Tender For - Repair/Maint Of Bleaching Dozers And Connected Accessories And Repair /Maint Of Starter Panel , Starters, Relays, Contactors , Valves Smc Tanks And Connected Works At Admin Site And Lkt Area At Af Stn Bhowali.
Tender Overview
Project Description
Tender for - Repair/Maint Of Bleaching Dozers And Connected Accessories And Repair /Maint Of Starter Panel , Starters, Relays, Contactors , Valves Smc Tanks And Connected Works At Admin Site And Lkt Area At Af Stn Bhowali.
BOQ
| Sl. No. | Item Description |
| 1 | Materal and labor for dismantling existing unserviceable bleaching dozer of any type and size from existing position and Servicing and maintenance of STEQUA 411 AE chlorine dosing applicator, including inspection and reassembling refixing the same after repairing minor parts testing and calibration of chlorine dosing system, including checking of free residual chlorine complete all as specified and directed |
| 2 | Cleaning and descaling of 100-litre chlorine dosing tank, including cleaning of internal cavities all as specified and directed |
| 3 | Repair and replacement of defective water inlet regulators, valves and NRV all as specified and directed |
| 4 | Repair and replacement of defective water outlet regulators, valves and NRV all as specified and directed |
| 5 | Repair/replacement of refill holding assembly and cavity lids all as specified and directed |
| 6 | Repair/replacement of dosing adjustment mechanism all as specified and directed |
| 7 | Replacement of defective level controller and associated accessories all as specified and directed |
| 8 | Replacement of damaged connecting pipes, flexible ducts and fittings all as specified and directed |
| 9 | Replacement of electrical driven pump unit and accessories, all as specified and directed |
| 10 | Supply only STEQUA 411 AE chlorine refill cateridges compatible with existing applicator all as specified and directed |
| 11 | Supply only DPD free residual chlorine test kit with 500 tablets all as specified and directed |
| 12 | Material and labour for comprehensive servicing, repair and maintenance of existing STEQUA 411 AE chlorine dosing system, including dismantling, cleaning and descaling of 100-litre water treatment tank, inspection and repair/replacement of defective water inlet regulator, outlet regulator, overflow valve, drain valve, non-return valve, level controller, sludge level gauge, multi-cavity refill holding assembly, cavity lids, dosing adjustment mechanism, connecting pipes and associated fittings, including replacement of defective components as required, reassembling, testing, calibration and commissioning of the complete system to ensure proper and controlled chlorine dosing, after the above repair works mentioned fron Ser No 01 to 09 complete all as specified and directed by the Engineer-in-Charge. |
| 13 | Supply and replacement of GI tubing medium grade 25 MM Dia galvanised, with all fitting and fixed complete to walls and ceilings or laid in floors all as specified and directed |
| 14 | Supply and replacement Gun-metal, globe or gate valves,25 MM Dia with iron wheel head, screwed both ends for iron pipe and fixed |
| 15 | Material and labor for dismantling of existing Declibac chlorine dozing pump model no 96NGQ51 inspection and fault diagnosis all as specified and directed |
| 16 | Material and labor for cleaning and servicing of complete pump assembly all as specified and directed |
| 17 | Material and labour for repair/replacement of suction valve assembly all as specified and directed |
| 18 | Material and labour for repair/replacement of delivery valve assembly all as specified and directed |
| 19 | Material and labour for repair/replacement of NRV assembly all as specified and directed |
| 20 | Material and labour for repair/replacement of suction and delivery hose all as specified and directed |
| 21 | Material and labour for repair/replacement of electric mortor of same type and size all as specified and directed |
| 22 | Supply and fixing pump head assembly all as specified and directed |
| 23 | Material and labor for gear box servicing all as specified and directed |
| 24 | testing caliberation and commissioning including necessary welding work and necessary fittings for satisfactory working condition all as specified and directed |
| 25 | Material and labour for comprehensive repair and servicing of existing water pressure filteration plant of capacity 22000 LPH including removal of exhausted filter media , cleaning of pressure vessels , replacement of graded quartz sand 1 Cum , gravel 0.8 Cum and activated carbon 1.5 Cum , repair of internal distribution system , replacement of defective stainers , valves pressure guages and connecting pipe lines servicing of backwashing arragements testing and commissioning of complete plant to achieve rated filteration capacity complete all as specified and directed by Engr in charge |
| 26 | Material and labour for comprehensive repair and servicing of existing electronic water level indicator system including dismantling, inspection, fault diagnosis, cleaning and servicing of electronic control panel, repair/replacement of defectivePCB , SMPS,digital display unit sensor/probe assembly, SS electrodes ,connecting cables, terminal blocks, relays, buzzer, selector switches , MCBs, contactors and assossiated electrical accessories as required , including caliberation testing and commissioning of the complete system to ensure accurate water level indication and proper functioning of high level and low level alarms complete all as specified and as directed. |
| 27 | Comprehensive maintenance and servicing of existing plummer 4K model water filteration plant including inspection, dismantling, cleaning and descaling of filter vessels, replacement of exhausted filter media , cleaning replacement of filter cateridges, servicing of pumps, valves pressure guages ,flow meters ,electrical control panel, connecting pipe lines and assosiated accessories sanitization of stiorage tnks, testing of treated water quality ,caliberation, trial run and commissioning of complete plant to achieve designed filteration capacity complete all as specified and directed |
| 28 | Comprehensive maintenance and servicing of existing domestic RO water purifier of 8-litre storage capacity, including dismantling, inspection, cleaning and sanitisation of storage tank, replacement of sediment filter, pre-carbon filter, post-carbon filter, RO membrane, high-pressure pump, pressure switches, solenoid valve, flow restrictor, automatic shut-off valve, UV lamp, SMPS, connecting pipes, fittings and associated accessories as required, including testing of TDS, leakage, water production capacity, reassembling and commissioning of complete system, complete all as directed by Engineer-in-Charge. |
| 29 | Dismantling and removal of damaged/leaking SMC tank panels from bottom of 25000Ltrs capacity, including necessary dismantling of connected fittings and careful handling of serviceable components, complete as directed by the Engineer-in-Charge. |
| 30 | Supply and replacement of SMC tank panels of matching dimensions, thickness, profile and quality, including necessary compatible gaskets, jointing materials, bolts, nuts, washers and accessories, complete all as specified and directed. |
| 31 | Repair of existing SMC tank joints and arresting of leakage by tightening/replacement of defective fasteners and gaskets, resealing of joints with compatible materials, and rectification of minor leaks, complete all as specified . |
| 32 | Reassembly of tank panels, sealing of joints, checking of inlet, outlet, overflow and drain connections, filling and leak testing of the tank, including all labour, tools and tackles, complete as directed by the Engineer-in-Charge. |
| 33 | Material and labor for cement concrete in Foundations, including rafts,footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete type B1 (1:2:4) with 20 MM Graded aggregate complete all as specified and directed |
| 34 | Supply and fixing Cast iron Sluice Valve Class PN 1.6, 80 MM dia inclusing taking down ld damged sluice valve complete all as specified and directed |
| 35 | Supply and fix Gun-metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed of size 40 MM Dia complete all as specified and directed including taking down old unserviceable valve complete all as specified and directed |
| 36 | Supply and replacement of Copper conductor stranded cable 10 Sqmm 3 core complete all as specified and directed |
| 37 | Material and labor for painting complete motor and pump set including base frame after cleaning and removing old paint and rust and other foreign particles by scrubbing by using suitable type sand pappers all as aspecified and directed |
| 38 | Dismantling the existing horizontal multistage centrifugal pump, opening all stages, removing and cleaning the impellers, inspecting and repairing worn cast-iron impellers by suitable welding, grinding and machining wherever technically feasible, checking and rectifying wear-ring clearances, cleaning internal passages, reassembling and refitting the pump, including necessary labour, tools and tackles, alignment, testing and commissioning to achieve satisfactory discharge and pressure, complete as directed by the Engineer-in-Charge. |
| 39 | Complete repair and servicing of existing 20 HP, 3-phase motor starter, including replacement of defective C&S MNX-series contactor of suitable AC-3 rating and coil voltage, checking and servicing of overload relay, auxiliary contacts, control wiring, terminals and operating mechanism, replacement of minor defective components as required, tightening of connections, insulation testing, functional testing and commissioning, complete as directed by the Engineer-in-Charge |
| 40 | Supply, installation, testing and commissioning of a suitable 3-phase electronic soft starter, 415 V, 50 Hz, suitable for a 20 HP (15 kW) pump motor, rated current not less than the motor full-load current and selected as per manufacturer’s recommendations, with adjustable starting voltage and starting time, integral bypass where applicable, complete with necessary compatible MCCB/MPCB or short-circuit protection, contactor, thermal overload protection, control wiring, power wiring, mounting accessories, ferrules, lugs, earthing connections and all other accessories required for proper operation, including connection to the existing motor starter panel, testing and commissioning, complete in all respects as directed by the Engineer-in-Charge after taking down old unserviceable starter of any type and size. |
| 41 | Supply and fix in pump house starter panel board MCCB 3 Pole, 415 V, Adjustable type, 160 Amps with breaking capacity 36 KA after taking down old burnt MCCB complete all as specified and directed |
| 42 | Supply and fix in pump house starter panel board MCCB 3 Pole, 415 V, Adjustable type, 125 Amps with breaking capacity 36 KA after taking down old burnt MCCB complete all as specified and directed |
| 43 | M&L for dismantling, disconnecting and decoupling the existing defective 20 HP, 3-phase, 415 V, 50 Hz induction motor coupled to pump set, transporting to workshop, opening the motor, removing burnt copper winding, cleaning stator slots, rewinding with super enamelled copper conductor of original gauge and turn ratio, providing necessary slot insulation and insulating materials, varnishing and oven drying, overhauling and greasing, replacement of bearings of suitable size, reassembling, transporting back to site, refixing, coupling, alignment, making necessary electrical connections and testing the motor for satisfactory operation, complete all as specified and directed by the Engineer-in-Charge. |
| 44 | M&L for taking out the defective 12.5 HP, 3-phase submersible pump motor from the borewell, disconnecting electrical connections, dismantling the motor, removing the burnt winding, cleaning and preparing the stator, rewinding with suitable grade of insulated copper wire of the original gauge and turns as per the manufacturer's winding data, providing necessary slot insulation and insulating materials, varnishing and baking wherever applicable, reassembling the motor, replacing defective seals and other minor consumable parts as required, testing insulation resistance and winding continuity, checking motor performance, refitting the motor to the pump assembly, lowering into the borewell, reconnecting the electrical supply and testing for satisfactory operation, complete all as specified and directed by the Engineer-in-Charge |
| 45 | M&L for taking out, dismantling and overhauling the existing defective 12.5 HP submersible pump set, including inspection of pump casing, impellers, diffusers, shaft, bushes, bearings, coupling, non-return valve and other internal components; cleaning and removal of scale, silt and deposits; rectification of minor defects; replacement of worn-out bushes, bearings, seals, O-rings, gaskets and other minor components as required; checking shaft alignment and free rotation; reassembling the pump set, testing for satisfactory discharge and pressure, reconnecting with the motor and carrying out trial run, complete all as specified and directed by the Engineer-in-Charge Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 16 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 18 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender