Tender For Repairs To Runway / Dispersal Area In Aftt Area At Nda Under Ge (Nda) Khadakwasla
Tender Value
89.77 Lakhs
Estimated cost
Bid Submission
15 Dec 2026
27 days left
EMD
1.60 Lakhs
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
khadakwasla → Maharashtra
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repairs To Runway / Dispersal Area In Aftt Area At Nda Under Ge (Nda) Khadakwasla
BOQ
| Sl. No. | Item Description |
| 1 | M&L for preparing black top surfaces of airfield with compressed pressure air jet,scrubbers and brushing with wire brushes for removing all loose dust, dirt, caked mud and cleaning the cracks in surface etc. sweeping with brooms and finally fanning clear surface with gunny bags and making the surface free from dust etc complete all as specified and directed. |
| 2 | M&L for applying evenly uniform coating with Polymer modified emulsion (PME) of RW grade Fog seal/spray treatment by spraying with self-propelled or towed bitumen mechanical pressure sprayer and moping of total liquid (Mixture of Emulsion and water) @ 1.0 kg per sqm after Dilution with water in 1:1 ratio or as per manufacturers instruction whichever is approved by GE and ensure uniform finish of Runway/airfield surface including sealing of all cracks etc all as per manufacturers instruction, MORTHs specification for fog spray/seal and as directed by Engineer-In-Charge.(Note : The work shall be carried out by approved qualified applicator of the Manufacturer of PME.) |
| 3 | M&L for applying evenly uniform coating (Two coats) with Polymer modified emulsion (PME) of RW grade Fog seal/spray treatment by spraying with self-propelled or towed bitumen mechanical pressure sprayer and moping of total liquid (Mixture of Emulsion and water) @ 1.0 kg per sqm after Dilution with water in 1:1 ratio or as per manufacturers instruction whichever is approved by GE and ensure uniform finish of Runway/airfield surface including sealing of all cracks etc all as per manufacturers instruction, MORTHs specification for fog spray/seal complete all as specified and as directed. |
| 4 | M&L for preparing new /existing painted concrete/ bituminous surfaces (road,runway,dispersal,taxi) and painting lines,dashes,letter etc exceeding 10cm wide with applying two coats of water based paint road marking materials/paints upto a uniform finished surface etc all as per MORTH Specifications,white or golden yellow with using road painting/marking machine complete all as specified and directed. |
| 5 | M&L for removing old paint by paint removers or burning off by blow lamps and cleaning with scrapers and number of coats, any width or girth and preparation of previously untreated steel surfaces of any description not otherwise described exc. 10cm width or girth and applying two coats of synthetic enamel paint of approved / standard design pattern and shades of Wind sock post or similar structures over a coat of red oxide / Zinc chrome primer to give an even and smooth surface having no sign of brush marks complete all as specified and as directed. |
| 6 | M&L for preparing new/ old painted bituminous / concrete / plastered surfaces surfaces of any description not otherwise not exc 10cm width or girth and applying two coats of water based paint road marking materials / paints upto a uniform finished surfacet of approved / standard design pattern and shades (Golden yellow, black, white, fiery orange etc) over a coat of primer complete all as specified and directed by Engr-In-Charge. |
| 7 | Supply and install (Fix) SURE-BOND™ Runway Crack Sealing Tape (100cm width, 4.0mm thickness) over sub-grade or surface cracks on asphalt/concrete runways complete all as specified and as directed. The rate shall be all-inclusive and cover: (i) Surface Preparation: Cleaning cracks, removing loose debris, dust, vegetation, and moisture using high-pressure air compressors or heat lances to ensure a completely bone-dry surface.(ii) Material Supply: Delivering and storing the specified tape (Modified Bitumen with Polyester textile carrier, meeting Tensile Strength 25 kN, Softening Point 80°C,.(iii) Fixing & Application: Applying the manufacturer's recommended special binder, pasting the sealing tape centered over the cracks, removing the siliconised protective film, and heavy rolling/pressing to guarantee a 100% waterproof, wrinkle-free bond without air pockets. (iv) Waste & Overlaps: All material wastage, joint overlaps, scaffolding, tools, plant machinery, labor, and safety measures required to complete the job. |
| 8 | Supply and install (Fix) 'RUNPHALT' Elastomeric Solid Rope Joint and Crack Sealant into existing cracks and joints on asphalt or concrete pavement surfaces.The comprehensive \\"Supply and Fix\\" rate must include:(i) Surface Preparation: Thoroughly cleaning out cracks and joint cavities to completely remove loose debris, dirt, and dust using hand tools (such as screwdrivers and whisk brooms) or high-pressure air, including washing/rinsing and ensuring the cavity is completely bone-dry before application.(ii) Material Supply & Handling: Supplying and delivering to the site 'RUNPHALT' Solid Rope Sealant (furnished as a solid elastomeric \\"rope\\" on spools, in 1/4 inch or 1/2 inch\\" thickness, with a melting point of 225°F and VOC <10g/L. Processing thinner cracks via stretching or slicing using razor blades as recommended by the manufacturer.(iii) Fixing & Direct-Heat Melting: Manually inserting and pushing the solid rope sealant (with its protective plastic wrap intact) deep into the crack cavity. Melting the product inside the cavity by applying a direct flame process using a hand-held torch (e.g., Bernzomatic torch) for approximately 20–30 seconds until the material completely liquefies, self-levels, and bonds tenaciously to the pavement walls.(iv) Curing & Protection: Allowing a minimum initial setup time of 20 minutes before any subsequent sealing coats, and guarding the application for a 24-hour full cure before opening to traffic. Includes all waste management, personal protective equipment (PPE/eyewear), specialized tools, and site safety management. |
| 9 | Supply and apply (Fix) 'ASPHA-FLO' Modified Pourable Crack Filler into existing pavement cracks on Runways, Taxiways, Tarmacs, or asphalt roadways.The comprehensive \\"Supply and Fix\\" rate must include:• Surface Preparation: Cleaning out asphalt pavement cracks, removing all loose debris, dust, vegetation, and standing moisture using high-pressure air compressors or mechanical wire brushes to guarantee a clean bonding surface.• Material Supply & Handling: Supplying and delivering to the site 'ASPHA-FLO' pourable crack filler, formulated with a signature-grade modified asphalt emulsion, specialized polymers, and weather-proofing additives. The material must be pre-mixed and fully ready to use straight out of the container with no heating or thermal preparation required.• Application & Fixing: Directly pouring/stuffing the cold-applied modified emulsion into the cleaned asphalt cracks directly from the container. Ensuring the compound completely fills and seals the cavity to guard against weather-driven freeze and thaw cycles, preventing crack propagation into potholes.• Curing & Site Management: Allowing the pourable filler to properly set and cure according to manufacturer specifications before exposing the section to aircraft or vehicular traffic. Includes managing zero-waste operations, contractor portability, cleaning up overspills, personal protective equipment (PPE), and safety control on-site. |
| 10 | Supply and install (Fix) 'RUN-PATCH' Self-Adhesive, Cold-Applied, Polymer Modified, High-Tack Bituminous Spread Sheet Patching System for instant repair, sealing, and waterproofing of potholes, cracks, joints, utility cuts, and manhole surrounds on Runway, Taxiway, and Tarmac surfaces. The comprehensive \\"Supply and Fix\\" rate must include:• Surface Preparation: Repairing and preparing damaged or broken concrete/asphalt pavement surfaces. Cleaning out areas, removing loose debris, dust, vegetation, and standing moisture to ensure proper bonding.• Pre-Filling (Cracks/Potholes >6mm): Providing, placing, and compacting cold aggregate mix filler into any pothole, joint, or crack cavity measuring greater than 6mm in depth/width prior to patch application, bringing the surface level as directed.• Material Supply: Delivering and storing 'RUN-PATCH' 1m x 10m rolls (average thickness 4.0mm) consisting of polymer-modified bitumen reinforced with a high-strength fiberglass grid and an integrated special strengthener layer. Material must meet or exceed all specified indices: Bonding Strength \(\ge \) 0.4 MPa, Low-Temperature Stretch of 5.8mm, Softening Point \(\ge \) 80°C, and Water Impermeability under 0.3 MPa pressure for 30 minutes.• Fixing & Layer Formation: Peeling, positioning, pasting, and firmly embedding the self-adhesive sheet patch directly over the prepared asphalt or concrete surface without requiring specialized trucks or heavy heating equipment. Ensuring full perimeter containment to form a continuous, high-strength waterproof seal.• Site Management: All overlaps, cutting waste, labor, tools, safety apparel (PPE), quality testing compliance, and clearing of site debris complete as per the manufacturer's operational manual. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 16, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 15, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 27 daysDec 17, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 29 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender