Angle size 50x50x6mm of size 0.3m wide 1.0 mtr. Length with proper welding of 8 mm size of bar 2 Nos. in length and 6 Nos. in width including CC casting & RCC in Ratio 1:2:4 (cement, coarse sand and stone ballast)
121vii) Supply of M.S.Angle 50x50x6mm for trench cover.
1229. Painting of StructuresPainting of the following structure with one coat of ready mixed primer and two coats of ISI Mark Aluminium paint after rubbing with sand paper to the surface of the structure including labour and T&P complete in all respect.(i) Double pole & steel structure
12310. Installation of 33/11 KV, 10 MVA Transformeri) Shifting of available 10 MVA, 33/11 KV, Transformer to transformer plinth in Switch Yard.
124ii) Erection of shifted Transformer at plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect.
12511. Water level earthing by Boring and lowering of G.I.Pipe size 40mm dia of 2mm thickness, into the ground upto water level or minimum 50Mtr, which ever is more, with the lower end of solid copper cone Approx 225mm long and 750gm in weight shall be used and screwed in pipe as well as bringing out a continuous 6SWG copper wire, from the cone upto the ground surface where it will be bolted to the G.I. Strip for Transformer neutral connection, the G.I.Strip will be connected to star point through using Copper Bond Strip of size-50x6mm.
12612. Fabrication and erection of neutral earthing L Type support made of M.S. Channel size 100x50mm including supply of neutral bond. Structure shall be 4 Mtr. Long with 1 Mtr. Arms & 1.0Mtr M.S.Angle support from 50x50x6mm. Structure shall be grouted in ratio 1:3:6 in block size 300x300x700mm and painted of welding joint with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint work includes connecting neutral bushing rod of power Transformer and G.I. Earthing strip with the help of flexible copper bond, G.I. Bolt and washer.
12713. i) Fabrication and erection of cable support made of two pieces of G.I. Angle (65x65x6)mm, 2.75 meter long, joined to each other by means of 5 Nos. G.I. Flat (50x6) mm pieces of size 750 mm long each by welding at equal intervals and grouting in a block of size (300x300x700)mm in C.C. 1:3:6 (cement, coarse sand and stone ballast) complete and painted of welding joint with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint. Work includes providing of three Nos. G.I. clamps made of (50x6)mm G.I. Flat for holding the cable including nuts and bolts.
128ii) Fixing 150mm dia 2mm thick 2M long G.I.Pipe over 33KV/11KV XLPE Cable before mounting the 2No. Cable on Cable support structure. The work includes fixing of Clamp, sealing of top and bottom end of the G.I.Pipe. One end of G.I.Pipe is to be buried under earth about 500mm.
12914. Fabrication and grouting of M.S.Frames 3.60 mt. long for support of copper Bus Bar. Bus Bar will be installed in L.V. side of Power transformer. The M.S.Frame shall be made of M.S.Channel (100x50)mm in ‘T’ shape. 2 Nos. support of M.S. Angle iron (50x50x6)mm, 0.60mt. long below the top channel, drilling of 3 Nos. hole on the top channel for fixing of 11 KV pin insulator and painted of welding joint with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint and grouting the frame in C.C. ratio 1:3:6 (cement, coarse sand and stone ballast) in a block of size (300x300x700) mm. The work also includes the fixing of 3 Nos. 11 KV pin insulator with pin and binding the copper Bus Bar with the pin insulator by Aluminium binding wire in complete.
13015. Fabrication of copper bus bar of size (2500x50x6)mm in L.V. side of 10MVA 33/11 KV, power transformer, Work includes connection of outside bus bar in L.V. side busing rod of Power Transformer and other side with outdoor 11 KV cable box as well as providing empire tape and H.T. tape etc. for proper insulation work.
13116. Installation of 11 KV Switch Gears in Control Room 02 Nos. incoming and 08 Nos. outgoing, 01 No. Bus CouplerCarefully & safely shifting of 11 KV switch gears from outside to inside the switch gear room grouting foundation of bolts in C.C. ratio of 1:2:4 (including cutting of RCC floor and finishing of RCC floor) as per requirement placing, aligning and fixing of 11 KV anchor GI bolts and nuts of proper size for completion of work.
13217. Safely mounting of 11 KV PT on 11 KV incoming switch gear filling of oil (if required) making all electrical connections and testing & commissioning of work.
13318. Proper fixing and making bus bar connection in between two switch gears after proper cleaning. Work also include proper insulation, taping by empire, PVC and H.T. tape etc. Naming of O/G & I/C feeder on Pannel with Yellow & Black Paint.
13419. H.T. Power Cable Laying: i) Laying 11 KV, (3x300) mm2 XLPE, Cable from power transformer to 11 KV incoming switch gear in the cable trench 0.45 m wide, 0.90m depth. Providing 150 mm local sand for cushion beneath and 150 mm above the cable (quality of local sand required 0.375 cum/m in length). The cable shall be dully protected by brick (Supplied by contractor). On both side of cable by laying brick vertically and bricks would also be laid bricks along the single cable (minimum 18 Nos. of bricks are to be laid top and outer side along the single cable. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminal’s, back filling of earth and testing and commissioning of power cable etc. Spare cable shall be left over and laid in the trenches in shape of 6 m ring at both ends.
135ii) Laying and dressing of 11 KV 3x300 mm2 power cable in air/Trench.
13620. i) Laying 11 KV, 3x185mm2 XLPE, Power cable from outgoing switch gear to 11 KV double poles in the cable trench 0.45m wide, 0.90m depth. Providing 150 thickness mm local sand for cushion beneath and 150mm above the cable (quantity of local sand required 0.375 cubm/m in length). The cable shall be duly protected by brick (Supplied by contractor). On both side of cable by laying bricks vertically and bricks would also be laid horizontally on top of vertically laid bricks along the single cable (minimum 18 Nos. of bricks are to be laid top and outer side along the single cable. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminal’s, back filling of earth and testing and commissioning of power cables etc. Spare cable shall be left over and laid in the trenches in shape of 6m rings at both ends. At the end of feeder cables, where the cable is to be laid across pucca/main road, 100 mm dia G.I. pipe will be weared over the cable in the cable trench for the protection of cable.
137ii) Laying and Dressing of 11KV 3x185mm² Power Cable in Air.
138iii) Supply and filling of sand in cable trench in the Switch Gear Room.
13921. i) Preparation of 11 KV Power Cable ends:Making of 11 KV XLPE Heat shrinkable outdoor jointing kits after duly plumbing and taping of cable, providing, fixing and crimping of proper size good quality lugs
140ii) Making of 11 KV XLPE heat shrinkable indoor jointing kits in switch gears after carefully removing the insulation of cable, providing and crimping of proper size of lugs, plumbing and taping of cable with good quality available insulation tape with J/Kit boxes, Fixing and insulating of lugs on cable with switch gear complete in all respect.
14122. Installation of 24V Battery and Battery Charger:Assembling and installation of the cabinet of 24V battery and battery charger in switch gear control room including grouting of foundation bolts as per drawing of manufacture, including providing the foundation nuts and bolts of proper size. The electrical connection between battery and battery charge with flexible copper lead of size 7/20 SWG shall be done properly. The work includes installation, wiring upto control panel, testing and commissioning complete in all respect.
14223. Laying of different size of (2x2.5)mm2control cables (Armoured) i.e. from Buchholz realy to Marshalling box Marshalling box to indication protection board in switch gear room, 33 KV CT’s to CT’s Junction Box, 33 KV CT, 33 KV PT, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box and indication board as per required for installed equipment. Providing & laying of Control cable tray with in control cable from VCB & CT Connection.
14324. Laying of different size of (4x2.5)mm2 control cables (Armoured) i.e. from Buchholz realy to Marshalling box Marshalling box to indication protection board in switch gear room, 33 KV CT’s to CT’s Junction Box, 33 KV CT, 33 KV PT, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box and indication board as per required for installed equipment. Providing & laying of Control cable tray with in control cable from VCB & CT Connection.
14425. Lighting Arrangement of 33/11 KV S/S outdoor switch yard and its area:Supply & installation and erection of 6 Mtr. Long street light supports with 2.4 feet long street light brackets including fixing and supply of junctions box, street light support shall be made and fabricated from G.I.. pipe of 3.0 Mtr. Long 100mm dia. And 3.0 Mtr. Long 75mm dia with 2.4 Mtr. Long street light bracket in arc shape and made up of 40 mm dia G.I.. pipe. Grouting of support in C.C. ratio 1:3:6 (cement, core sand and stone ballast) in size (0.40x0.4x1.2)m, Lightning poles shall also be earthed by connecting to earth mat.
14526. Supply and Fixing of LED light (Minimum120W) and of standard quality ISI mark with water tight elbow fitting etc. complete in all respect and suitable for above street light supports (Acceptable make Phillips, Bajaj, Havells or Syska).
14627. Laying of 3½x150 mm2 PVC LT cable from 11/0.4 KV, 63 KVA T/F to L.T. distribution board in switch gear room after digging trench for laying cable and refilling of trench including connections at both ends after providing and crimping of lugs of proper size for completion of work and laying brick over & both sides of L.T. cable after digging trench of 0.3 m wide & 0.5 m depth and providing and wearing 75 mm dia G.I.. pipe of 2.5 M length over L.T. Cable complete in all respect.
14728. Laying of 3x120mm2 11KV cable from 11KV outgoing VCB in control room to PCC Double Pole after digging trench for laying cable and refilling of trench including connections at both ends after providing and crimping of lugs of proper size for completion of work and laying brick over & both sides of 11KV cable after digging trench of 0.3 m wide & 0.5 m depth and providing and wearing 75 mm dia G.I.. pipe of 2.5 M length over 11KV Cable complete in all respect.
14829. Providing & Fixing 100amp TPN MCCB distribution board (1 No. I/C & 3 No. O/G for Substation T/F), 4 Pole and 4 nos. 32amp single phase, MCCB in box as per catalogue no. 607780 ligrant make or equivalent for street light.
14930. Construction of 11 KV Feeder Double Poles:Erection and grouting of 2 Nos. 11.0Mtr STP Pole for making DP Structure including fabrication fixing of M.S.Channel, M.S.Angle, TPMO, Fuse Set, disc, insulators, pin insulators etc. the work includes supply and fixing of necessary clamps size 75x10mm with G.I.Nuts bolt & washer, bolts and washers. The work also includes grouting of Double pole support in C.C. 1:3:6 (cement, Core sand & stone ballast) in block of size (0.45m x 0.45 x 1/6 length of the pole) including earthing of Double pole with Earthing rod complete in all respect.
15031. Supply & Erection of No. Plate, SMC Danger board, barbed Wire (02 Kg) per Pole on 63KVA double Pole.
15132 .Providing & wearing of 110 mm dia 3.0Mtr long G.I.Pipe in the feeder cable of size of (3x185/3x300)mm2 XLPE 11KV power cable before making the outdoor cable boxes. The work includes the sealing of G.I. Pipe, top end and lower end of the pipe is to be buried in to the ground about ½ m and proper dressing of cable etc. The work includes lifting, mounting and clamping of 11 KV feeder cable boxes on the feeder with double pole structure and making connections including supply of cable mounting clamps etc. Marking of I/C & O/G cable with Supply & installation of name plate of equipment with Yellow & Black Paint on all G.I.Pipe in Substation / 33KV line / 11KV line.
15233. Erection of ACSR Weasel Conductor for jumpering on Double Pole
15334. Erection and grouting of 2 Nos. PCC 9.0Mtr long for making DP Structure including fabrication fixing of M.S.Channel, M.S.Angle, TPMO, Fuse Set, pin insulators etc. the work includes supply and fixing of necessary clamps with nuts, bolts and washers. The work also includes grouting of Double pole support in C.C. 1:3:6 (cement, sand & stone ballast) in block of size (0.45m x 0.45 x 1/6 length of the pole) including earthing of Double pole with Earthing rod complete in all respect.
15435. Supply & Erection of No. Plate, SMC Danger board, barbed Wire (02 Kg) per Pole on feeder double Pole.
15536. Plinth of Substation T/F with RCC Top of size 2x2x1.6 Mtr. Incl. 2 nos. M.S.Channel of 125x65x6mm and 10 No. holding clamp as per specification (All material supply by the Contractor).
15637. Installation of 11/0.4 KV, 63 KVA T/F on Plinth and providing and fixing of Lugs & copper L-piece (04 No.) of size 400x50x6mm on LT bushing Rod of S/s T/F and making of 11 KV & L.T.Connections of Transformer complete.
15738. Supply and commissioning of chemical Pipe earthing of 3.0Mtr for 63KVA
15839. Installation of 33 KV Isolators:Assembling and installation of line/Bus Isolator on the isolator structure. Adjusting of operating mechanism in proper alignment so as to ensure smooth operation of the same. In case of Line Isolator proper operation of earth links shall also be ensured. The work includes fabrication for proper fixing if required. This Job also include greasing of isolator Jaw.
15940. Installation of 33 KV Lightning Arrestors: Assembling and installation/mounting of 3 Nos. lighting arrestors on the L.A.’s structure/terminal gentry, complete with earthing and line connections. The work includes fabrication for proper fixing, if required.
16041. Installation of 33 KV Post Insulators:Installation of 6 Nos. PI on structure. The work includes fabrication for proper fixing, if required.
16142. Installation of 33 KV Fuse Set:Assembling and installation of fuse set on the fuse set structure. The work includes fabrication for proper fixing, if required.
16243. Installation of 33 KV VCBAssembling and installation of 33 KV VCB on the VCB out door structure on the plinth. Adjustment of operating mechanism in proper alignment for smooth operation of the same. The work also includes fabrication of addition arrangement for proper fixing, if required.
16344. Installation of 33 KV VCB Control Panel for single feeder or Double T/F Control Panel.Carefully and safely shifting of 33 KV VCB control panel from outside of the switch gear room to inside of the switch gear room, grouting with anchor bolts in the floor, work also includes cutting & proper finishing of floor if necessary for completion of work. Placing and fixing of panel on foundation, bolts of proper size in proper position and alignment.
16445. Installation of 33 KV C.T.’s:Installation of 3 Nos. C.T.’s on the C.T’s structure. The work includes fabrication for proper fixing, and also clamps for C.T Connection if required to complete the work.
16546 .Installation of 33 KV P.T.’s:Installation of 3 Nos. P.T.’s on the P.T’s structure and P.T.Junction box. The work includes fabrication for proper fixing, if required to complete the work.
16647. 33 KV CT’s Junction Box:Providing & fixing of junction box of size (400x400x150) mm made of M.S. sheet of 16 SWG in between 33 KV CT’s & control panel. The work also include making proper connection on the junction box and making all connection in between CT’s and control panel complete as per manufacture’s panel drawing including testing and commissioning of work etc. complete the work.
16748. 33 KV Bus Bar Jumpering:ACSR Panther Conductor / Dog Conductor & Jumpering, including clamping/binding with ACSR Panther conductor/33KV 3x300mm2 XLPE cable with providing P.G.Clamp & other accessories.
16849. Single line diagram, Tripping Board & Substation layout:Providing & fixing of single line diagram board for 33/11 KV substantions of size (1200x900)mm made of Indian Plywood 6 mm thick fitted on wooden frame made of Sal wood of size (50x30)mm. Two support of Sal wood of size 1200 mm and two supports of size 900 mm shall be tapered on the front side and properly finished, the board shall painted with white enamel paint in two coats after one coat of primer shall be used in both side. The prescribed matter/chart shall be written neatly with red, green and black paint as required & providing 04 Nos. copyes of layput of substation after survey on A-2, Paper.
16950. Fabrication, Erection & Grouting of 33/11KV S/S Name Board of size (1.5x1.5) Mtr 2.40Mtr high frame providing of M.S.Angle of size 65x65x6mm, Two cross Bracing of M.S. Flat of size 25x6mm shall be fixed with frame, Board shall be made of Providing of 18SWG M.S. sheet of size 1.5x1.5mtr shall be fitted in frame with Rivit Board letter should be written by black paint on yellow back ground Providing All required materials by the contractor own his cost.
17051. Supply & fixing of Aluminium clamps such as Isolator, LA, Transformer end clamp, fuse set, post insulator, PG clamp etc. complete with nut, bolt & washer for Dog / Panther Conductor
17152. To provide required No. of technicians to work on power T/f, HT/LT panels & 33KV line during testing as assisting technical hands of test team during commissioning & energisation (Testing & Commissioning). 33KV line & 11KV line test to be done by using meggar & Hi-Port before charging.
17253. Construction of SSO’s approached road 1.2 Mt wide in switch yard by laying dry brick ballast in 15 cm layer, 115 mm thick brick work 1:4 in both side of edge, providing 10 cm thick CC in ratio 1:2:4. The work include proper plastering top & side of road and making groove, leveling & dressing of earth beneath the brick work on edge. All required materials provided / supply by the contractor own his cost.
17354. Construction of Fire Protection wall as per RESPO Drawing.
17455. Supply & fixing Fire Fighting Equipment of approved make 4.5 Kg Co2 Fire extinguisher portable type.
17556. Supply & fixing of foam type Fire extinguisher
17657. Supply & fixing of Fire bucket stand with 6 nos. bucket
17758. Supply & fixing of Rubber Mat 1Mtrx2Mtr thikness 20mm,
17859. Supply & Fixing Substation Furniture10 no chair, 3 no table, 2 no Bench size 6x1.1/4, 2 no Rack, 4 no steel stool, 2 no Almiraha & 3 no office chair,
17960. Supply & Fixing 10\\" exhaust Fan complete in every respect.
18061. Supply & Fixing T&P of Substation of switchgears
18162. Supply & Fixing 33/11KV Substation name board SMC with stand
18263. Supply & Fixing Protection board complete
18364. Supply & fixing Sefety Kit & First aid kit
18465. Supply & Fixing Chemical Pipe earthing 80mm dia 3mtr long Pipe.( Feeder & S/S)
18566. Tree cutting of existing area for making switchyard
18633KV Line67. Excavation and taking out of existing 33KV line for shifting of 33KV cable.
18768. 33KV 3x300SQ.M.M XLPE Cable laying after Digging of trench of size (750x1050)mm in open cut. (Including shifting of 33KV existing line 100Mtr).
18869. Providing & Laying of Ist Class Bricks, along the length on both side of 33KV XLPE Cable in Cable Trench (minium 18No. Bricks/Mtr) and Stone Slab of size 450x600x40mm on top of the Cable, Providing 150mm thickness River sand for cushion beneath and 150mm above the cable as per specification.
18970. Back filling of excavated earth in the cable trench upto the ground level and ramming properly.
19071. Laying of 33KV, 3x300Sq.mm XLPE Cable in the air on cable Riser Double Pole, existing trench cable trench, nala x-ing & G.I.Pipe and making connection with 33KV over head line at both ends.
19172. Making of 33KV Outdoor type cable end termination by heat shrinkable XLPE Cable Jointing Kits and crimping with proper size aluminium lugs. Work includes providing Aluminum lugs, insulating tapes etc as per specifications.
19211KV Line73. The excavation of foundation pit in mix soil/normal soil/soft soil & hard rock and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all clamps size (65x8mm), Nut bolt & Washer, Stone Pad, Lugs, Al. Binding wire and other accessories as per drawing. The work includes carriage and handling of supports & hardware material from sectional store to pit site as well as an fabrication work if required. Fixing of 04 Nos. M.S.Channel 100x50x2.4Mtr (With arrangement of 03 Nos. 11KV Pin insulator with Pin). The work also includes cutting of channel/angles, making holes on M.S.Channel / M.S. Angle, spring washer of proper size for channel/angle. Contractor also provide M.S.Channel clamps and E- clamps at his own cost as per Respo Norms.(i) End Double Pole Structures(a) 9M Long PCC Pole
19374. Riser Double PoleThe excavation of foundation pit in mix soil/normal soil/soft & hard rock and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all clamps and other accessories as per drawing. The work includes carriage and handling of supports & hardware material from sectional store to pit site as well as an fabrication work if required. Fixing of 04 Nos. M.S.Channel 100x50x2.4Mtr (With arrangement of 03 Nos. 11KV Pin insulator with Pin). The work also includes cutting of channel/angles, making holes on M.S.Channel / M.S. Angle, spring washer of proper size for channel/angle. Contractor also provide M.S.Channel clamps and E- clamps at his own cost as per Respo Norms.(a) 9M Long PCC Pole
19475. Grouting of supports in CC 1:3:6 (Cement, sand & 20mm stone grift). Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, upto ground level, 300mm plinth above the ground level with C.C. 1:3:6 (Cement, Course sand and Stone grift) with muffing as per drawing. Work includes back filling and proper ramming.(i) End Double Pole Structures(a) 9M Long PCC Pole
195(i) Riser Double Pole Structures(a) 9M Long PCC Pole
19676. Grouting of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:3:6 cement, sand, 20mm Stone grift) as per drg. Including back filling of soil and proper ramming etc.
19777. Fixing, tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing, including providing & fixing of Stay Insulators of 11KV and Stay Clamps.
19878. Earthing of supports with M.S.Earth Rod of (20x2500)mm long including excavation of pit and driving M.S.Rod 3.0M apart from suppor and 0.5M below the ground level and connecting belowl the earth electrodes with the help of G.I.wire No.8SWG and earthing lugs.
19979. Making Jumpers on Sectional Pole, by providing & fixing of P.G.Clamps of proper sizes, suitable for Dog Conductor/ 11KV, 3x185Sq.mm XLPE cable (12 Nos. P.G.Clamps at each section double Pole & 06 No. P.G.Clamps at each end double Pole).(a) End Double Pole
200(b) Riser Double Pole
20180. Providing & fixing of SMC Danger board at each Pole as per specification of the drawing. Size 200mmx250mm & 3mm thickness with G.I.Clamp & nut & bolt for 11KV
20281. Providing & fixing of SMC Number Plate at each Pole as per specification of the drawing. Size 200mmx250mm & 3mm thickness with G.I.Clamp & nut & bolt.
20382. Providing & Wrapping of 2.0Kg, 11KV barbed wire per pole on PCC Poles as anti-climbing device for a length of 0.9Mtr. Wire pitch/gap 13mm and fixing upper and lower end keeping lower end at a height of 2.75Mtr. from the ground, complete with providing and fixing of lower end & upper end clamps made of M.S.Flat 40x5mm complete with nuts & bolts.
20483. 11KV XLPE Cable laying after Digging of trench of size (450x900)mm in open cut.
20584. Providing & Laying of Ist Class Bricks, along the length on both side of 11KV XLPE Cable in Cable Trench (minium 18No. Bricks/Mtr) and Stone Slab of size 450x600x40mm on top of the Cable, Providing 150mm thickness River sand for cushion beneath and 150mm above the cable as per specification.
20685. Back filling of excavated earth in the cable trench upto the ground level and ramming properly.
20786. Laying of 11KV, 3x185Sq.mm XLPE Cable in the air on cable Riser Double Pole, existing cable trench, Pucca trench, nala x-ing & G.I.Pipe and making connection with 11KV over head line at both ends.
20887. Supply and laying of HDPE Pipe PE-80, PN-6, DN-140mm dia Pipe for laying of 11KV, 3x185Sq.mm, XLPE Cable with HDD (trenchless) method including cable laying.
20988. Making of 11KV Indoor/Outdoor type cable end termination by heat shrinkable XLPE Cable Jointing Kits and crimping with proper size aluminium lugs. Work includes providing Aluminum lugs, insulating tapes etc as per specifications.
21089. Making of 11KV Straight through Cable Jointing Kits 3x185mm² and crimping of proper size aluminium lugs. Work includes providing insulating tapes etc as per specifications.
21190. Providing and fixing 110mm dia (Minimum 2mm thick) 2mm thick 3M long G.I.Pipe over 11KV, 3x185Sq.mm XLPE Cable before mounting the 2No. Cable on double pole. Work includes fixing of Clamp, sealing of top and bottom end of the G.I.Pipe. One end of G.I.Pipe is to be buried under earth about 500mm.
21291. Laying, spreading, lifting and final sagging of 3 phases ACSR Dog conductor in accordance with Line chart includidng binding and fixing of all accessories in 03Nos. Conductor in parallel.
21392. Supply & fixing of cable route marker along the route of 11KV cable with proper grouted with proper painting & marking PVVNL, 11KV Cable.
21493. Road restoration charges for 1Mtr wide Kuccha Road (Inter locking Tiles, Bricks Road & Developed green belt only) or Deposite charges to take the permission/approval/NOC from any Development Authority/Govt. Body/Forest Deptt./and other concerned Deptt. for construction of 11KV line
21594. Road restoration charges for 1Mtr wide Pucca Road (Cemented, Concrete & Black road only) or Deposite charges to take the permission/approval/NOC from any Development Authority/Govt. Body/Forest Deptt./and other concerned Deptt. for construction of 11KV line Total in Figures 0.0 0.0 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select % 0.0 0.0 Zero Only Quoted Rate in Words Zero Only Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58577739
AUTHORITY Government Departments
TENDER VALUE 2 Crore
LAST DATE 01-12-2026
Authority
Authority Name Paschimanchal Vidyut Vitran Nigam Limited
Work Description Tender for Work For Construction Of New 33/11Kv (2×10 Mva) Substation Bankapur, Jewar & Associacted With Construction Of New 33 Kv Link Line For New Bankapur Substation From Existing Additional Source From Jewar Town And Emanating 11Kv Feeders In Distirct G.B. Nagar Under Deposit Scheme.
Basic Detail
Tender No 39/ECWC-I/MRT/2026-27
Bidding Type Tender
Location
City Meerut
State Uttar Pradesh
Key Dates
Publish Date 17 Nov 2026
Submission Date 01 Dec 2026
Open Date 02 Dec 2026
Finance
Tender Value 2 Crore
Tender Fee 5900
EMD 2 Lakhs
Exemption Available
Document List
4242408f-2f45-451e-baf6-138411f73f06.html
BOQ_2296613.xls
FormABandOMNo2413and2259.pdf
TenderDocumentsofTNo39.pdf
Tendernotice_1.pdf
WorksheetT39.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 17, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 01, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 8 days
Dec 02, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 9 days

Tender Documents

Download All (ZIP) ↓
html

4242408f-2f45-451e-baf6-138411f73f06.html

xls

BOQ_2296613.xls

pdf

FormABandOMNo2413and2259.pdf

pdf

TenderDocumentsofTNo39.pdf

pdf

Tendernotice_1.pdf

pdf

WorksheetT39.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender