Tender For Annual Plan-Cheruvalath Thazhakuni Thode Iyyamkode Perodu Under Thuneri Block Panchayath-Cheruvalath Thazhakuni Thodu Iyyamkode Perodu Under Thuneri Block Panchayath Under Annual Plan 2026-27-General Civil Work
Tender Overview
Project Description
Tender for Annual Plan-Cheruvalath Thazhakuni Thode Iyyamkode Perodu Under Thuneri Block Panchayath-Cheruvalath Thazhakuni Thodu Iyyamkode Perodu Under Thuneri Block Panchayath Under Annual Plan 2026-27-General Civil Work
BOQ
| Sl. No. | Item Description |
| 1 | Thodu construction |
| 2 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete |
| 3 | OD259630/2026-2027:RING BUND Type II Putting up ring bund with earth fill gunny bags of top width 0.60mbottom width 1.0m height 1.0 m side and filling in between with earth to form ring bund andmaintaining the same leak proof till the completion of the work and clearing the site bydismantling the bund after completion of the work. etc. complete |
| 4 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 5 | OD259632/2026-2027:Dry rubble without concrete leveling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc complete as per direction of Engineer in charge . (modified spec 60.7.1 of DAR) |
| 6 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 7 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns |
| 8 | 50.2.26.1:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. |
| 9 | 51.2.3:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade |
| 10 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 11 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender