Tender For Shifting Of Electrical Systems Obstructing The Widening Of Tapua- Nonkhara-Kusumkhor Road (A.D.M.) In The Under Electricity Distribution Division -Bilgram Hardoi.
Tender Value
17.50 Lakhs
Estimated cost
Bid Submission
25 Nov 2026
2 days left
EMD
17500
Bank guarantee accepted
Document Fee
3540
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Hardoi → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Shifting Of Electrical Systems Obstructing The Widening Of Tapua- Nonkhara-Kusumkhor Road (A.D.M.) In The Under Electricity Distribution Division -Bilgram Hardoi.
BOQ
| Sl. No. | Item Description |
| 1 | Safe loading Carriage & unloading of following material from store centre to pit site/JE dump store approx 60 Km. |
| 2 | PCC Pole 8.5 Mtr. Long |
| 3 | PCC Pole11 mtr long |
| 4 | 11 KV X arm V Type 65x65x6mm |
| 5 | ACSR weasel conductor |
| 6 | Stay complete |
| 7 | LT ABC (3×50+1×35+1x16) sqmm |
| 8 | LT ABC (3×95+1×70+1×16) sqmm |
| 9 | GI wire 10 SWG |
| 10 | GI wire 06 SWG |
| 11 | M.S. Channel (Dropper) 100×50×2028mm |
| 12 | M.S. Angle75×75×2028mm (T/F Base) |
| 13 | Cross Bracing M.S. Angle |
| 14 | Top channel M.S. (100x50x2240) mm |
| 15 | M.S. T Off channel |
| 16 | Earthing Complete |
| 17 | 11 KV Polymeric disc insulator B&S Type |
| 18 | 11 KV Disc fitting |
| 19 | 11 KV Polymeric pin insulator |
| 20 | 11 KV pin with nut |
| 21 | Erection of material that is carriage from store center to site |
| 22 | Erection of PCC 8.5 mtr long Single pole with all accessories (All neccessary decentralized item will be provided by the contractor at his own cost except PCC pole) |
| 23 | Erection of PCC 8.5 mtr long double pole with all accessories(All neccessary decentralized item will be provided by the contractor at his own cost PCC pole) |
| 24 | Erection of PCC 11 mtr long Single pole with all accessories(All neccessary decentralized item will be provided by the contractor at his own cost PCC pole) |
| 25 | Erection of PCC 11 mtr long Double pole with all accessories(All neccessary decentralized item will be provided by the contractor at his own cost PCC pole) |
| 26 | Concreating of Pole (All material shall be provided by the contractor at his own cost) |
| 27 | Grouting and Nozzling of 11 KV stayset complete including fixing of necessary clamps. Accessories required including its grouting by civil material (sand, brick blast & cement). All material except stay wire shall be supplied by the contractor. |
| 28 | Ordinary earthing by 11 KV MS earth Rod 2500 mm long as per RESPO schedule. All material except earthing rod shall be supplied by the contractor. |
| 29 | Stringing and Sagging of LT ABC (3×50+1×35+1x16) sqmm. (All neccessary decentralized item will be provided by the contractor at his own cost except ABC cable) |
| 30 | Stringing and Sagging of LT ABC (3×95+1×70+1×16) sqmm. (All neccessary decentralized item will be provided by the contractor at his own cost except ABC cable) |
| 31 | Stringing and Sagging of ACSR Weasel Conductor on 11 KV Line. (All neccessary decentralized item will be provided by the contractor at his own cost except ACSR weasel conductor) |
| 32 | Dismentling and Mounting of Existing 10 /16 KV T/F to newly constructed single pole & its commissioning including jumepring with all system (All neccessary decentralized item will be provided by the contractor at his own cost except T/F) |
| 33 | Dismentling and Mounting of Existing 25 KV T/F to newly constructed double pole & its commissioning including jumepring with all system (All neccessary decentralized item will be provided by the contractor at his own cost except T/F) |
| 34 | Dismentling and Mounting of Existing 63 KV T/F to newly constructed double pole & its commissioning including jumepring with all system (All neccessary decentralized item will be provided by the contractor at his own cost except T/F) |
| 35 | Gurading of 11 KV line (All material provided by the contractor at his own cost including guarding angle except GI wire) |
| 36 | Dismenteling of old existing pole & scrap material and loading carriege & unloaoding from site to ESC Hardoi(PCC POLE, CONDUCTOR,ABC CABLE ETC) |
| 37 | Looping and chopping of tree branches Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 17, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 25, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysNov 26, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender