Tender For Cleaning And Desilting Of Ugr, Esr Etc. , Supplying Of 1 No Water Flow Meter All Alied Works With One Year O & M At Rural Water Supply Scheme Gawan In Gawan Blockunder D.W. & S Div 2 Giridih (Group No- Gir-05)
Tender Overview
Project Description
Tender for Cleaning And Desilting Of Ugr, Esr Etc. , Supplying Of 1 No Water Flow Meter All Alied Works With One Year O & M At Rural Water Supply Scheme Gawan In Gawan Blockunder D.W. & S Div 2 Giridih (Group No- Gir-05)
BOQ
| Sl. No. | Item Description |
| 1 | GAWAN Rural Water Supply Scheme (O&M) Expected Supply (in KL) (Morning & Evening) (Multiplying by 2.0Times) including 10% for westage of water F.Y 2026-27 (Excluding Energy Charge) |
| 2 | Electromagnetic Flow Meter (EMF) As Per ISO 4064, for Raw/Pure water with accuracy +/-0.5% of measured value & protection as per given specifications for size 100mm-1000mm including sensor, transmitter surge arrestor, cable Gl duct if suitable size for 25 mtrs built in GSM/GPRS (with Simcard and its charges, valid for 36 months) including the pipe cutting, leveling and installation of flow meter in the pipelines with necessary tool tackles, cranes including 36 months guarantee etc complete, as may be required at site & based on technical specifications 250 mm Nominal Diameter Flowmeter . |
| 3 | Dewatering of stagnate water from Intake Well for cleaning of surface, wall etc. all complete as per direction of E/I. |
| 4 | Supplying labours tools & tackles for cleaning filled silt & mud etc in all lift anddisposal of spoils upto a lead of 50 mtr. All complete as per specification anddirection of E/I. |
| 5 | Supplying all labours tools and equipment and cleaning the bed and wall of sump , Intake Well , Floculator, Ariator,Filter Bed, Drains etc. with wire brush, Nariyal brushes and broom etc including providing necessary scaffolding and taking out deposited silt & mud and final cleaning will be done with bleaching powder solution with accidental charge etc all complete as per direction of E/I. |
| 6 | 18% GST |
| 7 | Labour cess Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender