Tender For Sinking Of One Number Deep Tubewell (100Mm X 50Mm) With Installation Of 1Hp Submersible Pump With Motor Set & Allied Works At Bagnan-I Ccc Under Uluberia Division In The District Of Howrah. (The Rate Is Inclusive Of Cess But Excluding Gst)
Tender Overview
Project Description
Tender for Sinking Of One Number Deep Tubewell (100Mm X 50Mm) With Installation Of 1Hp Submersible Pump With Motor Set & Allied Works At Bagnan-I Ccc Under Uluberia Division In The District Of Howrah. (The Rate Is Inclusive Of Cess But Excluding Gst)
BOQ
| Sl. No. | Item Description |
| 1 | Labour for boring tube well of required dia. by water jet system through any type of soil strata including hire and labour charges for boring pipes, scaffolding, tools and plants as necessary and taking out them and lowering pipes, strainers, blind pipe etc. and fitting and fixing the same complete including bucket washing and other incidental works in the connection. The tube well should have a minimum 50 mm gap in between the outside of the tubewell pipe and the bore.[Page No.-49,Item No.-1of PWDSOR w.e.f.01.11.17] For depth upto 150 meter for 50mm dia. tubewell with top enlargement of 100mm dia. 50mm dia. boring. |
| 2 | 100 mm dia. boring etc. top enlargement. |
| 3 | For depth more than 150 meter for 50mm. dia. tubewell with top enlargement of 100mm dia. 50mm dia. boring etc. beyond 150 meter. |
| 4 | Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I).[Page No.-13,Item No.-19(III) of PWDSOR w.e.f.01.11.17]40 mm dia. |
| 5 | 50 mm dia. |
| 6 | 100 mm dia. |
| 7 | Supplying high density polythene strainer of approved make with adapter conforming to I.S. specifications. 50 mm dia.[Page No.-52,Item No.-5 of PWDSOR w.e.f.01.11.17] |
| 8 | Supplying, fitting & fixing steel cutter piece upto 450 mm long with sockets. 50 mm dia.[Page No.-53,Item No.-9 of PWDSOR w.e.f.01.11.17] |
| 9 | Supplying M.S. female adopter of approved make and brand as per direction of the EIC. 32 mm dia.[Page No.-53,Item No.-9 of PWDSOR w.e.f.01.11.17] |
| 10 | Supplying, fitting & fixing heavy type bell mouth reducing socket. 50mm x 100mm.[Page No.-54,Item No.-17 of PWDSOR w.e.f.01.11.17] |
| 11 | Labour for making arrangement for showing verticality test including the cost of hire charges of tools and plants, scaffolding, labour etc. all complete.[Page No.-55,Item No.-22 of PWDSOR w.e.f.01.11.17] |
| 12 | Collecting sample of water for bacteriological and chemical test from any depth at any time during execution of work including hire and labour charges for tools and plants and sterilising the equipments, paying all charges and fees, testing etc. complete in all respect as per direction.[Page No.-55,Item No.-23 of PWDSOR w.e.f. 01.11.17] |
| 13 | Geophysical investigation of the electro-logging system with all tools and plants as necessary including supply of necessary reports. [Page No.-56,Item No.-29 of PWDSOR w.e.f. 01.11.17] |
| 14 | Supply of KIRLOSKAR/KSB/Crompton Greaves or other approved make of Submersible Pump motor set (Model no. Gold3/VII/as per approved, 1phase/0.75 KW, 1 HP, 220Volts, Head range (65m-26m), Discharge range-(L/PM) (15-45) including control panel board & cost of all materials, taxes and all incidental charges complete. (Ref: rate as per order no. ZMK/Civil/Order/F-136/1112 Dated: 16.07.2025) |
| 15 | Supplying, laying and fixing 3 core x 1.5 mm2 Submersible flat cable including cost of all materials, taxes and all incidental charges complete.(Ref: rate as per order no. ZMK/Civil/Order/F-136/1112 Dated: 16.07.2025). |
| 16 | Supplying, fitting and fixing PVC pipes of approved make of Schedule 40(medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories,specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew,reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads,fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately) [Page No.-12,Item No.-19/I of PWDSOR w.e.f. 01.11.17](a) For Exposed Work PVC Pipes (Dia) 15mm |
| 17 | Providing and fixing suitable size threaded mild steel cap or spot welded plate to the top of bore well housing/ casing pipe, removable as per requirement, all complete for borewell of:100 mm dia (Ref. CPWD DSR code no.23.13.1 ) |
| 18 | Development of tube well in accordance with IS : 2800 (part I) and IS:11189, to establish maximum rate of useable water yield without sand content (beyond permissible limit), with required capacity air compressor,running the compressor for required time till well is fully developed,measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method, collecting water samples & getting tested in approved laboratory,including disinfection of tubewell, all complete, including hire & labour charges of air compressor, tools & accessories etc., all as per requirement and direction of Engineer-in-charge. (Ref. CPWD DSR code no.23.12) |
| 19 | Gravel packing in tubewell construction in accordance with IS: 4097,including providing gravel fine/ medium/ coarse, in required grading & sizes as per actual requirement, all complete as per direction of Engineerin-charge. (Ref. CPWD DSR code no.23.8) |
| 20 | Providing and fixing M.S. clamp of required dia to the top of casing/housing pipe of tubewell as per IS: 2800 (part I), including necessary bolts & nuts of required size complete. 200 mm clamp (Ref. CPWD DSR code no.23.14.3 ) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender