Tender For Consultancy Services For Preparation Of Detail Project Report And Pre-Construction Services For Construction Of Road Dat Bridge-Balbir From Km 0.00 To Km 21.100 To Nh Single Lane With Paved Shoulders Under 109 Reinforced Cement Concrete / 32 Br
Tender Overview
Project Description
Tender For Consultancy Services For Preparation Of Detail Project Report And Pre-Construction Services For Construction Of Road Dat Bridge-Balbir From Km 0.00 To Km 21.100 To Nh Single Lane With Paved Shoulders Under 109 Reinforced Cement Concrete / 32 Brtf / Ce (P) Beacon In Union Territory Of J&K On Qcbs Mode
BOQ
| Sl. No. | Item Description |
| 1 | Estimate of Local Currency CostsI. Remuneration for Local Staff (Including per diem allowance)Professional Staff |
| 2 | Team Leader cum Senior Highway Engineer |
| 3 | Bridge Design Engineer |
| 4 | Highway Design Engineer |
| 5 | Meterial cum Geotechnical Engineer - Geologist |
| 6 | Senior Survey Engineer |
| 7 | Traffic and Road Safety Expert |
| 8 | Environmental Specilist |
| 9 | Quantity Surveyor / Documentation Expert |
| 10 | Land Acquistion Expert |
| 11 | Senior Hyrology & Hyraulic Expert |
| 12 | Utility Expert |
| 13 | Sub-Total-1 |
| 14 | SUB-PROFESSIONAL STAFF :(To be assessed by consultant as per requirement of assignment and one sub professional be a fresh graduate) |
| 15 | Sub-Professional-1 |
| 16 | Sub-Professional-2 |
| 17 | Sub-Professional-3 |
| 18 | Sub-Professional-4 |
| 19 | Sub-Professional-5 |
| 20 | Sub-Professional-6 |
| 21 | Sub-Professional-7 |
| 22 | Sub-Professional-8 |
| 23 | Sub-Professional-9 |
| 24 | Sub-Professional-10 |
| 25 | Sub-Total-2 |
| 26 | Total(Sub Total 1 + Sub Total 2) |
| 27 | SUPPORT STAFF |
| 28 | Office Manager |
| 29 | Typist |
| 30 | Office Boy |
| 31 | Night Watchman |
| 32 | Total: |
| 33 | Transportation (Fixed Costs) Rate/Month |
| 34 | The vehicles provided by the consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc.A. For use of consultants |
| 35 | Total: |
| 36 | Duty Travel to Site(Fixed Costs):Note: Rate quoted includes Hotel charges, travel cost etc. complete. |
| 37 | Duty Travel to Site (LS) |
| 38 | Total: |
| 39 | Office Rent (Fixed Costs)The rent cost includes maintenance, cleaning, repairing etc. (Rate per Month) |
| 40 | Office Rent (Fixed Costs) |
| 41 | Total: |
| 42 | OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs)Rate/Month |
| 43 | Office/ Drafting Supplies |
| 44 | Computers Supplies |
| 45 | Computer Running Costs |
| 46 | Domestic and International Communication |
| 47 | Total: |
| 48 | OFFICE FURNITURE AND EQUIPMENT (Rental) |
| 49 | Office Furniture and Ecquipment (LS) |
| 50 | Total: |
| 51 | REPORTS & DOCUMENTS PRINTING |
| 52 | Monthly report (3 copies per Month) |
| 53 | Inception Report & QAP |
| 54 | Submission of preliminary alignment report including, preliminary cost estimate for preferred alignment along-with cost of land acquisition, traffic study and outcome |
| 55 | Environment and Social Impact Screening Report |
| 56 | Draft Feasibility Report |
| 57 | Final Feasibility Report |
| 58 | Strip Plan with LA Reports |
| 59 | Draft LA and Clearances I Report |
| 60 | Final LA and Clearances I Report |
| 61 | Draft Environmental Assessment Report & RAP |
| 62 | Final Environmental Assessment Report and RAP |
| 63 | Draft Detailed Design Report & Drawings etc. |
| 64 | Draft EMP |
| 65 | Draft Bidding Documents |
| 66 | Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. |
| 67 | Final EMP. |
| 68 | Final Bidding Documents |
| 69 | Draft 3(a),3(A) and 3(D) notification for land acquisition (3 copies each) |
| 70 | LA & Clearances II Report |
| 71 | Total: |
| 72 | Survey and Investigation:A. Topographical Survey (Fixed Rate) |
| 73 | Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer. |
| 74 | Detailed topographic surveys using mobile / aerial LiDAR or better Technology Topographyic survey incl hire cahrges for equipments and supplis of survey teams comprising of project survey field staff etc, inclsive of cost of materials, labours |
| 75 | B. Investigation (Fixed Cost) |
| 76 | Road and Bridge Inventory (through 3D NSV and MBIU) |
| 77 | FWD Test and Pavement Evaluation |
| 78 | Roughness Survey |
| 79 | Axle Load Survey |
| 80 | Material Survey and Investigation (provide quanity considering for Two quarry location on test for coarse agreemegate and one for Fine agrregate) |
| 81 | Sub-grade Investigation (provide quanity considering one sample for CBR or K value at every subgrade/ embankment source say 1 test for evry 5Km depening upon topography) |
| 82 | Traffice Survey incl all sub survey such as axle load survey, O&D survey etc. as per ToR for all propsed alignments. |
| 83 | Special Investigation for Hill Roads for slope stabilisation |
| 84 | Land Acquisition Studies incl GIS Mapping |
| 85 | Any other Investigations/Surveys/ Hydrological Mode for Major Bridges |
| 86 | Sub-Geotechnical/ Soil Investigation (Boring)Note:*Quantities of boring shall be taken from Financial Proposal Form No.V. for financial evaluation, the sequantities and rates quoted by the consultant will be considered. However, payment shall be made on the actual quantity of boring at rates quoted above by the consultant, which may be substantially more or less than the estimated quantities. |
| 87 | a) Boring in all type of soils (other than hard rock) |
| 88 | b) Boring in hard rock |
| 89 | Total: |
| 90 | C. Network Survey and GPR |
| 91 | Network Survey of the existing Highways as a repository for civil works as per directions from Authority./ Provisional sum towards Envirinmental Clearance/ Wildlife Clearance |
| 92 | GPR Survey for detection of under ground utilities |
| 93 | Total: |
| 94 | Cost of Supply and Fixing Boundary pillars |
| 95 | Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed atan interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/ or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum ) |
| 96 | Total: |
| 97 | Land Acquisition Team including support staff and logistics/ transportation.A. Land Acquisition Team including support staff : |
| 98 | Ex-Land Revenue Inspector/ Officer or equivalent (1*6) |
| 99 | Ex-Kanoogo/Girdwar or equivalent (1*6) |
| 100 | Ex-Patwari or Equivalent (1*6) |
| 101 | Typist (2*6) |
| 102 | Peon (1*6) |
| 103 | Number of Land acquisition Teams (One Only) |
| 104 | Grand Total for All Land acquisition Teams(A) |
| 105 | B. Logistics for Land Acquisition Team |
| 106 | Computer including necessary peripherals (2*6) |
| 107 | Printers (2*6) |
| 108 | Vehicles (Bolero or Equivalent) with monthly running limit of 4000 km (1*6) |
| 109 | Number of Land acquisition Teams (One Only) |
| 110 | Grand Total (B) |
| 111 | Grand Total for All Land acquisition Teams and Logistics (A) + (B) |
| 112 | Note: (i) The consultant shall provide one land acquisition expert along with allied team and supporting logistic as envisaged in clause 5.1.5.1 of TOR for each CALA for stretches proposed for DPR preparation.(ii) Details of land acquisition teams including support staff, logistics support for land acquisition teams to be deployed by the consultant for each CALA as detailed above is minimum. However, the consultant has to ensure adequate manpower given to CALA in terms of area under acquisition in the jurisdiction of each CALA in consultation with MORT&H/BRO, to ensure completion of land acquisition proceedings in time frame stipulated in contract agreement. Cost variation in this regard is not admissible. |
| 113 | Estimate of costs for Expatriate consultants (in Indian Rupees)REMUNERATION OF EXPATRIATE STAFF including per diem allowances. |
| 114 | Staff |
| 115 | Sub-Professional-1 |
| 116 | Sub-Professional-2 |
| 117 | Sub-Professional-3 |
| 118 | Sub-Professional-4 |
| 119 | Sub-Professional-5 |
| 120 | Sub-Professional-6 |
| 121 | Sub-Total-I |
| 122 | Mobiliation and Demobilization |
| 123 | A. International Airfares (Fixed costs) |
| 124 | B. Inland Travel in Home Country (Fixed costs) |
| 125 | C. Other Missc expenses (like DA, internal travel expenses other incidentals) |
| 126 | Sub-Total-II |
| 127 | Total (I+II) |
| 128 | Total cost net of Tax |
| 129 | Taxes and Duties |
| 130 | A. Income Tax (Expatriate) |
| 131 | B. Other Taxes/Duties (if any) Specify clearly |
| 132 | Total |
| 133 | Total cost (inclusive of all the taxes) but net of Goods and service Tax**Total cost net of Goods and Service Tax shall be considered for financial evaluation. |
| 134 | Goods and service Tax |
| 135 | TOTAL COSTS (Including GST) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 42 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 43 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender