Tender For Tender For The annual rate contract For Electrical Maintenance At Rcf Thal
Tender Value
Ref. Documents
Estimated cost
Bid Submission
08 Dec 2026
18 days left
EMD
7 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Raigad → Maharashtra
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Tender For The annual rate contract For Electrical Maintenance At Rcf Thal
BOQ
| Sl. No. | Item Description |
| 1 | SERVICE AS PER FOLLOWING DESCRIPTION |
| 2 | Laying70 sqmm and below (Laying of cables only in pre-excavated trench,on ground, inside cable tray, on wall etc.) |
| 3 | Laying 95 SQMM TO 400 SQMM CABLES |
| 4 | Clamping OF 70 sqmm and below Clamping of cable laid on wall, cable tray, etc. |
| 5 | Clamping OF 95 TO 400 SQMM CABLES. |
| 6 | Removal 70 sqmm and below Removal of cable from open trench/ground |
| 7 | Removal 95 sqmm TO 400 sqmm |
| 8 | Removal70 sqmm and below Removal of clamped cable on wall / cable tray |
| 9 | Removal 95 to 400 sqmm |
| 10 | Laying TRS cable 1.5,2.5 sqmm, 2,3 or 4 cores. |
| 11 | RemovalTRS cable 1.5,2.5 sqmm, 2,3 or 4 cores. |
| 12 | Termination16 sqmm and below Cable size in sqmm for 2,3,3.5,4 core. |
| 13 | Termination95/120/150 |
| 14 | Termination240/300/400 |
| 15 | Joint temporary16 sqmm and below Cable size in sqmm for 2,3,3.5,4 core. |
| 16 | Joint temporary25/35/50/70 Rates per cable end. |
| 17 | Joint temporary95/120/150 |
| 18 | Joint Permanent16 sqmm and below Cable size in sqmm for 2,3,3.5,4 core,per Raychem cable joint. |
| 19 | Joint Permanent25/35/50/70 Rates per Raychem cable joint. |
| 20 | Joint Permanent95/120/150 per Raychem cable joint |
| 21 | Glanding16 sqmm and below Cable size in sqmm for 2,3,3.5,4 core. |
| 22 | Glanding95 sqmm to 400 sqmm |
| 23 | L and C 8 SWG GI wire (Laying, clamping on wall, poles, structures etc. |
| 24 | L and C 3 x 25 Al/GI strip |
| 25 | L and C upto 8 x 100 GI strip |
| 26 | L and C1core/Al bare conductor upto 25 sqmm |
| 27 | Laying10 cores and below Control cables 1.5,2.5 sqmm laying in pre excavated |
| 28 | Laying12 to19 cores trench, on ground, wall, tray etc. |
| 29 | Clamping up to19 cores trench, on ground, wall, tray etc. |
| 30 | Removal up to 19 cores trench, on ground, wall, tray etc. |
| 31 | Glanding10 cores and below Control cables 1.5,2.5 sqmm |
| 32 | Termination 19 cores and below Control cables 1.5,2.5 sqmm |
| 33 | Installation/ replacement DP /ICTPN switch On MS angle/flat/civil structure upto 100A |
| 34 | Installation/ replacement of ICTPN upto 400 A On MS angle/flat/civil structure |
| 35 | Installation/ replacement 3 ph ICDB_ 6 /12/24 ways/ph On MS angle/flat/civil structure |
| 36 | Installation/replacement normal light fitting upto 150W On wall, on poles/structure . |
| 37 | Installation / replacement normal light fitting above 150W On wall, on poles /structure. |
| 38 | Installation / replacement light fittingTube/LED/wellglass fittings upto 150W Increased safety. |
| 39 | Installation / replacement light fitting/LED/wellglas fittings above 150W, Increased safety. |
| 40 | InstallationFlood Light fitting 300/500/1000 W |
| 41 | InstallationCeiling fan.1200/1400 mm sweep. |
| 42 | InstallationRegulator. Regulator for ceiling fan |
| 43 | InstallationExhaust fan 300/450 MM sweep. |
| 44 | InstallationPedestal fan Assembly and installation |
| 45 | InstallationWall mounting fan Assembly and installation |
| 46 | Installation Junction / choke box Above 3 Me height |
| 47 | InstallationJunction / choke box below 3 Me height |
| 48 | InstallationMCBs and HRC Fuse bases In panels, Switchboards upto 100A |
| 49 | InstallationMetal clad switch socket.In panels, Switchboards. |
| 50 | InstallationHRC fuse base.HRC fuse base upto 400 A |
| 51 | InstallationElmex strips 35 sqmm |
| 52 | InstallationTimer for lighting. |
| 53 | InstallationPush Button station.Push Button station. |
| 54 | Installation5/15 Amp switch/socket |
| 55 | InstallationUpto 4\\" x 6\\" switch bd |
| 56 | InstallationUpto 10\\" x 12\\" switch bd. |
| 57 | InstallationCall bell / Buzzer |
| 58 | InstallationDomestic point wiring Per meter per pair of wires |
| 59 | Installation Ceiling rose, block etc. |
| 60 | InstallationLamp holder. Pendent insulating lamp holder. |
| 61 | InstallationWater heater. Storage type water heater. |
| 62 | InstallationCable tray covers. |
| 63 | Replacement Lamp/ T/L rod/choke/starter/ holder upto 150W On wall, ceiling, poles upto 3 ME height. |
| 64 | ReplacementAviation fitting On chimney (SGP), 150 me max height. |
| 65 | ReplacementAviation fitting On structures except chimney |
| 66 | ReplacementAviation Lamp On chimney (SGP), 150 me max height. |
| 67 | ReplacementAviation Lamp On structures except chimney. |
| 68 | Replacement Fuse wire |
| 69 | Replacement HRC fuse upto 63A |
| 70 | ReplacementHRC fuse upto 400A |
| 71 | ReplacementHRC fuse base NS HRC fuse NS type |
| 72 | ReplacementHRC fuse base. HRC fuse base up to 400 A |
| 73 | ReplacementCall bell/buzzer With connections |
| 74 | ReplacementDomestic point wiring With connections /Me/pair of wires |
| 75 | Replacement Energy meter 3 phase With connections |
| 76 | Replacement Water heater.Storage type water heater. |
| 77 | Tightening Wires/cable leads Upto 10 SQMM |
| 78 | TighteningWires/cable leads From 16to 70 SQMM |
| 79 | TighteningWires/cable leads From 95 to 300 SQMM |
| 80 | Short circuitsLighting circuits. Domestic /office(Attending short circuits, cleaning, wires replacement, fuse etc. replacement, reconnections and testing.) |
| 81 | Short circuits Lighting circuits. Street lights. |
| 82 | Wiring1/2 inch Circuit wiring in PVC flat conduit with max 6 wires |
| 83 | Wiring1 inch. |
| 84 | WiringDomestic point wiring Rates/ Me/pair of wire including connections |
| 85 | RewiringTube lights tube light fittings rate per fittting |
| 86 | RewiringTube lights 2x40 W Rates per set |
| 87 | Calibration Energy meter 1 phase |
| 88 | Calibration Energy meter 3 phase |
| 89 | Supply ofSkilled labour During General/ shift hours |
| 90 | Supply ofUnskilled labour During General/ shift hours |
| 91 | Supply ofSkilled labour After 8 hrs |
| 92 | Supply ofUnskilled labour After 8 hrs Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 17, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 08, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 18 daysDec 08, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 18 daysTender Documents
Download All (ZIP) ↓
Disclaimer