Defence Statutory Bodies & Commissions/Committees Closing in 27 days TDR #58526454

Tender For Repair And Periodical Maintenance Of Air Conditioning Plant 4X450 Tr,150 Tr ,Water Cooled Screw Chilled Air Conditioning And Maintenance Of Fire Fighting System And Pipe Line At Naval Base Karwar.

Issued by Statutory Bodies & Commissions/Committees · Uttara Kannada, Karnataka
Tender Value
1.45 Crore
Estimated cost
Bid Submission
12 Dec 2026
27 days left
EMD
2.20 Lakhs
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Uttara Kannada → Karnataka
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Repair And Periodical Maintenance Of Air Conditioning Plant 4X450 Tr,150 Tr ,Water Cooled Screw Chilled Air Conditioning And Maintenance Of Fire Fighting System And Pipe Line At Naval Base Karwar.

BOQ

Name of Work:- REPAIR AND PERIODICAL MAINTENANCE OF AIR CONDITIONING PLANT 4X450 TR,150 TR ,WATER COOLED SCREW CHILLED AIR CONDITIONING AND MAINTENANCE OF FIRE FIGHTING SYSTEM AND PIPE LINE AT NAVAL BASE KARWAR.
Sl. No. Item Description
1Carrying out non- Comprehensive annual maintenance of 4x 450 TR and 1x 150 TR water chiller plant by approved OMC (original manufacturing company i.e. DAKIN) including following routine work .
2i) Inspecting the machine 4 times a year in equal quarters. During this inspection the following work will be carried out:ii) Check oil Level in the compressor.iii) Check liquid sight glasses to determine ,if there is a refrigerant shortage.iv) Checking of microprocessor logic operation.v) Inspecting the unit for leaks with a soap solution.vi) Inspect entire system for any unusual conditions such as noise, vibration, etc.vii) Check the system operating pressure and temperatures to ensure proper operating conditions.vii) Check Evaporator and condenser approach. viii) Check chilled water flow by checking pressure drop across the chiller.ix) Inspect all safety controls and adjust if required.x) Inspect all operating control and sequence of operation.Xi)Review daily operating log maintained by Customers operating personnel and instruct operating engineer as required. xii) Report to Customer in writing on any detected deficiencies, and if requested, issue estimate to make repairs.xiii) Topping of Refrigerant and Oil if required. (supply of Refrigerant and Oil not included.xiv)Yearly adjustments of controls if required. xv) All maintenance and repair work covered by this agreement will be scheduled by DAIPL and performed during regular working hours, seven (7) days per week, holidays and weekends excepted. Service will be available at other times at an additional overtime cost of one and half (1-1/2) times the normal hourly rate. xvi) Spares will be replaced on extra chargeable basis in case required.xvii) Informing the operating personnel of changes or adjustments made and recommending to them improvements in trouble free operation of the plant.xviii) Imparting operational training to your operating staff at the beginning of contract.
3Chiller Unit 450 TR Model no SAAEA7CH4WAMMA
4Chiller Unit 450 TR Model no SAAEA7CH4WAMMA
5Chiller Unit 450 TR Model no SAAEA7CH4WAMMA
6Chiller Unit 450 TR Model no SAAEA7CH4WAMMA
7Chiller Unit 150 TR Model no PFS1701DBRYV
8Supply and replace the following defective / worn out spares / controls for the chiller Plant all as specified and as directed.
9Pressure transducer - Low pressure / High Pressure / Oil pressure up to 10 Kg / cm2
10Temperature sensor suitable for the chiller unit.
11Pressure relief valve
12Valve-Ball as per existing make
13Valve Saloined as per existing make
14Expansion valve as per existing make
15Single Convertor 0-10 Volt PWR 9000C-M-G-1-1-0-N
16Fan and Finger guard of Chiller unit Part Code- SACS110350-5
17PLC Unit Model No- CPCOM+D000UE1DLF0 Part Code- SACS190353-1
18Controller of Display unit Model no- CONTROLLER-P+5D4BBB30EL0-CAREL SN C00251996
19Controller of Display unit Model no- CONTROLLER-P+5D4BBB30EL0- SN C00252048
20Flow switch as per existing make
21M & L for descaling of complete condenser units for central/ package type AC plant of capacity 450 TR by means of adding descaling chemical solution or equivalent in the cooling tower sump of required quantity and circulating the liquid to remove the scales inside the pipes and removing side covers of condenser, cleaning the water tubes by scrubbing with nylon brushes and flushing with fresh water, re fixing the covers, Inlet and out let pipes including replacement of neoprene rubber gasket etc. complete all as specified and directed by Engineer-in-charge
22M & L for descaling of complete condenser units for central/ package type AC plant of capacity 150 TR by means of adding descaling chemical solution or equivalent in the cooling tower sump of required quantity and circulating the liquid to remove the scales inside the pipes and removing side covers of condenser, cleaning the water tubes by scrubbing with nylon brushes and flushing with fresh water, re fixing the covers, Inlet and out let pipes including replacement of neoprene rubber gasket etc. complete all as specified and directed by Engineer-in-charge
23Repairing /servicing and overhauling the centrifugal pump by dismantling the pump coupled with induction motor, opening the pump, inspecting for defects and replacing the worn out parts like gland bush, bearings, gland bolts and nuts, gland packing, gasket, water seal etc including repairs to pump shaft by remetalling, grinding, polishing and reassembling the same and replacing the rusted nuts, bolts, washers etc and coupling with motor testing complete for the following capacity of pump all as specified and directed by Engr-in-charge.
24(a) Primary chiller water pump capacity 300 USGPM
25(b) Primary chiller water pump capacity 900 USGPM
26(c) Secondary chiller Pump 300 USGPM
27(d) Secondary chiller Pump 900 USGPM HP
28(e) Condenser Pump 450 USGPM
29(f) Condenser Pump 1350 USGPM
30(f) Cooling Tower motor of 30 HP Capacity
31(f) Cooling Tower motor of 11 HP Capacity
32M & L for taking out the centrifugal pump motor and transporting to work shop , split opening the motor removing the u/s burnt winding wire, cleaning the slots, re winding with super enameled copper conductor wire of suitable size including insulating materials, varnishing and drying and reassembling and transporting back to site , coupling with pump testing and commissioning all as directed for the following capacities of motors : -
33(a) Primary chiller water pump motor cap 5.4 HP
34(b) Primary chiller water pump motor cap15 HP
35(c) Secondary chiller Pump motor cap 50 HP
36(d) Secondary chiller Pump motor cap 150 HP
37(e) Condenser Pump motor cap 30 HP
38(f) Condenser Pump motor cap 40 HP
39Dismantling the covers of cooling tower and the cooling fan blades from the position, electrical connections and taking down the cooling tower motor of capacity 30 HP, split opening the motor, removing the burnt out winding, cleaning the slots re winding with super enameled copper conductor wire of suitable size including insulating materials, varnishing and drying and reassembling and transporting back to site and testing on commissioning all as directed by Engineer -in Charge.
40Dismantling the covers of cooling tower and the cooling fan blades from the position, electrical connections and taking down the cooling tower motor of capacity 11 HP, split opening the motor, removing the burnt out winding, cleaning the slots re winding with super enameled copper conductor wire of suitable size including insulating materials, varnishing and drying and reassembling and transporting back to site and testing on commissioning all as directed by Engineer -in Charge.
41Supply and fix cooling tower fins as per existing size and shape during all as specified and directed
42Descaling of cooling tower by dismantling the cooling tower fins removing the scales in the fins, sump by scrubbing with wire / nylon brush and refixing the fins in position including replacing the float valve for supply water line, painting the steel/wooden surfaces with two coats of enamel paint over a coat of zinc oxide primer and testing the cooling tower all as specified and as directed.
43Supply and fill Gas R-134 a in cylinder for charging / topping up of water cooled chiller plant of Capacity 4x 450 TR and 150 TR unit Complete all as specified and directed by engineer-in -Charge.
44Material and Labour for leak testing of gas by evacaveting the gas by suitable means and filling with nitrogen gas for 24 hours rectifying the leakages with and including required material / brazing etc. and refilling gas testing chiller all specified and directed.
45Supply and replace in repairs Motorized butter fly valve of dia 250 mm suitable for condensing /chiller water line with ISI marked including jointing with gasket ,nut, bolts washer all as specified by Engr-in- charge
46Supply and replace in repairs Motorized butter fly valve of dia 150 mm suitable for condensing /chiller water line with ISI marked including jointing with gasket ,nut, bolts washer all as specified by Engr-in- charge
47Supply and fix in replace in repairs Ball valve of dia 40 mm suitable for condensing /chiller water line with ISI marked including jointing with proper gasket ,nut, bolts washer all as specified by Engr-in- charge
48Supply and fix in replace in repairs Ball valve of dia 25 mm suitable for condensing /chiller water line with ISI marked including jointing with proper gasket ,nut, bolts washer all as specified by Engr-in- charge
49Supply and fill compressor oil for centrifugal compressor for toping up / replacement as required and all as directed.
50Supply and fill the dosing chemical Corrosion/Scale Inhibitor INDION 7106 for dosing plant as required and all as directed.
51Supply and fill the dosing chemical Corrosion/Scale Inhibitor INDION 9053 for dosing plant as required and all as directed.
52Supply and fill the dosing chemical Corrosion/Scale Inhibitor INDION 5489 for dosing plant as required and all as directed.
53Supply and fill the dosing chemical Corrosion/Scale Inhibitor INDION 5545 for dosing plant as required and all as directed.
54Supply & fixing in replacement of water pressure gauge (0 to 16 Kg/cm2) as per existing make
55Supply& fixing in replacement of Temp gauge (0 to 100 deg Centigrade) as per existing make
56Supply and fix in repair and replacement of Digital flow meter
57S&F in replacement of following ball bearing (NDE/DE) suitable for cooling tower motor ,chiller motor,Blower motor, condenser motor etc removing of existing unserviceable bearing of any type or make all as directed by Engr-in-charge.
58(a) 6205/2Z
59(b) 6206/2Z
60(c) 6207/2Z
61(d) 6208/2Z
62Supply and fix in replacement MCCB of following capacities
63(a) 630 A TP 50 KA Adjustable type 415V AC
64(b) 400A,TP.415V,50 Hz, 36 KA adjustable type
65(c) 250A,TP.415V,50 Hz 36 KA adjustable type
66(d) 125A,TP.415V,50 Hz 36 KA adjustable type
67(e) 100A,TP.415V,50 Hz,16KA adjustable type
68(f) 160A,TP.415V,50 Hz,36KA adjustable type
69(g)63A,TP,415V,50Hz,16KA adjustable type
70(h) Extended Rotary Handle type MCCB 100 Amp 415 Volt 36 KA
71(j) Extended Rotary Handle type MCCB 400 Amp
72Supply and fix in replacement of Power contactor AC-3 of Aux voltage 230V
73(a) MNX 95-TP of rating 95A,
74(b) MNX 80-TP of rating 80A,
75(b) MNX 75 -TP of rating 80A,
76(c) MNX 25-TP of rating 25A,
77(d) MNX 265 -TP of rating 265 A,
78Supply and fix in replacement of over load relay with inbuilt single phase protection of following capacities
79(a) MN5 of rating 20-33A
80(b) MN5 of rating 14-23A
81(c) MN12 of rating 28-46.5 A
82(d) TA200DU 135 A
83Serviceing of existing installed VFD as per OEM (original manufacturing company i.e. Danfoss) manufacturer's standard and testing complete as per specified and directed
84Painting of 450 TR capacity existing cooling tower with existing color all as per directed and specified.
85Supply and replacement and testing of GM gate/ globe valve heavy duty confirming to IS-778 with iron wheel head screwed both end for 50 mm or size as per existing complete all as specified and directed.
86Supply and fix in replacement MCB of following capacities
87(a) 6A to 32 Amp ,SP,240V,50Hz,10 KA C curve
88Supply Erecrtion testing and commissioning in repair O closed cell elastomeric nitrile rubber with aluminum foil laminated on one side, having thermal Temperature, of 20 c as per EN 12667, moisture diffusion resistance factor or u Value of minimum 7000 for base insulation material without the foil as per EN 12086, fire performance such that it passes Class 1 as per BS476 Part 7 for surface spread of flame and also fire performance of V0, HB as per UL 94, 1996, density without the foil between 40 to 55 KG/ Cum. the insulation material shall be FM ( factory Mutual) USA approved and dust & fiber free. the Aluminium foil shall be 60 microns thick and its weight shall be 193 gms as per EN ISO 2286-2, tensile strength 90 N/ 15 mm as per EN ISO 527-3 with elongation>10% as per EN ISO 527-3. All complete as specified in particular specification 19 mm thick thermal insulation as directed.
89Repair to Microprocessor based control panel display unit for 450 TR AC chiller unit including spare parts
90Repair to Microprocessor based control panel display unit for 150 TR AC chiller unit including spare parts
91Preventive Maintenance of Elgin Air Compressor system by approved OMC (original manufacturing company i.e. ELGI) including following routine work .ELGi Air Compressor Qty- 03 ( Four Visit every Compressor) MODEL - OF300AE
92Preventive Maintenance of Air dryer system by approved OMC (original manufacturing company i.e. ELGI) including following routine work .Air Dryer Qty- 02 ( Four Visit every Air Dryer)
93Scope of work Note - item No 36 & 37Check and ensure the oil level and quality of oil i) Check and ensure there is no air and oil leakage in the compressor package ii) Check, clean and change the air filter as required iii) Change oil and oil filter at recommended intervals iv) Check and replace the oil separator element at recommended intervals v)Check and replace the drive coupling element if required vi) Check and ensure the operation of the safety valve against the set pressure vii) Check and ensure all the quick coupling fitting and flexible hoses are intact viii) Check and ensure the proper functioning of all the valves in the compressor package and replace the service kits if required.ix) Check and ensure the proper functioning of the auto drain valve and clean/change as required x) Check and ensure the proper functioning of all the safety switches xi) Check and ensure the proper functioning and condition of electrical contactors xii) Check and ensure the proper functioning of all safety interlocking devices xiii) Check the condition of the air end and main motor bearings by using SPM and remedial measures recommended once in year.xiv)Check the compressor operating environment and advise relevant recommendations for reliable operation of compressor. xv) Study and recommend upgrade kits if applicable xvi) Submit the Compressor Performance/Health Check Report once in a year Note: All the maintenance activities shall be carried out as per the
94Carrying out Half yearly maintenance of ELGi Air Compressor system by approved OMC (original manufacturing company i.e. ELGI) including following routine work included Child part of 8000 hr consumable kit OA3.kit part No- 41240089
95During this inspection the following Item will be carried out:ii) Air filter element OW4iii) AIR OIL SEPERATOR SPINON .iv) KIT - AIR PIPING OA3 v) KIT IC MOS OA2vi) KIT-LUBRICATION PIPING - OA3.vii) KIT-PIPE COUPLING OA3vii) OIL FILTER ELEMENT-75 LPM viii) PANEL FILTER AV230
96Supply and replacement of Low Pressure compressor ELGI AIRLUBE UT SYN PLUS
97Supply and Greaseing of Low Pressure compressor GREASE- EM UNIREX N3
98Supply and replacement in repair of Auto Drain Valve as per existing with ISI marked complete all as specified and directed.
99Supply and replacement in repair of Motorized Butterfly Valve 100 mm in Air compressed line with ISI marked complete all as specified and directed.
100supply and replacement in repair of Non Return Valve size 150mm in compressed line with ISI marked complete all as specified and directed.
101supply and replacement in repair of Gate Valve size 150 mm in compressed line with ISI marked complete all as specified and directed.
102supply and replacement in repair of Gate Valve size 100 mm in compressed line with ISI marked complete all as specified and directed.
103Supply and replacement in repair of Pre Filter 5 micron Element with ISI marked complete all as specified and directed.
104Supply and replacement in repair of Pre Air Filter 1 micron Element with ISI marked complete all as specified and directed.
105Supply and replacement in repair of After Air Filter 1 micron Element with ISI marked complete all as specified and directed.
106Supply and replacement in repair of Differential pressure Valve (DP Valve) with ISI marked complete all as specified and directed.
107Supply and replacement in repair of Pressure -Reducing valve (RP valve)with ISI marked complete all as specified and directed.
108Supply and replacement in repair of Solenoid Valve 5/2 Way with ISI marked complete all as specified and directed.
109Supply and fix in repair and replacement of Pressure Gauge with ISI marked complete all as specified and directed.
110Supply and fix in repair existing Size (100mm to 250 mm Dia)of pipe of Gasket in pipeline system with nut bolt as per site requirement Complete all as specified and directed.
111Material and labour providing and carrying out stainless (SS-316/SS-304) pipe Fabrication work including cutting edge preparation beveling,fit-up,TIG/MIG welding fabrication of bends ,elbow reducers,flanges,tees and other pipe fittings as required. The work job Pipe line of 100 mm dia to 250 mm dia of Existing Pipe line The work shall include alignment, joint preparation, welding, grinding, finishing, and inspection of welded joints, complete
112Supply and fix in repair and replacement of Temperature Gauge with ISI marked complete all as specified and directed.
113supply and fix in replacement of Air Dryer Actuator as per existing with ISI marked complete all as specified and directed
114Supply and fix in replacement MCCB of following capacities
115(a) 250A,TP.415V,50 Hz 36 KA adjustable type
116(b) 125A,TP.415V,50 Hz 36 KA adjustable type
117(c) 50A,TP.415V,50 Hz,16KA adjustable type
118(d) 63A,TP,415V,50Hz,16KA adjustable type
119Supply and fix in repair Illuminated Push button with element for Raise.(Green) & Lower (Green)
120Supply and fix in repair Phase Indicating Lamp R (Red), Y (Yellow), B (Blue)
121Supply and fix in repair Amps meter as per site requirement suitable complete all specified and directed.
122Supply & Fix in repair selector switch of 3 stage on - off - on suitable for existing panel complete all specified and directed.
123Supply & Fix in repair selector switch of 3 stage on - on - on suitable for existing panel complete all specified and directed.
124Labour only for Non Comprehensive Routine maintenance checkup of Fire alarm system's error and alarms, necessary inspection of the Fire alarm system and take necessary corrected actions, resolve any issues regarding the system and take corrective actions for the problems , check connectivity and communication at all terminations, check all power sources and outlets used in the system complete for all panels all Fire alarm system at Pier-2 & Pier-5' with respective Tunnel Area by authorised service engineer of OEM and furnish the report to Engineer-in-charge.
125(a) All as per above item No 1 but for CWP-03 at Naval Base karwar
126(b) All as per above item No 1 but for UC-02 at Naval Base karwar
127(c) All as per above item No 1 but for 5 SS at Naval Base karwar
128(d) All as per above item No 1 but for SWP- 02 at Naval Base karwar
129(e) All as per above item No 1 but for Pier-5 Lower Deck at Naval Base karwar
130(f) All as per above item No 1 but for 2 SS at Naval Base karwar
131(g) All as per above item No 1 but for Pier-2 lower Deck at Naval Base karwar
132(g) All as per above item No 1 but for MDSS at Naval Base karwar
133M&L in repair 4 zone fire Suppression system Panel with 6 hours battery back up, detector circuit monitored for open circuit, short circuit and 4 zone panel including 2 No 12V,7 AH dry rechargeable battery etc complete all as specified and directed by Engineer-in-Charge.
134Supply & installation in repairs of Hooter/Sounder cum strobe along with required accessories complete all as specified and directed by Engineer-in-charge.
135Supply & installation in repairs of Addressable Smoke detector along with required accessories complete all as specified and directed by Engineer-in-charge
136Supply & installation in repairs of Addressable Manual Call Point along with required accessories complete all as specified and directed by Engineer-in-charge.
137Supply & Laying in repairs of 2 Core 1.5 Sq mm Copper Flexible Cable for control wiring with & including copper lugs, connectors etc complete all as specified and directed by Engineer-in-charge.
138Supply & Fix in repairs lead acid type battery of 12 Volts 7 AH capacity complete all as specified and directed .
139Supply and installation in repair of MCP Glass only complete all as specified and directed
140Supply and installation in repair of mother board of Fire Alarm control panel complete all as specified and directed
141Supply and installation in repair of Power supply of Fire Alarm control panel complete all as specified and directed
142Supply & installation in repair of Addressable Multi Sensor detector along with required accessories complete all as specified and directed by Engineer-in-charge.
143Supply (AFFF 3 - C6) Aqueous Film Forming Foam UL listed for the Bladder tank Proportion system Horizontal type the Foam Concentrate (AFFF 3- C6) Complete all as specified by Engg-in- Charge
144Filling the (AFFF 3 - C6) Aqueous Film Forming Foam UL listed in HD Make Bladder system Horizontal type installed of Capacity 5500 ltr of AFFF concentrate by OEM(original manufacturing company i.e. HD Fire) from Filling kit consisting of water drain pipe, Air Filling and Foam Conc Filling unit with Centrifugal Pump and required Tool tackles complete all as specified and directed by Engineer-in -Charge.
145Supply & installation testing and commissioning in repair of 150 NB (6\\") SS 316L Pipe, ASTM A312 TP316L, Schedule 10S, OD 168.3 mm, suitable for foam fire-fighting service, complete with necessary end preparation and identification marking fittings for 150 NB foam line compatible for AFFF 3C -6 concetrate , including bends/elbows, tees, reducers, flanges, couplings, fabrication and other required fittings, as per approved layout and as per site requirement duly recommended by Engr in charge complete with SS-compatible clamps, brackets, anchor supports and necessary hardware gaskets, bolts, nuts and washers, for 150 NB foam line complete all as specified and directed.
146Material and labour applying painting to the existing fire-fighting of MS fire cabinet box with MS angle frame as per existing made including surface cleaning, removal of rust, loose paint, dust, oil, and other foreign materials, surface preparation, application of one coat of suitable anti-corrosive primer, followed by two coats of approved red synthetic enamel paint or fire-service identification paint complete all as specified and directed by Engineer-in-Charge.
147Material and labour applying painting to the existing/new fire-fighting pipeline of 100 mm NB to 250 mm NB diameter, including surface cleaning, removal of rust, loose paint, dust, oil, and other foreign materials, surface preparation, application of one coat of suitable anti-corrosive primer, followed by two coats of approved red synthetic enamel paint or fire-service identification paint the painting shall be carried out uniformly over the entire exposed pipe surface, including fittings, bends, tees, flanges, and supports, wherever Complete all as specified and directed.
148Supply & installation in repairs Zone control Valve along with required accessories complete all as specified and directed by Engineer-in-charge.
149Supply and fix in repair and replacement of Signal Butter fly valve complete all as specified and directed by Engineer-in-charge.
150Supply and fix in repair and replacement of Water flow indicator complete all as specified and directed by Engineer-in-charge.
151Supply and fix in repair and replacement of Pressure gauge complete all as specified and directed by Engineer-in-charge.
152Supply and fix in repair and replacement of Drain Valve as per existing Zone control valve
153Supply & installation in repairs Water Curtain Nozzle along with required accessories complete all as specified and directed by Engineer-in-charge.
154Supply and fix in repair Fire sprinkler Pendent 68 Degree temperature rating pendent type complete all as specified and directed by Engineer-in-charge
155Supply & installation in repairs Deluge Valve along with required accessories complete all as specified and directed by Engineer-in-charge
156S&F in repairs hose box made of 18 gauge MS Sheet 800mm X 750mm X 300 mm with double door with 4 mm thick glasses and door frame made of 16 gauge MS sheet painted fire red out side and inside yard complete all as specified and directed.
157Supply and fix in repair Branch pipe gun metal 63 mm instantaneous inlet, made threaded outlet, 15mm bore nozzle short complete all as specified and directed by engr-in-charge.
158Supply and fix gun metal Double headed hydrant landing valve of 63 mm dia with instantaneous coupling complete all as specified and directed by Engr-in-charge.
159Material and labour RRL hose type A 15 m length and 63 mm dia, non-percolating type conforming to IS 636 complete all as specified and directed by Engr-in-Charge
160Supply and fix in repair and replacement of Single headed Hydrant Valve complete all as specified and directed.
161Supply and fix in repair and replacement of Butterfly Valve of size 100 mm dia complete all as specified and directed.
162Supply and fix in repair and replacement of Butterfly Valve of size 80 mm dia complete all as specified and directed.
163Supply and fix in repair and replacement of Butterfly Valve of size 50 mm dia complete all as specified and directed. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58526454
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 1.45 Crore
LAST DATE 12-12-2026
Authority
Authority Name Military Engineer Services
Work Description Tender for Repair And Periodical Maintenance Of Air Conditioning Plant 4X450 Tr,150 Tr ,Water Cooled Screw Chilled Air Conditioning And Maintenance Of Fire Fighting System And Pipe Line At Naval Base Karwar.
Basic Detail
Tender No 86169
Bidding Type Tender
Location
City Uttara Kannada
State Karnataka
Key Dates
Publish Date 13 Nov 2026
Submission Date 12 Dec 2026
Open Date 14 Dec 2026
Finance
Tender Value 1.45 Crore
Tender Fee 1000
EMD 2.20 Lakhs
Exemption Available
Document List
86169Tender.pdf
89feb2e0-f26d-4c5d-aae7-bf1b616567b0.html
BOQ_895782.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 13, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 12, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 27 days
Dec 14, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 29 days

Tender Documents

Download All (ZIP) ↓
pdf

86169Tender.pdf

html

89feb2e0-f26d-4c5d-aae7-bf1b616567b0.html

xls

BOQ_895782.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender