Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - In The Area Of Eutd-2 Aligarh; Electrical System Or Installation; On Semi Turnkey Basis - Safe Carriage Of Following Materials From Store Centre Or
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - In The Area Of Eutd-2 Aligarh; Electrical System Or Installation; On Semi Turnkey Basis - Safe Carriage Of Following Materials From Store Centre Or Any Other Place To The Respective Site Of Work Through The Kachha/Pacca Road Including Loading, Unloading At The Respective Ends And Erection Of Same Including The Work Of Dragging As Per Site Requirement, Jumphering Of Transformer With 11 Kv Line Through Lt Abc Cable, Weasal Conductor Etc. Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work As Per Respo Norms Is Included In The Work. , 11 Kv Xlpe Cable 3X70sqmm (For Underground & Overhead) , 11 Kv Xlpe Cable 3X120sqmm (For Underground & Overhead) , Gi Pipe 6 Dia , Earthing Of Pole , Stay Set Complete , Acsr Dog Conductor , 11 Kv Polymeric Pin Insulator , 11 Kv Pin With Nut Bolt , 11 Kv Polymeric Disc Insulator , 11 Kv Disc Fitting , Stp Pole 11 Meter (Single Support & Double Pole) , 11 Kv Pilfer Proof Metering Cubicle , T-Off Channel , V-Type Cross Arm , Top Channel 100X50x2240mm , Dropper Channel 100X50x2000mm , Ms Base Angle , 11 Kv Ct/Pt Metering Pole Mounting Unit 10/5 A , Supply, Fixing And Erection Of Following Materials As Per Site Requirement As Per Respo Norms:- , 11 Kv Jointing Kit 3X70sqmm (O/D & I/D) , 11 Kv Jointing Kit 3X120sqmm (O/D & I/D) , Number Plate With Clamp , Danger Board With Clamp , Barbed Wire , Aluminium Tape , Stone Pad , Clamp With Nut & Bolt , 140Mm Hdpe Pipe Od-4Pe-80 Grade Uv Stabilized , Nut Bolt & Washer , Concreting Of Support , Concreting Of Stay , Cable Laying Charges Along With Cost Of Bricks & Sand As Per Resspo Norms , Tranch For Ht & Lt Cable As Per Resspo Norms , Dismentling Of Following Old & Unsed Material From Line And Its Safe Carriage Form Site To Store As Per Resspo Norms , Acsr Dog Conductor , Xlpe Cable 3X120sq.Mm. , 11Mtrs. St Pole , Iron Scrap , 63Kva Distribution Transformer
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Safe carriage of following materials from Store centre or any other place to the respective site of work through the Kachha/Pacca road including loading, unloading at the respective ends and erection of same including the work of dragging as per site requirement, jumphering of Transformer with 11 KV line through LT ABC cable, Weasal conductor etc. Cost of labour, T&P carrier etc. required for proper completion of work as per RESPO Norms is included in the work. | Safe carriage of following materials from Store centre or any other place to the respective site of work through the Kachha/Pacca road including loading, unloading at the respective ends and erection of same including the work of dragging as per site requirement, jumphering of Transformer with 11 KV line through LT ABC cable, Weasal conductor etc. Cost of labour, T&P carrier etc. required for proper completion of work as per RESPO Norms is included in the work. |
| 2 | 11 KV XLPE Cable 3x70sqmm (for underground & Overhead) | 11 KV XLPE Cable 3x70sqmm (for underground & Overhead) |
| 3 | 11 KV XLPE Cable 3x120sqmm (for underground & Overhead) | 11 KV XLPE Cable 3x120sqmm (for underground & Overhead) |
| 4 | GI Pipe 6\\" Dia | GI Pipe 6\\" Dia |
| 5 | Earthing of Pole | Earthing of Pole |
| 6 | Stay Set Complete | Stay Set Complete |
| 7 | ACSR Dog Conductor | ACSR Dog Conductor |
| 8 | 11 KV Polymeric Pin Insulator | 11 KV Polymeric Pin Insulator |
| 9 | 11 KV Pin with Nut bolt | 11 KV Pin with Nut bolt |
| 10 | 11 KV Polymeric Disc Insulator | 11 KV Polymeric Disc Insulator |
| 11 | 11 KV Disc Fitting | 11 KV Disc Fitting |
| 12 | STP pole 11 Meter (Single Support & Double Pole) | STP pole 11 Meter (Single Support & Double Pole) |
| 13 | 11 KV Pilfer proof metering cubicle | 11 KV Pilfer proof metering cubicle |
| 14 | T-off Channel | T-off Channel |
| 15 | V-type Cross Arm | V-type Cross Arm |
| 16 | Top Channel 100x50x2240mm | Top Channel 100x50x2240mm |
| 17 | Dropper Channel 100x50x2000mm | Dropper Channel 100x50x2000mm |
| 18 | MS Base Angle | MS Base Angle |
| 19 | 11 KV CT/PT Metering Pole Mounting Unit 10/5 A | 11 KV CT/PT Metering Pole Mounting Unit 10/5 A |
| 20 | Supply, fixing and erection of following materials as per site requirement as per RESPO Norms:- | Supply, fixing and erection of following materials as per site requirement as per RESPO Norms:- |
| 21 | 11 KV Jointing Kit 3x70sqmm (O/D & I/D) | 11 KV Jointing Kit 3x70sqmm (O/D & I/D) |
| 22 | 11 KV Jointing Kit 3x120sqmm (O/D & I/D) | 11 KV Jointing Kit 3x120sqmm (O/D & I/D) |
| 23 | Number Plate with Clamp | Number Plate with Clamp |
| 24 | Danger Board with Clamp | Danger Board with Clamp |
| 25 | Barbed Wire | Barbed Wire |
| 26 | Aluminium Tape | Aluminium Tape |
| 27 | Stone Pad | Stone Pad |
| 28 | Clamp With Nut & Bolt | Clamp With Nut & Bolt |
| 29 | 140mm HDPE Pipe OD-4PE-80 Grade UV Stabilized | 140mm HDPE Pipe OD-4PE-80 Grade UV Stabilized |
| 30 | Nut bolt & washer | Nut bolt & washer |
| 31 | Concreting of Support | Concreting of Support |
| 32 | Concreting of Stay | Concreting of Stay |
| 33 | Cable laying Charges Along with Cost of Bricks & Sand as per RESSPO Norms | Cable laying Charges Along with Cost of Bricks & Sand as per RESSPO Norms |
| 34 | Tranch for HT & LT Cable as per RESSPO Norms | Tranch for HT & LT Cable as per RESSPO Norms |
| 35 | Dismentling of following old & unsed material from line and its safe carriage form site to store as per RESSPO norms | Dismentling of following old & unsed material from line and its safe carriage form site to store as per RESSPO norms |
| 36 | ACSR Dog Conductor | ACSR Dog Conductor |
| 37 | XLPE Cable 3x120sq.mm. | XLPE Cable 3x120sq.mm. |
| 38 | 11Mtrs. ST Pole | 11Mtrs. ST Pole |
| 39 | Iron Scrap | Iron Scrap |
| 40 | 63KVA Distribution Transformer | 63KVA Distribution Transformer |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 16 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 17 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender