Tender For Work Related To The Maintenance And Repair Of Broken Ht/Lt Power Lines And Poles, And Other Associated Tasks, To Ensure Uninterrupted Power Supply In The Ss Baxipura, Kalpipara, Parsaura, Dph Areas
Tender Value
5 Lakhs
Estimated cost
Bid Submission
21 Nov 2026
3 days left
EMD
5000
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Bahraich → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Work Related To The Maintenance And Repair Of Broken Ht/Lt Power Lines And Poles, And Other Associated Tasks, To Ensure Uninterrupted Power Supply In The Ss Baxipura, Kalpipara, Parsaura, Dph Areas
BOQ
| Sl. No. | Item Description |
| 1 | (A) CarrieageCarriage of the follwing material from Electricity store centre, Bahraich to the work site/dump site. |
| 2 | PCC/STP Pole (size 8.5/9/11 Mtr. Long) |
| 3 | AB Cable of different size |
| 4 | ACSR conductor |
| 5 | Other line material |
| 6 | (B) Erection1. Any kind of fabrication work including hole in X-arm/clamp etc. shall be done by the contractor at his own cost.2. Fastner including suitable size of washer shall be provided and erected by the contractor at his own cost. |
| 7 | Erection of single PCC/ST Poles alongwith fitting of all accessories on pole. (size 8.5/9/11 Mtr. Long) |
| 8 | Erection of sectional double PCC/STP pole alongwith fitting of all accessories. (size 8.5/9/11 Mtr. Long) |
| 9 | Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost. |
| 10 | Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely. All required materials provided by the contractor at his own cost. (size 8.5/9/11 Mtr. Long) |
| 11 | Straightening of tilted Pole in existing line with safe opening of conductor there after stringing, re-sagging & rebinding of conductor for Smooth supply. (size 8.5/9/11 Mtr. Long) |
| 12 | Replacement of X-arm/Pin insulator/Disk insularor etc. |
| 13 | Replacement/laying/stringing/sagging of ABC/ LT cable upto proper sag of different size with complete fitting. |
| 14 | Replacement/laying/stringing/sagging and binding of conductors with jumpering and complete fitting. |
| 15 | Dismentaling of Pole including all accessories installed on Pole Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 14, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 21, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysNov 23, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender