Tender For Schedule Of Quantity For Replacememt Of Bare Conductor To Ab Cable In Various Villages (Khalilungar, Jhipa, Lambani, Khalyon, Doba, Munani, Kafalgair, Talya Etc) Of Nagchula Feeder Under Edd, Bhikiyasain On Turnkey Basis .
Tender Overview
Project Description
Tender for Schedule Of Quantity For Replacememt Of Bare Conductor To Ab Cable In Various Villages (Khalilungar, Jhipa, Lambani, Khalyon, Doba, Munani, Kafalgair, Talya Etc) Of Nagchula Feeder Under Edd, Bhikiyasain On Turnkey Basis .
BOQ
| Sl. No. | Item Description |
| 1 | CENTRALIZED MATERIAL |
| 2 | 8 m. Long STP 410 SP-10 (BPHD GAL.) |
| 3 | 8.5 m. Long STP 410 SP-21 (BPHD GAL.) |
| 4 | Earth wire GI 7/1.6 mm 16 SWG |
| 5 | Earthing Rod MS 20x2500 mm |
| 6 | Stay Set GI 16X1800mm |
| 7 | Stay wire GI 7/3.15mm 7/10SWG |
| 8 | LT XLPE Cable 1x25 Sq.mm. |
| 9 | LT XLPE AB Cable 3x120 + 1x95 Sq.mm |
| 10 | NON-CENTRALIZED MATERIAL (SUPPLY) |
| 11 | MS Nut & Bolt off size |
| 12 | LT Bare. N. Conn. PG Clamp L-L 120-120 Sq.mm |
| 13 | LT Clamp with N&B ST Pole SP-21 |
| 14 | LT Clamp with N&B ST Pole SP-10 |
| 15 | Suspension Clamp with Eye Hook |
| 16 | Stay clamp off size |
| 17 | Dead End Clamp with I Hook |
| 18 | Stay Insulator 100x115 |
| 19 | Piercing Connector 120-25 Sq.mm |
| 20 | LT Bare N.conn. PG clamp for DB 50-50 Sq.mm |
| 21 | Piercing Connector 70 Sq.mm-25Sq.mm |
| 22 | Piercing Connector 35 Sq.mm-25Sq.mm |
| 23 | LT Bare N.conn. PG clamp for DB 70-50 Sq.mm |
| 24 | LT AB Cable 3x70+1x50 sqmm |
| 25 | LT AB Cable 1x35+1x25 sqmm |
| 26 | LT AB Cable 3Cx50+1x35 sqmm |
| 27 | LT Distrubiton Box 1 Phase |
| 28 | LT Distrubiton Box 3 Phase |
| 29 | Aluminium Lug 25 Sq.mm |
| 30 | MS Half Clamp for LT Distribution Box |
| 31 | LABOUR PART (WORK) |
| 32 | Erection of Earthing rod |
| 33 | Excavation of Pit for Stay Set |
| 34 | Erection of LT Stay Set |
| 35 | Grouting of stay Set |
| 36 | Excavation of Pit for Pole |
| 37 | Erection of Single SP-10 Pole |
| 38 | Erection of single SP-21 Pole |
| 39 | Grouting of Pole |
| 40 | Muffing of Pole |
| 41 | Dismantling of LT Line 1 P 2 w (Weasel) |
| 42 | Dismantling of LT Line 2 P 3 w (Weasel) |
| 43 | Dismantling of LT Line 3 P 4 w (Weasel) |
| 44 | Painting of SP-10 Pole |
| 45 | Painting of SP-21/23 Pole |
| 46 | Headload Cartage SP-10 Pole (1-3 Km) |
| 47 | Headload Cartage SP-21/23 Pole (1-3 Km) |
| 48 | Headload Cartage of Material (1-3 Km) |
| 49 | Laying of LT AB Cable 3x70+1x50 Sq.mm |
| 50 | Dismantling of AB Cable |
| 51 | Laying of LT XLPE ABC 3x120+1x95+1x16 Sq.mm |
| 52 | Installation of LT DB 1 Ph for LT AB Cable |
| 53 | Installation of LT DB 3 Ph for LT AB Cable |
| 54 | Disconnection & Reconnection of Consumer |
| 55 | Back Cartage of Petty material, 71-100 Km |
| 56 | Laying & Fixing LT XLPE Cable |
| 57 | Fixing of Suspension Clamp with I Hook |
| 58 | Erection of Dead End Clamp |
| 59 | Laying of LT AB Cable 3Cx50 + 1x35 Sq.mm |
| 60 | Fixing of Piercing Connector 70-25 Sq.mm |
| 61 | Fixing of Piercing Connector 50-25 Sq.mm |
| 62 | Fixing of PG Clamp 70-50 Sq.mm |
| 63 | Fixing of PG Clamp 70-25 Sq.mm Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender