Tender For Barbed Wire Fencing With Reinforced Cement Concrete Post Around Telwasa, Dhorwasa, Navin Kunada And Juna Kunada Oc Mine Under Chargaon-Telwasa Sub Area Of Majri Area / Ma9511cive022-26-27/409 Dated 13.11.2026 / Sr. No.03.
Tender Overview
Project Description
Tender for Barbed Wire Fencing With Reinforced Cement Concrete Post Around Telwasa, Dhorwasa, Navin Kunada And Juna Kunada Oc Mine Under Chargaon-Telwasa Sub Area Of Majri Area / Ma9511cive022-26-27/409 Dated 13.11.2026 / Sr. No.03.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 16-Nov-2026 | Safety precaution should be taken during execution of work. | Other | 30-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR CIL Hide Select GST Registered Bidder under regular scheme GST Registered Bidder under composition scheme GST Unregistered Bidder Not Applicable Tender Inviting Authority: Staff Officer (Civil), WCL, Majri Area. Name of the Work / Contract No: Barbed wire fencing with RCC post around Telwasa, Dhorwasa, Navin Kunada and Juna Kunada OC Mine under Chargaon-Telwasa Sub Area of Majri Area / ma9511cive022-26-27/409 Dated 13.11.2026 / Sr. No.03. . Category of services (To be selected by department) Category of bidder (To be selected by bidder) To be entered by department Service Tax Category ( To Be Selected by Bidder) ITC Available Works Contract Bidder's status (mandatory) Rate of GST (in %) Total GST(in Rs.) GST to be paid by bidder (in Rs.) GST to be paid by WCL (in Rs.) Name of the Bidder/ Bidding Firm / Company : Select 18.0 0.0 0.0 0.0 PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the bidder name and values only.) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # S. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category Total amount inRs. P TOTAL AMOUNT With Taxes Total amount in words |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area |
| 3 | Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement:1½coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts |
| 11 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C.posts, struts, earth work and concrete to be paid for separately) :-Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire |
| 12 | Finishing walls with Acrylic Smooth exterior paint of required shade . New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm |
| 13 | Writing of letter on board surface including painting of back ground of boards cleaning surface and enganging all labours and materials required to complete the job etc complete as per the instructions of engg in charge |
| 14 | Total impact of GST for the purpose of CTC Total in Figures 14781080.54 14781080.54 INR One Crore Forty Seven Lakh Eighty One Thousand &Eighty and Paise Fifty Four Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 8 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender