Tender For (A)Repairing And Maintenance Of 11 Kv O/H Line F.No-11 From Birajpur To Mathabandh Through Passing K.K.C Link Siding For Safe And Uninterrupted Incoming Power Supply Of Socp And Muraidih, Colliery (B)Repairing And Maintenance Of Ab Switch
Tender Overview
Project Description
Tender for (A)Repairing And Maintenance Of 11 Kv O/H Line F.No-11 From Birajpur To Mathabandh Through Passing K.K.C Link Siding For Safe And Uninterrupted Incoming Power Supply Of Socp And Muraidih, Colliery (B)Repairing And Maintenance Of Ab Switch Horn Gap And Lighting Arrester In 11 Kv O/H Line In Pure Barora Substation And Changing Of Rusted Pole And Conductor In 440 Volt O/H Line In Barora New Colony Muraidih, Colliery.
BOQ
| Sl. No. | Item Description |
| 1 | Item Description/ Heading |
| 2 | Dismantling of Sagged Dog conductor 10 span x 60 Mtr x 3 wire |
| 3 | Tensioning of conductor 10 span x 60 Mtr x 3 wire |
| 4 | Laying & Hanging of PVC cable |
| 5 | Providing & making of heat shrinking pole mounting epoxy kit 11 KV grade |
| 6 | Dismantling of damaged Pin insulator |
| 7 | Providing and fitting of Pin insulator |
| 8 | Dismantling of damaged Disc insulator |
| 9 | Providing and fitting of disc insulator |
| 10 | Connection and disconnection of repairing jumper |
| 11 | Dismantling of damaged cradle guard 5span x 60Mtr |
| 12 | Providing & Erection of cradle guard 5span x 60 Mtr |
| 13 | Providing & erection of earth wire |
| 14 | Repairing of AB switch at KKC link siding |
| 15 | Providing of fixed contact for AB switch |
| 16 | Providing of moving contact for AB switch |
| 17 | Branches of Tree cutting for clearance of O/H lines |
| 18 | Dismantling of burnt horn gap |
| 19 | Repairing of Horn gap |
| 20 | Fitting of horn gap after repairing |
| 21 | Repairing of AB switch |
| 22 | Dismantling of damage lighting arrester |
| 23 | Fitting of lighting arrester |
| 24 | Cable lead making and jumphering on pole |
| 25 | Disconnection & connection of jumpers |
| 26 | Erection of Rail pole with transporting |
| 27 | Providing & Erection of stay set to rusted |
| 28 | Fabrication of Iron materials |
| 29 | Supply & Erection of bolt, nut & clamp |
| 30 | Fitting of shackle Pin insulator |
| 31 | Drawing of dog conductor 10 span x 50Mtr x 4 wire |
| 32 | Providing & Erection of cradle guard |
| 33 | Disconnection & connection of service wire |
| 34 | Dismantling of pipe pole with transporting |
| 35 | Dismantling of damage stay set |
| 36 | Dismantling of Iron materials |
| 37 | Dismantling of shackle pin insulator |
| 38 | Dismantling of LT conductor 10spanx50Mtrx4wire |
| 39 | Dismantling of damage cradle guard |
| 40 | Branches of tree cutting for clearance of O/H line at Pure barora substation |
| 41 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender