Tender For Construction Of Link Road From Tathol To Dayal In Km. 0/00 To 2/00. (Sh:- Removal Of Formation Deficiency In Km. 1/150 To 1/285, Construction of 900Mm Dia Reinforced Cement Concrete Hpc With Wing Walls At Rd 0/885, 1/00 & 1/135 & providing
Tender Overview
Project Description
Tender for Construction Of Link Road From Tathol To Dayal In Km. 0/00 To 2/00. (Sh:- Removal Of Formation Deficiency In Km. 1/150 To 1/285, Construction of 900Mm Dia Reinforced Cement Concrete Hpc With Wing Walls At Rd 0/885, 1/00 & 1/135 & providing and laying Gsb In Km. 0/00 To 1/00). Under Mmgsy.
BOQ
| Sl. No. | Item Description |
| 1 | Excavation in soil in hilly area by machanical means including cutting and trimming of side slopes and disposal of excavated earth with a lift upto 1.50mtr. And a lead upto 20.00 mtr. as per technical specification Clause 1603.1. ( one six zero three point one) and MORD specification including carriage of all labour equipment and materials to various location of site through all modes of transportations in all lead, lift and all incidental charges. all work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erossions, damage to hill side, water pollutions etc. and to protect stability of hill side rock work shall be executed with chiseling, wedging out rock, where blasting is prohibited).All earth work in excavation including rock excavation shall be carried out true to lines, grades, side slopes, width, camber super elevations and leyels as shown on the drawing or as directed by the Engineer-in-Charge. The recovery of useful stone whether usefull or not is 174.33 cubic meter in all cases falling which recovery @ Rupees 300/- only (Rupees three hundereed only) per cubic metre shall be effected on prorata basis. Stacking of materials useful for construction at suitable site and safe disposal of unserviceable cut material in specified manners, trimming, filling of unevenness blindages and finishing of the road to specified dimensions as directed by the Engineer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage rain and other cases, it shall be removed by the suitable diversion, bailing out or dewatering as directed and the area of the foundation or embankment shall be kept dry. Any loss to the public or private property during the course of execution shall be the sole responsibility of the contractor, which shall have to be duly compensated by him at his own cost of all cases. |
| 2 | Earthwork in excavation for all type of road structures such as retaining wall, breast wall and parapets etc. in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock chiesling / wedging out rocks (where blasting is prohibeted) as per drawing and technical specification true to lines and grades. Dimensions and other particulars as per drawing and Technical Specification Clause 305.1(Three hundred Five point One) including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and stacking of materials useful for construction at suitable sites and safe disposal of unserviceable excavated materials in specified manners to dumping site (to be arranged by the contractor) including trimming, dressing of sides and bottom, filling of unevenness blindages, backfilling in trenches with excavated suitable material and finishing of the road to specified dimensions or as directed by the Engineer-in-Charge. All work of excavation by blasting shall be carried out by taking all necessary precautions against soil erosions, damage to hill side, water pollutions etc., and to protect stability of hill side rock. Any loss to the public or private property during the course of execution shall be the sole responsibility of the contractor, which shall have to be duly compensated by him at his own cost of all cases. |
| 3 | Providing and Laying concrete 1:4:8 (one cement isto four sand isto eight graded stoe aggregate 40 mm (forty milimeters) nominal size for plain reinforced concrete mechanically mixed and viberated in open foundations including the cost of form work complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 (eight hundred two,eight hundred three,one thousand two hundred two & one thousand two hundred three) including carriage of all labour equipments and material to various location through all modes of transportation in all leads and lifts as per the direction of the Engineer-in-charge. |
| 4 | Providing and Laying concrete 1:3:6 (one cement isto three sand isto six graded stone aggregate for plain reinforced concrete mechanically mixed and viberated in open foundations including the cost of form work complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 (eight hundred two,eight hundred three,one thousand two hundred two & one thousand two hundred three) including carriage of all labour equipments and material to various location through all modes of transportation in all leads and lifts as per the direction of the Engineer-in-charge. |
| 5 | Providing and laying (to level or slope) reinforced cement concrete pipe NP2- 900 mm (nine hundred milimeter) diameter for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 (one cement isto two sand) but excluding excavation, protection work, back filling, concrete and masonry work in head walls and parapets as per technical specification clause 1108(one thousand one hundred eight), or as directed by the Engineer-in-Charge including carriage of materials with in all leads and lifts and other incidentals. |
| 6 | Providing weep holes in brick masonry/stone masonry/plain reinforced concrete abutment, wing wall, return wall with 100mm (one hundred millimeter) dia PVC pipe extending through the full width of the structure with slope of 1:20 (One verticle isto twenty horizontal) towards drawing face complete as per drawing and technical specification clause 614, 709, 1204.3.7(six hundred fourteen, seven hundred nine, one thousand two hundred four point three point seven) as per MORD specification including carriage of all labour, equipment and material to various location through all modes of transportation in all leads lifts and all incidental charges. |
| 7 | Backfilling of Granular material behind abutment, wing wall and return wall, breast walls, retaining walls and parapets up to all heights, depths and levels complete as per drawings and MORD technical specification clause 1204.3.8 (one thousand two hundred four point three point eight) , including carriage of all labour equipment and materials to various location of site through all modes of transportations in all leads lifts and all incidental charges. |
| 8 | Preparation of sub grade by dressing to camber (Earth work for the cutting involved for sub grade to be paid for separately depending upon the classification of soil completed as per HPPWD specification and as per MORD specification and as per direction of Engineer in charge including carriage of all labour equipments and materials to various locations through all modes of transportation in all leads lifts and all incidental charges. |
| 9 | Consolidation of sub grade with road roller including making good the undulation etc. with earth or quarry soil etc. and re-rolling the sub-grade completed as per HPPWD specification and as per MORD specification and as per direction of Engineer in charge including carriage of all labour equipments and materials to various locations through all modes of transportation in all leads lifts and all incidental charges. |
| 10 | Construction of granular sub base by providing well graded matrial , spreading in uniform layers with tractor mount grader on prepared surface , mixing by mix in place method with ratovator at OMC, and compacting with three wheel 80-100 kn static roller to achieve the desired density, complete as per Technical Specification Clause 402 and as per the direction of Engineer-in -Charge including carriage of material within all leads, lifts and other incidentals. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender