Tender For Construction Of 01 Nos 132 Kv Ambashakti Solar Bay On Deposit Basis At 132 Kv Substation Madhogarh Under Etd, Orai.
Tender Value
20.51 Lakhs
Estimated cost
Bid Submission
27 Nov 2026
6 days left
EMD
25000
Bank guarantee accepted
Document Fee
1770
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Aligarh → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of 01 Nos 132 Kv Ambashakti Solar Bay On Deposit Basis At 132 Kv Substation Madhogarh Under Etd, Orai.
BOQ
| Sl. No. | Item Description |
| 1 | Safe carriage of substation structure approx 27.96 MT (ATM, BTM, ATMS, BXM, AXM, BCT, ALP, etc.) from EFU Naini Prayagraj & various substation to 132 KV S/S Madhogarh (distance approx 400 Km). The work include sorting of structure & loading on private carrier and unloading of the same at 132 KV S/S Madhogarh(including toll tax etc). |
| 2 | Safe carriage of various equipment (CB, CT, PTetc.) & Material (MS Flat, NutBolt etc.) from different location to 132 KV S/S Madhogarh (distance approx 350 Km). the work including loading on private carrier and unloading of the same at 132KV S/S Madhogarh (including toll tax). |
| 3 | Erection of Main & auxiliary structure consisting of columns, beams, peaks, masts etc. and auxiliary structure required for installation of isolators, C.Ts. P.Ts. L.As. and all other equipments. The job consists of shifting of all material i.e. structure parts, nuts, bolts, washers etc. from store to site of erection, erection of structure as per relevant drawing and practices using flat and spring washer with each bolt. Matching of holes, cutting, fabrication of members if required shall also be done by the contractor without any extra cost to complete the work satisfactorily. All material to be erected shall be supplied by UPPTCL free of cost but all men, material and T&P required for satisfactorily completion of work shall be arranged by the contractor at his own cost. |
| 4 | Fabrication of main & auxiliary part like cross arm , peak , stub etc as per bom including cutting shearing ,welding , drilling bending. All material given by UPPTCL. |
| 5 | Painting of various black steel structure with standard make light gray 608-4 synthetic enamel aluminium paint of premium quality (Nerolack/Burger/Asian make)after cleaning of rust/dust including cost of all material , man powers& T&P at 132 KV S/S Madhogarh. |
| 6 | Erection of following equipments as per Instruction manual of various equipments and technical specification including shifting of material / equipments from store to erection site including all other associated work to complete the job satisfactorily. |
| 7 | 132 KV C.B. |
| 8 | 132 KV C.T. |
| 9 | 132 KV P.T. |
| 10 | 132 KV Line isolator with Earth switch (Motorised) |
| 11 | 132 KV Tendom isolator (Motorised) |
| 12 | 132 KV Bus isolator (Motorised) |
| 13 | 132 KV CT & PT junction box |
| 14 | 132 KV PI |
| 15 | 132 KV LA |
| 16 | 0.2s Accuracy Class ABT meters (main & check) with cubicle. |
| 17 | 132 KV control & relay panel (SAS based) as per UPPTCL technical sepcification. |
| 18 | Integration of 132 KV Bay with Existing SAS system & sending telemetry data to SLDC Lucknow / Modipuram (104 Protocol) & addition of bays into Remote Gateways & data validation with SLDC Lucknow / Modipuram. |
| 19 | Data AMR intregration of ABT Energy Meters for sending telemetry data to SLDC Lucknow / Modipuram. Necessary interconnection from data transmission of ABT meters to LAN switch upto DCU / Gateway & all others hardware, software etc. alongwith installation of LAN switch, communication cable with necessary hardware wherever required in between energy meter to LAN switch to SDH equipments upto DCU /Gateway and all other hardware & software. |
| 20 | Primary interconnection of 132 KV equipments and main & transfer buses including cutting, bending of conductors and jumpering, clamping along with all other associated work to complete the job satisfactory as per drawing and technical specification. |
| 21 | Earthing |
| 22 | Laying of earthmate using 40 mm MS rod |
| 23 | Laying of 40 mm dia, 3m long, MS electrode |
| 24 | Cutting,straightening,bending,laying 800 mm below inside ground and above ground of following size of MS Flat for earthing of main & aux. structures, equipment structures & equipments etc. including welding with main earthmat and with object to be earthed / excavation of trenches and its back filling. |
| 25 | 25x6 mm |
| 26 | 50x6 mm |
| 27 | 75x 10 mm |
| 28 | Laying of following size control cable in the cable trench from control relay panel to various equipments/ marshalling boxes / JB etc. in switchyard as per cable schedule, it saddling at every 75cm. Distance with AL saddles for size 25x3 mm size including carriageof cable drums from store to laying site and shifting back to store and all other associated work to complete the job satisfactorily as per technical specification. |
| 29 | 2C x 2.5 Sq. mm |
| 30 | 4C x 2.5 Sq. mm |
| 31 | 6Cx2.5 Sq. mm |
| 32 | 10Cx2.5 Sq. mm |
| 33 | Laying & temination of following size allumunium power cable in the cable trench from ACDB to BMK in switchyard as per cable schedule, including carriageof cable drums from store to laying site and shifting back to store and all other associated work to complete the job satisfactorily as per technical specification. |
| 34 | Stringing of bus bar comprising of moose conductors tension & suspension strings complete with antifog type disc insulators, tension & suspension clamps, PG clamps, Bus Post clamps, connectors, & all other required materials for : |
| 35 | 132 KV Main Bus - I (Twin Moose) |
| 36 | 132 KV Main Bus - II (Twin Moose) |
| 37 | 132 KV Transfer Bus |
| 38 | 132 KV Jack bus |
| 39 | Termination of above laid cables as per drawing for 132 KV SAS bay including cost of cable glands, ferrules, cable tags and lugs complete at both end as per cable schedule. |
| 40 | Making of Delta earthing with 40 mm MS Round bar for 120 KV LA works includes fabrication, cutting, welding etc as per UPPTCL standard & design . |
| 41 | Preparing interconnection drawing (Cable schedule) of 132KV control panel to junction box of equipments i.e. CTs, PTs, C.B, isolators etc. in 3 sets duly approved by concerned executive engineer. The drawings of equipments, control and relay panel to be provided by department. |
| 42 | Tree cutting, trimming, and safely stacking/storing the timber at the 'Bay' construction site at 132 KV Substation, Madhogarh. |
| 43 | Supply Part |
| 44 | Hardware fittings |
| 45 | Single tension fittings suitable for ACSR Moose conductor. |
| 46 | Single suspension fittings suitable for ACSR Moose conductor. |
| 47 | PG Clamp suitable for Moose to Moose conductor. |
| 48 | PG Clamp suitable for Moose to Zebra conductor. |
| 49 | Bus Post clamp suitable for Moose conductor. |
| 50 | Copper bond size 16x500 mm with bolt side lug punched. |
| 51 | BMK for 132 KV switchyard. |
| 52 | Providing & fixing of 150 waat LED Street Light with bend pipe, fitting, (Make Philips / CGL / Bajaj/Syska) min 2 yr. warranty period. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 13, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 27, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysNov 27, 2026
Bid Opening Date
Technical bids will be opened and evaluated.