Tender For Work Regarding Pipeline Extension In Ward No. 10 (Lal Bahadur Shastri) From Asharfi Lals House To Achhe Lals House, Including The Installation Of 2 Standposts And 10 Connections.
Tender Value
1.77 Lakhs
Estimated cost
Bid Submission
27 Nov 2026
8 days left
EMD
17745
Bank guarantee accepted
Document Fee
2714
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kheri → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Work Regarding Pipeline Extension In Ward No. 10 (Lal Bahadur Shastri) From Asharfi Lals House To Achhe Lals House, Including The Installation Of 2 Standposts And 10 Connections.
BOQ
| Sl. No. | Item Description |
| 1 | Supply of 90 mm dia HDPE Pipe PN-6: Class PE-100 for distribution system conforming to latest/ relevant I.S.4984/1995 Specifications with all jointing materials and specials conforming to latest / relevant I.S. specifications including F.O R. destination and all taxes and insurance etc. with loading unloading but excluding the cost of trenches all complete as per instructions of Engineer-in-charge. |
| 2 | Supply of HDPE specials as per conformation to I.S.S. suitable for above HDPE pipes F.O.R. destimation including all taxes and insurance |
| 3 | Carting from store (upto 8Km. or within municipal limit which is more) 90mm HDPE pipes, specials coupling, fittings etc.to the site of work. Lowering the same into trenches and laying to true alignment and gradient including testing and jointing of pipe lines (excluding trenching), but including cutting of pipes for making joints.\ |
| 4 | Supplying 80 mm dia DI butterfly /sluice valves, class I, working pressure 10 Kg/cm2 confirming to IS:780/1969 or its latest amendments, including valve fittings & Dismantling Joints as perrequirement F.O.R.destination, and lowering them into thealready prepared trenches, complete and also including supply of jointing materials etc. complete .including all taxes and insurance, as per instructions of Engineer -in -charge. |
| 5 | Carting of 80 mm dia sluice valves / scour valve from store to site of works (upto 8Km. or within municipal limit which is more) of following sizes to site of work, lowering in already prepared trenches and fixing them in position ,making flange joints including supply of all materials such as bolts, nuts, rubber insertion, white lead, testing etc . complete. |
| 6 | Construction of Sluice Valve Chamber Masonary type as per Unit estimate UP Jal Nigam U |
| 7 | Supply of under ground sluice value type fire hydrant consisting of 80 mm dia sluice valve, 80mm dia tail pieces, 80mm dia duck foot bend and 80 mm dia standard makes iron coupling with cap and etc. complete conforming to latest/relevent I.S.pecifications including all taxes and insurance up to site of work |
| 8 | Carting from store to site of works(upto 8Km. or withinmunicipal limit which is more) of 80mm dia size flanged fire hydrant to site of work, fixing them in position for flanged joints . |
| 9 | Construction of Fire Hydrant Chamber as per Unit Estimate UP Jal Nigam U |
| 10 | Dismantling of interlocking tiles with P.C.C (1:6:12) base including sorting out and stacking of serviceable materials and disposal of unserviceable materials upto distance of 50m. and also including temporary reinstatement of road by old materials. (dia + 60 cm) |
| 11 | Excavation for pipe line in ordinary soil (loam, clay, sand) with lift up to 1.5 m and lead up to 50 m and including filling back, watering and ramming of excavated earth into the trenches and removal and disposal of surplus earth within 50 meters.. Width (OD+600)mm,Depth(1000mm+OD) |
| 12 | Permanent reinstatement of Interlocking tiles with 40% new tiles (80 mm thick M-30 Grade) including all material labour, T&P etc. complete. |
| 13 | deducting 60% Servicable Interlocks |
| 14 | Provision for interconnection with existing pipe for of different diameter including supply of all pipes and specials and also their laying, jointing and testing complete but excluding supply and laying of pipe 90 mm dia to 180 mm dia |
| 15 | Road Crossing - Excavation in foundation of trench of proper size in soil mixed with moorum, Shingle, Kankar, soft rock, hard rock, including refilling, dressing and ramming earth or sand or bajri, ballast, including providing, supply, carting, lowering, laying and jointing of casing pipe of RCC NP-3 with appropriate size, with rubber ring joint, sand filling in gap inside RCC pipe, insertion of distribution pipe into the encasing pipe including supply of T&P, including concrete of 150 mmthick in with 40mm gauge brick ballast local sand and cement in proportion of 8:4:1, provision for barricading, labour for traffic diversion etc. Complete for proper completion of work as per instruction of Engineer. 110mm dia pipe. |
| 16 | Making house connection should be done atleast 2 m inside the boundary wall with provision of tap from distribution line to outer wall of house with supply of 1 m above GL G.I. pipe (15 mm) (above ground) & average 5 mtr. MDPE Pipe (20 mm) (below ground) including specials saddle Tapetc. of suitable size T&P etc. including excavation laying and jointing for proper completion of work as per instructions of Engineer as per Dwg 12 (excluding road restoration) |
| 17 | Providing, laying, jointing, and fixing in position Public Stand Post connection complete on existing 90 mm OD (PE-100, PN- 6) HDPE distribution main pipe, including supplying and fixing 90 mm x 20 mm electrofusion tapping saddle with integrated brass cutter/ferrule, providing and laying 20 mm OD (PE- 80/PE-100, PN-16) MDPE service pipe (up to 5.0 m length) withcompression fittings and transition MTA/FTA adapters, 15 mm (1/2\\") nominal bore medium class GI vertical riser pipe with necessary GI specials, 15 mm (1/2\\") heavy-duty ISI marked brass bib cock and isolation stop valve, complete with earth excavation, backfilling, PCC 1:3:6 foundation bedding, brick masonry support pillar in CM 1:4 with 12 mm thick cement plaster 1:4 and neat cement finish, PCC platform apron withoutward drainage slope, hydraulic testing, flushing,commissioning, and all labour, materials, tools, plant, and sundries complete as per departmental specifications and directions of the Engineer-in-Charge. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 13, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 27, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysNov 28, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender