Tender For Constructing 1.1 Km Line And Installing 100 Kva Transformer At Villoor Of Electrical Section Chengamanadu Under Electrical Division Kottarakkara
Tender Value
5.11 Lakhs
Estimated cost
Bid Submission
01 Dec 2026
11 days left
EMD
12800
Bank guarantee accepted
Document Fee
1298
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kollam → Kerala
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Constructing 1.1 Km Line And Installing 100 Kva Transformer At Villoor Of Electrical Section Chengamanadu Under Electrical Division Kottarakkara
BOQ
| Sl. No. | Item Description |
| 1 | Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm withbare/insulated Messenger through existing poles |
| 2 | Additional rate for excavation ofPit for 'A' type pole in Laterite. |
| 3 | Additional rate for excavation ofone Pit for HT Pole/HT Stay inLaterite. |
| 4 | Providing one Earth using GI earth pipe of size 38.1mm dia2.5m length including digging separate pit (0.45 x 0.45 x 2.5 m) at a minimum distance of 1.5 m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil and backfilling |
| 5 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 6 | Transporting poles by hired vehicle to adistance upto 5km and carrying upto 4numbers of poles excluding loading&unloading charges. |
| 7 | Transporting LT ABC by hired vehicle to a distance up to 5km and carrying up to 2 drum including loading & unloading using crane |
| 8 | Additional rate for refitting/redoing oneShackle Set, including reshacling one span, while renewing any type of LT pole. |
| 9 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 10 | Fitting and erecting one HT A type pole in position incl. fitting cross arm,digging & back filling pit in ordinary soil(as per standards) , drawing sufficient length of GI earthing leads from F clamp through V cross arm to ground for earthing (excluding provision of earthing) |
| 11 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excludingprovision of earthing). |
| 12 | Providing concrete muffing (0.45x0.45x1.5m) ( 0.5m above GL and 1m below GL).Excavation 0.45x0.45x1m concrete (1:3:6 20mm) 0.45x0.45x1.5m.Plastering (1:3) 12mm 0.45mx0.45mx 5 sides |
| 13 | Fitting and erecting one HT Double pole structure using A type pole in position incl. fitting 2 No channel cross arm,digging & back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing |
| 14 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 15 | Dismantling (without damage) one LTPSC/RCC Strut pole including removal of clamps and stacking |
| 16 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 17 | Drilling hole of various sizes on existing Channel/Cross arm |
| 18 | Dismantling (without damage) one km LTsingle phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 19 | Stringing, shackling, fitting cross arms,insulators and binding, giving jumperconnection etc. using ACSR Rabbit, for one km LT three phase 4 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. |
| 20 | Fitting and providing one strut using HT PSC pole incl. digging and back filling pit in ordinary soil |
| 21 | Disconnecting and lowering down the Single phase WP service connection with guy wire from the OH line incl. reconnecting the same after completing the line work |
| 22 | Stringing, shackling, fitting cross arms,insulators and binding, giving jumperconnection etc. using ACSR Rabbit for Phase and Neutral, for one km LT single phase 2 wire line including cutting and removing tree branches wherever ecessary and conveyance of all aterials (except poles) from stacking place. |
| 23 | Providing Transformer fencing to a height of 1.8 m above ground level using MS Angle frames of size ISA 50x50x6mm for outer frame, 2 runs of 40 x 6 MS flat for horizontal bracing and grills with MS rods 8 mm Dia @10cm c/c for verticals, providing gate with locking arrangements, providing danger board & name board, embeding the legs in cement concrete 1:2:4, footing of size 30cmx30cmx50cm, painting with synthetic enamel paint two coats over one coat of iron primer etc complete, incl cost of transportation |
| 24 | Cleaning and levelling of transformeryard/RMU, spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6 mm broken stone, after constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreading, consolidating etc. |
| 25 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. |
| 26 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 27 | Dismantling one ordinary street light /CFL/LED fitting from the existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires |
| 28 | Dismantling ( without damage) one LT PSC/RCC pole after disconnecting stays, strut, etc. and stacking the same |
| 29 | Dismantling ( without damage) one LT PSC/RCC pole after disconnecting stays, strut, etc. and stacking the same |
| 30 | Fitting one LT 2 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line. |
| 31 | Additional rate for providing one HT Pin with insulator, complete on any type of HT pole. |
| 32 | Transporting Transformers by hired vehicle to a distance upto 5km and carrying upto 2 numbers of 3/100/160/250kVA Transformers/ Ring Main Units excluding loading&unloading charges. |
| 33 | Dismantling (without damage) one 11kVPSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking thesame. |
| 34 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 35 | Erection of suspension clamp for 11KV ABC of any size |
| 36 | Fiting One no MVT on existing cross armexcluding termination work (for One phase) of any rating for 11 kV AB Cable |
| 37 | Erecting one 100kVA Transformer to existing DP and giving connections, including loading from TMR/SRS/other stacking place & unloading at site but excluding cost for transporting transformer. |
| 38 | Fitting one Additional 75x40mm, 1.8mChannel cross arm in existing single pole including conveyance of materials. |
| 39 | Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm and connecting to existing MVT or otherterminals,using the cable end termination kit supplied departmentally including charges for cable jointer etc. complete as per the direction of the departmental officers. |
| 40 | Dismantling (without damage) one km LTthree phase 4 wire OH line conductor bydismantling cross arms, insulators andstacking the conductors in rolls properly. |
| 41 | Dismantling (without damage) one km LTadditional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly |
| 42 | Stringing, shackling, fitting cross arms,insulators and binding, giving jumperconnection etc. using ACSR Rabbit, for one km LT 3ph 5 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place |
| 43 | Transferring LT 3 phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators refitting the same on the new pole,binding ete complete |
| 44 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators refitting the same on the new pole,binding ete complete |
| 45 | Fitting 6 channel cross arms, AB switch,DO fuse,Station class LA,HT & LT connections upto OH lines etc on existing DP structure,Fixing distribution box/provision for one set (3 No) of LT fuses,drawing sufficient lemgth of GI earthing leadsto the groubd for earthing excluding provision for earthing and mounting of transformer on poles |
| 46 | Providing Cable Tie |
| 47 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets,connecting with bolt & nut etc. |
| 48 | Dismantling one section fuse from structure and bringing back to section store Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 17, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 01, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysDec 05, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender