Tender For Conversion From Single Deck Floating Roof (Sdfr) To Double Deck Floating Roof (Ddfr) And Revamping Of Two Crude Oil Tanks T202c & T202d Of Nominal Capacity Of 60000 M3 At Uran Plant
Tender Value
Ref. Documents
Estimated cost
Bid Submission
07 Jan 2027
54 days left
EMD
55.02 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Raigad → Maharashtra
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Conversion From Single Deck Floating Roof (Sdfr) To Double Deck Floating Roof (Ddfr) And Revamping Of Two Crude Oil Tanks T202c & T202d Of Nominal Capacity Of 60000 M3 At Uran Plant
BOQ
| Sl. No. | Item Description |
| 1 | LUMP SUM PRICE for material & services for the entire scope of work for LSTK Project of \\"Conversion from Single Deck Floating Roof (SDFR) to Double Deck Floating Roof (DDFR) and revamping of Two crude oil Tanks T202C & T202D of nominal capacity of 60000 M3 at Uran Plant |
| 2 | TOTAL LUMP SUM PRICE for the LSTK project inclusive of GST (bidder to fill sheet name I-LSTK) OIL AND NATURAL GAS CORPORATION LTD. Project Name: Conversion from single deck to double deck floating roof and revamping of Two crude oil Tanks T202C & T202D of nominal capacity of 60,000 M3 (79m dia. and 14.4m height) at Uran Plant Appendix: A-3 Proforma for Price Schedule Tender No. Note 1: Only Yellow Coloured Cells to be filled. Note 2: This excel workbook has Five work sheets. Please fill all the Five sheets very carefully and upload as per this price format. Note 3: Please refer general notes below. Name of Bidder : Bid Reference No. I LSTK Project Sl. No. Items Currency INR A Lump sum price for material and services for entire scope of work for the LSTK project (Invoice value of ferrous scrap to be paid by the contractor as described in SCC clause 3.9 and please refer note no.12 below). B Insurance in compliance of GCC clause 7.3 (i.e., Sum of B-1 to B-6 below) 0.0 B-1 Contractor’s All Risk Insurance/ Erection all risks/ Storage cum erection Insurance (including Offshore and Onshore Terrorism cover) B-2 Cargo Transit Insurance B-3 Third Party Liability Insurance B-4 Motor Vehicles Package Policy which included Third Party Liability Insurance B-5 Workmen’s Compensation Insurance / Employer’s Liability Insurance B-6 Contractor's Constructional Plant and Equipment Insurance C IGST/ CGST & SGST/ UTGST as applicable D Total LUMP SUM PRICE for the LSTK Project (i.e. A+B+C) 0.0 General Notes: |
| 3 | Payment shall be made as per Milestone Payment Formula for the respective works. |
| 4 | Cost of material shall include cost of the materials/ equipments etc. required to be incorporated in the works, aids for fabrication, transportation and installation, cost of spares and any special tools & tackles required for pre commissioning, lubricants, chemicals and consumables for testing/ pre-commissioning and the cost of consumables for startup/ commissioning as well as for duration of operation as per details given in bidding documents. |
| 5 | Bidders to ascertain themselves all the applicable taxes & duties and include in their offer all such taxes and duties as applicable & quoted, which shall be considered for the purpose of evaluation. Bidders also to indicate ONLY such taxes & duties in relation to this contract, which the bidder is liable to pay directly to Indian Tax authorities separately in the price format at I-C. Reimbursement of IGST, CGST, SGST, UTGST etc. (which bidder is required to pay directly to Indian Tax Authorities) would, however, be made at actuals in Indian Rupees upon submission of documentary proof of duty assessment & payment (through deposit or through credit) thereof and would further be limited to the amount indicated in price schedule, whichever is less. No reimbursement shall be made to the bidder for Custom Duty, IGST, CGST, SGST, UTGST etc., paid by bidders to their Sub Contractor, Vendors, Agents etc. Change in law is not applicable against such taxes & duties (i.e. Custom Duty, IGST,SGST,CGST,UTGST etc.) paid by bidders to their Sub Contractor, Vendors, Agents etc. |
| 6 | The above costs i.e. total lump sum price are all inclusive costs for providing the material & services as per the requirements contained in the Bidding Documents read with subsequent amendments/addendum /corrigendum /clarifications conveyed to the bidder. Bidder to note that price quoted at sl. no. D above i.e. TOTAL LUMSUM PRICE for complete scope of work of the tender (i.e.A+B+C) shall be considered for ascertaining the ranking of bidders. |
| 7 | TDS as applicable under statute, will be deducted |
| 8 | Bidders shall submit copy of Price Proforma (Appendix-A3) in the unpriced (techno-commercial bid filled as 'x' and/or 'X' marks at places where bidder has quoted in original sealed priced bid Proforma as a confirmation that he has quoted against that particular item. For all the cells marked 'x' and 'X' in the Proforma Schedule (Appendix-A3) of Prices in the unpriced (techno-contractual) bid. Bidders shall click on the individual cell and select from the drop down list for confirmation that he has Quoted / Not Quoted against that particular item. For other cells e.g. Custom Duties, Change in Law etc. (wherever drop down option is not provided), fill the relevant information. |
| 9 | Bidders to consider various Custom & GST exemptions/Concessional rate available for eligible PEL/ML areas. |
| 10 | In cases where Contractors contends that their Corporate Policies with worldwide coverage meets the insurance requirements of the contract in respect of Policies from B-1 to B-6 under item B above, Contractor needs to ensure that all the conditions mentioned in the contract in respect of insurance are complied with. Any other policy not mentioned above but required to be taken on the basis of specific nature of contract, as mentioned in the contract should also be included in the Total Insurance cost. |
| 11 | Please refer GCC clause no. 11.2.4 regarding delay analysis report which shall be signed by ONGC & contractor at periodic intervals of 06 months. However, as soon as delay occurs partly or fully on part of the contractor as on the scheduled completion date, pending final joint delay analysis, provisionally LD amount will be withheld from contractor’s invoices which will be finalized and settled after finalization of delay analysis, for which LD amount was provisionally withheld. The LD withheld/levied shall be as per GCC clause 6.3.2 & 6.3.3 of the contract. |
| 12 | The bidder shall be deemed to have visited and examined the site, fully acquainted themselves with the existing site conditions,including sub soil strata, nature of work, and all factors affecting the execution of work before submission of the price bid. |
| 13 | Local Content Compliance and Payment Condition:The Contractor shall ensure that the percentage of local content declared in Appendix B-25 in accordance with relevant Para of ITB and the Public Procurement (Preference to Make in India) Order is actually achieved during execution of the Contract and shall submit Local Content Certification, duly certified by a Cost Accountant or Chartered Accountant in practice, during execution of the project but not later than submission of the Final Bill or before achieving ninety percent (90%) of financial progress, whichever is earlier. Failing submission of such certification within the stipulated time, ONGC shall withhold ten percent (10%) of the Contract Value, and payment of the last ten percent (10%) of the Contract Value shall be made only after receipt and acceptance of the aforesaid Local Content Certification, confirming compliance with the local content category declared at the time of tendering. Further, in the event the Contractor fails to meet the declared local content requirement resulting in change of supplier category from Class-I to Class-II/Non-Local or from Class-II to Non-Local, ONGC shall levy a penalty of ten percent (10%) of the Contract Value. |
| 14 | The dismantling, removal, handling, loading, weighment, transportation and disposal of all scrap generated under this Contract are integral to the scope of work and related expenses are deemed included in the Contractor’s quoted price. All scrap shall be made hydrocarbon‑free and handled safely by the Contractor .The Contractor shall compulsorily purchase all dismantled ferrous scrap under this contract from ONGC. ONGC will issue the sale order and/or tax invoice based on actual weighed quantity at the designated ONGC weighbridge and the Contractor must pay as per the sale order /Invoice before removing scrap from the ONGC premises. Ferrous scrap rates shall follow prevailing MSTC quarterly bulletin rates. All taxes, duties, levies and statutory charges are payable by the Contractor. The Contractor must obtain all statutory/environmental clearances, indemnify ONGC against liabilities. II UNIT RATE : Deleted III Cost Re-Imbursable Additional Items: Cost Plus Percentage |
| 15 | Percentage fee applicable to cost of material used for extra work items. |
| 16 | Percentage fee applicable to equipment subcontracts for extra work |
| 17 | Percentage fee applicable to labour subcontracts for extra work |
| 18 | Percentage fee applicable to one year’s spares Notes: |
| 19 | The above percentage will also be used by the Company to order bought-out items and extra equipment not included in the Bidding Documents. |
| 20 | In respect of item 4 the cost shall be reimbursed as per provision of clause 5.16 of GCC. IV CUSTOMS DUTY : Deleted V Change In Laws and Regulations: Laws, Acts, Rules, Regulations etc. and the tariffs thereof considered by the Bidder while estimating the incidence of taxes, duties, fees, charges, levies etc. included in the bidder’s lump sum prices for the Works (as quoted in the Appendix A-3, I through V) as per relevant provisions of General Conditions of Contract to be used for the purpose of adjustment of Contract Price in the event of change of Law in terms of Clause 7.6 of General Conditions of Contract are as under: Sl. no. ITEM Bidding Documents Clause Reference Laws / Acts / Rules / regulations reference Tarif indicating rate of tax/ duty/ fee/ charge/ levy Tax Amount included in the Lump sum price (Add taxes together for all locations/ works) 1.0 2.0 3.0 4.0 5.0 |
| 21 | IGST/ CGST & SGST/ UTGST as applicable: Note:- |
| 22 | Bidder may suitably add other heads/columns/rows to indicate all the provisions and related information with regard to above. Bidders are requested to go through Clause 7.6 of General Conditions of Contract carefully, while furnishing the above table. Strike out the items, which are not applicable or write `not applicable’. |
| 23 | The Taxes and duties shown above shall tally with the same quoted in Price Format. |
| 24 | Change in law shall not be applicable to taxes and duties in respect of subcontractors, venders etc. of contractors. |
| 25 | Bidder shall indicate the details of Laws/ Acts / Rules/ Regulations reference and tariff indicating rates of tax/ duties/ fee/ charge/ levy under Column 3 & 4 respectively in the unpriced bid also. |
| 26 | Bidders are advised to refer thoroughly scope of work (all disciplines), price impacting activities in the entire terms & conditions mentioned in the tender documents. |
| 27 | For clarity on tax clauses and change in law clauses of GCC, bidder/ contractor may note the following:a. If there is any difference in rate between quoted rate of tax and applicable rate of tax as on bid submission date, then such difference in rate will be maintained for effecting change in law, if any, in future. Without prejudice to any other remedies available to company in the contract or in Law, in case of change in laws during scheduled completion period (included extended period without levy of LD/without reserving right to levy LD), irrespective of amount and rates of taxes quoted by successful bidder/contractor, the total quoted amount (including tax amounts) will be considered as inclusive of all applicable tax amounts which are applicable on the date of bid submission and accordingly, difference between applicable rate of taxes on the date of bid submission and the rates of taxes applicable on the date of change in law, will be reimbursed to successful bidder/contractor by company in case such difference is positive and such difference will be recovered from the successful bidder/contractor by the company in case such difference is negative. b. In case the quoted tax rate/tax amount is less than the applicable tax rate/ tax amount on date of bid submission, it would be considered that the difference in the two rates/amounts is included in the amounts quoted in other quoted line items, other than the quoted tax amount and (i) payment/reimbursement will be limited to considering the quoted tax rate or the quoted tax amount or the amount shown in proof of payment, whichever is lower and (ii) in case there is a change in law, such difference between the quoted tax rate/tax amount and the applicable tax rate/ tax amount on date of bid submission, will be subtracted from the base value (base value is the amount on which taxes are applied which would be derived from the total quoted/contract value inclusive of taxes) to arrive at the net base value on which effect of change in law would be applied. c. In case the quoted tax rate/tax amount is more than the applicable tax rate/ tax amount as on the date of bid submission (i) payment/reimbursement will be restricted to the lower of the two and (ii) in case there is a change in law, it will be treated as per Point \\"a\\" above. Name of Authorised Signatory: x Designation: x Place and Date: x Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 13, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJan 07, 2027
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 54 daysJan 08, 2027
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 55 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender