Tender for Mtps Ii - Mi - O&Ahs - Foph - Overhauling Of Hfo Heater Top Bottom, Hfo Cooler Top & Bottom And Dismantling Of 100 Nb, 80 Nb, Damaged Erw Pipes & 2 Carbon Steel Pipes Fabrication And Erection Of New 100 Nb & 80 Nb Erw Acw Water Pipe Line & 2 Carbon Steel Steam Pipe Line In Foph Area Of Mtps-Ii During Capital Overhauling 2026-27.
BOQ
| Sl. No. | Item Description |
| 1 | Draining the oil from HFO Heaters, removing steam and condensate connecting pipe from Heater, removing steam safety valve from steam box, removing steam box from Heater including cost of consumables, Safety appliances and T&P’s etc., (HFO Heaters) |
| 2 | Removal of ‘U’ tube bundle from the HFO heating shell without making any damages to the bundles and resting on the supports including cost hire charges for Safety appliances, consumables and T&P’s etc. (HFO Heaters) |
| 3 | Cleaning the outer surface of the ‘U’ tube bundle and inner surface of the shell and disposing the oil sediments to the area as per the Engineer - in - charge, including cost hire charges for consumables, Safety appliances and T&P’s etc. (HFO Heaters) |
| 4 | Cleaning inner side of each tube of the ‘U’ tube bundle one by one by admitting fresh water and cleaning mechanically by long size nylon brushes thoroughly till all the sledge inside the tubes are flushed away including cost hire charges for consumables, Safety appliances and T&P’s etc. (HFO Heaters) |
| 5 | Reassembling the shell tube, steam box, safety valves etc., in HFO heater, connecting all inlet and outlet valves, replacement of the all stud bolt & nuts, washers with new one, renewal of steam side and oil side gaskets to the interconnecting pipe lines and assembling the steam box including cost hire charges for consumables, Safety appliances and T&P’s etc. (HFO Heaters) |
| 6 | Draining the oil from HFO Coolers, removing water from Cooler, removing inlet isolation valve and outlet MOV from water box, removing water box from Cooler including cost of consumables, Safety appliances and T&P’s etc. (HFO Coolers) |
| 7 | Removal of ‘U’ tube bundle from the HFO cooling shell without making any damages to the bundles and resting on the supports including cost hire charges for Safety appliances, consumables and T&P’s etc. (HFO Coolers) |
| 8 | Cleaning the outer surface of the ‘U’ tube bundle and inner surface of the shell and disposing the oil sediments to the area as per the Engineer - in - charge, including cost hire charges for consumables, Safety appliances and T&P’s etc. (HFO Coolers) |
| 9 | Cleaning inner side of each tube of the ‘U’ tube bundle one by one by admitting fresh water and cleaning mechanically by long size nylon brushes thoroughly till all the sledge inside the tubes are flushed away including cost hire charges for consumables, Safety appliances and T&P’s etc. (HFO Coolers) |
| 10 | Reassembling the shell tube, water box in HFO Cooler, connecting all inlet and outlet valves, replacement of the all stud bolt & nuts, washers with new one, renewal of Water side and oil side gaskets to the interconnecting pipe lines and assembling the water box including cost hire charges for consumables, Safety appliances and T&P’s etc. (HFO Coolers) |
| 11 | Performing hydraulic test for ‘U’ tube bundle with fresh water including fabrication of suitable nipples, bends, etc. to suit the pump and the water box fittings including cost hire charges for consumables, Safety appliances and T&P’s etc (HFO Heaters & HFO Coolers) |
| 12 | Charges for dismantling of 100 NB, 80 NB, damaged ACW pipe line by cutting and welding from FOPH compound area to ESP area. |
| 13 | Charges for Erection of new ACW line 100 NB, 80 NB M.S ERW pipe by cutting & welding including cost of consumables. |
| 14 | Charges for fabrication of M.S bend out of 100 NB, 80 NB, M.S ERW pipe by cutting & welding including cost of consumables. |
| 15 | Charges for supply of Ø 80 NB MS ERW Pipe. |
| 16 | Charges for supply of 100 NB Gate Valve |
| 17 | Charges for cutting the wornout tubes of tube dia above 44.5 mm & up to 63.5 X 5.2 mm edge preperation the new & existing tubes, positioning the tubes with proper alignment TIG and ARC welding the joint from flask tank to HFO Tank (2), HFO Heater suction steam line. Cost of argon gas, cutting gas all consumables and T&P's etc, |
| 18 | Charges for the supply of carbon steel pipe25 NB Carbon steel pipe, Size: OD: 33.4 X 6.35 mm thick. |
| 19 | Charges for the supply of carbon steel pipe50NB, carbon steel pipe sixe: OD 60.3 X 5.54 mm thick |
| 20 | Charges for the supply of carbon steel bend 25 NB carbon steel 90° bend size: OD: 33.4 X 635 mm thick |
| 21 | Charges for the supply of carbon steel bend 50 NB carbon steel 90°Size: OD 60.3 mm X 5.54 mm thick |
| 22 | Charges for the Supply of 25 mm (1\\") Forget Carbon steel Globe valve |
| 23 | Charges for the Supply of 50 mm (2\\") Forget Carbon steel Globe valve Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender