Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - In The Area Of Eutd-1 Aligarh; Electrical System Or Installation; Buyer - Safe Carriage Of 13 Mtrs. S.T Poles From Store Centre, Sarsol To The Respe
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - In The Area Of Eutd-1 Aligarh; Electrical System Or Installation; Buyer - Safe Carriage Of 13 Mtrs. S.T Poles From Store Centre, Sarsol To The Respective Site Of Work Including The Work Of Its Loading & Unloading At The Repective Ends. , Safe Carriage Of Line Material Viz. Conductor, G.I. Earth Wire, Cross Arm, Angle, Channel, Insulators, Clamps & Other Material From Store Centre, Sarsol To The Respective Site Of Work Including The Work Of Its Loading & Unloading At The Respective Ends. , Erection Of Single Support By 13 Mtrs. S.T Poles Including Fixing Complete Ht/Lt Fittings As Per Resspo Munual Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Grouting Of Single Support (13 Mtrs. S.T Poles) As Per Resspo Manual Including Of The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand & Brick Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast Etc. , Erection & Grouting Of 13 Mtrs. St Double Pole Including Fixing Complete Ht/Lt Fitting As Per Resspo Manual Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand & Brick Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast Etc. , Erection & Grouting Of 13 Mtrs. St Tri-Pole Including Fixing Complete Ht/Lt Fitting As Per Resspo Manual Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand & Brick Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast Etc. , Erection & Grouting Of 13 Mtrs. St Four Pole Including Fixing Complete Ht/Lt Fitting As Per Resspo Manual Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand & Brick Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast Etc. , Laying, Sagging, Stringing, Binding & Jumpering Of Acsr Dog Conductor On The Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. , Erection And Grouting Of Stay Set Including The Work Of Nozzling Etc. As Per Respo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T&P Etc. Required For Proper Completion Of Work As Per Resspo Manual. , Fixing & Connecting Of Earthing Rods As Per Resspo Manual Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. , Neutral & Body Earthing Of 630Kva Distribution Transformer At Honble District Court, Aligarh By Digging Of Pit Upto Water Level And Then Inserting 1-¼ Dia Gi Pipe Of ‘A Grade, Conforming To The Requirement Of Is Specification And Then Connecting The Top Of The Inserted Pipe And Transformer Body Through Gi Strip Of Size 40X6 Mm With The Help Of Nut And Bolt Or Through Gas Welding, As Per Direction Of Supervising Engineer. It Includes The Cost Of All Material Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. The Aforesaid Work Shall Be Carried Out As Per Resspo Norms. , Fabrication Of 33Kv F-Bracket As Per Resspo Norms. , Fabrication Of 33Kv Top Channel As Per Resspo Norms. , Fabrication Of 33Kv Dropper Channel As Per Resspo Norms. , Fabrication Of 33Kv E-Bracket As Per Resspo Norms. , Fabrication Of 33Kv V-Type Cross Arm As Per Resspo Norms. , Fabrication Of 33Kv Bracing Angle As Per Resspo Norms. , Fabrication Of 33Kv Guarding Angle As Per Resspo Norms. , Gurading Of 33 Kv Line By Laying Two Nos. Gi Wire Paraller And Fixing Of Lacings (Tilli) At A Distance At 2-3 Mtrs. As Per Respo Norms And Also Including The Cost Of Arrangement Of Labour, T&P Etc Required For Proper Completion Of Work. , Safe Carriage Of 33Kv Line Isolator From Store To Site And Its Proper Installation On Double Pole As Per Resspo Norms , Dismantling Of Old & Used Conductor Form Existing Line And Its Safe Carriage From Site To Store As Per Resspo Norms :- , Dismantling Of Old & Used St Pole/ Iron Scrap Form Existing Line And Its Safe Carriage From Site To Store As Per Resspo Norms :-
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Safe carriage of 13 Mtrs. S.T Poles from Store Centre, Sarsol to the respective site of work including the work of its loading & unloading at the repective ends. | Safe carriage of 13 Mtrs. S.T Poles from Store Centre, Sarsol to the respective site of work including the work of its loading & unloading at the repective ends. |
| 2 | Safe carriage of line material viz. Conductor, G.I. Earth Wire, Cross Arm, Angle, Channel, Insulators, Clamps & other material from store Centre, Sarsol to the respective site of work including the work of its loading & unloading at the respective ends. | Safe carriage of line material viz. Conductor, G.I. Earth Wire, Cross Arm, Angle, Channel, Insulators, Clamps & other material from store Centre, Sarsol to the respective site of work including the work of its loading & unloading at the respective ends. |
| 3 | Erection of single support by 13 Mtrs. S.T Poles including fixing complete HT/LT fittings as per RESSPO Munual including the cost of labour, T&P and carrier etc. required for proper completion of work. | Erection of single support by 13 Mtrs. S.T Poles including fixing complete HT/LT fittings as per RESSPO Munual including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 4 | Grouting of single support (13 Mtrs. S.T Poles) as per RESSPO Manual including of the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. | Grouting of single support (13 Mtrs. S.T Poles) as per RESSPO Manual including of the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. |
| 5 | Erection & grouting of 13 Mtrs. ST double pole including fixing complete HT/LT fitting as per RESSPO Manual including the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. | Erection & grouting of 13 Mtrs. ST double pole including fixing complete HT/LT fitting as per RESSPO Manual including the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. |
| 6 | Erection & grouting of 13 Mtrs. ST Tri-pole including fixing complete HT/LT fitting as per RESSPO Manual including the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. | Erection & grouting of 13 Mtrs. ST Tri-pole including fixing complete HT/LT fitting as per RESSPO Manual including the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. |
| 7 | Erection & grouting of 13 Mtrs. ST Four pole including fixing complete HT/LT fitting as per RESSPO Manual including the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. | Erection & grouting of 13 Mtrs. ST Four pole including fixing complete HT/LT fitting as per RESSPO Manual including the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc. |
| 8 | Laying, sagging, stringing, binding & jumpering of ACSR Dog conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. | Laying, sagging, stringing, binding & jumpering of ACSR Dog conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. |
| 9 | Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work as per RESSPO Manual. | Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work as per RESSPO Manual. |
| 10 | Fixing & connecting of earthing rods as per RESSPO Manual including the cost of labour, T&P etc. required for proper completion of work. | Fixing & connecting of earthing rods as per RESSPO Manual including the cost of labour, T&P etc. required for proper completion of work. |
| 11 | Neutral & body earthing of 630KVA Distribution Transformer at Hon'ble District Court, Aligarh by digging of pit upto water level and then inserting 1-¼” dia GI pipe of ‘A’ grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 40x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. It includes the cost of all material labour, T&P, carrier etc. required for proper completion of work. The aforesaid work shall be carried out as per RESSPO norms. | Neutral & body earthing of 630KVA Distribution Transformer at Hon'ble District Court, Aligarh by digging of pit upto water level and then inserting 1-¼” dia GI pipe of ‘A’ grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 40x6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. It includes the cost of all material labour, T&P, carrier etc. required for proper completion of work. The aforesaid work shall be carried out as per RESSPO norms. |
| 12 | Fabrication of 33KV F-Bracket as per RESSPO Norms. | Fabrication of 33KV F-Bracket as per RESSPO Norms. |
| 13 | Fabrication of 33KV Top Channel as per RESSPO Norms. | Fabrication of 33KV Top Channel as per RESSPO Norms. |
| 14 | Fabrication of 33KV Dropper Channel as per RESSPO Norms. | Fabrication of 33KV Dropper Channel as per RESSPO Norms. |
| 15 | Fabrication of 33KV E-Bracket as per RESSPO Norms. | Fabrication of 33KV E-Bracket as per RESSPO Norms. |
| 16 | Fabrication of 33KV V-Type Cross Arm as per RESSPO Norms. | Fabrication of 33KV V-Type Cross Arm as per RESSPO Norms. |
| 17 | Fabrication of 33KV Bracing Angle as per RESSPO Norms. | Fabrication of 33KV Bracing Angle as per RESSPO Norms. |
| 18 | Fabrication of 33KV Guarding Angle as per RESSPO Norms. | Fabrication of 33KV Guarding Angle as per RESSPO Norms. |
| 19 | Gurading of 33 KV line by laying two nos. GI wire paraller and fixing of lacings (tilli) at a distance at 2-3 Mtrs. As per RESPO Norms and also including the cost of arrangement of labour, T&P etc required for proper completion of work. | Gurading of 33 KV line by laying two nos. GI wire paraller and fixing of lacings (tilli) at a distance at 2-3 Mtrs. As per RESPO Norms and also including the cost of arrangement of labour, T&P etc required for proper completion of work. |
| 20 | Safe carriage of 33KV Line Isolator from Store to site and its proper installation on double pole as per RESSPO Norms | Safe carriage of 33KV Line Isolator from Store to site and its proper installation on double pole as per RESSPO Norms |
| 21 | Dismantling of old & used Conductor form existing line and its safe carriage from site to store as per RESSPO Norms :- | Dismantling of old & used Conductor form existing line and its safe carriage from site to store as per RESSPO Norms :- |
| 22 | Dismantling of old & used ST Pole/ Iron Scrap form existing line and its safe carriage from site to store as per RESSPO Norms :- | Dismantling of old & used ST Pole/ Iron Scrap form existing line and its safe carriage from site to store as per RESSPO Norms :- |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender