Bids Are invited for Custom Bid For Services - Installation Of Structural Supports And Shielding Walls Erection Of Embedded Pipelines And Hook Up Of Existing Potentially Active Process Pipelines Inspection And Testing Works In The Radioactive Area At
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - Installation Of Structural Supports And Shielding Walls Erection Of Embedded Pipelines And Hook Up Of Existing Potentially Active Process Pipelines Inspection And Testing Works In The Radioactive Area At Wip Trombay - Platform Fabrication For Maintenance Of Piping Gadgets, Pipe Line Protection Structures With Walkway Using Ss 304/Mild Steel Material & Insulation Protection Structure Ss304 Channels, Ss304 Angles, Ss304 Plates For Piping And Equipment Installation Works , Procurement, Testing (From Nabl Approved Lab) And Inspection Of Ms Raw Materials And Further Preparation & Approval Of Drawing, Fabrication, Dp Testing, Inspection, Descaling, Shot Blasting, Painting And Installation Of 25Mm Thick Portable Shielding Walls For Piping Gadgets And Associated System. , Hook-Ups With Existing Potentially Active Pipelines In The Form Of A Butt Welding (Gtaw) And In-Cell But Welding With Radiography Quality For Ss304l Pipes & Pipe Fittings Of Different Size Using High Purity Argon Gas (99.995% Min) For Shielding & Back Purging With Good Quality Of Water-Soluble Purge Dam Paper Followed By Liquid Penetrant Examination For Root & Final Weld, Local Passivation Of The Weld Joints, Permanent Marking Of The Joint Number, Line Testing, Air Flushing & Line Tracing As Per Approved Procedure And Technical Specifications. , Fillet Welding (Gtaw) In Radioactive Area For All Stainless Steel Pipelines Using High Purity Argon Gas (99.995% Min) For Shielding & Back Purging Followed By Liquid Penetrant Examination For Root & Final Weld And Final Approval Of These Welds After Pressure Testing Shall Be Carried Out As Per Tender Technical Specification. , Radiography Of Butt Welding Joints In Radioactive Area On The Basis Of Relevant Standards And Approved Procedure As Per Attached Tender Technical Specifications. , Erection, Installation, Supporting ( Utilizing Ss/ Ms Structural Members Such As Angles, Channels, Beam Etc.), Testing And Commissioning Of Ss304l Piping In Sizes From 8 Mm Nb To 200 Mm Nb [This Work Involves Identification Of Existing Pipelines, Piping Spool/ Nozzles Of Equipment Inside The Cell, Taking Site Measurements Inside And Outside The Cell, Incorporating The Required Changes In Ga Drawings, Preparation & Approval Of Pipe Spool Drawings Prior To Any Fabrication Activity, Identification Of All Materials, Taking Delivery Of The Same From Departmental Stores, Complete Handling, Transportation, Cleaning, Detergent Washing, Pickling & Passivation, Iron And Chloride Contamination Checks, Rinsing, Marking, Cutting Of Pipes And Edge Preparation, Fabrication Of Ss Pipe Bends With 5D And More Radius With Lpe, Fit-Up, Tack Welding, Full Welding With Lpe, Alignment, Maintaining Slope, Line Tagging, Weld Joint Tagging, Supporting, Local Passivation Of Weld Joint, Pneumatic Testing Of Lines, Complete Erection, Preparation Of As Built Drawings Etc. And Readying The Same For Gtaw Welding As Per Approved Spool Drawings]. Pressure Testing Of All Pipe Lines & Embedded Plugs/Pipe Eps During Commissioning Shall Also Be In The Scope Of The Supplier. Additionally, The Work Shall Also Involve Erection Of Eic Approved Safe Working Platform, Scaffolding, Handling Gadgets Such As Jib Crane, Chain Pulley Bock, Arrangement Of Working Tools And Tackels, Personal Protective Equipment & Safety Gear/Garments Such As Gloves, Safety Glasses And Shoes, Earplugs Or Muffs, Hard Hats, Respirators, Or Coveralls, Vests And Full Body Suits Etc. Shall Be In The Scope Of The Supplier. The Work Shall Be Carried Out In Radioactive Area. , Segregation, Handling, Shifting, Transportation To Designated Place/Location Of All Process Equipments, Plates, Angle, Channels, Valves, Fittings, Pipes And Other Assemblies Such As Off Gas Heaters, Tanks, Columns, Furnace Assemblies, Glove Boxes, Different Pots And Other Remote Handling Equipments Etc. Inside The Cell.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Platform fabrication for maintenance of piping gadgets, pipe line protection structures with walkway using SS 304/Mild Steel material & insulation protection structure SS304 channels, SS304 angles, SS304 plates for piping and equipment installation works | Platform fabrication for maintenance of piping gadgets, pipe line protection structures with walkway using SS 304/Mild Steel material & insulation protection structure SS304 channels, SS304 angles, SS304 plates for piping and equipment installation works |
| 2 | Procurement, testing (from NABL approved lab) and inspection of MS raw materials and further preparation & approval of drawing, fabrication, DP testing, inspection, descaling, shot blasting, painting and installation of 25mm thick portable shielding walls for piping gadgets and associated system. | Procurement, testing (from NABL approved lab) and inspection of MS raw materials and further preparation & approval of drawing, fabrication, DP testing, inspection, descaling, shot blasting, painting and installation of 25mm thick portable shielding walls for piping gadgets and associated system. |
| 3 | Hook-ups with existing potentially active pipelines in the form of a Butt welding (GTAW) and in-cell but welding with radiography quality for SS304L pipes & pipe fittings of different size using high purity Argon gas (99.995% min) for shielding & back purging with good quality of water-soluble purge dam paper followed by Liquid Penetrant Examination for root & final weld, local passivation of the weld joints, permanent marking of the joint number, line testing, air flushing & line tracing as per approved procedure and technical specifications. | Hook-ups with existing potentially active pipelines in the form of a Butt welding (GTAW) and in-cell but welding with radiography quality for SS304L pipes & pipe fittings of different size using high purity Argon gas (99.995% min) for shielding & back purging with good quality of water-soluble purge dam paper followed by Liquid Penetrant Examination for root & final weld, local passivation of the weld joints, permanent marking of the joint number, line testing, air flushing & line tracing as per approved procedure and technical specifications. |
| 4 | Fillet welding (GTAW) in radioactive area for all stainless steel pipelines using high purity Argon gas (99.995% min) for shielding & back purging followed by Liquid Penetrant Examination for root & final weld and final approval of these welds after pressure testing shall be carried out as per tender technical specification. | Fillet welding (GTAW) in radioactive area for all stainless steel pipelines using high purity Argon gas (99.995% min) for shielding & back purging followed by Liquid Penetrant Examination for root & final weld and final approval of these welds after pressure testing shall be carried out as per tender technical specification. |
| 5 | Radiography of butt welding joints in radioactive area on the basis of relevant standards and approved procedure as per attached tender technical specifications. | Radiography of butt welding joints in radioactive area on the basis of relevant standards and approved procedure as per attached tender technical specifications. |
| 6 | Erection, installation, supporting ( utilizing SS/ MS structural members such as angles, channels, beam etc.), testing and commissioning of SS304L Piping in sizes from 8 mm NB to 200 mm NB [This work involves identification of existing pipelines, piping spool/ nozzles of equipment inside the cell, taking site measurements inside and outside the cell, incorporating the required changes in GA drawings, preparation & approval of pipe spool drawings prior to any fabrication activity, identification of all materials, taking delivery of the same from departmental stores, complete handling, transportation, cleaning, detergent washing, pickling & passivation, iron and chloride contamination checks, rinsing, marking, cutting of pipes and edge preparation, fabrication of SS pipe bends with 5D and more radius with LPE, fit-up, tack welding, full welding with LPE, alignment, maintaining slope, line tagging, weld joint tagging, supporting, local passivation of weld joint, pneumatic testing of lines, complete erection, preparation of as built drawings etc. and readying the same for GTAW welding as per approved spool drawings]. Pressure testing of all pipe lines & Embedded plugs/pipe EP's during commissioning shall also be in the scope of the supplier. Additionally, the work shall also involve erection of EIC approved safe working platform, scaffolding, handling gadgets such as jib crane, chain pulley bock, arrangement of working tools and tackels, personal protective equipment & safety gear/garments such as gloves, safety glasses and shoes, earplugs or muffs, hard hats, respirators, or coveralls, vests and full body suits etc. shall be in the scope of the supplier. The work shall be carried out in radioactive area. | Erection, installation, supporting ( utilizing SS/ MS structural members such as angles, channels, beam etc.), testing and commissioning of SS304L Piping in sizes from 8 mm NB to 200 mm NB [This work involves identification of existing pipelines, piping spool/ nozzles of equipment inside the cell, taking site measurements inside and outside the cell, incorporating the required changes in GA drawings, preparation & approval of pipe spool drawings prior to any fabrication activity, identification of all materials, taking delivery of the same from departmental stores, complete handling, transportation, cleaning, detergent washing, pickling & passivation, iron and chloride contamination checks, rinsing, marking, cutting of pipes and edge preparation, fabrication of SS pipe bends with 5D and more radius with LPE, fit-up, tack welding, full welding with LPE, alignment, maintaining slope, line tagging, weld joint tagging, supporting, local passivation of weld joint, pneumatic testing of lines, complete erection, preparation of as built drawings etc. and readying the same for GTAW welding as per approved spool drawings]. Pressure testing of all pipe lines & Embedded plugs/pipe EP's during commissioning shall also be in the scope of the supplier. Additionally, the work shall also involve erection of EIC approved safe working platform, scaffolding, handling gadgets such as jib crane, chain pulley bock, arrangement of working tools and tackels, personal protective equipment & safety gear/garments such as gloves, safety glasses and shoes, earplugs or muffs, hard hats, respirators, or coveralls, vests and full body suits etc. shall be in the scope of the supplier. The work shall be carried out in radioactive area. |
| 7 | Segregation, handling, shifting, transportation to designated place/location of all process equipments, plates, angle, channels, valves, fittings, pipes and other assemblies such as off gas heaters, tanks, columns, furnace assemblies, glove boxes, different pots and other remote handling equipments etc. inside the cell. | Segregation, handling, shifting, transportation to designated place/location of all process equipments, plates, angle, channels, valves, fittings, pipes and other assemblies such as off gas heaters, tanks, columns, furnace assemblies, glove boxes, different pots and other remote handling equipments etc. inside the cell. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 17 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 18 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender