Supply Of Computerised Numerically Controlled (CNC) Tandem Under Floor Wheel Lathe(TUFWL) for BG Wheel Sets on turnkey basis with CAMC. Qty. 2 Nos.
Tender Overview
Project Description
Supply Of computerised numerically controlled (cnc) tandem under floor wheel lathe(tufwl) for bg wheel sets on turnkey basis with camc. qty. 2 nos. , design, manufacturing and supply of computerised numerically controlled (cnc) tande m under floor wheel lathe (tufwl) for bg wheel sets alongwith all concomitant accessories conformi ng to technical specification no. cr/ir/cnc- tufwl (bg)/with works/2026 (revision-1) , important fe atures of tender and formats & drawings i.e. section iv,v & vi enclosed.at solapur [ warranty period : 30 months after the date of delivery ] ] , camc of 8 years after expiry of comprehensive warranty period of 24 months from the d ate of ptc for the tufwl.not withstanding the warranty period indicated elsewhere in the tender docu ment the warranty indicated in this schedule shall be taken as overriding and final. [ warranty period : 2 years, amc period: 8 years, rate of discounting: 10 % ] ] , concomitant works (as per section-iv clause no. 4.2.2 ) for the tufwl ] , construction of foundation, installation, testing, commissioning and proving- out on turn key basis for the tufwl ] ] , design, manufacturing and supply of computerised numerically controlled (cnc) tande m under floor wheel lathe (tufwl) for bg wheel sets alongwith all concomitant accessories conformi ng to technical specification no. cr/ir/cnc- tufwl (bg)/with works/2026 (revision-1) , important fe atures of tender and formats & drawings i.e. section iv,v & vi enclosed.at mumbai [ warranty period: 30 months after the date of delivery ] ] , camc of 8 years after expiry of comprehensive warranty period of 24 months from the d ate of ptc for the tufwl.not withstanding the warranty period indicated elsewhere in the tender docu ment the warranty indicated in this schedule shall be taken as overriding and final. [ warranty period : 2 years, amc period: 8 years, rate of discounting: 10 % ] ] , concomitant works (as per section-iv clause no. 4.2.2 ) for the tufwl ] , construction of foundation, installation, testing, commissioning and proving- out on turn key basis for the tufwl ] ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | Design, Manufacturing and Supply of Computerised Numerically Controlled (CNC) Tande m Under Floor Wheel Lathe (TUFWL) for BG Wheel Sets alongwith all concomitant accessories conformi ng to technical specification no. CR/IR/CNC- TUFWL (BG)/WITH WORKS/2026 (Revision-1) , Important Fe atures of Tender and Formats & Drawings i.e. Section IV,V & VI enclosed.at Solapur [ Warranty Period : 30 Months after the date of delivery ] ] |
| 2 | CAMC of 8 years after expiry of comprehensive warranty period of 24 months from the d ate of PTC for the TUFWL.Not withstanding the warranty Period indicated elsewhere in the tender docu ment the warranty indicated in this schedule shall be taken as overriding and final. [ Warranty Period : 2 years, AMC Period: 8 years, Rate of Discounting: 10 % ] ] |
| 3 | Concomitant Works (as per Section-IV Clause no. 4.2.2 ) for the TUFWL ] |
| 4 | Construction of Foundation, Installation, Testing, Commissioning and Proving- out on turn key basis for the TUFWL ] ] |
| 5 | Design, Manufacturing and Supply of Computerised Numerically Controlled (CNC) Tande m Under Floor Wheel Lathe (TUFWL) for BG Wheel Sets alongwith all concomitant accessories conformi ng to technical specification no. CR/IR/CNC- TUFWL (BG)/WITH WORKS/2026 (Revision-1) , Important Fe atures of Tender and Formats & Drawings i.e. Section IV,V & VI enclosed.at Mumbai [ Warranty Period: 30 Months after the date of delivery ] ] |
| 6 | CAMC of 8 years after expiry of comprehensive warranty period of 24 months from the d ate of PTC for the TUFWL.Not withstanding the warranty Period indicated elsewhere in the tender docu ment the warranty indicated in this schedule shall be taken as overriding and final. [ Warranty Period : 2 years, AMC Period: 8 years, Rate of Discounting: 10 % ] ] |
| 7 | Concomitant Works (as per Section-IV Clause no. 4.2.2 ) for the TUFWL ] |
| 8 | Construction of Foundation, Installation, Testing, Commissioning and Proving- out on turn key basis for the TUFWL ] ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 31 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender