Tourism Government Departments Closing in 0 days TDR #58527018

Tender For Limited Rfp For Conducting Interactive Session Mpidc (24Th Nov - Singapore 26Th/27Th Nov- South Korea) ,2026.

Issued by Government Departments · Bhopal, Madhya Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
17 Nov 2026
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Bhopal → Madhya Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Limited Rfp For Conducting Interactive Session Mpidc (24Th Nov - Singapore 26Th/27Th Nov- South Korea) ,2026.

BOQ

Name of Work:- Limited RFP for Conducting Interactive session MPIDC (24th nov – Singapore 26th/27th Nov- South Korea) ,2026.
Sl. No. Item Description
1Item Wise BoQ BoQ_Ver4.0 Item Wise Normal INR Only INR Select, Excess (+), Less (-) Tender Inviting Authority: MPSTDC Name of Work: Limited RFP for Conducting Interactive session MPIDC (24th nov – Singapore 26th/27th Nov- South Korea) ,2026. Contract No: Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. ITEM NAME AND BRAND NAME Item Code / Make N0 OF DAYS REMARKS NUMBER OF DAYS BRAND NAME Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency PRICE Weightage Average WEIGHTAGE Quantity HSN / SAC Code TOTAL AMOUNT/QTY*RATERs. TOTAL AMOUNT/QTY*RATERs. TOTAL AMOUNT In Words
2ITEMS
3Main Ball Room Stage platform in full dark grey carpet on top finish-1219.5 cm X 488 cm X 80 cm Height 40' x 16' x 2' 7.5\\" ht
4Main Ball Room Stage platform in full dark grey carpet on top finish-183 cm x 122 cm x 80 cm Height 6' x 4' x 2' 7.5\\" ht
5Main Ball Room Carpentry constructed with carpet / paint on top -244 cm x 122 cm x 64 cm Height 8' x 4' x 2'1\\" ht
6Main Ball Room Cove Lighting in Steps front-244 cm 8rft
7Main Ball Room Carpentry constructed with carpet / paint on top -122 cm x 122 cm x 64 cm Height 4' x 4' x 2'1\\" ht
8Main Ball Room Railing for Climbing Steps with Black Paint Finish-As per step As per step
9Main Ball Room Ply frame wih black cloth finish - Front-1219.5 cm x 80 cm Height 40' x 2'7.5\\" ht
10Main Ball Room Ply frame wih black cloth finish - Sides-366 cm x 80 cm Height 12' x 2'7.5\\" ht
11Main Ball Room Stage platform in full dark grey carpet on top finish-854 cm X 122 X 170 cm Height 28' x 4' x 5'7'' ht
12Main Ball Room Ply frame wih Print finish-846 cm X 91 cm Height 27'9\\" x 3' ht
13Main Ball Room AS PER DESIGN - MDF WITH VINYL STICKER HAVING COVE LIGHTING-64cm x 366cm Height 2'1\\" x 12' ht.
14Main Ball Room AS PER DESIGN - MDF WITH VINYL STICKER HAVING COVE LIGHTING-61cm x 319cm Height 2' x 10'6\\" ht.
15Main Ball Room AS PER DESIGN - MDF WITH VINYL STICKER HAVING COVE LIGHTING-102cm x 274cm Height 3'4\\" x 9' ht.
16Main Ball Room Ply frame wih Print finish-183 cm x 274 cm Height 6' x 9' ht
17Main Ball Room AS PER DESIGN - MDF WITH VINYL STICKER - PANEL E-122 cm x 381 cm Height 4' x 12'6'' HT.
18Main Ball Room AS PER DESIGN - MDF WITH VINYL STICKER - PANEL F-183 cm x 381 cm Height 6' x 12'6'' HT.
19Main Ball Room MDF made podium with white paint finish having vinyl print on Foamboard-60 cm x 60 cm x 122 cm 2' x 2' x 4' ht.
20Main Ball Room Black Masking for Comfort Monitors-42\\" plasma 42\\" plasma
21Main Ball Room Fabric flag -2.4 mtr 2.4 mtr
22Main Ball Room As per requirement - Black Masking-915 cm x 122 cm Height 32' x 4' Height
23Main Ball Room As per requirement - Black Masking-122cm x 122 cm Height 4' x 4' Height
24Main Ball Room Riser for Cameraman with black skirting -122 cm x 183 cm x 76 cm ht 4' x 6' x 2.5' ht.
25Inside Ballroom Branding Ply frame wih Print finish-244 cm x 335 cm Height 8' x 11' Height
26Inside Ballroom Branding Side Closing - Madeup of MDF with Paint Finish-30 cm x 335 cm Height 1' X 11' Height
27Inside Ballroom Branding LED Baton Masking-244 cm x 20 cm Height 8' x 8\\" Height
28Inside Ballroom Branding Carpentry constructed backdrop with print finish-488 cm x 335 cm Height 16' x 11' Height
29Inside Ballroom Branding Side Closing - Madeup of MDF with Paint Finish-30 cm x 335 cm Height 1' X 11' Height
30Inside Ballroom Branding LED Baton Masking-488 cm x 20 cm Height 16' x 8\\" Height
31SOUND REQUIREMENT - MAIN BALLROOM PA System for 150 Pax -Standard Standard
32SOUND REQUIREMENT - MAIN BALLROOM Standard Requirement-Standard Standard
33SOUND REQUIREMENT - MAIN BALLROOM Standard Requirement-Standard Standard
34SOUND REQUIREMENT - MAIN BALLROOM Standard Requirement-Standard Standard
35SOUND REQUIREMENT - MAIN BALLROOM Digital Sound Mixer-Standard Standard
36SOUND REQUIREMENT - MAIN BALLROOM Standard Requirement -Standard Standard
37SOUND REQUIREMENT - MAIN BALLROOM For MC, SPEAKERS, PANEL DISCUSSIONS, QnA Session -Standard Standard
38SOUND REQUIREMENT - MAIN BALLROOM For MC & SPEAKER Address-Standard Standard
39SOUND REQUIREMENT - MAIN BALLROOM DJ GEAR - for House / Amient Music-Standard Standard
40SOUND REQUIREMENT - MAIN BALLROOM DJ - with Collection - Indian Instrumnetal Music, Ambient Music, Walkin walk out tracks during show-Standard Standard
41VIDEO REQUIREMENT - MAIN BALLROOM Centre LED to run videos & presentations -8500 mm x 3000 mm Standard
42VIDEO REQUIREMENT - MAIN BALLROOM On stage presentation -42 inches 42 inches
43VIDEO REQUIREMENT - MAIN BALLROOM Live Feed from Video Camera or Content running on back LED Screen-42 inches 42 inches
44VIDEO REQUIREMENT - MAIN BALLROOM Standard requirement -Standard Standard
45VIDEO REQUIREMENT - MAIN BALLROOM ON PODIUM TO RUN PRESENTATION-Standard Standard
46VIDEO REQUIREMENT - MAIN BALLROOM ON CONSOLE TO RUN PRESENTATION-Standard Standard
47VIDEO REQUIREMENT - MAIN BALLROOM Standard requirement -Standard Standard
48VIDEO REQUIREMENT - MAIN BALLROOM Standard requirement -Standard Standard
49VIDEO REQUIREMENT - MAIN BALLROOM Standard requirement -Standard Standard
50VIDEO REQUIREMENT - MAIN BALLROOM Standard requirement -Standard Standard
51YOU TUBE LIVE Standard requirements -Standard Standard
52LIGHT REQUIREMENT - MAIN BALLROOM Standard requirement -Standard Standard
53LIGHT REQUIREMENT - MAIN BALLROOM Standard requirement -Standard Standard
54LIGHT REQUIREMENT - MAIN BALLROOM Standard requirement -Standard Standard
55LIGHT REQUIREMENT - MAIN BALLROOM Standard requirement -Standard Standard
56LIGHT REQUIREMENT - MAIN BALLROOM Standard requirement -Standard Standard
57LIGHT REQUIREMENT - MAIN BALLROOM Standard requirement -Standard Standard
58LIGHT REQUIREMENT - MAIN BALLROOM Standard requirement -Standard Standard
59LIGHT REQUIREMENT - MAIN BALLROOM Standard requirement -Standard Standard
60TRUSSING Standard size -Standard Standard
61TRUSSING Standard size -Standard Standard
62TRUSSING Standard size -Standard Standard
63TRUSSING Standard size -Standard Standard
64LIGHT REQUIREMENT - MEETING ROOMS Standard size -Standard Standard
65LIGHT REQUIREMENT - MEETING ROOMS Standard size -Standard Standard
66LIGHT REQUIREMENT - MEETING ROOMS Standard size -Standard Standard
67PREFUNCTION - BRANDING Ply frame wih Print finish-305 cm x 244 cm Height 10' x 8'
68PREFUNCTION - BRANDING Side Closing - Madeup of MDF with Paint Finish-30 cm x 244 cm Height 1' X 8'
69PREFUNCTION - BRANDING LED Baton Masking-305 cm x 20 cm Height 10' x 8\\" ht.
70PREFUNCTION - BRANDING Ply frame with Print finish-122 cm x 183 cm Height 4' x 6'
71PREFUNCTION - BRANDING LED Baton Masking-244 cm x 20 cm Height 4' x 8\\" ht.
72PREFUNCTION - BRANDING Ply frame wih Print finish-305 cm x 244 cm Height 10' x 8'
73PREFUNCTION - BRANDING Side Closing - Madeup of MDF with Paint Finish-30 cm x 244 cm Height 1' X 8'
74PREFUNCTION - BRANDING LED Baton Masking-305 cm x 20 cm Height 10' x 8\\" ht.
75PREFUNCTION - BRANDING Carpentry constructed backdrop with flex print and Mounting-366 cm x 244 cm Height 12' x 8'
76PREFUNCTION - BRANDING Side Closing - Madeup of MDF with Paint Finish-30 cm x 244 cm Height 1' X 8'
77PREFUNCTION - BRANDING LED Baton Masking-366 cm x 20 cm Height 12' x 8\\" ht.
78PREFUNCTION - BRANDING Wooden Platfrom with dark Grey carpet-12' x 4' x 3'' ht 12' x 4' x 3'' ht
79PREFUNCTION - BRANDING MDF Box pillar with printed vinyl sticker finish-61cm x 61cm x 61cm 2' x 2' x 2' Height
80PREFUNCTION - BRANDING MDF Box pillar with printed vinyl sticker finish-61cm x 61cm x 122cm 2' x 2' x 4' Height
81PREFUNCTION - BRANDING MDF Box pillar with printed vinyl sticker finish-61cm x 61cm x 183cm 2' x 2' x 6' Height
82MEETING ROOM 1 - BRANDING Carpentry constructed backdrop with flex print and Mounting-244cm x 244 cm Height 8' x 8'
83MEETING ROOM 1 - BRANDING Side Closing - Madeup of MDF with Paint Finish-30 cm x 244 cm Height 1' X 8'
84MEETING ROOM 1 - BRANDING LED Baton Masking-244 cm x 20 cm Height 8' x 8\\" ht.
85MEETING ROOM 1 - BRANDING Ply frame wih Print finish-122 cm x 183 cm Height 4' x 6'
86MEETING ROOM 1 - BRANDING LED Baton Masking-244 cm x 20 cm Height 4' x 8\\" ht.
87MEETING ROOM 1 - BRANDING Self Standing Indian Flag- 2 MTR
88MEETING ROOM 2 - BRANDING Carpentry constructed backdrop with flex print and Mounting-244cm x 244 cm Height 8' x 8'
89MEETING ROOM 2 - BRANDING Side Closing - Madeup of MDF with Paint Finish-30 cm x 244 cm Height 1' X 8'
90MEETING ROOM 2 - BRANDING LED Baton Masking-244 cm x 20 cm Height 8' x 8\\" ht.
91MEETING ROOM 2 - BRANDING Ply frame wih Print finish-122 cm x 183 cm Height 4' x 6'
92MEETING ROOM 2 - BRANDING LED Baton Masking-244 cm x 20 cm Height 4' x 8\\" ht.
93MEETING ROOM 3 - BRANDING Ply frame wih Print finish-122 cm x 183 cm Height 4' x 6'
94MEETING ROOM 3 - BRANDING LED Baton Masking-244 cm x 20 cm Height 4' x 8\\" ht.
95FLORAL DÉCOR - MAIN BALLROOM Lilies, marigold or seasonal flowers with ferns-488 cm wide 16' wide
96FLORAL DÉCOR - MAIN BALLROOM Lilies, marigold or seasonal flowers with ferns-61cm wide 2' wide
97FLORAL DÉCOR - MAIN BALLROOM Lilies, marigold or seasonal flowers with ferns-Standard Size Standard Size
98FLORAL DÉCOR - MAIN BALLROOM Tricolour - Saffron, white and green-Standard Size Standard Size
99FLORAL DÉCOR - MAIN BALLROOM Hand Bouquets-Standard Standard
100FLORAL DÉCOR - MAIN BALLROOM Standard Size-Standard Size Standard Size
101FLORAL DÉCOR - MAIN BALLROOM Standard requirements -Standard requirements Standard
102FURNITURE REQUIREMENT - MAIN BALLROOM Standard requirements -Standard requirements Standard Size
103FURNITURE REQUIREMENT - MAIN BALLROOM Standard requirements -Standard requirements Standard Size
104PE Endorsement For Structures above 3 mts-For Structures above 3 mts Standard
105POWER SLD w/32A power DB-SLD w/32A power DB Standard
106SIMULTANEOUS INTERPRETATION - MAIN BALLROOM 6' x 6' -Standard requirements Standard
107SIMULTANEOUS INTERPRETATION - MAIN BALLROOM Standard requirements -Standard requirements Standard
108SIMULTANEOUS INTERPRETATION - MAIN BALLROOM Standard requirements -Standard requirements Standard
109SIMULTANEOUS INTERPRETATION - MAIN BALLROOM 8 hours-Standard requirements Standard
110SIMULTANEOUS INTERPRETATION - MAIN BALLROOM 8 hours-Standard requirements Standard
111SIMULTANEOUS INTERPRETATION - MAIN BALLROOM 8 hours-Standard requirements Standard
112EVENT COVERAGE HD Photography with soft copy output - 2 shifts each day-to Shadow Dignatories Standard
113EVENT COVERAGE HD Shoot on DSLR - 2 shifts each day-to Shadow Dignatories Standard
114EVENT COVERAGE HD Photography with soft copy output - 2 shifts -Standard requirement Standard
115EVENT COVERAGE HD Cam Shoot - for live feed to include camera man - 2 shifts-Standard requirement Standard
116EVENT COVERAGE Live mixing setup-Standard requirement Standard
117OFFICE SET UP - Meeting Room 1 Standard requirements -Standard requirement Standard
118OFFICE SET UP - Meeting Room 1 Standard requirements -Standard requirement Standard
119OFFICE SET UP- Meeting Room 1 Standard requirements -Standard requirement Standard
120OFFICE SET UP- Meeting Room 1 Standard requirements -Standard requirement Standard
121OFFICE SET UP- Meeting Room 2 Standard requirements -Standard requirement Standard
122OFFICE SET UP- Meeting Room 2 Standard requirements -Standard requirement Standard
123OFFICE SET UP- Meeting Room 2 Standard requirements -Standard requirement Standard
124OFFICE SET UP- Meeting Room 2 Standard requirements -Standard requirement Standard
125Printing & Stationary Standard requirements -Standard requirement Standard
126Printing & Stationary Standard requirements -Standard requirement Standard
127Printing & Stationary Standard requirements -Standard requirement Standard
128Printing & Stationary Standard requirements -Standard requirement Standard
129Printing & Stationary Standard requirements -Standard requirement Standard
130Printing & Stationary Standard requirements -Standard requirement Standard
131Printing & Stationary Standard requirements -Standard requirement Standard
132MANPOWER 2 shifts X 2 days-Standard requirement Standard
133MANPOWER 2 shifts x 2 days-Standard requirement Standard
134MANPOWER 2 shifts x 7 days-Standard requirement Standard
135MANPOWER 2 shifts x 4 days-Standard requirement Standard
136MANPOWER 2 shifts x 2 days-Standard requirement Standard
137MISCELLANEOUS as per the requirement with proper supportings-Standard requirement Standard
138MISCELLANEOUS Overall designing of all the elements-Standard requirement Standard
139MISCELLANEOUS as per the protocol with propoer supportings-Standard requirement Standard Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select % 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58527018
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 17-11-2026
Authority
Authority Name Madhya Pradesh State Tourism Development Corporation Limited
Work Description Tender for Limited Rfp For Conducting Interactive Session Mpidc (24Th Nov - Singapore 26Th/27Th Nov- South Korea) ,2026.
Basic Detail
Tender No korea/CS/2026
Bidding Type Tender
Location
City Bhopal
State Madhya Pradesh
Key Dates
Publish Date 13 Nov 2026
Submission Date 17 Nov 2026
Open Date 17 Nov 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
BOQ_660877.xls
fa5a513a-90a5-4e7c-b61c-52e8db2b7a2a.html
RFP.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 13, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 17, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Nov 17, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
xls

BOQ_660877.xls

html

fa5a513a-90a5-4e7c-b61c-52e8db2b7a2a.html

pdf

RFP.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender