Tender For Construction Of Public Toilet At Ghoghla, Diu.
Tender Value
54.06 Lakhs
Estimated cost
Bid Submission
30 Nov 2026
13 days left
EMD
1.08 Lakhs
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Diu → Daman and Diu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Public Toilet At Ghoghla, Diu.
BOQ
| Sl. No. | Item Description |
| 1 | Works |
| 2 | EXCAVATION upto 1.50 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Dense or Hard soil MECHANICALLY but other than hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, cutting vegetation up to 1.5m ht if required and disposing off the excavated stuff upto all lead and lift. Note- All types of soil that can be removed by JCB/ Poclain bucket shall be classified under this item. |
| 3 | EXCAVATION 1.50 to 3.00 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Hard Murrum MECHANICALLY but other than hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, and disposing off the excavated stuff upto all lead and lift. |
| 4 | EXCAVATION 1.50 to 3.00 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Soft rock not requiring blasting but other than hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, and disposing off the excavated stuff upto all lead and lift |
| 5 | EXCAVATION 3.00 to 5.00 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Soft rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, and disposing off the excavated stuff upto all lead and lift |
| 6 | EXCAVATION 3.00 to 5.00 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, and disposing off the excavated stuff upto all lead and lift |
| 7 | FILLING with selected & approved available excavated earth (excluding rock) in excavated pits, trenches, in plinth, sub-base for of roads, drains, manhole, sumps, or where required with approved locally available materials including spreading in layers not exceeding 200mm, watering, ramming, compacting mechanically using 2 ton compactor etc, complete. Measurements for net volume of space occupied by filling. If desired by the engineer-in-charge the contractor shall at his own expense carry out modified proctor compaction test to determine the maximum dry density. The criteria for acceptance of filling shall be compacting to 95% modified Proctor density with use of mechanical roller/rammer etc complete as directed and instructed by Engineer-in-charge. Volume of material filled to be measured for payment. |
| 8 | FILLING with selected & approved Murrum material brought by Contractor from outside client's premises, including Identification of Borrow pits and including Royalty charges & or duties as per requirement of local authority, in foundations, excavated pits, trenches, in plinth, sub-base for of roads, drains, manhole, sumps, or where required with approved locally available materials including spreading in layers not exceeding 200mm, watering, ramming, compacting mechanically using 2 ton compactor etc, complete. Measurements for net volume of space occupied by filling. If desired by the engineer-in-charge the contractor shall at his own expense carry out modified proctor compaction test to determine the maximum dry density. The criteria for acceptance of filling shall be compacting to 95% modified Proctor density with use of mechanical roller/rammer etc complete as directed and instructed by Engineer-in-charge. Volume of material filled to be measured for payment. |
| 9 | Providing and laying RUBBLE SOLING wherever required in foundation and plinth including hand packing fillings interstices with chips and sand. Watering and compacting to consolidated thickness, etc complete as directed by engineer-in-charge |
| 10 | Providing material and labour for laying PLINTH PROTECTION including excavation of 30 cm depth and Filling with dry bricks bats of 20 cm thick and top layers C.C. 1:2:4 ( 1 cement 2 coarse sand: 4 graded stone aggregate 20m nominal size)50mm thk finished in proper grade and slop etc. complete as directed by engineer-in-charge |
| 11 | Carring out plinth treatment to post construction / existing structure by spraying chemical solution for termite control treatmentincluding labour and material consistment with I.S.I specification.Using Chlordene and Chiorpurfiles 20 EC. As Per 6131_paret-II Consentration Weight one percent is recommended i.e one LTR. 20 EC chemical emulsion with 19 liter give 1 % concrentration inclusive of one LTR. chemical emulsion appication at the rate of 5 LTR. chemical / Sqm of surface is recommended as per I.S. treated Plinth area of structure to be measured for payment as directed by engineer-in-charge |
| 12 | Providing and laying PLAIN CEMENT CONCRETE 1:2:4 (1- Cement : 2- Coarse sand : 4- graded stone aggregates 20 mm nominal size) in foundations and superstructure including, machine mixing, leveling compacting, curing and formwork if any, scaffolding, staging etc. complete as directed and instructed by Engineer-in-Charge. Volume of PCC laid to be measured for payment. |
| 13 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.250 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel or form finish ply shuttering , scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Foundations, footings, Base of columns and Mass concrete, as directions of Engineer in charge Complete.Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. |
| 14 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.250 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel or form finish ply shuttering , scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Columns, Pillars posts and struts etc complete as directed by Engineer-incharge. Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. |
| 15 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.250 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel or form finish ply shuttering , scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Lintels, Beams, Girders and Cantilever etc complete as directed by Engineer-incharge.Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. |
| 16 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.200 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel or form finish ply shuttering, scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Slabs, landing, shelves and Cantilever etc complete as directed by engineer-incharge.Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M20 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. |
| 17 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.250 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel or form finish ply shuttering , scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Slabs, landing, shelves and Cantilever etc complete as directed by Engineer-incharge.Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. |
| 18 | Providing, laying and fixing in position REINFORCEMENT High yield deformed bars/TMT/FE500D for R.C.C. works at all levels including cutting, bending and binding with 16 gauge M.S. annealed wire, providing cover blocks of C.M. 1:2 Embedded with binding wire etc. complete. The reinforcement detailing to IS 456 or, if specified by engineer, shall conform to IS: 13920 (Ductile detailing of R. C. Structures), bars as per IS 1786 the rate shall be inclusive of executing such detailing. Laps to be measured shall be as shown in drawing and for reinforcement length longer than available in market. Chairs, pins and laps other than that specified shall not on be measured and paid for. No extra to be paid for height, rate remains same at all levels, complete as per drawings, specification, direction of engineer-incharge. Make: TATA, SAIL, JSW or as approved by engineer-in-charge Complete. |
| 19 | Providing fusion bonded Epoxy coating not less than 175 micron thickness and up to 300 micron to reinforcement bars as per IS- 13620-1993/ASTM-775 M including testing of coating at plant and all taxes as directions of chief engineer in charge Complete. (A) 8mm to 32mm dia bar |
| 20 | Providing material & labour for laying Rebar in Existing Column, Beam and Slab including all dia. Of bars 8mm to 32mm as per drawing and specification as directions of Chief Engineer in charge Complete. Make Hilti or Fischer or its equivalent as approved by engineer-in-charge |
| 21 | Providing material and labor for Structural steel work (Confirming to IS 4923-1997) riveted, bolted or welded in builtup, conventional, Hollow section, etc for all type sections, in framed work, railing work, any type of fabrication work, including cutting, hoisting, fixing in position and applying a priming coat &two coat applying synthetic enamel paint of approved steel primer all complete as per the structural designs and as directions of Engineer- in -Charge Complete. |
| 22 | Providing and constructing white stone Bela masonry block work in superstructure, in courses, using approved quality white stone, laid in cement mortar 1:6 (1 part cement : 6 parts coarse sand), including dressing and proper bonding of stones, filling and packing of joints, maintaining line, level and plumb, and all necessary materials, labour, scaffolding, curing, tools and equipment, complete in all respects as directed by the Engineer-in-Charge. |
| 23 | Providing and laying 10mm thick in single coat CEMENT PLASTER in (i)Cement mortar 1:3 (1-cement:3-sand) at all height/all floors to internal surfaces of all elements, walls, R.C.C. work, Ceiling,[backing coat at places where glazed or ceramic tiles are to be fixed etc]. including hacking of concrete surfaces, racking of joints, scaffolding, curing, providing chicken mesh at all necessary joints, etc. complete. Final finished surface shall be little rough , so it has proper bonding to paint putty.The surfaces to be plastered to be hacked immediately on de-shuttering. The Brick/ RCC surface to be plastered to be cured sufficiently before start of plaster. Initial bare surface area to be Plastered shall be measured for payment unless noted otherwise, etc as directions of Engineer in charge Complete. |
| 24 | Providing and applying premium exterior textured plaster finish over prepared plastered surfaces, using ready-mixed acrylic/cement-based texture coating of approved make and shade. The work shall include surface preparation, cleaning, crack filling, application of primer, textured finish (as per approved pattern such as sand, roller, stucco, or spray texture), and protective weather-resistant top coat wherever specified. The finished surface shall be uniform in texture, free from cracks, undulations, peeling, and discoloration, complete in all respects as per the architect's instructions. |
| 25 | Providing material and labor for applying Two coats of gypsum upto desired thickness for getting undulation free surface and accurate plumbness in walls. including providing grooves as per architectural drawings at all the edges of windows/Doors with neat finish on new/existing wall surface to give an even shade including thoroughly brushing the surface free from mortar dropping and other foreign matter and sand papered smooth.make the surface uniform and levelled and must be without any undulation as directed by engineer in charge complete.Make: Diamond gypsum or as approved by engineer-in-charge. |
| 26 | Providing material and labor for applying Two coats of acrylic putty upto desired thickness for getting undulation free surface and accurate plumbness in walls. including providing grooves as per architectural drawings at all the edges of windows/Doors with neat finish on new/existing wall surface Work includes surface cleaning, removal of loose particles, minor leveling, and application of putty in one or more coats to accurately achieve the required thickness. After proper curing, the surface will be sanded to a smooth, even finish suitable for painting. Thickness will be checked for accuracy throughout the application to ensure compliance with project specifications. |
| 27 | Providing material & labour for Internal Wall painting (two coats) with Luxury Emulsion of approved brand and manufacture including suitable primer coat on undecorated wall surface to give an even shade including throughly brushing the surface free from mortar droppings and other foreign matter and sand papered smooth. as directed by engineer in charge complete. One component waterborne 100% pure acrylic interior eggshell emulsion that must offer protection against different varieties of bacteria and fungus. Paint should free of HCHO, APEO and have crack bridging property of min 0.9 mm with class 1 flame spread resistance The product shall have a Volume Solids of minimum 35%The product shall be independently tested and approved for properties alike resistance to bacterial and fungal species, crack tolerance and flame spread resistance.The coating shall contribute to satisfying the following credit(s): Indoor Environmental Quality (IEQ) under LEED® 2009 Environmental Quality (EQ) and Materials and Resources (MR) under LEED® v4This product shall have a VOC limit not more than 24 g/lit. The product can be like Asian paint Royale series or approved equivalents.Two Coats of above paint should be applied using conventional Roller / Airless spray at the site after application and drying of applied Putty-Primer. For measurement of painting items the area painted shall be considered without any multiplication factor for different kinds of surfaces painted. Rate shall be quoted accordingly. All painting items final finish shall be as per manufacturer'sspecification as per acceptance of Engineer in charge /Architect. No extra payment shall be made for extra/over coat if required.The rate shall be inclusive of providing bamboo scaffoldingMake: Jotun,Asian Paints, Berger Paints, Dulux Paints or equivalent.Guidelines for application1. Surface Preparation - Inspection: Assess the wall surface for defects like cracks, moisture, or old paint layers. All imperfections must be fixed before starting the painting process. - Cleaning: Clean the wall to remove dust, grease, and loose particles. Use a mild detergent solution or a vacuum to ensure a clean surface. - Repair: Fill cracks, holes, and other imperfections with a suitable filler (e.g., putty or spackle). Sand the area smooth after drying. - Priming: Apply a suitable primer to the wall to ensure proper adhesion of the artistic paint. Choose a primer based on the wall material (e.g., masonry, drywall, plaster). Allow the primer to dry according to the manufacturer's instructions. 3. Application Process - Base Coat: - Apply a base coat of paint, using a roller for large areas and a brush for edges and corners. Choose a base color that complements the final artistic design. - Allow the base coat to dry completely - Artistic Painting: - As per details provided by architect, Plan the design by sketching it lightly on the wall with a pencil or chalk & get necessary approval from architect or engineer-in-charge. Post approval proceed for final application. 4. Finishing - Sealing (Optional): Apply a clear sealer or varnish over the artwork for added protection, a matte, satin, or gloss finish based on the desired effect.6. Quality Standards - Adhesion: Paint should adhere firmly to the wall without peeling or flaking. - Finish: The final surface should be even, free of brush marks, and match the intended artistic design. - Durability: The painted surface should withstand normal wear and cleaning without damage Please Enable Macros to View BoQ information |
| 28 | Providing material & labour for Internal Wall painting (two coats) with Luxury Emulsion of approved brand and manufacture including suitable primer coat on undecorated wall surface to give an even shade including throughly brushing the surface free from mortar droppings and other foreign matter and sand papered smooth. as directed by engineer in charge complete. One component waterborne 100% pure acrylic interior eggshell emulsion that must offer protection against different varieties of bacteria and fungus. Paint should free of HCHO, APEO and have crack bridging property of min 0.9 mm with class 1 flame spread resistance The product shall have a Volume Solids of minimum 35%The product shall be independently tested and approved for properties alike resistance to bacterial and fungal species, crack tolerance and flame spread resistance.The coating shall contribute to satisfying the following credit(s): Indoor Environmental Quality (IEQ) under LEED® 2009 Environmental Quality (EQ) and Materials and Resources (MR) under LEED® v4This product shall have a VOC limit not more than 24 g/lit. The product can be like Asian paint Royale series or approved equivalents.Two Coats of above paint should be applied using conventional Roller / Airless spray at the site after application and drying of applied Putty-Primer. For measurement of painting items the area painted shall be considered without any multiplication factor for different kinds of surfaces painted. Rate shall be quoted accordingly. All painting items final finish shall be as per manufacturer'sspecification as per acceptance of Engineer in charge /Architect. No extra payment shall be made for extra/over coat if required.The rate shall be inclusive of providing bamboo scaffoldingMake: Jotun,Asian Paints, Berger Paints, Dulux Paints or equivalent.Guidelines for application1. Surface Preparation - Inspection: Assess the wall surface for defects like cracks, moisture, or old paint layers. All imperfections must be fixed before starting the painting process. - Cleaning: Clean the wall to remove dust, grease, and loose particles. Use a mild detergent solution or a vacuum to ensure a clean surface. - Repair: Fill cracks, holes, and other imperfections with a suitable filler (e.g., putty or spackle). Sand the area smooth after drying. - Priming: Apply a suitable primer to the wall to ensure proper adhesion of the artistic paint. Choose a primer based on the wall material (e.g., masonry, drywall, plaster). Allow the primer to dry according to the manufacturer's instructions. 3. Application Process - Base Coat: - Apply a base coat of paint, using a roller for large areas and a brush for edges and corners. Choose a base color that complements the final artistic design. - Allow the base coat to dry completely - Artistic Painting: - As per details provided by architect, Plan the design by sketching it lightly on the wall with a pencil or chalk & get necessary approval from architect or engineer-in-charge. Post approval proceed for final application. 4. Finishing - Sealing (Optional): Apply a clear sealer or varnish over the artwork for added protection, a matte, satin, or gloss finish based on the desired effect.6. Quality Standards - Adhesion: Paint should adhere firmly to the wall without peeling or flaking. - Finish: The final surface should be even, free of brush marks, and match the intended artistic design. - Durability: The painted surface should withstand normal wear and cleaning without damage Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 16, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 30, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysDec 02, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender