Tender For Drawing Ht Abc 650 Mtr And Installing 100 Kva Dtr At Ambeelara Of Electrical Section Chengamanadu Under Electrical Division Kottarakkara
Tender Value
5.21 Lakhs
Estimated cost
Bid Submission
01 Dec 2026
8 days left
EMD
13100
Bank guarantee accepted
Document Fee
1298
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kollam → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Drawing Ht Abc 650 Mtr And Installing 100 Kva Dtr At Ambeelara Of Electrical Section Chengamanadu Under Electrical Division Kottarakkara
BOQ
| Sl. No. | Item Description |
| 1 | Providing one Coil Earth using No8 GI earth wire (50 mm dia,115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling |
| 2 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 3 | Additional rate for refitting/redoing oneShackle Set, including reshacling one span, while renewing any type of LT pole. |
| 4 | Providing one Earth using GI earth pipe of size 38.1mm dia2.5m length including digging separate pit (0.45 x 0.45 x 2.5 m) at a minimum distance of 1.5 m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil and backfilling |
| 5 | Stringing, shackling, fitting cross arms,insulators and binding, giving jumperconnection etc. using ACSR Rabbit, for one km LT three phase 4 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 6 | Transporting poles by hired vehicle to a distance up to 5km and carrying up to 4 poles excluding loading & unloading |
| 7 | Transporting LT ABC by hired vehicle to a distance up to 5km and carrying up to 2 drum including loading & unloading using crane |
| 8 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and econnecting the same after completing the line work. |
| 9 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 10 | Fitting and erecting one HT A type pole in position incl. fitting cross arm,digging & back filling pit in ordinary soil(as per standards) , drawing sufficient length of GI earthing leads from F clamp through V cross arm to ground for earthing (excluding provision of earthing) |
| 11 | Fitting and erecting one HT PSC type pole in position incl. fitting cross arm, digging & back filling pit in ordinary soil(as per standards) , drawing sufficient length of GI earthing leads from F clamp through V cross arm to ground for earthing (excluding provision of earthing),drawing earth leads |
| 12 | Providing concrete muffing (0.45x0.45x1.5m) ( 0.5m above GL and 1m below GL).Excavation 0.45x0.45x1m concrete (1:3:6 20mm) 0.45x0.45x1.5m.Plastering (1:3) 12mm 0.45mx0.45mx 5 sides |
| 13 | Fitting and erecting one HT Double pole structure using A type pole in position incl. fitting 2 No channel cross arm,digging & back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing |
| 14 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 15 | Dismantling (without damage) one LTPSC/RCC Strut pole including removal of clamps and stacking |
| 16 | Fitting one set AB switch on existing DP giving connection and drawing sufficient length of GI earthing leads to the grounf for earthing excluding provision for earthing |
| 17 | Drilling hole of various sizes on existing Channel/Cross arm |
| 18 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. |
| 19 | Fitting one LT 2 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line. |
| 20 | Fitting and providing one strut using HT PSC pole incl. digging and back filling pit in ordinary soil |
| 21 | Disconnecting and lowering down the Single phase WP service connection with guy wire from the OH line incl. reconnecting the same after completing the line work |
| 22 | Additional rate for providing one HT Pin with insulator, complete on any type of HT pole. |
| 23 | Providing Transformer fencing to a height of 1.8 m above ground level using MS Angle frames of size ISA 50x50x6mm for outer frame, 2 runs of 40 x 6 MS flat for horizontal bracing and grills with MS rods 8 mm Dia @10cm c/c for verticals, providing gate with locking arrangements, providing danger board & name board, embeding the legs in cement concrete 1:2:4, footing of size 30cmx30cmx50cm, painting with synthetic enamel paint two coats over one coat of iron primer etc complete, incl cost of transportation |
| 24 | Cleaning and levelling of transformeryard/RMU, spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6 mm broken stone, after constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreading, consolidating etc. |
| 25 | Pole numbering using printed Aluminiumsheets of 22 SWG having size 20 x 12 cm or Painting the surface of line supports where numbers are to be inscribed, Pole numbers shall be painted in circular / rectangular background, using approved quality anti algalyellow paint in two coat after scraping and cleaning the surface at a height of 2.5 metre above ground level. The number and letters should be in black synthetic enamel paint. The size of the number should be at least 2cm in height x 1.5cm in width. including cost of paint. |
| 26 | Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm withbare/insulated Messenger through existing poles |
| 27 | Transporting Transformers by hired vehicle to a distance upto 5km and carrying upto 2 numbers of 3/100/160/250kVA Transformers/ Ring Main Units excluding loading&unloading charges. |
| 28 | Dismantling ( without damage) one LT PSC/RCC pole after disconnecting stays, strut, etc. and stacking the same |
| 29 | Additional rate for excavation of Pit for 'A'type pole in Laterite. |
| 30 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 31 | Dismantling (without damage) one 11kVPSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 32 | Fitting 6 channel cross arms, AB switch, DO fuse, Station class LA, HT & LT connections upto OH lines, etc. on existing DP structure, Fixing distribution box/provision for one set (3No.) of LT fuses, drawing sufficient lengthof GI earthing leads to the ground forearthing, excluding provision of earthing & mounting of Transformer on poles. |
| 33 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 34 | Erection of suspension clamp for 11KV ABC of any size |
| 35 | Fiting One no MVT on existing cross armexcluding termination work (for One phase) of any rating for 11 kV AB Cable |
| 36 | Fitting one Additional 75x40mm, 1.8mChannel cross arm in existing single pole including conveyance of materials. |
| 37 | Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm and connecting to existing MVT or otherterminals,using the cable end termination kit supplied departmentally including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 38 | Dismantling (without damage) one km LTthree phase 4 wire OH line conductor bydismantling cross arms, insulators andstacking the conductors in rolls properly. |
| 39 | Transferring LT 3 phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators refitting the same on the new pole,binding ete complete |
| 40 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators refitting the same on the new pole,binding ete complete |
| 41 | Dismantling (without damage) LT stayincluding digging pit in all classes of soil and backfilling. |
| 42 | Erecting one 100 kVA Transformer to existing DP and giving connections including loading from TMR/SRS/other stacking places & unloading at site but excluding cost for transporting transformer |
| 43 | Providing Cable Tie |
| 44 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets,connecting with bolt & nut etc. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 17, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 01, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysDec 05, 2026
Bid Opening Date
Technical bids will be opened and evaluated.