Tender For Complete Repairing Of 400Kw, 6.6Kv, 3Phase Induction Motor Sl. No. 3F6607947 For Mmv, Complete Repairing Of 250Amps, Andrew Yule Make 6.6Kv Flp Vcb And Complete Repairing Of 315Kv, 6.6Kv/550V Andrew Yule Make Flp Transwitch Unit Of Khottad
Tender Overview
Project Description
Tender for Complete Repairing Of 400Kw, 6.6Kv, 3Phase Induction Motor Sl. No. 3F6607947 For Mmv, Complete Repairing Of 250Amps, Andrew Yule Make 6.6Kv Flp Vcb And Complete Repairing Of 315Kv, 6.6Kv/550V Andrew Yule Make Flp Transwitch Unit Of Khottadih Colliery And Rotor Shaft Replacement & Rewinding Of Cg Make 40 Hp, 3 Phase, 550 Volt, 960 Rpm Taper Shaft Induction Motor And Repairing Of Electroteknica Make 11Kv, 400 Amps, 3 Phase Vacuum Circuit Breaker At Pit No. B Under Pandaveswar Colliery
BOQ
| Sl. No. | Item Description |
| 1 | Complete repairing of 400KW, 6.6kV, 3Phase induction Motor Sl. No. 3F6607947 for MMV of Khottadih Colliery . (Inclusive of EPF/CMPF) |
| 2 | Dismantling of complete motor. |
| 3 | Cleaning & decarbonising of core slot cleaning. |
| 4 | Supply of electrolyte grade super enamelled copper wire. |
| 5 | Insulation of F-class insulation materials. |
| 6 | Supply of tape suitable for H.T. Grade. |
| 7 | Supply of nimex paper for starter core. |
| 8 | Supply of varnish suitable for HT motor. |
| 9 | Supply of thinner suitable for HT motor. |
| 10 | Cost of D.E. bearing no NU321 ECJ/C3. |
| 11 | Cost of N.D.E. bearing no: 6321 – C3. |
| 12 | Taking out of coils from stator slots. |
| 13 | Formation of coils with converted DG. |
| 14 | Inter layer insulation of the coils. |
| 15 | Labour charge. |
| 16 | Inserting of the coils into the core slots. |
| 17 | Fabrication of both sides bearing housing. |
| 18 | Final assembling of the motor. |
| 19 | Less for scrap value |
| 20 | Overhead and profit @10% |
| 21 | Transporting charge to and fro |
| 22 | Complete repairing of 250Amps, Andrew yule make 6.6kV FLP VCB of Khottadih Colliery. (Inclusive of EPF/CMPF) |
| 23 | Basbar terminal. |
| 24 | Basbar copper plate 5’x ½ “ x ¾ “ |
| 25 | Height thing 3.3KV Grade. |
| 26 | Supply & fitting vacuum bottle. |
| 27 | E/Leakage relay 3.3KV/110V. |
| 28 | LED lamp etc. |
| 29 | C.B.C.T.C. |
| 30 | Overload assembly. |
| 31 | C.T. 100/5. |
| 32 | P.T. moulded 6.6KV/110V |
| 33 | Isolator repairing. |
| 34 | Wiring wire H.T. Grade. |
| 35 | Hardware materials. |
| 36 | Testing & painting. |
| 37 | Repairing charge. |
| 38 | Overhead and profit @10% |
| 39 | Transporting charge. |
| 40 | Complete repairing of 315KV, 6.6kV/550V Andrew yule make FLPTranswitch Unit of Khottadih Colliery. (Inclusive of EPF/CMPF) |
| 41 | Dismantling of coil from core weightiest |
| 42 | Gas kit nuts/bolts and other hardware Materials |
| 43 | Silver brazing electrodes D/A oxygen etc |
| 44 | Fitting of re-formed coils on the limes with required insulation & necessary coil connection. |
| 45 | Dry-up & testing T S Unit(Transformer) |
| 46 | Cleaning & decarburizing of old primary conductor. |
| 47 | Cleaning & decarburizing of old Secondary conductor. |
| 48 | Providing New conductor. |
| 49 | Re-insulation of primary conductor with DGC/Nomex insulation with class ‘F’ materials (WT. of nomex required per kg hare conductor at a rate Rs. 155/- per Kg of bare conductor.(Wt. Of bare conductor will be 5% less due to old nomex/DGC insulation lopping.) |
| 50 | Re-insulation of Secondary conductor with DGC/Nomex insulation with class ‘F’ materials (WT. of nomex required per kg hare conductor at a rate Rs. 155/- per Kg of bare conductor.(Wt. Of bare conductor will be 5% less due to old nomex/DGC insulation lopping.) |
| 51 | Reformation of disc of type primary as per old coils. |
| 52 | Reformation of disc of type secondary as per old coils. |
| 53 | Thinner & varnish including backing dry out recommended temperature. |
| 54 | Overload and profit @10% |
| 55 | Transporting charge. |
| 56 | Less for scrap value. |
| 57 | Repairing of Electrotecknica Make 11 kV, 400 amps Vacuum Circuit Breaker at surface sub-station for smooth power supply at Pit No. B under Pandaveswar colliery. (Inclusive of EPF/CMPF) |
| 58 | Supply of Numerical relay with all protection |
| 59 | Current transformer |
| 60 | Side Operated manual mechanism |
| 61 | Complete Servicing |
| 62 | OH & Profit @ 10% |
| 63 | Complete Repairing/rewinding of 40HP 960RPM, 550V CG make induction motor at Pandaveswar colliery. (Inclusive of EPF/CMPF) |
| 64 | Super Enamelled copper wire. |
| 65 | Insulating Materials. |
| 66 | Cost of glass lead with socket. |
| 67 | Wooden forma for making coils. |
| 68 | Cost of thinner & varnish. |
| 69 | Materials required for cleaning de-carbonising of stator & rotor washing, grinding if bearing & painting. |
| 70 | Cost of dismantling of broken rotor shaft by hydraulic puller. |
| 71 | Cost of new rotor shaft (EN-24) |
| 72 | Cost of making of rotor shaft as per dismantling old original rotor shaft. |
| 73 | Re-winding charges. |
| 74 | Cost of refitting of new shaft in the rotor using hydraulic puller stator & rotor assembly with test. |
| 75 | Both side ends cover welding, machining & locking. |
| 76 | Cost of ball bearing (6312) |
| 77 | Cost of body bolts & nuts. |
| 78 | Less for scrap value. |
| 79 | Overhead and profit @10% |
| 80 | Transporting charge. |
| 81 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.