Tender For Project No. 627/2026-27, Arakkilad Crematorium Furnace Installation Work
Tender Overview
Project Description
Tender For Project No. 627/2026-27, Arakkilad Crematorium Furnace Installation Work-Supply, Installation, Testing, And Commissioning Of An Eco-Friendly, Automated Lpg/Natural Gas-Fired Crematorium Unit Including Primary And Secondary Combustion Chambers, Body Loading Trolley, Hot Duct, Flue Gas Purification System (Venturi Wet Scrubber, Cyclone Separator, Mist Eliminator, Dilution System With Id Fan), 30M Ms Stack/Chimney With Activated Carbon Absorption Unit, Plc-Based Control Panel, And All Mandatory Safety Accessories Conforming To Cpcb And Kspcb Emission Norms As Per Revised Suchitwa Mission / Lsgd Specifications And The Expression Of Interest Published Along With The Tender. The New Crematorium Unit Shall Be Installed After Safely Dismantling, Removing, And Clearing The Existing Non-Functional Crematorium Furnace, Chimney, Pollution Control Units, Gas Piping, And Associated Electro-Mechanical Structures, Including Sorting, Stacking, And Carting Away All Unserviceable Materials And Scrap From The Municipal Site As Directed By The Engineer-In-Charge. The Tenderer Shall Submit A Detailed Item-Wise Cost Split-Up Clearly Segregating The Expenses For The Dismantling/Site Clearance Works And The Supply/Installation Of The New Furnace System (Including Gst) Please Enable Macros To View Boq Information
BOQ
| Sl. No. | Item Description |
| 1 | Crematorium Furnace Installation |
| 2 | Supply, installation, testing, and commissioning of an eco-friendly, automated LPG/Natural Gas-fired crematorium unit including primary and secondary combustion chambers, body loading trolley, hot duct, flue gas purification system (Venturi wet scrubber, cyclone separator, mist eliminator, dilution system with ID fan), 30m MS stack/chimney with activated carbon absorption unit, PLC-based control panel, and all mandatory safety accessories conforming to CPCB and KSPCB emission norms as per revised Suchitwa Mission / LSGD specifications and the Expression of Interest published along with the tender. The new crematorium unit shall be installed after safely dismantling, removing, and clearing the existing non-functional crematorium furnace, chimney, pollution control units, gas piping, and associated electro-mechanical structures, including sorting, stacking, and carting away all unserviceable materials and scrap from the municipal site as directed by the Engineer-in-charge. The tenderer shall submit a detailed item-wise cost split-up clearly segregating the expenses for the dismantling/site clearance works and the supply/installation of the new furnace system (Including GST) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender