Tender For Addn / Altn To Existing Main Guard Room With Provisioning Of Two Rooms For Ic Dsc And Associated Works Under Ge Af Tech Area Agra
Tender Value
42.80 Lakhs
Estimated cost
Bid Submission
07 Dec 2026
15 days left
EMD
85600
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Agra → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Addn / Altn To Existing Main Guard Room With Provisioning Of Two Rooms For Ic Dsc And Associated Works Under Ge Af Tech Area Agra
BOQ
| Sl. No. | Item Description |
| 1 | Cutting openings, through brick walls built in cement mortar for door, window and other openings or enlarging existing openings. converting window into door openings, etc. or cutting out defective brick work for under-pinning, including providing, fixing and removing shoring, cleaning and stacking bricks, removing surplus serviceable bricks, hard-core, etc.. to store and rubbish not 50 m complete all as specified and directed. |
| 2 | M&L for Forming jambs, etc with cement mortar 1:4 or PCC 1:2:4 to openings (to foregoing item), including cutting, toothing and properly bonding into old work, also facing, jointing and pointing to match existing work, complete all as specified and directed. |
| 3 | Dismantling structural steel work including doors, gates but excluding framed truss etc complete all as specified and directed. |
| 4 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. |
| 5 | Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc complete all as specified and directed. Please Enable Macros to View BoQ information SCHEDULE OF CREDIT 1. All worn out/unserviceable materials/items which will be obtained from different items of Sch `A’/ BOQ (as mentioned above) during replacement work, shall become contractor’s property and amount of credit shall be recovered from the contractor's RAR & final bill as and when payments are submitted. These materials shall be allowed to be removed from works site only after credit amount for the same is recovered from the contractor’s payment. Items not covered under this Schedule shall become the property of department and the same shall be returned/ deposited by the contractor at MES store yard without any extra cost to department/ government and all materials which are credited to the contractor, shall be recorded in MB 2. The contractor shall have no claim regarding fixation of credit rates in this schedule and no rebate on \\"Schedule of credit\\" rates/ amount shall be accepted. However contractor can offer more credit rates/ amount. 3. The total credit amount may vary as per execution of work above different items involved in this credit schedule. 4. The quantities given in column 4 are provisional and same shall be measured and paid based on actual quantities obtained against relevant items of Schedule ‘A’/ BOQ. These materials shall not be reused/ reincorporated in the work except where specified. 5. The measurements of dismantled materials shall be the gross quantity obtained and not the net quantity considered for payment in schedule. The old and unserviceable materials to be retrieved from taking down/demolition/dismantling etc are considered in schedule of credit. No claim of contractor with regard to quality/position of old materials shall be entertained Srl No Description of item Qty Unit Assessed rate by department Remarks Rate in (Rs) Amount in ₹ |
| 6 | Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc complete all as specified and directed. Please Enable Macros to View BoQ information SCHEDULE OF CREDIT 1. All worn out/unserviceable materials/items which will be obtained from different items of Sch `A’/ BOQ (as mentioned above) during replacement work, shall become contractor’s property and amount of credit shall be recovered from the contractor's RAR & final bill as and when payments are submitted. These materials shall be allowed to be removed from works site only after credit amount for the same is recovered from the contractor’s payment. Items not covered under this Schedule shall become the property of department and the same shall be returned/ deposited by the contractor at MES store yard without any extra cost to department/ government and all materials which are credited to the contractor, shall be recorded in MB 2. The contractor shall have no claim regarding fixation of credit rates in this schedule and no rebate on \\"Schedule of credit\\" rates/ amount shall be accepted. However contractor can offer more credit rates/ amount. 3. The total credit amount may vary as per execution of work above different items involved in this credit schedule. 4. The quantities given in column 4 are provisional and same shall be measured and paid based on actual quantities obtained against relevant items of Schedule ‘A’/ BOQ. These materials shall not be reused/ reincorporated in the work except where specified. 5. The measurements of dismantled materials shall be the gross quantity obtained and not the net quantity considered for payment in schedule. The old and unserviceable materials to be retrieved from taking down/demolition/dismantling etc are considered in schedule of credit. No claim of contractor with regard to quality/position of old materials shall be entertained Srl No Description of item Qty Unit Assessed rate by department Remarks Rate in (Rs) Amount in ₹ |
| 7 | Old unserviceable brick bats |
| 8 | Scrap iron |
| 9 | Old unserviceable wooden chowkhats with shutters n exc 1.5 Sqm each incl hold fast & iron mongery |
| 10 | Old unserviceable copper / aluminum Point wiring with conduit / wooden / PVC batten etc |
| 11 | Old unserviceable light fittings of any description and size / capacity |
| 12 | Old unserviceable earthing of any description Total amount of credit schedule 7380.0 Signature of contractor AGE (Contracts) For ACCEPTING OFFICER |
AI Tender Summary
Tender Timeline
Nov 14, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedDec 07, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 15 daysDec 14, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 22 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender