Tender For External Painting Of Proceess Pipings ,Valves Structures, Fire Water Tanks At Different Locations Under Erpl Haldia Unit Group A: Phbmpl And Phbpl Haldia- External Painting Of Proceess Pipings ,Valves Structures
Tender Overview
Project Description
Tender for External Painting Of Proceess Pipings ,Valves Structures, Fire Water Tanks At Different Locations Under Erpl Haldia Unit Group A: Phbmpl And Phbpl Haldia- External Painting Of Proceess Pipings ,Valves Structures
BOQ
| Sl. No. | Item Description |
| 1 | GST % for the tender Please select the rate of GST in cell AY13. Rate selected shall be applicable for the entire BoQ. |
| 2 | PHBMPL Haldia |
| 3 | SERVICE ITEMS |
| 4 | Surface preparation : Surface preparation using hand tool cleaning including removal of oil, grease and other contaminents by solvent cleaning followed by removal of defective paint,weld flux, slag from mettallic surfaces, by hand chipping, hand brushing, hand scrappers/chisels, steel wools, final cleaning with High Pressure (10000 PSI) low TDS fresh soft water jet cleaning and drying with compressed air as per the specification and direction of site engineer. Prepared surface shall confirm to WJ-4 as per NACE no.5/SSPC SP-12 Standards. The scope of contractor includes supply of all equipments, tools, tackles, labours etc. |
| 5 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of the Engineer-in-Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. [Note: This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done] |
| 6 | COMPOSITE ITEMS |
| 7 | Painting: Supply and application of paint including all labors, tools, tackles, equipment and consumables shall be in the scope of contractor. The painting system shall be as follows:-First Coat(Primer): Surface tolerant epoxy-(A two-component surface tolerant epoxy coating/Glass flake pigmented epoxy )(80%min.solid by vol.) with 100 microns DFT (min) by spray application.Middle Coat (MID Coat): Surface tolerant epoxy-(A two-component surface tolerant epoxy coating/Glass flake pigmented epoxy )(80%min.solid by vol.) with 150 microns DFT (min) by spray applicationThird Coat (Top Coat) : Two-Component weatherable acrylic aliphatic polyurethane topcoat (63% min. solid by vol.) with 50 microns DFT (min) by spray application Total DFT should be minimum 300 microns. Area of work: PHBMPL process piping & Structures |
| 8 | BG Sticker: Reflective radium sticker printing(background sticker) and apply including pasting and fixing with supply of all labours,tools tackles,scaffolding working at any height etc |
| 9 | Lettering sticker: Reflective radium sticker letter printing and apply in background stickering including pasting and fixing with supply of all labours,tools tackles, scaffolding working at any height etc |
| 10 | PHBPL Haldia |
| 11 | SERVICE ITEMS |
| 12 | Surface preparation : Surface preparation using hand tool cleaning including removal of oil, grease and other contaminents by solvent cleaning followed by removal of defective paint,weld flux, slag from mettallic surfaces, by hand chipping, hand brushing, hand scrappers/chisels, steel wools, final cleaning with High Pressure (10000 PSI) low TDS fresh soft water jet cleaning and drying with compressed air as per the specification and direction of site engineer. Prepared surface shall confirm to WJ-4 as per NACE no.5/SSPC SP-12 Standards. The scope of contractor includes supply of all equipments, tools, tackles, labours etc. |
| 13 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of the Engineer-in-Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. [Note: This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done] |
| 14 | COMPOSITE ITEMS |
| 15 | Painting: Supply and application of paint including all labors, tools, tackles, equipment and consumables shall be in the scope of contractor. The painting system shall be as follows:-First Coat(Primer): Surface tolerant epoxy-(A two-component surface tolerant epoxy coating/Glass flake pigmented epoxy )(80%min.solid by vol.) with 100 microns DFT (min) by spray application.Middle Coat (MID Coat): Surface tolerant epoxy-(A two-component surface tolerant epoxy coating/Glass flake pigmented epoxy )(80%min.solid by vol.) with 150 microns DFT (min) by spray applicationThird Coat (Top Coat) : Two-Component weatherable acrylic aliphatic polyurethane topcoat (63% min. solid by vol.) with 50 microns DFT (min) by spray application Total DFT should be minimum 300 microns. Area of work: PHBMPL process piping & Structures |
| 16 | BG Sticker: Reflective radium sticker printing(background sticker) and apply including pasting and fixing with supply of all labours,tools tackles,scaffolding working at any height etc |
| 17 | Lettering sticker: Reflective radium sticker letter printing and apply in background stickering including pasting and fixing with supply of all labours,tools tackles, scaffolding working at any height etc Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender