Tender For Construction Of New Oht 60000 Litres And Providing Line & Functional Household Tap Connection At Srilankan Tamil Refugees At Kottapattu In Tiruchirappalli District
Tender Value
84 Lakhs
Estimated cost
Bid Submission
30 Nov 2026
13 days left
EMD
84000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Tiruchirappalli → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of New Oht 60000 Litres And Providing Line & Functional Household Tap Connection At Srilankan Tamil Refugees At Kottapattu In Tiruchirappalli District
BOQ
| Sl. No. | Item Description |
| 1 | Construction of NEW OHT 60000 Liters in at Srilankan Tamil Refugees at Kottapattu Tiruchirappalli District.pkg 03 Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B |
| 2 | Second depth 2.00 m - Below |
| 3 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 4 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete. |
| 5 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers.Below GL |
| 6 | Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete. |
| 7 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete |
| 8 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. Below GL |
| 9 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete. |
| 10 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B |
| 11 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers. |
| 12 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete. |
| 13 | Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete |
| 14 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete. |
| 15 | Refilling the foundation with excavated earth including watering and consolidation etc., complete. |
| 16 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.For column 0-2.65M |
| 17 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete. |
| 18 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.First brace Beam |
| 19 | Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete |
| 20 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete. |
| 21 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.(3.10-3.30) |
| 22 | Square Column (3.30 - 4.30) |
| 23 | Square Column (4.30 - 5.30) |
| 24 | Square Column (5.30 - 5.75) |
| 25 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating Square Column (3.02 - 4.50) |
| 26 | Square Column (4.50 - 5.75) |
| 27 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.5.75-6.20 |
| 28 | Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete |
| 29 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.5.75-6.20 |
| 30 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.Square Column (6.20 - 6.30) |
| 31 | Square Column (6.30 - 7.30) |
| 32 | Square Column (7.30 - 8.30) |
| 33 | Square Column (8.30 - 8.85) |
| 34 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating 6.20-6.85 |
| 35 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.8.85-9.30 |
| 36 | Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete |
| 37 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.Third Brace beam (8.85-9.00) |
| 38 | Third Brace beam (9.00 - 9.30) |
| 39 | Landing Beam Projection (8.85 - 9.00) |
| 40 | Landing Beam Projection (9.00 - 9.30) |
| 41 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.Square Column (9.30 - 10.30) |
| 42 | Square Column (10.30-11.14) |
| 43 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete.9.30-11.14 |
| 44 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.Floor (Grid) BEAM - (11.14-11.30) |
| 45 | Centering Rate plain surface (11.30 - 11.59) |
| 46 | Centering Rate plain surface (11.14 - 11.30) |
| 47 | Centering Rate plain surface (11.30 - 11.59) |
| 48 | Floor Slab Bottom including working space (11.59 - 11.59) (5.69+0.90+0.90 =7.49 dia) |
| 49 | Floor Slab side (0.00 - 0.26) Chainage Height (11.59-11.85) |
| 50 | Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete |
| 51 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating 11.14-11.85 |
| 52 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.Curv. Surface haunch (slanding) (11.85 -12.30) |
| 53 | Curv. Surface Tank Side wall outer (12.30-13.30) |
| 54 | Curv. Surface Tank Side wall inner (13.30-14.30) |
| 55 | Curv. Surface Tank Side wall inner (14.30-14.89) |
| 56 | Curv. Surface Tank Side wall inner (14.89-15.30) |
| 57 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating Water Tank Side Wall (11.85 - 13.50) |
| 58 | Water Tank Side Wall (13.50-15.30) |
| 59 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete.Cover Slab Bottom (15.30-15.30) |
| 60 | Tank cover slab side wall (curved) (15.30-15.485) |
| 61 | Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete |
| 62 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete. 15.30-15.485 |
| 63 | Providing PVC ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes and cowl etc., complete., |
| 64 | Providing manhole cover of size 0.60 m X 0.60 m in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges etc., complete., |
| 65 | Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc., to required height and clear width of 4Scm consisting of two Nos. of ve~ical post of 10cm x lScm and step slab of 25mm x 25mm etc., complete. |
| 66 | Fabrication, supply, delivery and fixing of outside MS Ladder of 45cm clear wide made out of 50 mm x 50 mm x 60 mm MS angle for both sides and for steps at 30 cm C/C welded jointed etc., for I staging from GL to Fst level brace (weight 4.5kg/m) Iind and IIIrd staging upto floor slab and IVth staging from floor slab to roof top. Supply, delivery and fixing of 32 mm GI pipes medium for hand rails from I stage to IVth stage. RCC M30 Grade mix for Landing slab 5 nos. at Ground Level - 1 No. and abouve Ground Level - 4 Nos. Supply and fixing of 32 mm GI pipe medium for hand rails for the Landing slab. Supplying and fixing of MS base plate of 100 mm x 100mm x 6 mm thick for fixing Anchore fastener bolt for fixing of hand rails at Landing Slab and MS Ladder providing locking arrangements with two coats of approved enamel paint over one coat of red oxide paint as per approved Type Design and as directed by TWAD board officers. |
| 67 | Exterior Emulsion Paint two coats with approved exterior emulsion paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including |
| 68 | Towards cost and supply of plumbing materials for tank inlet, outlet, scour and over flow etc.,65mm dia GI pipes for inlet connection |
| 69 | 65mm dia GI pipes for over flow and RWH |
| 70 | 65mm dia GI pipes for delivery pipe. |
| 71 | 50mm dia GI pipes for scour pipe. |
| 72 | 65mm dia GI Elbow |
| 73 | 65mm dia GI Coupler |
| 74 | 75 X 63mm dia PVC Reducer |
| 75 | 65mm dia GI Flange Set |
| 76 | 65mm dia GM Gate Valve |
| 77 | 75mm PVC Threaded Adopter |
| 78 | Geophysical Investigation charges |
| 79 | Drilling of 180mm dia Bore well upto Recommended depth in Sedimentary area alluvial soil including all charges etc complete., |
| 80 | Drilling of 180mm dia Bore well upto Recommended depth in Hard Rock area including all charges etc complete., |
| 81 | Reming from 150mm dia pilot bore into 300mm dia bore upto 60m depth etc., |
| 82 | Supply of 180mm Pvc Cs Casing pipes including transpotation charges. |
| 83 | Supply of 180mm Pvc Cs Screen Casing pipes including transpotation charges. |
| 84 | Flushing with bore of 600CFM Compressor engaged including fuel,transfort etc,complete |
| 85 | Labour charges for inserting the PVC Casing pipe assembly with slot and without slots including jointing the pipe etc,.complete |
| 86 | 5HP Submersible Pumpset (100 x 125 ) |
| 87 | Conrol panel board |
| 88 | 20mm GI H-Nipple |
| 89 | 25mm GI Pipe |
| 90 | 25mm GI TEE |
| 91 | 4sqmm mulitistrand copper wire |
| 92 | 50mm GI elbow |
| 93 | 50mm GI clampset |
| 94 | 50MM Flange set |
| 95 | 50mm GM Gate valve |
| 96 | 50mm Non Return valve |
| 97 | 50mm GI Pipe |
| 98 | 50mm UPVC pipe for pumpset |
| 99 | Nylon Rope |
| 100 | 50mm GI adopter coupling |
| 101 | 180mm ms borecover plate |
| 102 | Reels insulator |
| 103 | 600mm x 600mm plywood |
| 104 | Erection of Submersible Pumpset |
| 105 | Solvent cement |
| 106 | Pedastal |
| 107 | Construction of sump .Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification |
| 108 | Supplying and filling in basement with filling m-Sand in layer of not more than 15 cm thick well rammed etc., complete. |
| 109 | Cement concrete 1:4:8 mix ( one cement four m-sand and eight aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication |
| 110 | Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification. |
| 111 | Supplying and Fabricating and placing in position MS steel or Ribbed or Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with standard specification |
| 112 | Reinforced Cement Concrete 1:1 1/2:3 (one cement, two R.Sand andOne and half hard broken stone jelly) using 20mm jelly for fabricating charges centering and shuttering for all RCC works including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. |
| 113 | Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete . |
| 114 | Towards the cost for inner and outer Ladder |
| 115 | Provision for Name Board etc complete |
| 116 | Providing Distribution Line & Functional Household Tap Connection at Kottapattu Srilankan Tamil Refugges Camp at Tiruchirappalli District,Supplyof 63mm OD PVC 4Ksc pipe |
| 117 | Earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by TWAD Board Officer. |
| 118 | Lowering and laying the PVC Pipes and specials to trench , laying to proper grade and alignment, Jointing with PVC coupler and specials fixing with Solvent cement paste etc (P248) |
| 119 | Refilling with excavated soil complying with standard specification in layers of 15 cm thick well rammed and consolidated after pipes and specials are laid and tested. (P275) |
| 120 | Supplyof 75mm OD PVC 6Ksc pipe |
| 121 | Earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by TWAD Board Officer. |
| 122 | Lowering and laying the PVC Pipes and specials to trench , laying to proper grade and alignment, Jointing with PVC coupler and specials fixing with Solvent cement paste etc (P248) |
| 123 | Refilling with excavated soil complying with standard specification in layers of 15 cm thick well rammed and consolidated after pipes and specials are laid and tested. (P275) |
| 124 | 63mm PVC Bend |
| 125 | 63mm PVC Tee |
| 126 | 63mm End cap |
| 127 | PVC Adhesive Sollution |
| 128 | Provision For PVC Pipe 4 meter length per FHTC )HSC Connection in DI Mains for Water Supply Scheme - Providing cost and supply of 63mm x20mm dia PVC saddle piece with bolt and nut with rubber bush under IS 7834 / 1987 |
| 129 | Brass Ferrule 15mm WD - M 0800 |
| 130 | Fixing Ferrule WD - W0743 |
| 131 | 15mm 1pm flow control |
| 132 | Providing cost and supply of 20mm dia UPVC Bend under IS 10124 / 1982 20mm |
| 133 | Providing cost and supply of UPVC Coupler under IS 10124 / 1982 20mm |
| 134 | Providing cost and supply of 20mm dia UPVC Pipe |
| 135 | Earthwork Excavation for 20mm PVC pipeLaying work including cost of work as per Standard Specifications 20B |
| 136 | Refilling as per standard specifications 20B (in Rm) |
| 137 | Labour charges for Laying & Jointing 20mm pipe in Excavated Trench in Proper Camber |
| 138 | Supply & Jointing 15mm SS / brass tap (Local Rate) |
| 139 | Cutting 20mm dia UPVC pipe |
| 140 | Cost and Supply of CC Platform and 0.15m X 0.15m Stand post (0.90m)with soak pit |
| 141 | Geophysical Investigation charges |
| 142 | Drilling of 180mm dia Bore well upto Recommended depth in Sedimentary area alluvial soil including all charges etc complete., |
| 143 | Drilling of 180mm dia Bore well upto Recommended depth in Hard Rock area including all charges etc complete., |
| 144 | Reming from 150mm dia pilot bore into 300mm dia bore upto 60m depth etc., |
| 145 | Supply of 180mm Pvc Cs Casing pipes including transpotation charges. |
| 146 | Supply of 180mm Pvc Cs Screen Casing pipes including transpotation charges. |
| 147 | Flushing with bore of 600CFM Compressor engaged including fuel,transport etc,complete |
| 148 | Labour charges for inserting the PVC Casing pipe assembly with slot and without slots including jointing the pipe etc,.complete |
| 149 | 5HP Submersible Pumpset (100 x 125 ) |
| 150 | Conrol panel board |
| 151 | 20mm GI H-Nipple |
| 152 | 25mm GI Pipe |
| 153 | 25mm GI TEE |
| 154 | 4sqmm mulitistrand copper wire |
| 155 | 50mm GI elbow |
| 156 | 50mm GI clampset |
| 157 | 50MM Flange set |
| 158 | 50mm GM Gate valve |
| 159 | 50mm Non Return valve |
| 160 | 50mm GI Pipe |
| 161 | 50mm UPVC pipe for pumpset |
| 162 | Nylon Rope |
| 163 | 50mm GI adopter coupling |
| 164 | 180mm ms borecover plate |
| 165 | Erection of Submersible Pumpset |
| 166 | Solvent cement |
| 167 | Pedastal |
| 168 | Name board |
| 169 | Photographic Charges |
| 170 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 16, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 30, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysNov 30, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 13 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender