Tender For Replacementof Leftover Analog Axle Counters With Digital Axle Counter (123 Dp) Chakradharpur Division, South Eastern Railway.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
30 Nov 2026
10 days left
EMD
3.03 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Ghaziabad → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Replacementof Leftover Analog Axle Counters With Digital Axle Counter (123 Dp) Chakradharpur Division, South Eastern Railway.
BOQ
| Sl. No. | Item Description |
| 1 | Cement Concrete of proportion 1:3:6 (Cement: Sand: Stone chips of 25mm nominal size)for miscellaneous works. It includes excavation, ramming of CC by using vibrator, curing and plastering with cement and sand mixture (aggregate will not exceed beyo |
| 2 | Installation, Testing & Commissioning of Single Section Digital Axle Counter phase reversal type as per Specification No. RDSO/SPN/177/ 2012, Ver.3 or latest without tool kit. This also includes supply & installation of maintenance free earth materials and exothermic bonding and other connecting Cable etc. as per RDSO specification. No: RDSO/SPN/ 197/2008 or latest including foundation of Mushroom and/ or Location Box or both. Resetting equipment to be connected to the EI Ring earth.Testing & Commissioning DONE BY OEM. Only supply of musroom done by CEL |
| 3 | Shifting of HASSDAC/SSDAC from old location and installation, wiring, testing and commissioning in new axle counter room/location box. This includes fixing of DPs at site if shifting required, evaluator in relay room/location box or goomties together with termination of cables, fixing and wiring of LV boxes, painting, lettering etc. as required. Necessary insertion/modification on the control/indication panel to be carried out as per site condition. Note: 1 set means one end of the block section. |
| 4 | Excavation of trench in all kinds of soils including soft rocky area and clearing of roots of trees, rocks, bushes, ballast & reconditioning etc.,including bailing out water and disposal of extra soil including back filling with excavated earth and ramming of trenches after cable laying for the following depths and widths as specified in Technical Circular No. 2 of 1988 & 01/2010 issued by CSTE/SER or any other latest guidelines. Note: In case, trenches are other than prescribed depth & width, Proportionate payment shall be released. (i)Depth 1.2meter, Width 0.5meter. |
| 5 | Laying of S&T Cables (Signal/Quad/Power/35 Sq.mm.) in the excavated trench to Drawing No. CON/SK/T/5 or latest. Supply and transportation of 'U' clamps, anchoring of cable at every 10metres interval with 'U' clamp on trench to Drawing No. CSTE/CON/CABLES/81 or latest. Supply, transportation, and placing of cable demarcating led belt to Drawing No. CON/SK/T/6 or latest punched at an interval of 30metres and wrapped round each cable throughout the cable route and also at every track/Road/platform crossing as above specified in Technical Circular No.2/1988 & 01/2010 issued by CSTE/SER or as per latest guidelines and guarding the cables. Collecting empty drums with left over cable and to be returned to the stores of stock holder. Note: Cables will be meggered before & after its laying by contractor under supervision of Railway representative & Contractor will submit their reports. |
| 6 | Transportation of cables in rolls with or without wooden drums (S&T Cables) from concerned store to the site of works. Note: The unit Drum-KM indicates Drum X length of cable in that drum. It doesn't have any significance over the distance it has to be carried for execution of the work. |
| 7 | Excavation of trench in all kinds of soils including soft rocky area and clearing of roots of trees, rocks etc. to a depth of 1 metre and width 0.3 mtr. Track/Pucca road/Platform crossing/Level crossing as per SEM Drawing No.15-D5 including supply, transportation and laying of DWC pipes(full)with collar (for jointing pipes)Inner diameter/Outer diameter : 103mm/120mm to Specification No.14830 (Part-2) : 2001 as per SEM Drawing No. 15-D4 and drawing of cable through DWC pipes with collar(for jointing pipes) including back filling and ramming after cable laying as specified in Tech. Circular No.2 of 1988 & 01/2010 issued by CSTE/SER for S&T Cables or any latest guidelines. This includes repairing and plastering of Platform/Pucca road after cable laying. |
| 8 | Cement Concrete of proportion 1:3:6 (Cement: Sand: Stone chips of 25mm nominal size)for miscellaneous works. It includes excavation, ramming of CC by using vibrator, curing and plastering with cement and sand mixture (aggregate will not exceed beyond 3.8cm). Note : All materials required for foundation are to be supplied by the contractor. |
| 9 | Execution of Full Apparatus Case with earth excavation for pit, concrete foundation, surrounding earth work, erection and installation as per Drawing No. Con/SK/T/8 or latest and wiring to be done as per SEM Drawing No.19-D8 or as per direction of site engineer. Supply and fixing of Hylam sheet strip of appropriate size of 3mm or 6mm as required with hole for fixing of terminals, fuse blocks, relay and other accessories for signal/track circuit, termination of cable with number embossed ferrules, bunching of cables with PVC tape, proper soldering of cable armour with earth catenary wire, earthing of cable armour as required. Writing & terminal description including Painting of the apparatus case inside and outside after clearing the surface thoroughly and first coating of anticorrosive paint and subsequent two coats of Aluminium paint outside and red oxide inside and lettering etc. This also includes transportation of 25mm/12mm Hylam sheet for shelf or as required and also includes minor modification in L/Boxes as per site requirement. The contractor shall supply 4 no. of foundation nuts & bolts of size 22mm dia. x 450mm long with 2 flat spring washers, with each nut & bolts, sand for filling up cable pit inside the apparatus case including plaster and bolts, nuts, screws, MS Clamps for fixing equipment/cable. Note:- Part payment shall be released after completion of- (i) Foundation-40%, (ii) Erection - 10%, (iii) Wiring, earthing, testing - 20%, (iv) Painting, writings - 10%, (v) Plastering, sand filling & etc.- 10%, (vi) Commissioning - 10%. |
| 10 | Execution of Straight joint on Quad cable/ jelly filled Telecom cable using Thermo-shrink/Universal jointing kit(RTSF). This includes excavation of cable joint pit of size 1.5 m X 1.5 m X 1.2 m for jointing of cables, back filling and ramming after jointing. After jointing, the cable through test such as insulation test, continuity test etc. to be carried out jointly with Railway Engineer. If any defect or any damage is observed during jointing the contractor has to redo the joint free of cost. Note: In case jointing is required to be done in the Location boxes, then 80% payment will be released. |
| 11 | Alteration/modification in existing location boxes, includes fixing/Removal or both the equipment, cable insertion,termination,wiring, testing & commissioning, two coat painting, lettering to suit the circuits as per approved wiring diagram. This includes filling with sand and plastering the same. Note : All the sundry materials such as paint, sand, cement, screws etc. to be supplied by the contractor. |
| 12 | Design and supply of the following drawings to office records as per requirement of the Railways. This includes alteration at different stages and finally supply of all the drawings including tracings within 30 days or as defined in the tender document from the date of commissioning of the work, otherwise penalty to be imposed as per tender document. This includes the following drawings for each station : (1)Prepration & supply of SIP if required.(1a) Cable layout plan, (2) Cable corrage plan, (3) Location Hut drawing, (4) Termination chart of end goomties and location hut, (5)Traction bonding plan, (6) Contact Analysis Chart, (7) SWRD & GWRD, (8) Equipment Layout Plan, (9) Power Supply arrangement diagram, (10) Relay Disposition chart, (11) Any other drawing as found relevant as per site condition. Office record if online maintenance is not implemented includes the following: (i) Battery History book, (ii) Track Circuiting Register, (iii) Track circuit maintenance Register, (iv) Cable Meggering Register, (v) Signal History Register, (vi) LED Register, (vii) Glued joint/Block joint Register, (viii)Point machine Maintenance Register, (ix) Joint Inspection Register such as P. Way, Electrical & Signal, (x) Relay Register, (xi) Route cancellation Register, (xii) Relay Room Key Register, (xiii) Emergency Point operation Register, (xiv) Crank Handle Register, (xv) Emergency Route Cancellation Register, (xvi) Axle counter reset register, etc. (xvii) Supply and preparation of SIP Where required. Note :-(i) All the diagram will be made on Auto CAD. The paper size of wiring diagram will be A-3 or as per IRSEM or as per IRSEM. Soft Copy/AUTOCAD file of all drawings to be submitted alongwith paper drawing. Wiring diagram will be made in 'Black colour'. Alteration to wiring diagram will be done using 'RED' and 'Green' colouring scheme. RED = new equipment/contact to be installed or commissioned. GREEN = redundant equipment/contact to be recovered. (i) Up to 6 to 10 line yard. |
| 13 | Alteration Modification, cable termination, wiring, testing & commissioning of existing Integrated power supply panel as per approved power supply diagram and specification. The contactor has to supply drawings in tracing paper in the format supplied by railways. |
| 14 | Preparation of Station Working Rules (SWR) in English on the basis of station working rule diagram and gate working rule diagram to be supplied by the contractor. Submission of two draft copy to railway for checking and resubmission of draft in three copies for approval of division after making corrections. Editable Soft copy to be supplied in pen drive. |
| 15 | Preparation of Station Working Rules (SWR) in Hindi/ Regional Language of that station on the basis of station working rule diagram and gate working rule diagram to be supplied by the contractor. Submission of two draft copy to railway for checking and resubmission of draft in three copies for approval of division after making corrections. Editable Soft copy to be supplied in pen drive. |
| 16 | Modification/Upgradation, wiring, validation & alteration of Data Logger/RTU of Digital & Analog Input including NMDL software etc. as per site engineer. The necessary wire from relay to tag block & from tag block to data logger, tag block, terminal, wiring material etc. required for this work to be supplied by contractor. Wire to be procured from RDSO approved firms. |
| 17 | Routing and connecting of all the equipment in the equipment/relay room to SEEB with 10 sq. mm copper cable using copper lugs with stainless steel nut and bolts and fixtures. The work includes laying and routing the copper cable in PVC / conduits and fixing them on wall. The PVC/conduit pipe to be supplied by Contractor. |
| 18 | Routing and connecting of all the SPDs in the equipment room/SEEB to MEEB with 16 sq. mm copper cable using copper lugs with stainless steel nut and bolts. The work includes laying and routing the copper cable in PVC / conduits and fixing them on wall. The PVC/conduit pipe to be supplied by Contractor. |
| 19 | Designing and Plotting of Signalling Interlocking Plan (SIP) in AUTOCAD. Two copies of prints with soft copy will be submitted to Railway for checking. If alterations are suggested/proposed by Railways then again two copies of prints will be submitted for advance approval after carrying out all thealterations as suggested/proposed by the Railways. Tracings will be submitted for all the diagrams mentioned above for the purpose of approval by Railway prior to commissioning of station. |
| 20 | Mechanised Drilling/MicroTunnelling under important/ busy metal/concrete road/Railway track and laying of GI pipe including supply (make: TATA/Jindal or better)of min. 75mm inner diameter Grade Medium with Spec. No. IS- 1239, Pt-1, 2004 including supply, Boring and pulling cable upto 110mm dia. at a depth of min. 1 meter as per site condition. This also includes reinstatement of the surface to the original state. |
| 21 | Alterations/modifications works on existing relay rack (Q series/Composite Relay Racks)/Cable Termination Racks (CTR) including works of installation, wiring, termination, testing and commissioning. The work includes fixing of aluminium/steel/M. S ladder along with supply as per requirement to accommodate additional plug board, relays, terminals/blocks,terminals,tag blocks,fuses, transformers, bus bars, elves/strips etc. in the existing relay racks/CTR's, 6 mm Hylam sheets of required length for writing terminal description etc. fixing and termination of cables on the relay racks, CTR's with number embossed ferrules, bunching of cables with PVC tapes, earthing of cable armours, covers including painting and lettering, making anti tilting arrangement. Note:- a) Relay rack (Q-series/Composite Relay Racks) : Payments for alterations in existing relays upto 20 nos. relays & above 20 nos. shall be made 50% & 100% respectively. b) Cable Termination Racks (CTR):- Payments for alterations in existing CTR upto 120 cores & above 120 nos. cores shall be made 50% & 100% respectively. |
| 22 | Termination of Outdoor Cables (Main Cables/tail cables) at location boxes, cable termination rack in relay room, station building, etc. The item includes dressing of cables and wires with dressing threads as per standard practice. All material required for this item will be supplied by contractor. |
| 23 | Supply & laying of 300mm X 100mm pre-cast/cast in-situ RCC cable ducts including top cover as per RDSO drawing No. SDO/S&T/RCC DUCT/1018/1 & 2, dated 29.5.23 or latest. Note- The rate is inclusive of all type of transportation including labour till it is placed into trenches. The laying of cables shall be paid separately fulfilling the laying procedure as per above drawings. Supply items shall be Inspection by representative of Sr. DSTE/CKP. |
| 24 | Supply of Thermo-shrink jointing (TSF) kits for jointing underground Quad cable of size 0.9mm/1.4mm diameter conductor for straight/ condenser/Y-(Derivation)/Loading Coil/Transformer Joints as per Specification No. IRS-TC-77/2012 Rev. 3 with Amd. 3.0 or latest. (Inspection by RDSO) . |
| 25 | Supply of Steel Apparatus case Full height as per Drawing No. SK/Drg./OL/SER /198 or latest with E type lock . E-type lock & their key ward No. will be decided by site engineer as per Specification No. IRS: S-10/78 with Rev. 8 or latest. Supply of Hylam sheets is not covered under this scope. This includes supply of one key & handle for each four Apparatus Case or minimum one. (Inspection by representative of Sr. DSTE/CKP) |
| 26 | Supply of 25 mm 6 Way PBT Terminal block as per Specification No. IRS:S-75/2006 Rev.2.0 or latest as per IRS Drg. No. SA-23756 Alt-3 or its latest amendments. (Inspection by RDSO) |
| 27 | Supply of Non-Deteriorating type of low voltage electric fuse for Railway signalling use, fuse with cylindrical cap without indication, cylindrical fuse as per Specification No. IRS:S-78/2006 or latest. (i) ND Fuse Cylindrical Type 2 Amp. (Inspection by RDSO) |
| 28 | Supply of Non-Deteriorating type of low voltage electric fuse for Railway signalling use, fuse with cylindrical cap without indication, cylindrical fuse as per Specification No. IRS:S-78/2006 or latest. (ii) ND Fuse Cylindrical Type 4/6 Amp. (Inspection by RDSO) |
| 29 | Supply of Non-Deteriorating type of low voltage electric fuse for Railway signalling use, fuse with cylindrical cap without indication, cylindrical fuse as per Specification No. IRS:S-78/2006 or latest. (iii) ND Fuse Cylindrical Type 16 Amp. (Inspection by RDSO) |
| 30 | Supply of PBT fuse block as per Specification No. IRS:S-75/2006 Rev. 2.0 or latest as per IRS drawing No. . SA: 23748 with alt 4 or its latest amendments. (Inspection by RDSO) |
| 31 | Supply of PVC insulated 10 Sq. mm Single core Multi strands copper conductor as per Specification No. IRS:S-76/89 or latest conforming to IS: 694/2010 or latest. Wire Colours shall be decided by Engineer-in-Charge. (Inspection by representative of Sr. DSTE/CKP) |
| 32 | Supply of PVC insulated 16 Sq. mm Single core Multi-strands copper conductor as per Specification No. IRS:S-76/89 or latest conforming to IS: 694/2010 or latest. Wire Colours shall be decided by Engineer-in-Charge. (Inspection by representative of Sr. DSTE/CKP) |
| 33 | Supply of PVC insulated 35 Sq. mm Single core Multi-strands copper conductor as per Specification No. IRS:S-76/89 or latest conforming to IS: 694/2010 or latest. Wire Colours shall be decided by Engineer-in-Charge. (Inspection by RITES) |
| 34 | Supply of PVC insulated Twin Core Multi strand screened wire of size 16/0.2 mm as per spec IS-694 with latest amendments. Make Network/ polycab, Delton or better. (Inspection by representative of Sr. DSTE/CKP) |
| 35 | Supply of PVC Switch Board Cables 20 pair /0.5 mm conductor dia. as per TEC specification GR/WIR-06/03 of march 02 or latest. (Inspection by representative of Sr. DSTE/CKP) |
| 36 | Supply of Negative Bus Bar 20 mm X 5 mm thick made of copper bar with brass screw & washer (The bar and screw should b e nickel plated) minimum length of one piece is to be 0.3 m. (Inspection by representative of Sr. DSTE/CKP) |
| 37 | Supply of 1 copy of SWR in English finally approved by railways along with spiral binding. This has to be done after CRS sanction has been obtained. (Inspection by representative of Sr. DSTE/CKP) |
| 38 | Supply of 1 copy of SWR in Hindi/Regional Language of that station finally approved by railways along with spiral binding. This has to be done after CRS sanction has been obtained. (Inspection by representative of Sr. DSTE/CKP) |
| 39 | Supply of sub equipotential bus bar (SEBB) of size 300x25x6 mm Cu equipotential Bus Bar. (Inspection by representative of Sr. DSTE/CKP) |
| 40 | Supply of Completion drawings as per special condition of contract 6 set for each EI station. Soft copy including Auto CAD copy has also to be provided in pen drive. (i) For upto 300 Vital Bits. (Inspection by representative of Sr. DSTE/CKP) |
| 41 | Supply, Transportation, Installation and commissioning of Copper Plate Earthing System complete with provision of: (i) Copper plate 300 mm x 300 mm x 3 mm. (ii) Earth Pit (8 to 10 ft.in depth) filled up with Charcoal (10 Kg) and salt (25 Kg) in layers. (iii) Water funnel on GI Pipe. (iv) Cast iron Top Plate (12\\" x 12\\"). (v) Drawing of Copper-Earth, from Earth Pit to location with 25 mm x 3 mm Copper Strip for termination in the OFC hut/Relay Room/Equipment Room/Location Box Earth Bus Bar. N.B: All the require materials for execution of the work (i.e. exothermic welding etc.) shall be supplied by the contractor. The work to be commissioned as per direction of Rly.'s Supervisor-in-charge. (Inspection by RITES) |
| 42 | Modification to the application logic of VDU (Visual Display unit) & MT (Maintenance Terminal) |
| 43 | Modification of Control- cum-Indication-panel as per RDSO Specification No. RDSO/SPN/186/2004 and as per approved front plate diagram with supply of required No. of dominos and push button/switches are to be supplied additionally in the same cost by the contractor to the Railway. |
| 44 | Fixing of Q series relay base plate/metal to metal relay mini group and major group base plate, laying, bunching, lacing, dressing & packeting of 60/40 core PVC indoor cable/flexible wire and termination of 60/40 core cable/flexible wire on tag block/base plate & base plates & soldering. This includes fuse wiring, bus bar looping etc. required for keeping installation ready for circuit wiring work & panel throughing work. The work shall be done as per approved plan, extant practice on SER & the instruction of Rly. Engineer-in-charge at site. Inspection authority: - Consignee Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 13, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 30, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysNov 30, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender