Defence Government Departments Closing in 30 days TDR #58513841

Bids Are invited for Repair And Overhauling Service - Normal Refit Of In Assetcom/0351/Bitra/Nr O/L-27/A; Any Other Suitable Brand; Yes; Buyer Premises, Service Provider Premises - Hull Services-Ins Bitra Nr-2700001Docking, Cleaning & Usg Surveydocki

Issued by Government Departments · Visakhapatnam, Andhra Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
14 Dec 2026
30 days left
EMD
1.03 Crore
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Visakhapatnam → Andhra Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair And Overhauling Service - Normal Refit Of In Assetcom/0351/Bitra/Nr O/L-27/A; Any Other Suitable Brand; Yes; Buyer Premises, Service Provider Premises - Hull Services-Ins Bitra Nr-2700001Docking, Cleaning & Usg Surveydockingcarry Out Docking Of Ship In (No Str 1/11 ) Version I And Version Ii For Complete Renewal Of Underwater Paint Scheme. Last Uw Paint Scheme Renewal In Mr 14. Last Docking Date: 12 Aug - 06 Sep 25 Version Ii At Varuna Outer Nd(V) , 00001Docking, Cleaning & Usg Surveycleaning(A) Remove Marine Fouling From The Hull Using Wooden Scraper Or Hydro Jetting With Maximum Pressure Not Exceeding 3000 Psi. , 00001Docking, Cleaning & Usg Survey(B) Scrap And Clean Under Water Area And Boot Top Area (Including Wind And Water Areas) To Remove All Loose Paint Film, Rust Etc. Wind Water Areas To Be Considered Upto 500 Mm Above The Boot Top. , 00001Docking, Cleaning & Usg Surveyusg Survey(C) Carry Out Ultrasonic Gauging Of Underwater Hull Areas And Above Water Areas , 00001Docking, Cleaning & Usg Surveydocking Reports(D) Firm To Provide 07 Sets Of Docking Form/ Report In 379 Duly Filled (Uw Steel Renewal, Painting Details, Sacrifical Anodes, Uw Valves, Sea Tubes/ Sea Chest, Other Details Pertaining To Water Jet As Mentioned Etc.) On Completion Of The Refit , 00001Docking, Cleaning & Usg Surveysurvey Reportnote:- Report Of Hull Survey Post Completion Be Submitted To Ss For Reference. , 00002Uw Shell Touching Compt/ Spcaceshitu Inspectionss/ Refitting Firm Is Required To Offer All U/W Shell Touching Compartments/ Tanks/ Void Spaces/ Cofferdams In Dry Dock For Inspection (For All Refits) Of Preservation Standards To Hitu Prior Final Undocking. , 00003Underwater Structuresurvey All Underwater Appendages(A) Survey All Under Water Appendages/ Fittings For Pitting, Corrosion Or Any Damage Paying Particular Attention To Paint Failure/ Damage Area To Stern Shaft Bracket, Ropeguard, Eddy Plates, Eddy Cones, Stern Tube, Skeg, Bilge Keel Plate, Stabilizers Fin Etc. Iaw No 01/15. Undertake Repair As Necessary.(I) Rudder - 2, (Ii) Reference Electrodes - 2, (Iii) Iccp Anodes -2, (Iv) Propellar - 2, (V) Echo Souder - 1, (Vi) Em Log - 1, (Vii) Spray Rails - 4, (Viii) Shaft Brackets - 2, (Ix) Sea Tubes And Gratings - 14. , 00003Underwater Structureoverhauling And Examination Of Uw Valves(B) Open Up And Remove Minimum 50% Of U/W Valves And Fittings For Examination And Also To Facilitate Survey Of Sea Tubes As Per Mt 11620. All Valves To Be Completed During Each Cycle In Conjunction With Nr1(22 (Obd Nos)) , 00003Underwater Structurepressure Testing Of Box Bilge Keel(C) Carry Out Pressure Testing Of The Box Type Spray Rails To Ensure Watertight Integrity Of The Structure Post Ndt Of Weld Joints. , 00003Underwater Structurepaint Restoration And Renewal(D) Clean To Bare Metal All Corroded Area And Area Of Paint Failure Of U/W Appendages And Preserved In Accordance With No 53/16 And Policy Directives Issued By Nhq/Ihq Time To Time. , 00003Underwater Structuredraught Marking Repair/ Renewal And Paint Restoration(E) Check Draught Marks Are In Position And Intact With Ship Structure. If Not Repair And Renew.(Nes-164/Defstan 02-164 & Br 3001 Chapter 28 Article 2811). Undertake Painting Of Draft Marks As Per No 53/16 And Policy Directives Issued By Ihq/Dna. (Size -10 Cm Of Thickness 8Mm). Location -(I) Forward (Ii) Midship, (Iii) Aft. Qty - 50 Nos. , 00003Underwater Structurefairing Of Uw Appendages(F) Examine Fairing Of Underwater Appendages For Roughness And Unfairness Or Any Damage Paying Particular Attention To The Shaft Brackets, Ropeguards And Eddy Plates Etc. Renew/Repair The Unfaired/Damaged Fairing For Their Smoothness. , 00003Underwater Structurestabilizers(G) Clean And Repaint The Sea Side Surface Of Stabilizer Fin Boxes. The Fin Wings Extended And Turned To Maximum Angle To The Horizontal To Give Better Access To The Fin Box (If Applicable). , 00003Underwater Structureshaft Brackets(H) Recoat Shaft Brackets In Accordance With No 53/16. , 00003Underwater Structurendt Of Weld Joints(J) Carry Out 100% Ndt Of The Weld Joints Of Spray Rails. , 00004Rudderabrasive Blasting / Scraping(A) Carry Out Abrasive Blasting/Scraping To Bare Metal Of Areas Of Corrosion/ Paint Damage. Restore The Paint Scheme As Per Ships Uw Paint Scheme In Accordance With No 53/16 , 00004Rudderstructural Examination(B) Examine Rudder Structure In Accordance With No 01/15, Paying Particular Attention To Hull Plating In The Vicinity Of Rudder(S) And Fittings Up To The Rudder Head, For Any Signs Of Corrosion And Any Other Defects/ Damage , 00004Rudderexamine Bearing And Bushes(C) Examine And Check Clearances Of Lower And Upper Bearings Or Bushes, Whichever Is Fitted, Of Rudder. Renew/ Repack Rudder Bearings/ Gland Bushes, If Required (Br 3000 Art. 2811 & Br 3001 Art. 2805 Refers) . , 00004Ruddersurvey And Repair Rudder Stock Housing(D) The Rudder Stock Housing Tube Be Surveyed, Repaired And Pressure Tested To A Pressure Of 0.2 Kg/Cm2. , 00004Rudderexamine Rudder Pintle(E) Examine Rudder Pintle Bearings To Ensure That They Are Fully Lubricated Before Undocking. , 00005External Underwater Hullpreservation/ Painting(A) Carryout Painting Of Underwater Hull And Boot Topping Area On Completion Of All Hot Work And Hydro Blasting/ Grit Blasting Of Underwater Hull, With 10 Years Long Life Paint Scheme (Llps) , 00005External Underwater Hullpreservation/ Painting(B) Shipyard To Procure Paints From Navy Approved Paint Suppliers [M/S Akzo Nobel Coatings Pvt Ltd (Bangalore) , 00005External Underwater Hullpreservation/ Painting(C) Painting To Be Carried Out Under Supervision Of Paint Manufacturer And Guarantee For 10 Years To Be Given By Supplier (Oem), Oem Certificate Be Issued Post Completion Of Painting. , 00005External Underwater Hullpreservation/ Painting(D) Llps Paint Scheme (Akzo Nobel) , 00005External Underwater Hullpreservation/ Painting(D) Llps Paint Scheme (Akzo Nobel)(I) 01 Coat Of Intergard 269 (Red) Primer To Dft 50 Microns , 00005External Underwater Hullpreservation/ Painting(D) Llps Paint Scheme (Akzo Nobel)(Ii) 02 Coats Of Anti-Corrosive Intershield 300 Colour Aluminium And Bronze Dft - 150 Microns Each Coat , 00006External Uw Hull External Uw Hull Surveysurvey The Structure In Accordance With No 01/15 And Ihq Mod (N)/ Dna Letter Nc/7631 Dated 01 Nov 22 As Mentioned:-(A) 100% Visual Survey And 100% Usg Of Full External Uw Hull Note:- Eye Hooks If Used For Propeller Or Shaft Removal/ Fitment Are To Be Removed Before Undocking And Ground Flushed. Pad Pieces With Fair Edges May Be Retained Except Those With Waterjets And Surface Drives , 00007Underwater, Above Water, Internal Compts, Mast / Super Structuresteel Renewal & Aluminium Renewal(A) Areas/ Structure Of Decks Found Weak/ Degraded/ Deteriorated During The Structural Survey Are To Be Cropped By Appropriate Methods And Renewed As Per Hull Survey Report/ Recommendations. , 00007Underwater, Above Water, Internal Compts, Mast / Super Structuresteel Renewal & Aluminium Renewal(A) Areas/ Structure Of Decks Found Weak/ Degraded/ Deteriorated During The Structural Survey Are To Be Cropped By Appropriate Methods And Renewed As Per Hull Survey Report/ Recommendations.(I) Material Of No.1 Dk: B Quality Mild Steel Conforming To Abs Specification, 05 - 08 Mm Thk; Cutting Process: Oxy-Acetylene Gas Cutting; Weld Process: Mmaw , 00007Underwater, Above Water, Internal Compts, Mast / Super Structuresteel Renewal & Aluminium Renewal(A) Areas/ Structure Of Decks Found Weak/ Degraded/ Deteriorated During The Structural Survey Are To Be Cropped By Appropriate Methods And Renewed As Per Hull Survey Report/ Recommendations.(Ii) Material Of 01 Dk , 02 Deck, Mer & Aer Soft Patches: Aluminium Plating Conforming To Abs Specification, 04 - 06 Mm Thk; Cutting Process: Cold Cutting By Rotary Cutting Wheel; Weld Process: Tig , 00007Underwater, Above Water, Internal Compts, Mast / Super Structuresteel Renewal & Aluminium Renewal(A) Areas/ Structure Of Decks Found Weak/ Degraded/ Deteriorated During The Structural Survey Are To Be Cropped By Appropriate Methods And Renewed As Per Hull Survey Report/ Recommendations.Note 1:- Quoted Cost Shall Include Cost Of Necessary Degutting And Regutting Of Portable And Semi-Portable Fittings, Lagging, Panelling, Tiling, Macrotech And All In Way Jobs Of Renewal Of The Structure To Be Carried Out As Required. Fittings That Are Damaged During The De-Gutting Are To Be Renewed And Refitted In Situ , 00007Underwater, Above Water, Internal Compts, Mast / Super Structuresteel Renewal & Aluminium Renewal(A) Areas/ Structure Of Decks Found Weak/ Degraded/ Deteriorated During The Structural Survey Are To Be Cropped By Appropriate Methods And Renewed As Per Hull Survey Report/ Recommendations.Note 2:- Testing Of All Weld Joints By Dye Penetrant Test Once After Completion Of Root Run And Finally On Completion Of All Weld Runs Followed By Water Hose Test (3 Kg Pr) , 00007Underwater, Above Water, Internal Compts, Mast / Super Structuresteel Renewal & Aluminium Renewal(A) Areas/ Structure Of Decks Found Weak/ Degraded/ Deteriorated During The Structural Survey Are To Be Cropped By Appropriate Methods And Renewed As Per Hull Survey Report/ Recommendations.Note 3:- Details Of Structural Renewals To Be Incorporated In Respective Deck Plans Giving All Details And Submitted For Information And Record. , 00008Sacrificial Anodessacrificial Anodesmake : Cathodic Control Company Pvt Ltdqty Fitted - 22 (Sacrificial) 04 (Iccp Anodes And Re) , 00008Sacrificial Anodessacrificial Anodesmake : Cathodic Control Company Pvt Ltdqty Fitted - 22 (Sacrificial) 04 (Iccp Anodes And Re)(A) Carryout Renewal Of Sacrificial Anodes Of 14 In Nos Sea Chest. Job Involves Milling Of Zinc Anodes Into Cylindrical Shape And Threading At One End To Ascertain Fitment In Sea Chest , 00008Sacrificial Anodessacrificial Anodesmake : Cathodic Control Company Pvt Ltdqty Fitted - 22 (Sacrificial) 04 (Iccp Anodes And Re)(B) Inspect Sacrificial Anodes Fitted To Underwater Hull, Rudders, Rope Gaurd, Shaft Tunnel, Stern Tubes, Inlets And Outlets, Sea Tubes, Bilges And Coffer Dams. Renew Those Consumed 50% Or More.Note:- For Sacrificial Anodes, A Minimum Of 4 Mm Gap Between The Hull And The Anode Is To Be Maintained. Old Anode Legs/ Weld Metal Is To Be Flush Ground, Post Removal And Restored With The Appropriate Paint Scheme Prior Fitment Of New Anodes.(On Rudder (P &S) - 08 Nos.On Sea Tubes - 14 Nos , 00008Sacrificial Anodessacrificial Anodesmake : Cathodic Control Company Pvt Ltdqty Fitted - 22 (Sacrificial) 04 (Iccp Anodes And Re)(C) Carryout Renewal Of Sacrificial Anodes Of Rudder And Inlets Job Involves Removal And Fitment Of Sacrificial Anodes.Sacrificial Anodes Details:On Rudder (P &S) - 08 Nos.On Sea Tubes - 14 Nos , 00009Iccp Systempre Docking Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01 , 00009Iccp Systempre Docking Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(A) Carry Out Pre Docking Checks On Anodes, Reference Electrodes And Auto Control Units Iaw No 03/21. Rectify Defects If Any During Dry Docking Phase. Re - 2 , Iccp Anodes - 2Note: Report Of Pre Docking Checks Be Submitted To Ss At The Earliest. , 00009Iccp Systempost Docking (Dry Docking) Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(B) Renew Dielectric Shield (25Sqft Area Around Anodes) In Accordance With Para 3.5, Chapter 3 Of Inbr 372/83. , 00009Iccp Systempost Docking (Dry Docking) Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(C) Check Insulation Of Anodes To Hull And Reference Electrodes To Hull. Rectify Deects, If Any , 00009Iccp Systempost Docking (Dry Docking) Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(D) Scrap Recess Of Securing Bolts/ Anodes/ Reference Electrodes With Emery Paper And Apply Fresh Coat Of Araldite Putty In Recess , 00009Iccp Systempost Docking (Dry Docking) Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(E) Carry Out Dummy Load Test Of Auto Control Unit Panel As Per Instruction In Chapter Inbr 372/84 & No 03/21. , 00009Iccp Systempost Docking (Dry Docking) Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(F) Examine For Leakage Where Iccp Anodes Fitted. Rectify Leakages By Filling With Plastic Compound. , 00009Iccp Systempost Docking (Dry Docking) Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(G) Examine Di-Electric Shield Around Iccp Anodes And Reference Electrodes. Preserve Di-Electric Shield I.A.W No 03/21. Area Covered By Anti-Fouling Paint On Ships Hull Should Also Include Area Of Di-Electric Shield Leaving Only 300Mm Distance From Iccp Anode/ Reference Electrode. A Tie Coat May Be Necessary Before Anti-Fouling Paint Application On Th Di-Electric Shield. Necessary Protection/ Cover The Anodes And Reference Electrodes During Painting In Vicinity. , 00009Iccp Systempost Docking (Dry Docking) Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(H) Open, Inspect And Clean The Iccp Cofferdams During Dry Docking Of The Ship. To Prevent Seepage Of Water Into Cofferdams, The Cable Entry Gland, Cable Exit Glands And Cofferdam Lid Should Be Made Watertight. As An Additional Measure, Potting With Ihq Approved/ Nmrl Developed Silicone Compound Is To Be Carried Out As Per Para26 Of No 03/21. , 00009Iccp Systempost Docking (Dry Docking) Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(J) Inspect Junction Boxes/ Cofferdams For Signs Of Corrosion And Wt Integrity, Especially On Cover And Cable Gland.Undertake Air Pressure Test Of The Cofferdam Post Structure Repair/ Renewal On Cofferdam Structure Prior Fittment Of The Cable Of The Anode/ Reference Electrode, As Per Norms Appilicable For Any Cofferdam/ Void Space Onboard. , 00009Iccp Systempost Docking (Dry Docking) Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(K) Carry Out Serviceability Checks Of Acu By Refitting Authority As Per Para 22© Of No 03/21.Note : The Iccp System Is Under Amc And Periodic Checks Are Being Carried Out By M/S Cathodic Controls Pvt Limited, Bangalore , 00009Iccp Systempost Undocking Checks Make : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(L) Carry Out Post Undocking Checks On Anodes (04 Nos), Reference Electrodes (02 Nos) And Auto Control Units (01 No.) Iaw No 03/21.Note: Report Of Post Undocking Checks Be Submitted To Ss At The Earliest. , 00009Iccp Systemcheck Bonding Connection Of Propellar And Ruddermake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(M) Check Bonding Connections Between Propeller Shaft & Hull And Rudder & Hull For Mechanical Soundness And Zero Resistance.(Refer Para 3.11 Of Inbr 372/83) , 00009Iccp Systemcheck Cable Glandsmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(N) Check Iccp Cable Glands For Firm Mechanical Tightness Of Connections And Ensure Continuity Of Circuits. Check Following(A) Cable Entry Into Cofferdams.(B) Cable Connections In Controller.(C) Cable Connections In Junction Box.(D) Cable Runs In Conduits. , 00009Iccp Systemserviceability Checks Acumake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(P) Carry Out Serviceability Checks Of Acu By Refitting Authority As Per Para 22 (C) Of No 03/21. , 00010Plating Above Waterabove Water Ship Side Inspection(A) Examine Above Water Shipside Structure For Deterioration Of Paint, Corrosion & Dents On Shell Plating At Fendering Positions And In The Way Of Anchors Where Abrasion Is Probable. . Repair Agency To Carry Out Visual Survey Of Projected Above Water Plating For Defects. Usg Of Areas Found Corroded During Visual Survey To Be Undertaken, If Required. , 00010Plating Above Waterhydroblasting/ Grit Blasting(B) Carryout Abrasive Blasting Conforming To Swedish Std Sa-2.5 Std/ Hydro Blasting Conforming To Wj-2L Std Of All Above Water Plating. Renew Complete Paint Scheme Inaccordance With No 53/16 , 00010Plating Above Waterpainting Of Ship Side(C) Carryout Painting Of Above Water Area On Completion Of All Hot Work And Blasting Of Above Water Hull, With M/S Akzo Nobel Paint Scheme. Provide Oem Certificate Of Paint To Ss On Completion Of Painting Job Involves.(I) Intergard 269 - 40 (Ii) Anticorrosive Paint Intergard 5600 (Grey) -60 (Iii) Anticorrosive Paint Intergard 5600 (Red) - 20 (Iv) Interthane 990 Polyurethane (Pu) (Grey-Ral 7040) -120 (V) Interthane 990 Polyurethane (Pu) Black-Ral 9011 - 60 , 00011Seatubespressure Testingall Sea Tubes Not Accessible For Survey And Painting Because Of Smaller Dia Are To Be Renewed With Seatubes Made Up Of Dmr249a Steel And Are To Be Air Pressure Tested To 2.5 Kg/Cm2 After Renewal Restore Paint Scheme In Accordance With No 53/16 And Policy Directives Issued By Ihq/Dna From Time To Time . , 00012Sea Chest/ Sea Tubes/ Uw Inlets/ Outlets And Obdssurvey Sea Chest/ Sea Tubes/ Uw Inlets/ Outlets And Obdsall Sea Tubes Are To Be Visually Surveyed And Ultrasonically Gauged As Per No 01/15 And Repair/ Renewal Is To Be Undertaken As Necessary. Endoscopic Survey Of 100% Of Seatubes To Be Carried Out.Note: 1. All Seatubes Are To Be Surveyed Irrespective Of Their Material.During Survey Of Sea Tubes, Specific Attention Is To Be Paid To The Neck Region. All Branch Pipes/ Flush Through Lines Welded To Sea Chest/Seatubes Are To Be Surveyed As Part Of Seatubes. In Case Of Talwar Class Of Ships, The Rubber Lining Of The Sea Tube Shall Be Inspected For Any Deterioration And Water Entrapment.2. Conditional Assessment Of Bimetallic Joints Is To Be Carried Out Whilst Undertaking Survey Of The Seatubes. 100% Endoscopy Of Seatubes Is To Be Carried Out Post Repairs And Application Of Coating Prior To Undocking Of The Ship.3. Sea Tubes Not Accessible For Survey And Painting Because Of Small Diameter Are To Be Renewed. , 00013Internal Uw Hull Structure & Above Water Structure Structure Covered With Underlay/ Insulation(A) Survey The Structure In Accordance With No 01/15 And Ihq Mod (N)/ Dna Letter Nc/7631 Dated 01 Nov 22 As Mentioned:-Structure Covered With Underlay/ Insulation - Survey Of The Condition Of Underlay / Insulation Is To Be Carried Out. The Deck Covering Be Inspected For Cracks, Bulging/ Undulation, Mechanical Damage, Discoloration Etc. In Case Of Damage Observed, The Structure Underneath To Be Visually Surveyed Post Removal Of Underlay/ Insulation Of Affected Area.Compartments With Deck Covering:(I) Co Toilet(Ii) Ss Bathroom(Iii) Js Bathroom(Iv) Officers Bathroom(V) Ahu Compt. (Vi) Stp Compt.(Vii) Galley(Viii) Scullery , 00013Internal Uw Hull Structure & Above Water Structure (B) Usg Of Areas Found Corroded During Visual Survey In Internal Uw & Above Water Structure , 00013Dadoe Areas Of Wt Bulkheads (C) 100% Visual And Usg Survey Of Dadoe Areas Of Wt Bulkheads At Each Deck Below Waterline. Note : Pulse Eddy Current Technology (Pect) May Be Adopted For Survey Of Secondary Structures As Per Ihq-Mod(N)/Dna Letter Nc/4523 Dated 26 Jul 22.20 Uw Compartments Excluding Tanks , 00013Internal Uw Hull Structure & Above Water Structure (D) All Uw Internal Structure And Above Water Structure To Be Visually Inspected Specific To Be Repaired.20 Uw Compartments , 00014Above Water Structure And Fittingssurvey Of Bollards/ Fairleads/ Cleat Deck Eyes/ Stanchion(A) Carry Out Survey And Inspection Of All Bollards/Fairleads/ Cleats/ Deck Eyes/ Staghorn And Other Deck Fittings Structure Including Stiffening Members In The Vicinity With Non-Destructive Techniques, If Required And Include In The Survey Report. For Towing And Cable Clench, Check The Efficacy Of The Attachment Using Non-Destructive Testing.47 Deck Fittings: Bollards, Towing Bollard, Fairlead, Cleat , Bullring , Rope Real, Bottle Screw, Roller With Pulley , Cable Clench , Towing Slip Etc. , 00015Air Pressure Testing Of Tanks, Cofferdams And Sea Tubesair Pressure Testing Of Tanks, Cofferdams And Sea Tubesall Tanks, Cofferdams And Sea Tubes Which Are Repaired By Build-Up/Renewal Are To Be Air Pressure Tested Iaw Para 47 Of No 01/15. The Pressure Testing Is To Be Carried Out By Refitting Firm In The Presence Of Ship Staff And Quality Control Inspectors Of The Refitting Firm. Under No Circumstance, The Procedure Of Running Pressure Test Is To Be Used To Confirm The Structural Integrity Of These Spaces.14 Sea Tubes.25 Obds04 Iccp Cofferdam01 Tank Cofferdam02 Void Space (Port & Stbd)09 Tanks , 00016Tanks/Tank Tops Tanks/Tank Tops Survey(A) Tanks/Tank Tops: 100% Visual And 100% Usg Survey Of All Tanks.Note:- (A) Usg Of Tank Tops May Be Undertaken From Inside The Tank In Case Of Degutting Constraints, If Any.Bilges, Cofferdams, Void Spaces Shaft Recess, Area In Vicinity Of Suction Strainers Of Educators.(B) Visual Survey Of All Accessible Areas.Tank Tops - Dinning Hall, Pump Room, Stp Lobby, Ss Mess, Dirty Water Tank, Dirty Oil Tank , 00016Tank Topschipping & Cleaning Of Tank Tops (C) Refitting Firm To Chip Clean All Tank Tops, Bilges Of Machinery Spaces,Cofferdams, Shaft Recess And Other Accessible Internal Surfaces Of Underwater Hull Up To And Including Area 500 Mm Above Boot Top Line For Hull Survey Inspection , 00017Fresh Water Tankvisual Survey And Usg Survey Of Fw Tanks(A) Carry Out 100% Visual Survey Of Tank Internally And Tank Tops For Corrosion/ Rust. Carry Out 100% Ultrasonic Thickness Gauging Of Structure, Repair/ Refit As Necessary And Carry Out Pressure Teesting On Completion Of Repairs.Note: - Usg Of Tank Tops May Be Undertaken From Inside The Tank In Case Of Degutting Constraints, If Any. , 00017Fresh Water Tankfw Tank Paint Inspection(B) Examine All Fw Tanks Paying Particular Attention To The Paint Coating Specially Areas Not Readily Visible Such As The Underside Of Framing Flanges For Pitting, Corrosion And Otherstructural Defects And Damage. Note Specific Defects To Yard For Rectification. Restore / Renew Paint Scheme In Accordance With Ncd 1491, No 53/16 And Policy Directive Issued By Ihq/Dna As Applicable. , 00017Fresh Water Tankwashing Of Fw Tank(C) Wash Down Completely Interior Paint Layers Of All Fresh Water Tank Including Pipes And Other Fittings With Fresh Water.Remove Dirt, Sludge, Debris And Loose Paint. Scrap Clean Corroded/ Rusted Areas To Bare Metal And Prepare Structure For Survey/ Inspection By Yard/ Trial Agency.Note:- Ss To Obtain Gas Free Certificate Prior To Entry In Tanks As Confined Spaces Iaw Br 3000. , 00017Fresh Water Tankgas Free Certificate(D) Obtain Gas Free Certificate Prior To Entry In Tanks As Confined Spaces Iaw Br 3000. , 00017Fresh Water Tankfw Pipe Line And Fittings Inside Tank(E) Check The Material Condition Of Fw System Pipe Lines Fitted Inside Tanks, Bell Mouths, Sounding Pipe Including Deck Piece And Brackets Housing The Fw System Pipe Lines. Raise Specific Defects To Yard For Rectification. , 00017Fresh Water Tankfw Tank Manhole Cover/ Coamings And Securing Arrangement(F) Examine Manhole Covers/ Coamings, Including Securing Arrangements And Gaskets. All Securing Studs/ Fasteners Are To Examine For Their Intactness And Soundness. Projectspecific Defects To Yard For Rectification , 00017Fresh Water Tankfw Tank Ladders/ Rungs And Brackets(G) Check The Material Condition Of Ladders/ Rungs Fitted Inside The Tanks Including Their Brackets For Intactness/ Welding. Raise Specific Defects To Yard For Rectification , 00017Fresh Water Tankfw Tank Vent/ Breather Pipe Lines(H) Breather Of Fw Tank Corroded And Perished. Repair/ Renewal To Be Carried Out , 00017Fresh Water Tankair Pressure Testing Of Fw Tanks(J) Undertake Pressure Testing Of Fw Tanks Which Are Repaired By Build-Up/ Renewal Iaw Para 47 Of No 01/15. The Pressure Testing Is To Be Carried Out By Refitting Authorities In The Presence Of Ship Staff And Quality Control Inspectors Of The Refitting Authority. Under No Circumstance, The Procedure Of Running Pressure Test Is To Be Used To Confirm The Structural Integrity Of These Spaces , 00017Fresh Water Tankfw Tank Ps Renewal And Restoration(K) Restore / Renew Paint Scheme In Accordance With Ncd 1491, No 53/16 And Policy Directive Issued By Ihq/Dna As Applicable.Note: (A) Inspection Of Paint Oem Be Carried Out Wherever Applicable.(B) Galvanised Ladders Are Not To Be Painted. Ensure That Suction Strainer Boxes Are Clear.(C) The Surface Preparation Work And Painting Interiors Of Fresh Water And Distilled Water Tanks Is Required To Be Undertaken By Healthy Personnel, Wearing Clean Outfits. On Completion, Of Painting, Each Tank Should Be Inspected To Ensure That The Coating/ Paint Film Completely Covers The Surface, With Particular Attention To Parts Of The Structures Which Are Not Readily Visible.(D) The Minimum Time For Filling The Fresh Water Tank If Freshly Coated Should Be 7 Days. The Tanks Should Be Washed Out With Fresh Water And Any Sediment Or Dirt Present Should Be Removed And The Covers Are Closed Before The Tanks Are Brought Into Use.(E) The Water Sample From The Tank After 72 Hours Of Immersion Should Be Sent To Nmrl Or The Naval Dockyard Laboratories For Potability Test Prior To Use Of Water For Drinking Purpose , 00018Fuel Tanks/ Lub Oil Tanksmechanical Cleaning(A) Clean Following Fuel/Lub Oil Tanks To Remove Dirt, Sludge, Debris And Loose Paint. Scrap Chip Clean Corroded/ Rusted Areas To Bare Metal And Prepare Structure For Survey/ Inspection By Yard/ Trial Agency And Ventilate.(I) Fo Tank No. 1: (Sq Mtrs - 110)(Ii) Fo Tank No. 2: (Sq Mtrs - 125)(Iii) Dirty Oil Tank (Sq Mtrs - 65)(Iv) Ru Fo Tank (P): (Sq Mtrs - 70)(V) Ru Fo Tank (S): (Sq Mtrs - 70)(Vi) Dirt Water Tank (Sq Mtrs - 40)(Vii) Lub Oil Tank Port & Stbd (Sq Mtrs - 70) , 00018Fuel Tanks/ Lub Oil Tanks(B) Prove And Provide Gas Free Certificate For All Fuel Tanks For Survey And Maintenance , 00018Fuel Tanks/ Lub Oil Tanks(C) Preserve The Surfaces By Application Of 01 Coat Of Heavy Filtered Mineral Oil (Om750) In 03 Nos Fuel Oil Storage Tanks. Provide Oem Certificate Of Om 750 To Ss On Completion Of Application , 00018Fuel Tanks/ Lub Oil Tanksvisual Survey And Usg Survey Of Fw Tanks(D) Survey The Fuel/ Lub Oil Tanks/ Tank Tops In Accordance With No 01/15 And Ihq Mod (N)/ Dna Letter Nc/7631 Dated 01 Nov 22 As Mentioned:-(I) 100% Visual And 100% Usg Survey Of All Tanks (For Group D Ships)Note:- Usg Of Tank Tops May Be Undertaken From Inside The Tank In Case Of Degutting Constraints, If Any. , 00018Fuel Tanks/ Lub Oil Tanksspecific Defects (Visual)(E) Examine & Repair The Structure Of All Fuel/Lub Oil Tanks Including Tank Tops For Pitting, Corrosion And Other Structural Defects And Damage. , 00018Fuel Tanks/ Lub Oil Tankspaint Restoration And Renewal(F) Examine Preservative Coatings Of Tanks. Restore / Renew Paint Scheme In Accordance With Ncd 1491, No 53/16 And Policy Directive Issued By Ihq/Dna As Applicable.Note:- (I) Inspection Of Paint Oem Be Carried Out Wherever Applicable. (Ii) All Precautions Against Fire Explosion, Toxic And Obnoxious Fumes Are To Be Taken In Accordance With B.R. 1754.Note: Inspection Of Paint Oem Be Carried Out Wherever Applicable. , 00018Fuel Tanks/ Lub Oil Tanksair Pressure Testing Of Fuel/ Lub Oil Tanks(G) Undertake Pressure Testing Of Fuel/Lub Oil Tanks Which Are Repaired By Build-Up/ Renewal Iaw Para 47 Of No 01/15. The Pressure Testing Is To Be Carried Out In The Presence Of Ship Staff And Quality Control Inspectors Of The Refitting Authority. Under No Circumstance, The Procedure Of Running Pressure Test Is To Be Used To Confirm The Structural Integrity Of These Spaces. , 00019Misc. Tankscleaning(A) Clean All Sludge And Bilge Tanks To Remove All Accumulated Water, Sludge, Debris And Loose Paint. Scrape/ Clean Corroded/Rusted Areas To Bare Metal And Prepare Structure For Survey/ Inspection By Yard/ Trial Agency. , 00019Misc. Tanksgas Free Certificate(B) Obtain Gas Free Certificate Prior Entry Of Personnel Into Enclosed Tanks Iaw Br 3000. , 00019Misc. Tanksoffering Of Uw Compartments (C) Ss Is Required To Offer All U/W Shell Touching Compartments And Tanks In Dry Dock For Inspection (For All Refits) Of Preservation Standards To Hitu Prior Final Undocking. , 00019Misc. Tanksstructural Examination(D) Undertake Survey Of All Sludge And Bilge Tanks Iaw No 01/15 And Ihq Mod (N)/ Dna Letter Nc/7631 Dated 01 Nov 22 As Mentioned:-Tanks(I) 100% Visual And 100% Usg Survey Of All Sludge And Bilge Water Tanks. (For Group D Ships).Tank Tops.(I) 100% Visual Survey Of Accessible Area.(Ii) Usg Of Areas Found Corroded During Visual Survey.(Iii) Structure Covered With Underlay/ Insulation - Survey Of The Condition Of Underlay / Insulation Is To Be Carried Out. The Deck Covering Is To Be Inspected For Cracks, Bulging/ Undulation, Mechanical Damage, Discoloration Etc. In Case Of Damage Observed, The Structure Underneath To Be Visually Surveyed Post Removal Of Underlay/ Insulation Of Affected Area.(Iv) Special Emphasis Is To Be Given To Inspection Of Manhole Covers/ Coamings, Including Securing Arrangements. All Securing Studs And Hinges Are To Examine For Their Intactness And Soundness.(Manholes Of Following Tanks:1. Fuel Tank 1 - 02 Nos.2. Fuel Tank 2 - 02 Nos.3. P & S Ru Tanks - 02 Nos.4. P&S Lub Tanks - 02 Nos.5. Dirty Water Tank - 01 Nos.6. Dirty Oil Tanks - 01 Nos. , 00019Misc. Tanksair Pressure Testing Of Tanks(E) Undertake Air Pressure Testing Of All Miscellaneous Tanks Such As Sludge And Bilge Tanks Which Are Repaired By Build Up/Renewal Iaw Para 47 Of No 01/15.Note: - The Pressure Testing Is To Be Carried Out By Refitting Authorities In The Presence Of Ship Staff And Qc Inspectors Of The Refitting Authority. Under No Circumstance, The Procedure Of Running Pressure Test Is To Be Used To Confirmthe Structural Integrity Of These Spaces. , 00019Misc. Tankspaint Scheme Renewal And Restoration(F) Carry Out Visual Survey Of All Miscellaneous Tanks Such As Sludge And Bilge Tanks And Undertake The Paint Renewal/ Restoration Of Paint Scheme Of All Misc Tanks Such As Sludge And Bilge Tanks, Affected Due To Hotwork /Plate Renewal/ Mechanical Damage Or Any Other Defects In Accordance With No 53/16. , 00020Cofferdam & Void Spacesmechanical Cleaning(A) Clean All Cofferdams And Void Spaces To Remove Dirt, Sludge,Debris And Loose Paint. Scrap Clean Corroded Rusted Areas To Bare Metal And Prepare Structure For Survey/ Inspection By Yard/ Trial Agency.Note:- Ss Is Required To Offer All U/W Shell Touching Compart-Ments/ Tanks/ Void Spaces/ Cofferdams In Dry Dock Forinspection (For All Refits) Of Preservation Standards To Hitu Prior Final Undocking(Void Space - 02 Nos. ( Area - 40 Sqm)Cofferdam - 01 Nos. 20 Sqm) , 00020Cofferdam & Void Spacesgas Free Certificate(B) Obtain Gas Free Certificate Prior To Entry In Cofferdams And Void Spaces As Confined Spaces Iaw Br3000. , 00020Cofferdam & Void Spacesspecific Defects ( Visual)(C) Exterior Surfaces Of Cofferdam/ Void Spaces Surveyed Internally, During Periodical Survey Of Structure To Be Included In Defect List Together With A List Of Items / Fittings Of Machinery And Equipment Which Will Be Required To Be Lifted To Facilitate Survey. , 00020Cofferdam & Void Spacesvisual Survey And Usg Survey Of Cofferdams & Void Spaces(D) Survey All Cofferdam And Void Spaces In Accordance With No 01/15 And Ihq Mod (N)/ Dna Letter Nc/7631 Dated 01 Nov 22 As Mentioned:-(I) Tank Tops - 100% Visual Survey Of Accessible Area. (For All Ships)..(Ii) Tanks- 100% Visual Survey Of All Cofferdam And Void Spaces. Usg Of Areas Found Corroded During Visual Survey. (For All Ships).Note: - Usg Of Tank Tops May Be Undertaken From Inside The Tank In Case Of Degutting Constraints, If Any. , 00020Cofferdam & Void Spacessacrificial Anodes In Cofferdams And Void Spaces(F) Examine The Condition Of Sacrificial Anode Fitted Inside The Cofferdams/ Void Spaces, Renew Sacrificial Anode Consumed Beyond 50%, If Any(M/S Akzo Nobel (Llps)Intergard 269Intershield 300 Aluminiumintershield 300 Bronze , 00020Cofferdam & Void Spacespaint Scheme Renewal And Restoration(G) Restore / Renew Complete Paint Scheme Of Cofferdams And Void Spaces Post Survey And Renewal Iaw No 53/16/ Ncd 1491 /Policy Directives Issued By Ihq/Dna As Applicable.Note: Inspection Of Paint Oem Be Carried Out Wherever Applicable In Accordance With Relevant No And Ncd.Note: Oem Certificate Of Paint Be Provided Post Completion Of Painting. , 00020Cofferdam & Void Spacesair Pressure Testing Of Cofferdams And Void Spaces(H) Undertake Pressure Testing Of All Cofferdams And Voidspaces Which Are Repaired By Build-Up/ Renewal Iaw Para 47 Of Nos. 01/15. The Pressure Testing Is To Be Carried Out By Refitting Authorities In The Presence Of Ship Staff And Quality Control Inspectors Of The Refitting Authority. Under Nos. Circumstance, The Procedure Of Running Pressure Test Is To Be Used To Confirm The Structural Integrity Of These Spacesbilges Area (Approx)1. Asp - 35 Sq Mtr2. Aer - 49 Sq Mtr3. Mcr &Mcr Lobby - 21 Sq Mtr4. Mer - 74 Sq Mtr5. Port & Stbd Void Space - 40 Sq Mtr6. Pump Room-20 Sq Mtr7. Rope And Canvas Store - 21 Sq Mtr.8. Ammo Locker - 18 Sq Mtr9.Baggage Store - 54 Sq Mtr , 00021Machinery Compartment Bilgestanks/Tank Tops Survey(A) Visual Survey Of All Accessible Areas(B) Usg Of All Internal Accessible Area Of Machinery Compt Bilges (For Group D Ships) , 00021Machinery Compartment Bilgeshydroblasting/ Grit Blasting(C) Entire Underwater Areas Including Boot Topping Area Are To Be Blasted To Sa 2.5 Standard By Hydrojet Blasting/ Grit Blasting As Per Instructions Contained In No 1/15 . Renewal Of Paint To Be Carried Out As Per No 53/16. , 00022Decks, Above Water Area & Super Structurehydroblasting/ Grit Blastingentire Decks, Deck Fittings, Above Water Area & Super Structure Are To Be Blasted To Sa 2.5 Standard By Hydrojet Blasting To Faciliate Survey Of The Structure For Renewals. , 00022Decks, Above Water Area & Super Structureentire Decks, Deck Fittings, Above Water Area & Super Structure Area Are To Be Blasted To Sa 2.5 Standard By Hydrojet Blasting As Per Instructions Contained In No 01/15 And Prepare Surfaces For Paint Scheme Renewal. , 00023Weather Decks & Platformsstructural Examination(A) Examine Deck Structure Paying Particular Attention To Deck Boundaries, Expansion Joints, Bimetallic Joints, Deck Areas Near Foundation Of Eqpt./Fittings For Pitting, Excessive Corrosion And Blistering/Cracking For Peeling Of Paint. Prepare Surface And Restore Paint In Accordance With No 53/16 And Policy Issued By Ihq/Dna From Time To Time. Raise Specific Defects To Dockyard For Survey And Repairs , 00023Weather Decks & Platformsdeck Examination(B) Carry Out Surface Preparation Of Steel Decks By Abrasive Blasting & Aluminium Deck, As Per Instruction Contained In Para 11 Of Appendix B Of No 53/16. Restore Paint Scheme In Accordance With No 53/16 And Policy Issued By Ihq/Dna , 00023Weather Decks & Platformsload Testing(C) Carry Out Load Testing Of All Deck Rings, Time Frame Not Exceeding More Than 27 Months(For Carriers Class) , 00023Weather Decks & Platformscompartment Inspection(D) Dry Compartments Without Deck Covering: - To Be Subjected To Visual Survey. , 00023Weather Decks & Platformscompartment Inspection(E) Dry Compartments With Deck Covering: - The Survey Of The Condition Of The Deck Covering Is To Be Carried Out. The Deck Covering Be Inspected For Cracks, Bulging/Undulations, Mechanical Damage Etc. In Case Of Damage Observed, The Deck Underneath To Be Visually Surveyed Post Renewal Of Affected Area.Note: Permissible Limits Of Deformation For Underwater External Hull: - Three Times Thickness Of Plate (3T). Permissible Limits Of Deformation For External Hull Above Water, Boot Top And Wind/Water Area, Primary Decks And Bulkheads: - Five Times Thickness Of Plate (5T) , 00023Weather Decks & Platformscompartment Inspection(F) Scrap Clean To Bare Metal On Areas Of Loose Paint, Rust Markscorrosion Using Hard Wood Or Plastic Scraper. Clean With Detergent Solution Labolene And Rinse With Fresh Water And Preserve Deck With Adequate Paint Scheme.( M/S Akzo Nobel (Llps)1.Intergard 2692.Intershield 300(Aluminum)3.Non Slip Epoxy D.A. Grey With Hardener – Grey) , 00024Upper Deck (No 1, 01 & 02)Preservation/ Paintingcarryout Painting Of Main Deck, 01 And 02 Deck With M/S Akzo Nobel Paint Scheme I.A.W No 53/16. Provide Oem Certificate Of Paint To Ss On Completion Of Painting. Job Involves , 00024Upper Deck (No 1, 01 & 02)Preservation/ Painting(A) Main Deck (Ms) (I) Application Of 01 Coat Of Epoxy Red Oxide Primer Dft 40 Microns On Blasting(Ii) Application Of 03 Successive Coats Of Epoxy Red Oxide Primer Dft 40 Microns Each(Iii) Application Of 02 Successive Coats Of Epoxy Heavy Duty Non Skid Paint(Dark Grey) Dft 300 Microns Each , 00024Upper Deck (No 1, 01 & 02)Preservation/ Painting(B) Aluminum Deck (No 01 And 02)(I) 01 Coat Of Epoxy Primer Dft 75 Microns On Blasting(Ii) 01 Coat Of Epoxy Primer Dft 75 Microns(Iii) 02 Successive Coats Of Epoxy Heavy Duty Non Skid(Dark Grey) Dft 300 Microns Eachnote : The Interval Between Application Of Each Coat Of Primer And Epoxy Heavy Duty Non Skid Is Not To Be Less Than 16 Hrs And Not To Exceed 72 Hrs , 00025Superstructure And Fittingspreservation/ Painting(A) Carryout 100% Visual And Usg Survey Prior Painting Of Superstructure, Mast, Deck Fittings, Soft Patches, Mushroom Heads After Blasting And Completion Of Hot Works With High Performance Paint Scheme Under Supervision Of Paint Manufacturer. Provide Oem Certificate Of Paint To Ss On Completion Of Painting. Job Involves , 00025Superstructure And Fittingspreservation/ Painting(A) Carryout 100% Visual And Usg Survey Prior Painting Of Superstructure, Mast, Deck Fittings, Soft Patches, Mushroom Heads After Blasting And Completion Of Hot Works With High Performance Paint Scheme Under Supervision Of Paint Manufacturer. Provide Oem Certificate Of Paint To Ss On Completion Of Painting. Job Involves(I) Application Of 01 Coat Of Intergard 269 Primer To Dft 40 Microns On Blasting , 00025Superstructure And Fittingspreservation/ Painting(A) Carryout 100% Visual And Usg Survey Prior Painting Of Superstructure, Mast, Deck Fittings, Soft Patches, Mushroom Heads After Blasting And Completion Of Hot Works With High Performance Paint Scheme Under Supervision Of Paint Manufacturer. Provide Oem Certificate Of Paint To Ss On Completion Of Painting. Job Involves(Ii) Application Of 01 Coat Of Intergard 269 Primer To Dft 40 Microns , 00025Superstructure And Fittingspreservation/ Painting(A) Carryout 100% Visual And Usg Survey Prior Painting Of Superstructure, Mast, Deck Fittings, Soft Patches, Mushroom Heads After Blasting And Completion Of Hot Works With High Performance Paint Scheme Under Supervision Of Paint Manufacturer. Provide Oem Certificate Of Paint To Ss On Completion Of Painting. Job Involves(Iii) Application Of 02 Coats Of Interlac 846 Color Ral 7040(Light Grey) To Dft 40 Microns Each. , 00026Superstructure (Aluminium)Structural Examination And Repairs(A) Examine Complete Superstructure For Structural Defects Paying Particular Attention To Inaccessible Areas, Bimetallic Joints And Dadoes Area.Usg Of Areas Found Corroded During Visual Survey To Be Undertaken, If Required , 00026Preservation/ Painting(B) On Completion Of Structural Repairs, Undertake Application Of Full Paint Scheme, With Requisite Surface Preparation As Per No 53/16. , 00026Modificationmodification Of Yardarms Of Mast Structure For Resiting Of Cots Radar , 00027Mast And Riggingsstructural Examination(A) Examine Mast Structure, Whip Aerial Platforms And The Surrounding Structure On Deck, Eye Plates, Load Carrying Members For Signs Of Corrosion. Examine Bolted, Riveted And Intermittent Welded Structure Connections For Signs Of Fracture. Portable And Semi Portable Fittings To Be Removed For Closer Examination Of Structure Underneath. 9Lattice Mastapprox. Area - 35 Sqm.) , 00027Mast And Riggingspainting Of Mast(B) Carry Out Complete Survey Of Structure As Per No 19/06 And Repair/Renew As Necessary. Paint The Mast In Accordance With No 53/16, Ncd 1493 And Policy Directives Issued By Ihq/Dna From Time To Time.(M/S Akzo Nobel (Llps)1. Intergard 2692.Anticorrosive Paint Intergard 5600 (Grey / Red)3.Interthane 990 Polyurethane (Pu) (Grey-Ral 7040)) , 00027Mast And Riggings(C) Damaged Paint To Be Restored As Per Paint Scheme. Prepare Surface And Preserve In Accordance With No 53/16, , 00027Mast And Riggingssurey And Testing Of Running Riggings(D) Survey And Test All Standing & Running Riggings Fitted On Mast Structure Along With Associated Fittings. Renew Wire Ropes And Associated Fittings As Necessary , 00028Guard Rail And Stanchionspvc Guardrails(A) Slack Off Guard Rail Wires. Clean, Lubricate And Work Through Full Limit Of All Bottle Screw And Shackles. Clean And Lubricate All Stanchion Stays And Heel Fitting. Check For Correct Positioning Of Stanchion And Drop Nose Pins. Clean And Lubricate Vice Headed Bolts. Examine Pvc Coated Steel Wires For Damage, Wear Or Corrosion. Renew If Necessary. Clean And Recoat With Boiled Linseed Oil. , 00028Guard Rail And Stanchionspvc Guardrails(I) Tulips , 00028Guard Rail And Stanchionspvc Guardrails(Ii) Bottle Screw Slips , 00028Guard Rail And Stanchionspvc Guardrails(Iii) D Shackles , 00028Guard Rail And Stanchionspvc Guardrails(Iv) Guard Rails (Wire Rope) , 00028Guard Rail And Stanchionspvc Guardrails(V) Load Testing Of Guard Rail With 750 Kg Iaw Inbr 1552 Randomly. , 00028Guard Rail And Stanchionsfixed/ Portable Guardrail Stanchion(B) Visual Survey/ Hammer Surve Of Portable And Fixed Guardrail Stanchions. Following Job Involves: , 00028Guard Rail And Stanchions(C) Checks/ Replacement, If Any Defect, The Condition Of Eyes For Guardrails , 00028Guard Rail And Stanchions(D) Replacement Of Stanchion Shoes With Securing Nuts & Bolts, If Any Defect , 00028Guard Rail And Stanchions(E) Replacement Of Portable Stanchion, If Any Defect , 00028Guard Rail And Stanchions(F) Repalcement Of Fixed Guardrail Stanchion, If Any Defect , 00028Guard Rail And Stanchions(G) Replacement Of Supporting Pipes Of Fixed Guardrail On Brigde Top, If Any Defect , 00028Guard Rail And Stanchionsstanchions (H) Apply Lightly Grease On Stanchion Sockets, Boom Heel Fittings And Screwed Connectors. Grease To Be Used:- Xg- 274 , 00028Guard Rail And Stanchionsearthing Connections(J) Replace/Renew Defective/ Broken/ Corroded Earthing Connections As Projected By Ss , 00028Guard Rail And Stanchionsmisc. Fittings (K) Examine Entire Guard Rail Assembly Viz Guard Rail Stanchions, Pvc Coated Wire, Ss Fittings, Eye Plates And Guard Rail Stanchion Heel Fittings . Raise Specific Defects To Yard Forrectifications. , 00028Guard Rail And Stanchionsbottle Screw Slip And Stanchions(L) Check That Pins Are Fitted To Tongues Of Bottle Screw Slips And That Pins Are Housed. Clean Anodised Aluminium Guard Stanchions, Tubular Guard Rails And Pvc Coated Guard Wireswith A Weak Detergent Solution. Use No Abrasive.Oil And Grease, Stains To Be Removed With A Clean Rag Dipped In White Spirit , 00028Guard Rail And Stanchionstubular Guard Rails(M) Inspect Tubular Guard Rails And Stanchions For Corrosion And Distortion, Paying Particular Attention To Welded Joints And Heel Fittings. Repair/ Renew As Necessary. , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(A) Carry Out Pre-Refit Trials And Project Specific Defects To Dockyard For The Following:(I) Slippage Of Brake(Ii) Noise In Drive.(Iii) Leakage Of Oil From Gear Box.(Iv) Overheating Of Gear Box/Bearing.(V) Gear Box Vibrations.(Vi) Spm Checks Of Motor , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(B) Strip And Inspect Cable Holder Brake Mechanism, Paying Particular Attention To The Trunnion Nut And Bevel Gears Of Hand Wheel Unit.(I) Examine Brake Linings, Pins And Bushes For Wear.(Ii) Drain Oil From Hand Wheel Unit Oil Bath And Refill With Fresh Oil.(Iii) Examine Ferrodo Linings, Pins And Bushes For Wear.Renew As Necessary , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(C) Carry Out The Following Inspection On Brake: - , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(I) Strip, Inspect And Overhaul Cable Holder Manual Brake Mechanism Paying Particular Attention To The Trunnion Nut And Bevel Gears Of Hand Wheel Unit. , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(Ii) Renew Ferrodo Brake Linings, Pins And Bushes As Per Sample. Material Specs Of Brake Lining - Length: 1 Mtr., Width- 50 Mm , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(Iii) Drain Oil From Hand Wheel Unit Oil Bath And Refill With Clean Oil Servo System 320 , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(D) Examine The Windlass/ Cable Holder Gear And Its Fittings. Check The Oil Seals For Leakage. Specific Defects If Any, To Be Rectified. Job Includes Following Also:- , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(I) Dismantle The Capstan Drum, Cable Holder And Its Fittings. , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(Ii) Check The Oil Seals For Leakages, Bush Bearings For Wear And Increased Clearances. Renew Deefctive Components As Necesasry. , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(Iii) Check The Extent Of Wear Of Snugs Of Cable Holder. Renew The Cable Holder If The Snugs Are Found Excessively Worn Causing Slippage Of Cable. , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(Iv) Spares Not Held With Ships Staff And All Necessary Spares For Repair/ Overhaul Of Equipment Are To Be Catered By The Repairing Firm. , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(E) Remove Gear Cases And Examine Secondary & Primary Worm And Worm Wheel Drive. Strip And Examine All Thrust And Roller Bearings. Examine Slipping Clutch And Magnetic Brakes. Examine Flexible Couplings Between Motor And Clutches. Adjust The Slipping Clutch As Necessary. Rectify The Defects, Renew As Required. , 00030Capstan And Cable Holderspre Refit Trials (A) Carry Out Pre-Refit Trials And Project Specific Defects To Dockyard For The Following: -(I) Slippage Of Brake.(Ii) Noise In Drive.(Iii) Leakage Of Oil From Gear Box.(Iv) Overheating Of Gear Box/ Bearing.(V) Gearbox Vibrations.(Vi) Spm Checks Of Motor. , 00030Capstan And Cable Holderschecks(B) Strip And Inspect Cable Holder Brake Mechanism, Paying Particular Attention To The Trunnion Nut And Bevel Gears Of Hand Wheel Unit.(C) Examine Brake Linings, Pins And Bushes For Wear.(D) Examine Ferrodo Linings, Pins And Bushes For Wear. Renew As Necessary , 00030Capstan And Cable Holdersfull Load Trials(E) Carry Out Full Load Trials And Observe For Any Abnormal Noise. Defect To Be Rectified If Any. , 00030Capstan And Cable Holdersworm Gears And Wheels(F) Remove Gear Cases And Examine Secondary And Primary Worm And Worm Wheel Drive. Strip And Examine All Thrust And Roller Bearings. Examine Slipping Clutch And Magnetic Brakes. Examine Flexible Couplings Between Motor And Clutches. Adjust The Slipping Clutch As Necessary. Rectify The Defects, Renew As Required. , 00030Capstan And Cable Holderselectromagnetic Break(G) Adjust The Electromagnetic Brake In Accordance With Equipment Manual. Adjust Clutch And Air Gap Of Electromagnetic Brake (Air Gap Should Be 0.5 Mm - 1 Mm). Renew Friction Disc If Lines Are Worn Out. Examine Ferrodo Brake Lining. Renew If Worn Out. , 00030Capstan And Cable Holdersoverhauling(H) Overhaul Capstan Motor, Subject To Spm Checks. Renew Bearings And Apply Fresh Grease. , 00031Under Slung Electric Mooring Capstanmooring Capstanmake : M/S Cyclo Transmissions, Pune Qty Fitted - 01 Nos , 00031Under Slung Electric Mooring Capstanmooring Capstanmake : M/S Cyclo Transmissions, Pune Qty Fitted - 01 Nosdismantle The Capstan Assembly And Carry Out Complete Overhauling Of The Capstan And Prove For Satisfactory Operation. Carryout Load Testing Of Capstan To 1.5 Tonnes And Issue Necessary Certificate.Note - Spares Not Held With Ship Staff. All Necessary Spares Renewed During Overhauling To Be Catered By Firm , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davitmake : Deck Machinery Department, Grseqty Fitted - 01 No(A) Dismantle Complete Structure And Carry Out Complete Overhauling Of Davit Assembly And Its Sub-Components . Renew Worn Out Parts/ Defective Components. The Work Involves The Following: - , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davit(I) Dismantle And Strip Open Hoist & Slewing Gear Box Assemblies. Open The Bearing Housings And Inspect Bearings For Play And Wear. Inspect The Shafts, Worm Wheel Assembly For Any Wear And Presence Of Metallic Particles. Check Oil In Gear Case And Examine Gear Teeth For Breakage And Presence Of Foreign Matter. Check Bearings For Collapse And Shaft For Rust And Corrosion. , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davit(Ii) Overhaul Slew And Hoist Motors. Check Wear Of Rotor Friction Linings. Measure The Rotor Thicknesses And Compare To The Minimum Permissible Limits. If Necessary Replace The Rotor. Measure And Adjust The Air Gap Between The Armature Plate And Stator To Permissible Limits. Hoist Motor: 1.5 Hp,415 V, 50 Hz, 3 Ph, 132S Frame Marine Duty Motor; Slew Motor:3 Hp,415 V, 50 Hz, 3 Ph, 100L Frame Marine Duty Motor; Degree Of Protection: Ip56 , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davit(Iii) Overhaul Electromagnetic Release Spring-Applied Brake Fitted On Hoist Motor. Inspect The Worn Wheel Assembly For Any Wear And Presence Of Metallic Particles. , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davit(Iv) Inspect The Friction Linings Of The Brake On Hoist Winch Motor And Renew If Worn Out , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davit(V) On Completion Of Overhauling, Carry Out Load Testing Of The Equipment. Swl: 1.2 T, Running Load: 1.8 T, Static Load: 2.4 T , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davit(Vi) Pre-Refit And Post Refit Trials To Be Carried Out. , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davit(Vii) Check Oil In Gear Case And Examine Gear Teeth For Breakage And Presence Of Forgien Matter. , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davit(Viii) After Completion Of Load Test, Examine The Complete Davit Structure And Associated Lifting Gears For Flaws Distortion, Defecaution Etc. Flaws Must Be Examined By Ndt Techniques And Carry Out Repairs If Necessary And Retest. Record Results Of Test And Examination , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davit(Ix) Carryout Annual Servicing Of Arh (Auto Release Hook) As Per Standard Speciications.Note - Arh To Be Serviced And Certification To Be Provided By M/S Vanson Engg Pvt Ltd (Oem And Navy Authorised Supplier Of The Equipment) , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davit(X) Undertake Replacement Of Boat Davit Falls.Note:- All Necessary Spares For Repair/ Overhaul Of Equipment Are To Be Catered By The Repairing Firm. , 000321.2 T Single Arm Radial Davitefswr Renewal(B) Renew The Extra Flexible Steel Wire Rope (Efswr) Of Boat Davit From End To End As Per Sample After Visual Survey And The Same To Be Rigged Up On Boat Davit. Wire Rope Dia: 12 Mm. Job Involves Following :- , 000321.2 T Single Arm Radial Davit(I) Removal Of Efswr From The Davit , 000321.2 T Single Arm Radial Davit(Ii) Connection Of Thimnle And Splicing Of The New Efswr On To The Thimble At Standing End. , 000321.2 T Single Arm Radial Davit(Iii) Rigging Up Of New Efswr On To The Davit. , 000321.2 T Single Arm Radial Davit(Iv) Calibrate The Over-Load Mechanism Of Starter , 000321.2 T Single Arm Radial Davit(V) Examine Entire Assembly Including Brake Lining ,Brake Shoe,Brake Disc And Associated Fittings. Renew Brake Lining And Shoe Of Excessively Worn Down , 000321.2 T Single Arm Radial Davit(Vi) Survey All Wire Ropes, Spare Gear And Other Associated Lifting Gears. Renew As Necessary. , 000321.2 T Single Arm Radial Davit(Vii) Carry Out Spm Checks On Electrical Motor. Lubricate/Replace Bearing As Necessary. , 000321.2 T Single Arm Radial Davit(Viii) Overhaul Electric Motor Subject To Qc Check.Carry Out Trials On Completion Of Repairs. , 000321.2 T Single Arm Radial Davit(Ix) Open Slewing Assembly Bearing Housing And Inspect Bearing For Play. Renew Components Viz Gears Bearings If Necessary. Renew O Rings And Oil Seals , 000321.2 T Single Arm Radial Davit(X) Inspect The Worm Wheel Assembly For Any Wear And Presence Of Metallic Particles. , 000321.2 T Single Arm Radial Davit(Xi) Check Oil In Gear Case And Examine Gear Teeth For Breakage And Presence Of Foreign Matter.Check Bearings For Collapse And Shaft For Rust And Corrosion.Renew/Repair As Necessary. , 000321.2 T Single Arm Radial Davit(Xii) Record Volt/Amps/Speed Parameters Of Davit And Associated Systems During Load Test. Record Load Test Details. , 000321.2 T Single Arm Radial Davit(Xiii) Check Brake Lining On Winch And Change Liner If Damaged. , 000321.2 T Single Arm Radial Davit(Xiv) Check All Rotating Parts, Lever Etc For Free Movement. , 00033Anchor Windlassanchor Windlass(A) Strip And Examine Shaft For Wear And Alignment Check And Clear Lubrication Point And Reassemble The Fittings , 00033Anchor Windlassanchor Windlass(B) Hand Wheel And Warping Drums To Be Removed. Examine Slit Keep Plate And Screw For Wear And Deterioration. Cable Holder Spinders, Bushes And Shafts To Be Examined For War And Defects. , 00033Anchor Windlassanchor Windlass(C) Dismantle Brakes, Examine Conditions Of Brake Linings. Renew Linings , Brakes Is To Be Ajustable On Completion. , 00033Anchor Windlassanchor Windlass(D) Examine Slipping Cluth, Magnectic Brakes And Couplings Renew Id Necessary. Replenmish System With New Clean Oil Oc 300. , 00033Anchor Windlassanchor Windlass(E) Inspect The Condition Of Deck Plating Under Windlass Foundation. Repair If Necessary. Preserve In Accordance With No 53/16. , 00033Anchor Windlassanchor Windlass(F) Carry Out Complete Overhaul Of Anchor Windlass And Carry Out Trails To Ensure Correct Performance On Completion Of Overhaul. , 00034Anchor And Cable / Lockerschain Cable/ Lockersmake : Chakravorty Traders Engg, Kolkata , 00034Anchor And Cable / Lockerschain Cable/ Lockers(A) Anchor Chain Cable And Accessories To Be Hydrojet Blasted To Bare Metal Surface So As To Facilitate Survey By Dockyard. Mechanical Chipping, Scrapping, Wire Brushing Etc In Inaccessible Areas, If Additionally Required By Dyd. 02 Half Shackles, 12 Full Shackles, 02 Anchor, 02 Bottle Screw Slip, 04 Swivel Adaptors , 00034Anchor And Cable / Lockerschain Cable/ Lockers(I) Stud Link Chain Cable Half Shackles- 13.25 Mtrs Each , 00034Anchor And Cable / Lockerschain Cable/ Lockers(Ii) Stud Link Chain Cable Full Shackles- 27.5 Mtrs Each , 00034Anchor And Cable / Lockerschain Cable/ Lockers(Iii) Us Danforth Anchor , 00034Anchor And Cable / Lockerschain Cable/ Lockers(Iv) Blake Slip , 00034Anchor And Cable / Lockerschain Cable/ Lockers(V) Bottle Screw Slip , 00034Anchor And Cable / Lockerschain Cable/ Lockers(Vi) Swivel Adapters , 00034Anchor Chain Cable & Accessoriesanchor Chain Cable & Accessories Make : Indian Chain Pvt Ltd(B) Carry Out Survey Of Anchor Chain Cable Accessories As Per No 02/21 , 00034Anchor Chain Cable & Accessoriesanchor Chain Cable & Accessories (I) Stud Link Chain Cable Half Shackles- 17.25 Mtrs Each , 00034Anchor Chain Cable & Accessoriesanchor Chain Cable & Accessories (Ii) Stud Link Chain Cable Full Shackles- 27.5 Mtrs Each , 00034Anchor Chain Cable & Accessoriesanchor Chain Cable & Accessories (Iii) Anchor , 00034Anchor Chain Cable & Accessoriesanchor Chain Cable & Accessories (Iv) D Shackle , 00034Anchor Chain Cable & Accessoriesanchor Chain Cable & Accessories (V) Bottle Screw Slip , 00034Anchor Chain Cable & Accessoriesanchor Chain Cable & Accessories (Vi) Swivel Adapters , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (C) All Lugless Joining Shackles, Anchor Shackles, Locker Lugged Shackles And Swivel Pieces Are To Be Disconnected Before Cleaning/Chipping To Remove All Paint And Rust. . Clean And Grease Trunnion Pin And Ho Using. Grease To Be Used:- Lg-280 Patt No 0474/910-0502 Note:- If There Is Likelihood Of The Twelve Month Period Being Exceeded, The Machined Surfaces Of The Joints Of Lugless Joining Shackles Are To Be Examined For Corrosion, All Such Shackles Being Stripped, Greased And Re-Assembled By Ship Staff. , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (D) Cleaning/Chipping To Remove All Paint And Rust From All Disconnected Parts. , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (E) Lay Out All Cables/ Anchor Ropes. Break, Clean And Grease All Joining Shackles. Strip And Grease Slip In Cable Locker. Re-Arrange Cable Length To Ensure Equality Of Wear.Re-Mark Cable Length. , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (F) Examine Hull Associated Fittings.Examine All Spare Chain Cable And Fittings, Clean And Coat With Cold Bituminous Paint.Dismantle Anchor , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (G) Unscrew Bottle Slip/ Compressor Whereas Fitted To Its Fullest Extent And Thoroughly Clean And Grease Threads Before Assembly. , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (H) Undertake Survey Of Adapter Piece For Cracks Or Wear And Undertake Repair As Per No 02/21 , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (J) Undertake Survey Of Adapter Piece For Cracks Or Wear And Undertake Repair As Per No 02/21 , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (K) Survey All Deck Fittings Associated With Anchor Chain Cable Arrangement Ie Deck Eyes/ Eye Plates Including Gulletine/ Gulletine Roller, Compressor With Complete Structure Whereas Fitted Paying Particular Attention Eye Plates/ Eye Bolts Etc For Wear, Corrosion/ Deterioration And Ovality Of Hole. Undertake Repair/ Renewal Iaw No 02/2 , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (L) Survey Anchor, Chain Cable, Swivel Adaptor, Shackles And All Associated Fittings (An Experienced Dockyard Blacksmith Is To Assist The Survey).Break, Clean And Grease All Joining Shackles. Undertake Repair/ Renewal As Applicable Iaw No 02/21. Forward A Report On In 305/ Nso 269(B) To Authorities As Mentioned In Para 15 Of No 02/21. , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (M) Check Original Dia Of Each Parts Of Anchor , Chain Cable And Accessories From Rigging Warrant & Offer Them Survey To Dyd Along With In 305 & Anchor Test Certificate. , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (N) Undertake Survey And Load Test Of All Steel Wire Rope Associated With Stern Anchor. Survey And Load Test Of Steel Wire Ropes Associated With Stern Anchor Are To Be In Accordance With Para 13 (C)- (H) Of No 02/21. Unwind The Steel Wire Rope From The Windlass Drum And Range On The Area Designated By The Refitting Authority. Prior To Restoring, Entire Steel Wire Rope Is To Be Cleaned, Dried And Lubricated. , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (P) Retest And Examination Of Cable In Accordance With Br 367, Article 13 And No 02/21. , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (Q) Examine The Condition Of Paint Of Cable Lockers For Sign Of Any Deterioration/ Damage Of Paint. Clean, Remove Damaged Paint And Rust Using Mechanical Chipping Or Scraping Or Wire Brush Tools. Paint The Cable Locker Iaw No 53/16 And Policy Directive Issued By Ihq/Dna From Time To Tim , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (R) Undertake Preservation Of The Anchor Chain Cable And Accessories Held Onboard, By Application Of Cold Bituminous/ Ps60 Paint Iaw Appendix ‘E Of No 53/16 , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (S) Assistance Required For Dismantling Of 12 No. Lugless Joining Shackles, 04 Lugged Shackles, 04 D-Shackles Of Slips. , 00035Stpoperational Checks(A) Undertake Complete Functional And Operational Checks Of Entire Sewage Treatment Plants And Check Specific Defects For Yard For Rectification. , 00035Stppvc Lines And Plug(B) Undertake Renewal Of All Pvc Pipelines And Pvc Plug Cock Valves , 00035Stpsystem Lines(C) Overhaul/ Chemical Clean All Sewage/ System Pipelines. , 00035Stpvisual Survey Sewage Tanks(D) Undertake Visual Survey Of V1 & V2 Tanks. If The Corrosion Is Found To Be Excessive,Undertake Usg Survey Of Tanks. Undertake Repairs As Necessary , 00035Stpsoil Pipes(E) Undertake Chemical Cleaning Of Soil Pipes. , 00035Stpmotors And Starters(F) Overhauling Of All Motors And Starters , 00035Stpsurvey And Painting Of Sewage Tanks(G) Carry Out Cleaning / Survey Of V1 And V2 Tanks And Repair As Necessary. Inspect The Internal And External Paint Coating And Recoat With Appropriate Paint Scheme After Completion Of Repairs And Surfacepreparation , 00035Stplevel Indicator Checks(H) Check Function Of Control Panel And Carryout Out Calibration Of Level Switches Of V1 And V2 Tanks. Replace If Necessary , 00035Stpoverhauling(J) Overhaul / Repair The Following :(I) Overboard Pump(Ii) Discharge Pump(Iii) Macerator Pump(Iv) Imo Pump (If Fitted)(V) Rotary Air Compressor , 00035Stpsystem Lines(K) Undertake Over Haul / Repair Of 100% Of System Valves (Non-Pvc) Fitted In The System. , 00035Stpv1 And V2 Tanks(L) Inspect Freeness Of Vent Line Of V1 And V2 Tanks By Blowing Throughwith Air. Project Defects If Any , 00035Stpispp Certificate(M) If Renewal Of Certificate Is Due, Obtain International Sewage Pollution Prevention Certificate Valid For Duration Of Five Years From A State Authorised Accredited Agencies As Specified In Mepc 115(51) And 227(64) For The Ship Adopted On 01 Apr 04 As Per Regulation 5 Of Revised Annex Iv Of Marpol 73/78 (Ncd 3930, Issue 3, Sep 16 Isrelevant) , 00035Stpeffluent Test(N) Carry Out Effluent Test Of Sewage Discharge. , 00036Sewage Treatment Plantsewage Treatment Plantmake : M/S Hi Point Pvt Ltd, Mumbai, Model : Omnipure 6 Mcqty Fitted - 01 , 00036Sewage Treatment Plantsewage Treatment Plantmake : M/S Hi Point Pvt Ltd, Mumbai, Model : Omnipure 6 Mcqty Fitted - 01 (A) Open, Examine And Overhaul Macerator And Obd Pump And Prove For Satisfactory Operation Post Overhaul. Examine For Wear And Clogging. Clean Clogged Parts. Check Proper Face Clearance Between Axial And Cutter. Carry Out Cutter Adjustment. Check Sleeve Bearing And Shaft For Wear. Examine Ball Bearings For Rust And Wear And Mechanical Seal Of Pump For Damage. Replace Worn Out Cutters, Bearings, O-Rings, Mechanical Seal And Other Sub-Components. Spares Not Held With Ships Staff. , 00036Sewage Treatment Plantsewage Treatment Plantmake : M/S Hi Point Pvt Ltd, Mumbai, Model : Omnipure 6 Mcqty Fitted - 01 (B) All Necessary Spares For Repair/ Overhaul Of Equipment Are To Be Catered By The Repairing Firm Through Oem (M/S Hi Point Services Pvt Ltd, Mumbai) , 00036Sewage Treatment Plantsewage Treatment Plantmake : M/S Hi Point Pvt Ltd, Mumbai, Model : Omnipure 6 Mcqty Fitted - 01 (C) Undertake Renewal Of All Pvc Pipelines And Pvc Plug Cock Valves. Overhauling Of All Sewage System Pipeslines. , 00036Sewage Treatment Plantsewage Treatment Plantmake : M/S Hi Point Pvt Ltd, Mumbai, Model : Omnipure 6 Mcqty Fitted - 01 (D) Undertake Chemical Claning Of Soil Pipes. , 00036Sewage Treatment Plantsewage Treatment Plantmake : M/S Hi Point Pvt Ltd, Mumbai, Model : Omnipure 6 Mcqty Fitted - 01 (E) Overhauling Of All Motors And Starters. And Pipe Lines. , 00036Sewage Treatment Plantsewage Treatment Plantmake : M/S Hi Point Pvt Ltd, Mumbai, Model : Omnipure 6 Mcqty Fitted - 01 (F) Overhaul / Repair The Follwing:- (I) Overboard Pump- 1 No, (Ii) Discharge Pump - 1 No, (Iii) Macerator Pump - 1 No , 00036Sewage Treatment Plantv1 And V1 Tanksmake : M/S Hi Point Pvt Ltd, Mumbai, Model : Omnipure 6 Mcqty Fitted - 01 (F) Carryout Cleaning/ Survey Of V1 And V2 Tanks And Repair As Necessary. Inspect The Internal And External Paint Coating And Recoat With Appropiate Paint Scheme After Completion Of Repairs And Surface Preparation.With. Area - 10 Sq.Mtrs , 00036Sewage Treatment Plantmake : M/S Hi Point Pvt Ltd, Mumbai, Model : Omnipure 6 Mcqty Fitted - 01 (G) Check Function Of Control Panel And Carryout Calibration Of Level Switches Of V1 And V2 Tanks. Replace If Necessary , 00036Sewage Treatment Plantforce Ehaust Blower Motormake : M/S Hi Point Pvt Ltd, Mumbai, Model : Omnipure 6 Mcqty Fitted - 01 (H) Dismantle And Overhaul Exhaust Blower Motor . Examine The Bearings And Seals And Renew If Necessary. Spares Not Held With Ships Staff. All Necessary Spares For Repair/ Overhaul Of Equipment Are To Be Catered By The Repairing Firm. , 00037Sanitary Systemsanitary System(A) Dismantle All Soil And Urinal Drain Pipe An Undertake Re-Galvanizing. , 00037Sanitary Systemsanitary System(B) Strip, Clean And Overhauling Of 100% Wc And Urinal Flushing Valves, Reducing Valves And Reducer. , 00037Sanitary Systemsanitary System(C) Strip And Clean 100% Of Soil And Urinal Drain Pipe. Re- Galvanise Where Required. , 00038Sewage Systemstorm Valvesdismantle And Overhaul Storm Valves Of Galley Drain And Stp Drain. Rectify The Defects And Pressure Test To 2 Kg Pressure On Completion Of Repairs. Valve Size: 65 Mm Nb , 00039Drainage Systemstorm Valvesdismantle And Overhaul Storm Valves Of Deck Drains In Mess Decks Drain. Rectify The Defects And Pressure Test To 2 Kg Pressure On Completion Of Repairs, If Any. Work Involves Removal& Refitment Of Lagging & Panneling On Ship Side In Sr.Sls Mess And Wash Spaces. Valve Size: 65 Mm Nb , 00039Drainage Systemdrain Pipes(A) Dismantle The Entire Stretch Of Drain Pipes From Deck Drains. Chemically Clean The Pipings Free Of Solid Deposits And Refit The Same On Completion. Material: Gi, 2 1/2 , 00039Drainage Systemdrain Pipes(B) Also Quote For Renewal Of Above Pipe Line At Damaged Locations. Material: Gi , Dia: 2 1/2 , 00040Ventilation Systematu 2 - 6 Tr(A) Degutting/ Regutting Of Air Treatment Units 2 (Fcu)To Be Undertaken. Following Job Involved:- , 00040Ventilation Systematu 2 - 6 Tr(A) Degutting/ Regutting Of Air Treatment Units 2 (Fcu)To Be Undertaken. Following Job Involved:-(I) Degutting/ Dismantling Of 01 Nos Air Treatment Units 01 No In Mer - 6 Tr ( For Mcr Only) , 00040Ventilation Systematu 2 - 6 Tr(A) Degutting/ Regutting Of Air Treatment Units 2 (Fcu)To Be Undertaken. Following Job Involved:-(Ii) Regutting/ Fitment Of Below Mentioned Parts Of Atus (Fcu ) To Be Undertaken: , 00040Ventilation Systematu 2 - 6 Tr(A) Degutting/ Regutting Of Air Treatment Units 2 (Fcu)To Be Undertaken. Following Job Involved:-(Iii) Degutting And Regutting Of Adjacent Fittings And Pumps : Power Panel, Da Panel No. 3, Fot 1 & 2 Pump , Centrifuge (1 &2 ) And Accessories. , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:- , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(I) Ahu Frame - Ss316l , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Ii) Ahu Base Frame - Stainless Steel Gr - 316 1 Mm , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Iii) Motor/ Blower Base Frame - Ss , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Iv) Vibration Pad - Neoprene Rubber , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(V) Frame Corners - Ss , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Vi) Ahu Panel Outer - Ss316 L , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Vii) Ahu Panel Inner - Ss 316L , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Viii) Insulation - Puf42 Kg /M3 , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Ix) Drain Tray - Ss316l , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(X) Blower - Kruger : Model Bdb 250 , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Xi) Motor - Megha Rototech : 0.75 Kw , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Xii) Drive Belt - Spb 1210 , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Xiii) Fan Pulley - Spb 158/ 25 , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Xiv) Motor Pulley - Spb 146/20 , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Xv) Cooling Coil (Dx) - Tubes - Copper, Fins - Copper , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Xvi) Filter Frame - Ss316 L , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Xvii) Filter Media - Hdpe , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Xviii) Gasket - Rubber , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Xix) Flexible Connection - Woven Fiber Glass With Neoprene Coating , 00040Ventilation System Galley Exhaustmake : Heinen And Hopeman Engg , 00040Ventilation System Galley Exhaustmake : Heinen And Hopeman Engg (C) Exhaust Trunking: Internal Surfaces Of The Galley Chimney And Trunking Are To Be Thoroughly Degreased And Cleaned. Work Involves Removal Of Mushroom Head-Blower Assembly And Refitment On Completion Of Cleaning , 00040Make : Heinen And Hopeman Engg (E) Carryout Trials Of A/C & Ventilation System To Ensure Saticfactory Performance. Examine And Test One Way, Two Way, Recirculation Flaps Whereas Applicable To Ship. Defects To Be Rectified. Renew Rubber Seatings And Carryout Chalk Test For Air Tightness , 00040Ventilation System Air Handling Units(F) Chemically Clean Heat Exchanger Fins And Coils. Job Includes Following :- , 00040Ventilation System Air Handling Units(G) Dismantling Of Heat Exchanger Units Of 02 Nos Atus (I) 01 No In Stp Lobby Cap - Stp Lobby Atu- 22 Tr (Main Atu No 1) (Ii) 01 No In Mer Capacity Atu- 8 Tr (Mcr Atu No 2) , 00040Ventilation System Air Handling Units(H) Chemical Cleaning Of Heat Exchanger Fins And Coils And Renewal Of 50% Damaged Copper Tubes Of Atus , 00040Ventilation System Air Handling Units(J) Survey And Renewal Of Atu Casing Structure And Heat Exchanger Structure(Bottom Plates And Body Casing Plates) Of Main Ahu Mat - Moulded Zn Sheets Thickness 2Mm(For Main Atu Only) , 00040Ventilation System Air Handling Units(K) Renew 02 In Nos Fan Bearings As Per Sample In Blower Fan Of Main Ahu , 00040Ventilation System Air Handling Units(L) Pressure Test The Heat Exchanger Units To 12 Kg Pr For Ahu 1 And 2. , 00040Ventilation System Air Handling Units(M) Job Involves Degutting And Regutting Of Following : (6 Tr Atu) (I) Atu Casing Box(Ii) Ventilation Blower - 01 Nos(Iii) Ventilation Dampers - 02 Nos(Iv) Chilled Gas Line - 5 Rmt (V) Cold Lagging - 06 Sqm(Vi) Mfmb Lagging - 10 Sqm , 00040Ventilation System Air Handling Units(N) Degutting/ Regutting Of Existing 6 Tr Atu , 00040Ventilation System Air Handling Units(P) Work Involves Removal Of Mer Soft Patch During Docking For Removal Of 6 Tr Atu And Refitment : Job To Be Undertaken During Docking Period , 00040Ventilation System Ventilation System(Q) Check Air Pressure Drop Through The Atu Using Manometer Connection. , 00040Ventilation System Ventilation System(R) Overhaul Motors And Blowers As Indicated By Ship. Grease Filters Of Exhaust Trunking In Galley To Be Cleaned And Preserved. Ecamine And Carry Out Overhauling Of Rod Gearing Connected With Associatedd Ventilations Valves, Also Replace Glands As Necessary And Survey The Area In Vivinity. , 00040Ventilation System Ventilation System(S) Chalk Test Of Wt Covers Seals. Packs/ Renew Seals As Necessary. Nwt Cover Seals And Hinges Louvers To Be Examined Tested. Raise Specfic Defects To Dockyard For Repairs. , 00040Ventilation System Ventilation System(T) Modification Of Ventilaltion Trunking To Cater For Ac Replacement View Increase In Air Flow Capacity And Cooling Capacity. Dimension 180Mm To 200Mm Thickness Throught The Ship , 00040Ventilation System Ventilation System(U) Pre Refit And Post Refit Ventilation Trials Be Undertaken As Part Of Refit Routines( Maintops) , 00041Ventilation Flapsrenewals(A) Ventilation Flaps Along With Frame And Grills Corroded And Perished Near Mer Soft Patch To Be Manufactured And Replaced. Qty- 10, Mat. - Ms. , 00041Ventilation Flapsrubber Beading(B) Rubber Beading Of Ventilation Flap Damaged And Perished To Be Renewed. Qty - 35 Rmt. , 00041Ventilation Flapsbutterfly Nuts(C) Butterfly Nuts Of Various Vent Flaps Damaged To Be Renewed. Mat - Ss, , 00042Wire Meshrenewalswire Mesh Of Various Supply And Exhaust Trunkings Corroded And Damaged To Be Manufactured As Per Sample. Mat - Gi, Qty - .5 Sqm. , 00043Ac Trunkingrepair(A) Air Leakage Observed From Ac Trunkings Near Atu Compartment And Main Alleyway (Feeding To Bridge And Radio Room) To Be Repaired/ Renewed. Work Involves - Removal Of Lagging, Repair/ Renewal Of Trunking, Refitment Of Lagging. Qty- 10 Rmt, Mat. - Gi. , 00043Ac Trunkinglagging(B) Chilled Lagging Of Ac Trunking Damaged/ Perished At Atu Compartment, Main Alleyway, Lower Deck Lobby And Galley. Lagging To Be Undertaken With 1 Inch Of Chilled Lagging To Avoid Condensation And To Be Coated With White Canvas Cloth. Qty. - 20 Sqm , 00043Ac Trunkingexhaust Trunking(C) Exhaust Trunking In Stp Compartment, Rope And Canvas Store, Js Bathroom And Asp Corroded And Holed At Indicated Location To Be Repaired/ Renewed. Mat. - Al/Gi, Qty. - 15 Rmt , 00044Towing Hookoverhaulingmake : India Nets, Indore Qty Fitted - 01 Nos , 00044Towing Hookoverhaulingmake : India Nets, Indore Qty Fitted - 01 Nos(A) 7.5 Tonne Swl Towing Hook To Be Dismantled And Thorougly Overhauled. Replace, Defective Components And Refit The Towing Hook On Completion. Note: The Lock Plate Securing The Towing Hook Swivel To The Foundation Bracket Is Not To Be Welded And Is To Be Fastened With The Bolts Screwed On To The Threaded Holes To Be Drilled On Foundation Bracket. , 00044Towing Hookload Testingmake : India Nets, Indore Qty Fitted - 01 Nos(B) Towing Hook To Be Load Tested To A Proof Load Of 7.5 Ton On Completion Of Overhauling. Previous Load Test Certificate And Load Test Proforma Will Be Submitted By The Ships Staff. , 00044Wt Hatchessupporting Bracketsmake : Eastern Enterprise , 00045Wt Hatchessupporting Bracketsmake : Eastern Enterprisesupporting Brackets Onto Which Retaining Catches Of Hatches Are Secured To Be Renewed In Main Deck Hatches. Mat: I Section (Fabricated) 10 Mm Thick, Web: 3 Wide, Rider: 3 Wide & Length Of Bracket: 1 Mtr , 00046Deck Fittingshull Surveythe Following Deck Fittings To Be Visually Surveyed And Areas Found Excessivey Deteriorated Are To Be Ultrasonically Guaged: Area To Be Renewed As Per Survey Reports. Survey Report Post Completeion Of Hull Survey Be Provided To Ss.Note: Steel Renewal To Be Undertaken , 00046Deck Fittingshull Survey(A) Twin Bollards - 08 Nos , 00046Deck Fittingshull Survey(B) Fair Leads- 08 Nos , 00046Deck Fittingshull Survey(C) Bull Rings - 02 Nos , 00046Deck Fittingshull Survey(D) Cleats- 12 Nos , 00046Deck Fittingshull Survey(E) Towing Bolard- 01 No , 00046Deck Fittingshull Survey(F) Cable Clench- 01 No , 00046Deck Fittingshull Survey(G) Towing Hook Foundation Bracket- 01 No , 00046Deck Fittingshull Survey(H) Brows - Nos -01 , 00046Deck Fittingshull Survey(J) Deck Eyes Blake And Screwslips- 02 Nos , 00046Deck Fittingshull Survey(K) Deck Eyes Of Anchor Strop- 02 Nos , 00046Deck Fittingshull Survey(L) Miscellaneous Deck Eyes - 08 Nos , 00047Watertight Scuttleswatertight Scuttlesmake : D S Engg Worksqty Fitted - 13 Nos , 00047Watertight Scuttleswatertight Scuttlesmake : D S Engg Worksqty Fitted - 13 Noswt Scuttles On Superstructure To Be Checked With Hose Test For Intact Watertight Integrity. Following Jobs To Be Carried Out In 13 In Nos Scuttles:- , 00047Watertight Scuttleswatertight Scuttlesmake : D S Engg Worksqty Fitted - 13 Nos(A) Manufacture And Fitment Of Locking Rings As Per Sample. Ring Outer Dia: 12 Inches; Mat: Gunmetal , 00047Watertight Scuttleswatertight Scuttlesmake : D S Engg Worksqty Fitted - 13 Nos(B) Illuminator Frames To Be Manufactured And Renewed As Per Sample. Frame Outer Dia: 14 Inches; Mat: Brass , 00047Watertight Scuttleswatertight Scuttlesmake : D S Engg Worksqty Fitted - 13 Nos(C) Renewal Of Gaskets As Per Sample. Mat: Silicon Rubber 1.5 Mm Thk , 00047Watertight Scuttleswatertight Scuttlesmake : D S Engg Worksqty Fitted - 13 Nos(D) Boxing Up Of Illuminator Assembly After Renewal Of The Above. , 00047Watertight Scuttleswatertight Scuttlesmake : D S Engg Worksqty Fitted - 13 Nos(E) Rain Coaming For All Scuttles To Be Manufactured And Welded On Bulkhead. Mat - Al , 00047Watertight Scuttleswatertight Scuttlesmake : D S Engg Worksqty Fitted - 13 Nos(F ) Lubricate And Carry Out Chalk Test Of All Watertight Scuttles , 00048Ships Side Scupper Ships Side Scupper 06 Pairs Of Scupper Lips On Weather Decks/ Ships Side At Indicated Locations Be Cropped And Renewed And Fitted With Ms Plate And Rubber Lips. , 00049Ventilation System Mushroom Headsspindles Of 08 In No Mushroom Heads On Weather Decks To Be Surveyed And Checked For Free Operation. Carryout Renewal Of Screw Shafts, Wire Mesh (18 Guage) And Rubber Beading And Refitment In Situ. The Details Are As Follows , 00049Ventilation System Mushroom Heads(A) Dismantling Of Mushroom Heads, Overhauling And Refitment On Completion , 00049Ventilation System Mushroom Heads(B) Renewal Of Screw Shafts As Per Sample. Mat: En8. Dim: 25 Mm Dia, 18 Inches Long And Square Threads On It. , 00049Ventilation System Mushroom Heads(C) Renewal Of Wire Mesh Guards On The Mushroom Heads , 00049Ventilation System Mushroom Heads(D) Renewal Of Rubber Beading On The Wt Flaps Of Mushroom Head As Per Sample , 00050Wcs And Wash Placesmodular Panellingsfollwing Jobs Be Undertaken : (A) Modular Ss Panneling In Jr & Sr Sailors Wc And Bathrooms And Officers Bathroom/ Wc To Be Renewed, Fitted And Sealed Water Tight In Situ. Mat: Ss Sheet, 18 Guage, Moulded To Shape; Silicon Sealing Compound And Ss Moulded Beadings. (B) Provisioning Of Inspection Window For Every 1 Mtr Iaw Ihq Mod (N) Directives Along With Locking Mechanism. Qty - 10 , 00051Ventilation Systemrobotic/ Chemical Cleaning(A) Carry Out Robotic Cleaning Of Entire Length Of Trunkings In Mess Decks, Office Spaces, Alleways, Galley And Stores. Work Involves Regutting And Degutting Of Modular Ss Pannelings. Panelling Damaged During Degutting Are To Be Renewed. , 00051Ventilation Systempanelling (B) Paneling To Be Degutted And Regutted As Envisaged, Approx 200 Sqm , 00051Ventilation Systemchemical Cleaning(C)Removal/ Refitment And Chemical Cleaning Of Galley Grease Filters Be Undertaken , 00051Ventilation Systemventilation Diffusers(D) Carryout Cleaning/ Overhauling Of All Ventilation Diffusers In Mess Decks, Dining Hall, Officerss Cabins, Offices And Wardroom.Job Involves Renewal Of Defective Diffusers As Per Existing Ones. Material Of Knob : Plastic Moulded , 00051Ventilation Systemventilation Diffusers(E) Carryout Cleaning/ Overhauling Of All Ventilation Diffusers In Bridge, Ger, Mcr And Galley.Job Involves Renewal Of Defective Diffusers As Per Existing Ones As Per Sample , 00052Wt Structurerubber Beadingsrubber Gaskets (Beadings) Of Following Watertight Structure To Be Renewed As Per Sample: , 00052Wt Structurerubber Beadings(A) Mer Soft Patch , 00052Wt Structurerubber Beadings(B) Aer Soft Patch , 00052Wt Structurerubber Beadings(C) Circular/ Rectangular Flaps On Super Structure , 00053Wt Hatcheswt Hatches(A) Visual Survey Of Structure Of Wt Hatch Sills And Wt Hatch Covers On Weather Decks To Be Carried Out Paying Particular Attention To The Region Adjoining The Rubber Beading And Hatch Hinges. Areas Found Deteriorated Are To Be Cropped And Renewed. , 00053Wt Hatcheschalk Test(B) Carry Out Chalk Test Of All Wt Hatches. , 00053Wt Hatchesretainer Clips/ Securing Arragament(C) Retainer Clips/ Securing Arragement Of Wt Hatches Of Weather Deck Jammed. To Be Replaced With New Spring Assisted Retainer Clips As Per Sample. , 00054Nwt Metallic Dorslocks And Door Closures23 In No 7-Lever Double Locking Godrej Mortise Locks Of Modular Ss Door Panels To Be Renewed And Fitted Onto Doors. Locks Not Incatted And Not Available With Ships Staff.Hydraulic Door Closures (Make - Godrej) To Be Renewed In 23 In Nos Doors.Make - Godrej , 00054Nwt Metallic Dorslocks And Door Closures(A) Rh Locks- 08 Lh Locks- 15 , 00054Nwt Metallic Dorslocks And Door Closures(B) Door Closures - 23 , 00055Apt Apt (A) All Tanks, Sea Atubes And Cofferdams Are To Be Air Pressure Tested.14 Sea Tubes. 25 Obds, 04 Iccp Cofferdam, 01 Tank Cofferdam, 02 Void Space (Port & Stbd)09 Tanks , 00055Apt Apt (B) Carry Out Pressure Testing Of Tanks And Sea Tubes To 0.2 Kg/Cm2 Which Are Repaired 14 Sea Tubes. 25 Obds, 04 Iccp Cofferdam, 01 Tank Cofferdam, 02 Void Space (Port & Stbd)09 Tanks , 00055Apt Apt (C) Undertake Apt Of All Water Tight Clusters View Ihq Fac Nc/5173/Fac Dated 19 Jun 14. , 00056Standing Rigging And Lifting Appliancesload Testing(A) The Following Standing Rigging, Seamanship Equipment And Lifting Appliances Are To Be Load Tested As Per Specifications Given By Ships Staff: , 00056Standing Rigging And Lifting Appliancesload Testing(I) Anchor Strops , 00056Standing Rigging And Lifting Appliancesload Testing(Ii) Deck Eyes Of Blake And Bottle Screw Slips , 00056Standing Rigging And Lifting Appliancesload Testing(Iii) Deck Eyes Of Anchor Strops , 00056Standing Rigging And Lifting Appliancesload Testing(Iv) Leadsman Platform , 00056Standing Rigging And Lifting Appliancesload Testing(V) Preventer Safety Chain Hook , 00056Standing Rigging And Lifting Appliancesload Testing(Vi) Towing Pendant Dia 24 Mm Fswr, 7.5 Mtr , 00056Standing Rigging And Lifting Appliancesload Testing(Vii) Bollard Strop 24 Mm Dia Fswr 2 Mtr , 00056Standing Rigging And Lifting Appliancesload Testing(Viii) Towing Shackles (Straight Shackle With Screw Bolt) , 00056Standing Rigging And Lifting Appliancesload Testing(Ix) Bow Shackles , 00056Standing Rigging And Lifting Appliancesload Testing(X) Senhouse Slip For Towinng , 00056Standing Rigging And Lifting Appliancesload Testing(Xi) Senhouse Slip General Purpose , 00056Standing Rigging And Lifting Appliancesload Testing(Xii) Straight Shackle , 00056Standing Rigging And Lifting Appliancesload Testing(Xiii) Bow Shackle , 00056Standing Rigging And Lifting Appliancesload Testing(Xiv) Eye Plates Of Light Jackstay On Bulkhead , 00056Standing Rigging And Lifting Appliancesload Testing(Xv) Deck Eyes For Light Jackstay , 00056Standing Rigging And Lifting Appliancesload Testing(Xvi) Ships Brow , 00056Standing Rigging And Lifting Appliancesload Testing(Xvii) Deck Eyes For Ras Points , 00056Standing Rigging And Lifting Appliancesload Testing(Xviii) Arh , 00056Standing Rigging And Lifting Appliancesload Testing(Xix) Snatch Block & Towing Pendant , 00056Standing Rigging And Lifting Appliancesload Testing(Xx) Ib Block , 00056Standing Rigging And Lifting Appliancesload Testing(Xxi) Guardrails Of Different Length With 10 Mm Dia , 00056Standing Rigging And Lifting Appliancesload Testing(Xxii) Crimping Of Guardrails , 00056Standing Rigging And Lifting Appliancesload Testing(Xxiii) Boat Slings , 00056Standing Rigging And Lifting Appliancesload Testing(Xxiv) Bradle Ring Of Sea Boat Rope , 00056Standing Rigging And Lifting Appliancesvisual Inspection(B) Easing Out Recovery Rope 24 Mm Pp Rope , 00056Standing Rigging And Lifting Appliancesvisual Inspection(C) Life Line 24 Mm Pp Rope , 00056Standing Rigging And Lifting Appliancesvisual Inspection(D) Llt Line 16 Mm Pp Rope , 00056Standing Rigging And Lifting Appliancesvisual Inspection(E) Recovery Line 16 Mm Pp Rope , 00056Standing Rigging And Lifting Appliancesvisual Inspection(F) Skbdl Line 12 Mm Rope , 00056Standing Rigging And Lifting Appliancesvisual Inspection(G) Berthing Houser 32 Mm , 00056Standing Rigging And Lifting Appliancesvisual Inspection(H) Towing Houser 48 Mm Pp , 00056Standing Rigging And Lifting Appliancesvisual Inspection(J) Towing Pendant 16 Mm , 00056Standing Rigging And Lifting Appliancesvisual Inspection(K) Larne Target Rope 32 Mm , 00056Standing Rigging And Lifting Appliancesvisual Inspection(L) Sea Boat Rope 32 Mm , 00057Draught Marksdraught Marksships Draught Marks To Be Build Up/ Renewed As Per Existing Dimentions At Fwd, Mid And Aft Sections Of Ship. Countor Of All Letters And Numbers To Be Welded Intermittently. All Figures Are Contained In An 80 Mm Width X 100 Mm High Rectangle. Letter M Is Contained In An 90 Mm Width X 100 Mm High Rectangle. Horizontal Separations Between Letters And Numerals Is To Be 20 Mm. Ss Will Provide Drawings. , 00058Wt Doors And Hatches Rubber Beadings(A) Rubber Beading Of 14 In Nos Wt Doors And 14 Wt Hatches To Be Renewed As Per Standardised Specifications. Mat: Silicon Rubber. Carryout Chalk Test Of All Beadings Post Renewal. , 00058Wt Doors And Hatches Wt Doors(B) Thoroughly Survey Of 15 Wt Doors And Coaming, If Required Requisite Plate Renewal/ Buildup Of The Same Be Undertaken. Mat - Ms , 00058Wt Doors And Hatches Securing Handles/ Clips(C) Following Jobs Be Undertaken:- (I) Survey Of Securing Handles/ Clips (12 Handles Each Doors) (Ii) Overhauling And Replacement Of Securing Handle/ Clips Of 15 Wt Doors Be Undertaken. , 00058Wt Doors And Hatches Hinges (D) Overhauling And Replacement Of Washers For 14 Wt Doors Hinges As Per Sample View Damaged/ Broken. Mat - Ss, Teflon. , 00058Wt Doors And Hatches Spring Mechanism(E) Replacement Of Spring Mechanism Along With Shaft Spindle Of 14 Wt Hatches View Corroded. Refitment The Spring Iaw Fost Safety Guidelines. Mat - Ms , 00059Lifebuoy Standlifebuoy Standcarryout Manufacturing Of 02 In Nos Ceremonial Lifebouys As Per Sample. Mat: Teak Wood With Perpex Sheet. , 00060Ventilation Systemair And Grease Filters(A) Wire Meshes Of The Following Air Filters Of Atus And Grease Filters Of Galley Chimney Perished. To Be Renewed As Per Sample. , 00060Ventilation Systemventilation System(I) 2 Ft X 2Ft Filters For Atu No.1 - 08 Nos, Mat: Gi Frame With Fine Wire Mesh Grid , 00060Ventilation Systemventilation System(Ii) 4 X 12 Filters- 04 Nos For Atu-2 Recirculated Air Suction Duct, Mat: Gi Frame With Fine Wire Mesh Grid , 00060Ventilation Systemventilation System(Iii) 4 X 8 Filters- 04 Nos For Atu-2 Fresh Air Suction Duct, Mat: Gi Frame With Fine Wire Mesh Grid , 00060Ventilation Systemventilation System(B) Carry Out Trails Of A/C & Ventilation System To Ensure Satisffactory Performance , 00060Ventilation Systemventilation System(C) Carryout Overhauling Of 100% Wtsvs / Wtbvs Or Any Other Ventilation Valves. , 00060Ventilation Systemventilation System(D) Examine And Test Recirculation Flaps , Defects To Be Rectified. New Rubber Seatings And Carry Out Chalk Test For Air Tightness. , 00060Ventilation Systemventilation System(E) Carry Out Internal Cleaning Of 100% Ventilation Trunking And 100% Trunking Of Galley Exhaust Trunking As Per Br 2203And Check Watertight Sluice Valves For Air Tightness As Per Br 2170. , 00061Gangway Apronsgangway Aprons02 Pairs Of Gangway Aprons Torn And Perished. To Be Renewed As Per Sample And Aprons To Be Painted With Name And Ships Crest. Details As Follows:- , 00061Gangway Apronsgangway Aprons(A) Stitching Of Aprons As Per Sample Provided By Ships Staff. Mat: White Synthetic Canvas, Size: 3 Mtr X 1 Mtr , 00061Gangway Apronsgangway Aprons(B) Fitment Of Brass Securing Eyes On The Apron , 00061Gangway Apronsgangway Aprons(C) Painting Of Ships Name And Crest On The Aprons , 000624.7 M Rib4.7 M Ribmake : Poly Glass Fibre Industriesqty Held - 01 Nos , 000624.7 M Rib4.7 M Rib(A) Test Disengaging Gear/ Boats Falls. Period Of Test Should Not Exceed 27 Months. (I) Examine All Equipment And Associated Fitting Including Polyester Webbings Slings And Gemini Slings And Eye Plates. (Ii) Any Part Affecting The Strength Of The Equipmewnt Becoms Defective And Is To Be Renewed Or Repaired/ Repainted, Ship Staff To Test Before Further Use And Arrange For Standard Dockyard Test At The First Opportunity. , 000624.7 M Rib4.7 M Rib(B) Survey Of Four Point Lifting Plates Fitted On Deck (Including Backup Plates, Nut, Bolts) As Per Para 5 Of Appendix B Of No 03/18. , 000624.7 M Rib4.7 M Rib(C) All External Surface Of Boat Be Coated With Gel Coat Pigented With Light Grey Shade To Ral 7040 To Priovide Smooth Finish To The Rib. , 000624.7 M Rib4.7 M Rib(D) Weigh The Rib And Compare With Ideal Weight. Record The Same In Boat Log Book. Undue Increase Of Weight, If Any Be Reported For Detailed Examination. Carry Out Leak Test Of Fuel Tank By Lp Air With Assistance From Repair Yards. , 000624.7 M Rib4.7 M Rib(E) Carryout Inspection Of Grp Hull For Chipping, Delamination, Cracks Etc. Carryout Repairs As Necessary , 000624.7 M Rib4.7 M Rib(F) All External Surface Of Boat Be Coated With Gel Coat Pigmented With Light Grey Shade To Ral 7040 To Provide Smooth Finish To The Rib. , 00063Furnituredining Hall(A) Carryout Renewal Of 02 In Nos Dining Tables And 02 In Nos Benches In Jr Sailors Dining Hall As Per Existing Sample , 00063Furniture(I) Table - 6 X 1 1/2 Crca Steel Iaw Ihq Directives - 02 Nos. , 00063Furniture(Ii) Benches - 6 X 1 1/2 Crca Steel Iaw Ihq Directives , 00063Furniture(B) Carryout Renewal Of Securing Arragement Of Micro Oven, Bread Toaster, Water Cooler And Wash Bashin As Per Dimension. Mat - Ms , 00063Furnitureoffices (C) Carry Out Renewal Of Pc Table Along With Porvisioning Of Racks For Stowage As Reference Of Existing Sample With Crca Steel Iaw Extant Policy. , 00063Furniture(D) Replacement/ Repair Of Existing Lockers With Crca Approved Materials As Per Sample Of Existing One Iaw Extant Ihq Policy. , 00063Furniturejs Mess And Ss Mess(E) Cutting And Welding Of Existing Bunks Ti Increase Height From Base Plate. , 00063Furnituress Mess(F) Carryout Renewal Of Dining Table (Size - 4 X 3 ) And Table (Size - 4 X 2.5) As Per Sample. Mat - Crca Steel. , 00063Furniturewardroom(G) Carryout Renewal Of Wooden Table With Crca Steel As Per Existing Dimension. , 00064Bonding Strapsscattered Locationsthe Bonding Straps At Several Locations To Be Renewed And Welded In Situ. Details Are As Follows:- , 00064Bonding Strapsscattered Locations(A) Welding Of Bonding Straps At Indicated Locations , 00064Bonding Strapsscattered Locations(I) Ms-Ms Bonding Straps On No.1 Deck- 70 Nos , 00064Bonding Strapsscattered Locations (Ii) Ms- Al Bonding Straps On No.1 Deck- 40 Nos , 00064Bonding Strapsscattered Locations(Iii) Al-Al Bonding Straps On Superstructure- 40 Nosnote: Aluminium Straps Are To Be Welded By Tig Welding Process. The Drilled End Is To Be Fastened With Nut And Bolt Arrangement( Firm Supply) Wherein The Bolt Will Be Welded On The Removable Part Of Structure. Bonding Straps Will Be Supplied By Ship Staff. , 00065Deck Talliesmain Deckthe Following Brass Deck Tallies Are To Be Renewed As Per Details Provided By Ships Staff And Fitted In Situ.The Work Involves Manufacture & Welding Of 05 Mm Thick Ms Pad Pieces With 02 Threaded Holes For Securing Tallies On Deck And Manufacture Of Brass Tallies With Details Engraved On Them. , 00065Deck Talliesmain Deck(A) 4 X 1 X 1.5 Mm Thk Tallies- 18 Nos , 00065Deck Talliesmain Deck(B) 2 1/2 X 8 X 1.5 Mm Thk Tallies- 08 Nos , 00065Deck Talliesmain Deck(C) 3 X 1 X 1.5 Mm Thk Tallies- 12 Nos , 00065Deck Talliesmain Deck(D) Manufacture Of 06 Mm Thick Pad Pieces As Per Dimensions Of Talleys Mentioned Above And Welding Them At Indicated Locations. Mat: Ms , 00065Deck Talliesmain Deck(E) Drilling Of Holes On Either Ends Of Plates And Tapping Of The Threads Inside The Holes For Screwing In The Bolts Securing The Talleys Onto Deck. , 00065Deck Talliesmain Deck(F) Fabrication Of Brass Talleys As Per Dimensions Mentioned Above , 00065Deck Talliesmain Deck(G) Engraving Of Details On The Talleys As Given By Ships Staff And Securing Them In Situ By Bolts. , 00066Air Hose Testingmachinery Spacesassistance Required For Surface Preparation Of All Welded Joints On Shell Plating And Wt Bulkheads To Bare Metal Surface By Mechanical Methods For Conduct Of Air Hose Testing. Portable And Semi Portable Fittings Obscuring The Accessibility To The Welded Joints To Be Degutted And Regutted On Completion Of The Testing. , 00067Furniturewooden Gratings(A) Wooden Gratings Of 02 Hmg, 02 Mmg And 01 Repeater And 02 Bathrooms Post At Bridge Top Deteriorated. To Be Renewed As Per Sample. Mat: Teak Wood , 00067Furnitureqtr Master State Boards(B) Sunmica And Beading Of 02 Duty State Board And 02 Officers State Board Cracked And Uprooted. Engraving Faded/ Worn Sliders Cracked/ Uprooted And Ply Delaminated. To Be Manufactured As Per Sample. Size: 1Mtr X 0.8 Mtr , 00068Modular Accommodationmetallic Lockers(A) Locking Arrangements Of 40 In Nos Lockers In Mess Decks (Jr Slr And Sr Slr) Defective. All Lockers Damaged And Found Deteriorated At Scattered Areas View Prolonged Usage. Lockers To Be Renewed As Per Specific Standards And Fitted At Mess Decks. Mat - High Grade Aluminum With Extra Tensile Strengthmake - Godrej , 00068Modular Accommodationshoe Racks(B) Carryout Fitment Of New Wall Mounted Enclosed Shoe Racks In Js Mess, Ss Mess, Captains Cabin And 04 Officers Cabins6 X 12 X 3 Mm Al Sheetmake - Godrej , 00068Modular Accommodationmetal Panelling(C) Metal Panelling Deteriorated/ Damaged At Dining Hall, Main Alley Way And Scattered Locations In Mess Decks To Be Renewed And Fitted Insitu. Mat - Al Modular Panels 18 Guage. , 00069Modular Accommodationbathroom Fittingscarryout Renewal Of Following Sanitary Fittings In Bathrooms And Wcs Make - Jaguar , 00069Modular Accommodationbathroom Fittings(A) Shower Mixer Valve , 00069Modular Accommodationbathroom Fittings(B) Wall Mounted Screw Down Cock , 00069Modular Accommodationbathroom Fittings(C ) Wash Basin (Ss) , 00069Modular Accommodationbathroom Fittings(D) Hand Shower In Wcs , 00069Modular Accommodationbathroom Fittings(E) Cock Tap Fittings , 00069Modular Accommodationbathroom Fittings(F) Flexible Hoses For Hot Water Connections (1.5 Mtr) Crimped At Either Ends , 00069Modular Accommodationbathroom Fittings(G) Shower Unit(H) Soap Stand(J) Curtain Rods(K) Soap Dispensar(L) Cloth Hanging Hooks(5 Each) , 00070Furnitureships Name Boardships Name Board To Be Manufactured As Per Sample And Fitted On Both Sides As Indicated By Ship Staff. Letters Are To Be Made In Both Hindi And English (Hindi Above Eng) From 2 Mm Thick Ss Plate And To Be Ni-Chrome Coated.Letters To Be Fixed On Good Commercial Teak Wood Board By M4 Csk Ss/ Wood Screws. Ss Will Provide Drawings , 00071Deck Fittingsrope Reels(A) Flange Plates Of 04 No Rope Reels Of Foxle/ Quarter Deck Deformed Heavily, Pawl And Ratchet Arrangement Broken And Plummer Bearings Jammed. To Be Repaired. Work Involves Renewal Of Plummer Bearings, Mfg & Fitment Of Pawl And Ratchet Arrangement As Per Sample And Removal Of Setting Of Deformed Flanges. Mat: Aluminium. Details Are As Follows:- , 00071Deck Fittingsrope Reels(B) Straightening/ Removal Of Deformation In Flanges Of Rope Reels , 00071Deck Fittingsrope Reels(C) Manufacture And Fitment Of Pawl And Ratchet Arrangement As Per Sample. Mat: Ms , 00071Deck Fittingsrope Reels(D) Renewal And Fitment Of Plummer Bearings Of Rope Reels , 00072Liferafttliferafttinspect And Test For Weigh Test, Flotaton Test, Drop Test, Lifting Test. Demand From Dockyard Replacement For Liferats Which Have A Balance Further Expected Life Of Less Than One Year, Stating In The Demand The Priority Of Supply. , 00073Habitabilityhabitabilitythoroughly Survey Of 40 Bunks Of Mess Decks/ Officer Cabins/ Captain Cabin. Jobs Invloves , 00073Habitabilityhabitability(A) Replacement/ Fitment Of Guard Rails Of Bunks Of All Bunks , 00073Habitabilityhabitability(B) Repair Of Steel Plates Of Bunks , 00073Habitabilityhabitability(C)Repair/ Replacement Of Bunks Supporting Structure , 00073Habitabilityhabitability(D) Relocation And Modification Of Bunks, Lockers, And Shoe Rack Dinning Table For Extra Space. , 00074Nwt Doorsnwt Door Mettalic Coating (A) Survey Door Structure/Door Frame For Deterioration/ Damage. Inspect Door Gaskets, Hinges, Locking Arrangements , Sliding Ways & Runners For Correctness. Repair/ Renew Asa Necessary. Check Clips And Hings For Looseness And Signs Of Wear. Renew Worn Out Parts As Necessay. , 00074Nwt Doors (Sliding)Nwt Doors (Sliding)(B) Sliding Channels Of Sliding Nwt Door Of Galley. Damaged. To Be Repaired/ Replaced. , 00074(C) Door Handles Of Galley And Ships Office Door Damaged. To Be Replaced , 00074Nwt Doors(D) Provision Store Door Handles Damaged. To Be Replaced. , 00075Portable H2s Gas Sensorportable H2s Gas Sensor Serviceability Checks/ Calibration Of Portable H2s Sensor Be Undertaken. , 00076Fixed H2s Gas Detection Systemfixed H2s Gas Detection System(A) Serviceability Checks/ Calibration Of Fixed H2s Gas Sensors Be Undertaken. , 00076Fixed H2s Gas Detection Systemfixed H2s Gas Detection System(B) Serviceability Checks Of Fixed H2s Gas Detection System Be Undertaken. Rectify If Any Defect , 00076Fixed H2s Gas Detection Systemfixed H2s Gas Detection System(C) Provisioning Of Back Up Supply Of Fixed H2s Gas Detection System Fitted In Stp And Mcr. , 00077Jack Staff/ Aft Staffjack Staff And Aft Staffthoroughly Hull Survey Of Jack Staff And Aft Staff Top Be Undertaken. Repair/ Renewal Of Pipes Be Undertaken If Any Defect Observed. Paint Renewal Be Undertaken After Hydroblasting Cleaning. , 00078Mfmb Laggingmfmb Laggingdegutting Of Mfmb Lagging For Hot Work/ Hull Survey And Regutting Post Completion Of Hot Work & Survey Be Undertaken At Indicated Location By Ss. , 00079Fairleadfairleadthoroughly Visual Survey Of Single Fairlead Of Both Port And Stbd Quaterdeck And Foxle To Be Undertaken. Necessary Defect Rectification Be Carried Out, If Any Defect , 00080Vertical Laddervertical Ladderthoroughly Visual Survey Of Vertical Ladder Of All The Compartment Be Undertaken. Following Job Involves: , 00080Vertical Laddervertical Ladder(A) Replacement Of Foot Steps, If Any Defect .Replacement Of Ladder Structure, If Any Defect , 00080Vertical Laddervertical Ladder(B) Inspect And Renew Treads- Deck Ladders. Inspect And Renew As Necessary, Poratable Alluminium Treads Of Between Deck Ladders. , 00080Vertical Laddervertical Ladder(C) Replacement Of Securing Eye And Deck Eye, Nuts & Bolt, If Any , 00081Vertical Ladderregalvanise Ladders Ladder Treads Of Galavanised Between Deck Laddrs To Be Rewelded And Ladders Regalvanished , 00082Between Deck Ladder Inclined Between Deck Ladder Thoroughly Visual Survey Of All The Inclined Between Deck Ladder Be Undertaken. Following Jobs Invloves: , 00082Between Deck Ladder Inclined Between Deck Ladder (A) Replacement Of Foot Steps With Provision Of Non-Skid, If Any Defect , 00082Between Deck Ladder Inclined Between Deck Ladder (B) Replacement Of Non-Skid Rubber Steps, If Any Defect , 00082Between Deck Ladder Inclined Between Deck Ladder (C) Replacement Of Securing Eye And Deck Eye, Nuts & Bolt, If Any Defect , 00082Between Deck Ladder Inclined Between Deck Ladder (D) Replacement Of Supporting Railing And Securing Arrangement, If Any Defect , 00083Supporting Rails Weather Deck Supporting Railthoroughly Visual/ Hammer Survey Of Weather Deck Support/ Guide Rails On Both Port & Stbd Catwalk Superstructure Plating Be Carried Out. Jobs Involve: , 00083Supporting Rails Weather Deck Supporting Rail(A) Replacement Of Supporting Pipes/ Rails On Both Port & Stbd Side, If Any Defect , 00083Supporting Rails Weather Deck Supporting Rail(B) Replacement Of Supporting Rail Bracket On Both Port And Stbd Side , 00084Naval Pipe Naval Pipe Thoroughly Visual/ Hammer Survey Of Naval Pipe Be Carried Out. Jobs Involve:(A) Cutting/ Welding/ Replacement Of Plates, If Any Defect , 00085House Pipe Hawse Pipe Thoroughly Visual/ Hammer Survey Of House Pipe Be Carried Out. Jobs Involve:(A) Cutting/ Welding/ Replacement Of Plates, If Any Defect , 00085House Pipe Hawse Pipe (B) Replacement Of House Pipe Cover, If Any Defect , 00086Gerracksmanufacturing Of Crca Racks In Ger Compartment For Securing Of Divator Sets. , 00087Crn 91Crn 91Repair/ Renewal Of Gunner Chair In Crn 91. Installtion Of Securing Arrangement Of Co2 Bottle In Crn 91. , 00088Miscmisc(A) Repair Of Windsoaks Stand . Nos 2(B) Replacement Of Captain Chair. Nos 1(C) Electroplating Of Emblem. Nos 03(D) Ships Bell Nos 01(E) Grse Board Nos 01 , 00089Misc Fittingsinstruction Talleydescription Plates And Instruction Talleys Of Following Equipments Damaged And Uprooted: (A) Single Arm Boat Davit. (B) Anchor Windlass. (C) Warping Capstan. (D) Iccp System. (E) Sewage Treatment Plant. (F) 4.7 M Rib. (G) Anchor Chain Cable. (Tallies To Be Manufactured As Per Sample. Mat- Brass). , 00090Wt Doorsrubber Beading(A) Rubber Beading Of Watertight Doors Damaged And Perished To Be Replaced With New Rubber Beading. Qty. - 100 Rmt. Mat. Silicon Rubber Beading. C418 , 00090Wt Doorsrenewals(B) Door Coaming Of Wt Doors On Upper Deck Corroded And Deformed. Renewal Of Doors To Be Carried Out Post Survey Of Structure. Mat - Ms/ Al, Qty-08 . , 00090Wt Doorsstructural Coaming(C) Structural Coaming Of Wt Door Corroded And Holed To Be Repaired/ Renewed. Mat. - Ms, Qty. - 06 , 00091Wt Hatchesretaining Springretaining Springs Of Wt Hatch Corroded And Broken To Be Repaired/ Renewed. Calibration Of Spring To Be Undertaken Post Repairs. Mat- Ms , Qty-12Nos. , 00092Scuttlesrenewals(A) Structure Coaming Of Scuttles Fitted On Superstructure Cracked/ Broken. Renewal Of Scuttles To Be Carried Out Post Survey. Mat - Brass, Qty. - 13 , 00092Scuttlesrubber Beading(B) Rubber Beading Of Scuttles Damaged And Perished To Be Replaced With New Rubber Beading. Qty. - 50 Rmt. Mat. Silicon Rubber Beading. , 00093Indicator Test Plugmanufacturing Indicator Test Plugs Of Wt Hatches And Doors Corroded And Damaged To Be Manufactured As Per Sample. Mat- Ss, Qty - 16. , 00094Bridge Windowsrenewals(A) Water Leakage Observed From Bridge Windows. Rubber Beading Damaged/ Perished. To Be Renewed. Qty. 40 Rmt. , 00094Bridge Windowsstructure Coaming(B) Structure Coaming Of Bridge Windows Corroded And Thinned To Be Repaired/ Renewed. Mat. - Al, Qty.- 07 , 00094Bridge Windowstoughened Glass(C) Bridge Window Glass Faded And Cracked To Be Renewed. Mat. - Toughened Glass. Qty. - 07. , 00095Window Wiperfresh Water Lineextension Of Fresh Water Line Of Window Wiper Over Bridge Windows On Both Port And Stbd Side. Material - Copper Lines. , 00096Bonding Strapsrenewalsbonding Straps Fitted On Weather Deck Fittings Damaged And Broken To Be Renewed Along With Securing Eye. Qty. - 200. Bonding Straps Will Be Provided By Ss. Mat- Ms & Al. , 00097Rope Reelrenewalsrope Reel Flange Fitted On Upper Deck Corroded And Perished To Be Repaired/ Renewed. Mat. - Ms, Qty. - 04 Nos. , 00098Air Treatment Unitatu Casing(A) Air Leakage Observed From Atu Casing And Body At Indicated Locations Needs To Be Arrested. Job Involves Repair Of Atu Casing And Renewal Of Rubber Coaming. , 00098Air Treatment Unitatu Filter(B) Atu Filters Corroded/ Damaged To Be Manufactured As Per Sample. Mat:- Frame-Gi, Wire Mesh-Copper. Qty - 02 , 00099Mushroom Headoverhauling(A) Spindle And Diaphram Of Mushroom Heads Jammed,Corroded, And Thinned. Work Involves Overhauling Of Mechanism And Renewal Of Rubber Beading. Mat- Ms, Qty - 09. , 00099Mushroom Headrenewals(B) Wire Mesh Of Mushroom Head Corroded And Broken. Wire Mesh To Be Renewed. Mat- Ms, Qty - 09. , 00099Mushroom Headrepair(C) Mushroom Head Cover Along With Foundation Thinned And Holed To Be Renewed. Mat- Ms, Qty - 09. , 00100Misc Fittingscupper Draindeck Drain Strainer Fitted On Upper Deck Corroded, Thinned And Broken To Be Manufactured And Welded Back In Situ. Mat - Ms, Qty - 10 Nos. , 00101Galley Drainage Pipe Lineoverhaulingdeck Drain Inside Ships Galley Covered With Deck Covering. Drain To Be Cleared. Work Involves De-Gutting Of Adjcent Area , Clearing Of Deck Covering And Application Of Deck Covering Post Repairs. Qty 05 Rmt. , 00102Deck Drainoverhaulingdeck Drain Line Of Junior Sailor Bathroom Clogged To Be Overhauled. Work Involves Removal, Cleaning And Refitment Of Pipe. Qty- 15 Rmt, Mat. - Ms. , 00103Wcrenewals Wcs Cracked/ Damaged To Be Renwed With New Wc Iaw Latest Guidelines. Qty. - 05 Nos. Mat- Ceramic/ Stainless Steel. , 00104Mirrorrenewalsmirrors Fitted In Bathroom Faded And Damaged To Be Renewed. Mat. - Ss 304 (0.9Mm Thick) Sheet, Qty -05 Nos. , 00105Wash Basinsecuring Bracketswash Basin And Securing Arrangement In Captain Cabin Bathroom, Dining Hall, Officers Bathroom, Junior Sailor Bathroom, Senior Sailor Bathroom And Ships Galley Damaged To Be Repaired. Mat - Ms. Qty- 06. , 00106Mfmb Laggingrenewalsmfmb Lagging At Indicated Locations(Bridge Near Window Glass, Radio Room And No Cabin, Dining Hall, Rope & Canvas Store And Messes) Perished To Be Renewed In Situ. Area - 100 Sqm , 00107Deck Coveringrenewalsdeck Covering Along With Dadoe Casting Cracked And Broken At Atu Compt, Stp, Officer Bath And Wc, Sr Sailor Bath And Wc Junior Sailor Bath And Wc, Ships Galley And Co Bathroom. Deck Covering To Be Renewed In Accordance With Ncd 3717 Issue 3. Area - 50 Sqm. , 00108Ss Paneling Renewalsss Paneling In Wet Compartment Damaged/ Perished To Be Repaired/ Renewed. Mat. Ss, Area- 50 Sqm. , 00109Crca Shoe Lockerrepairscrca Shoe Locker Fitted Below Bunks In Junior Sailor, Senior Sailor Mess And Officers Cabin Damaged/ Broken To Be Repaired/ Renewed. Work Involves Renewal Of Sliding Channel And Locking Mechanism. Qty. - 36 , 00110Chart Tablechart Tableexisting Chart Table Damaged And Corroded. Drawer Channel Damaged. Modification/ Renewal To Be Carried Out As Per Extra Space Available. Exiting Dimension - . Proposed Dimension - , 00111Habitability Gunnery Officeexisting Wooden Locker To Be Replaced With Crca Steel Iaw Nc/Policy/ H-121/ Equipment Dated 05 Apr 17. Size - 900X 1000X600mm, Qty - 01 , 00112Misc Furniturecrca Locker(A) Doors Of Crca Locker Fitted In Sailors Mess Uprooted From Hinges To Be Repaired/ Renewed. Qty. - 30. Size - 900X 1000 X 600Mm , 00112Misc Furnituremcr(B) Fixed Wooden Locker In Mer Broken And Perished To Be Repaierd/Renewed Along With Locking Arrangement In Situ. Mat - Crca, Qty- 02 Nos. , 00113Mortise Lockrenewalsmortise Locks Of Various Non Watertight Door Broken/ Damaged To Be Renewed. Make - Godrej, Qty. - 22 Nos. , 00114Hydraulic Door Closerrenewalshydraulic Door Closer Of Various Non Watertight Door Broken/ Damaged To Be Renewed. Make - Godrej, Qty. - 22 Nos. , 00115Kickout Panelrenewalskick Out Panels Of Nwt Door Damaged/ Perished To Be Manufactured And Fitted. Mat. - Crca, Qty. -22 Nos. , 00116Bathroom Doorrenewalsfour In No. Bathroom Door Alongwith Locking Mechanism Damaged And Not Closing Properly To Be Repaired/ Renewed. Mat. Crca (B15 And Equivalent), Qty - 02 Nos. , 00117Alleyway Doorrenewalsdoors In Main Alleyway, Gunnery Office And Mcr Along With Locking Mechanism Damaged And Not Closing Properly To Be Renewed. Mat. Crca (B15 And Equivalent). Qty - 05 , 00118Bridge Wing Doorrenewalsthree In No. Nwt Door Fitted In Bridge Alongwith Locking Mechanism Damaged And Not Closing Properly To Be Repaired/ Renewed. Mat. - Crca (B15 And Equivalent), Qty- 02 Nos. , 00119Ribrepair(A) Increase In Weight Of Rib Observed. Suspect Water Ingress From Bottom Hull. To Be Repaired. Work Involves Removal Of Collar And Deck Floor, Identify The Source Of Leakage And Defect Rectification.. , 00119Ribseating Arrangement(B) Seating Arrangement Along With Foundation Uprooted From Base To Be Renewed. Mat. Grp. Work Involves: - (I) Crop And Remove Old Seating (Ii) Eraction Of Grp Foundation (Iii) Install New Seating Arragngement As Per Exisiting Arrangement.(Iii) Renew Covers Provided For Stowage Along With Hinges. , 00119Ribrib Cradle(C) Seating Of Rib Cradle Damaged/ Perished To Be Renewed. Mat. Soft Wood With Sponge And Canvas Cover. , 00120Rope Reelrenewals(A) Rope Reel Flange Fitted On Upper Deck Corroded And Perished To Be Repaired/ Renewed. Mat. - Ms, Qty. - 04 Nos. , 00120Rope Reelrenewals(B) Rope Reel Foundation Structure Corroded Thinned And Holed To Be Repaired / Renewed. Mat. - Ms, Qty. - 04 Nos. , 00121Pvc Guard Railsrenewals10 Mm Pvc Guard Rails Near Gangway And Quarter Deck Damaged And Broken. Assistance Required For Crimping Of Pvc Guard Rails With Tulips. Qty-54 Nos. , 00122Bonding Strapsrenewalsbonding Straps Fitted On Weather Deck Fittings Damaged And Broken To Be Renewed Along With Securing Eye. Qty. - 200. Bonding Straps Will Be Provided By Ss. Mat- Ms & Al. , 00123Deck Eyesrenewalsdeck Eyes Fitted On Weather Deck Thinned And Perished To Be Renewed. Mat - Ms, Qty. - 20 , 00124Electroplatingelectroplatingthe Following Ceremonial Fittings To Be Electroplated: - , 00124Electroplatingelectroplatingthe Following Ceremonial Fittings To Be Electroplated: - (A) Ships Bell - 02 Nos. , 00124Electroplatingelectroplatingthe Following Ceremonial Fittings To Be Electroplated: - (B) Cremonial Dice Stanchions - 08 Nos. , 00124Electroplatingelectroplatingthe Following Ceremonial Fittings To Be Electroplated: - (C) Ceremonial Stanchion Securing Chain - 12 Nos , 00124Electroplatingelectroplatingthe Following Ceremonial Fittings To Be Electroplated: - (D) Emblem- 03 Nos. , 00124Electroplatingelectroplatingthe Following Ceremonial Fittings To Be Electroplated: - (E) Ships Name Plate- 02. , 00124Electroplatingelectroplatingthe Following Ceremonial Fittings To Be Electroplated: - . (G) Ships Commisioning Plate- 01. , 00125Brass Talleyframe Station Frame Station Tallies Fitted On Weather Deck Corroded And Thinned To Be Manufactured And Fitted. Qty - 44 Nos. , 00126Small Arms Postoverhauling And Renewalsrotating Mechanism Of Lmg At Quarterdeck To Be Renewed. Qty- 01. , 00127Minor Platformrenewalscat Walk Structure And Railing To Be Erected On Superstructure In Front Of Bridge For Accessing Windows From Superstructure. Work Involves:- Manufacture Of Metallic Grating Of Width 400 Mm Covering Entire Bridge Window. Length- 10 M(40 Rungs) , 00128Towing Hookoverhaulingtowing Hook Assembly On Quarter Deck Corroded And Jammed. Heating Assisstance Required. Mat. - Ms, Qty. - 01 No. , 00129Grenade Ru Lockerrenewalsru Locker Fitted On Weather Deck Corroded/ Thinned. To Be Manufactured As Per Specifications In Art 1209 Inmer Vol I. Work Involves Manufacturing Of Ru Locker With Lagging Internally And Have Sheet Metal Cladding Fitted Over The Tops And Sides To Form A 25 Mm Air Gap For Full Circulation Of Air. Qty One. Auth Ihq Mod (N) Letter Wp/2664 Dated 08 Jul 15. , 00130Watertight / Gt Control Marking Paintingpainting Of Watertight And Gas Tight Markings ( Alphabets) Namely X/Y/Z And A/M/R On All Wt Doors, Wt Hatches, Mushroom Head And Vent Flaps To Be Undertaken As Per Existing Policy. Qty - 100 Nos. , 00131Key Boardrepairrepair Of Existing Keyboards To Be Undertaken. Qty Required - 04 Nos. Defects Are - Locking Arrangement And Faded Sunmica Duplicate Key Board In Main Alleyway, Electrical Key Board, Engine Room Key Board, Exo Cabin , 00132Gangway Apronrenewals02 Sets Gangway Apron Damaged/ Perished. Length 09 Mtr, Width -01 Mtr. Material : Synthetic With Screen Printing. , 00133Wooden Gratingsrenewalswooden Gratings For Securing Of Hawsers, Larne Target Rope And Shore Supply Cable Damaged To Be Maunfactured. Mat. - Wood With Grp Coating, Qty. - 08. Size 1000Mm X 1000Mm , 00134Penant Nopaintingpainting Of Penant No. To Be Carried Out As Specified By Ship Staff As Per Existing Policy. , 00135Flag Lockerrenewalsdoors Of Flag Locker Fitted In Flag Deck Corroded And Holed To Be Renewed Along With Locking Mechanism As Per Drawing. Mat - Aluminium. , 00136Fresh Water Linerenewalsfresh Water Pipe Line In Bridge And Bridge Wing Along With Securing Brackets Corroded And Thinned. To Be Renewed. Mat. - Cu-Ni, Qty. - 10 Rmt , 00137Gangway State Boardrepairswooden Gangway Stateboard Damaged And Broken To Be Repaired Along With Stand. Mat - Wood, Qty - 04. , 00138Portable Ff Extinguishersecuring Bracketssecuring Brackets Of Following Portable Extinguisher Corroded And Perished To Be Manufactured And Fitted. Mat. - Ms, (A) 9 Ltr Afff - 20 Nos. (B) 2 Kg. Co2 - 15 Nos. (C) 10 Kg. Dcp - 02 Nos. , 00139Ba Controller Boardrenewalsba Controller Board Of Ship Damaged/ Broken To Be Manufactured As Per Specifications. Mat. Wood. , 00140Load Testingmisc Structure And Fittings(A) Bollards (16 Nos.) , 00140Load Testingmisc Structure And Fittings(B) Towing Bollard (01 No.) , 00140Load Testingmisc Structure And Fittings(C) Cleats (12 Nos.) , 00140Load Testingmisc Structure And Fittings(D) Fairleads (10 Nos.) , 00140Load Testingmisc Structure And Fittings(E) Bullring (02 Nos.) , 00140Load Testingmisc Structure And Fittings(F) Deck Clenches ( 02 Nos) , 00140Load Testingmisc Structure And Fittings(G) Cable Clench (02 Nos.) , 00140Load Testingmisc Structure And Fittings(H) Towing Hook (01 No.) , 00140Load Testingmisc Structure And Fittings(J) Towing Pendant (02 No.) , 00140Load Testingmisc Structure And Fittings(K) Towing Shackle (01 No.) , 00140Load Testingmisc Structure And Fittings(L) Bottle Screw Slip Deck Eye (02 No.) , 00140Load Testingmisc Structure And Fittings(M) Bottle Screw Slipd Shackles (02 Nos.) , 00140Load Testingmisc Structure And Fittings(N) Anchor Strop (02 Nos.) , 00140Load Testingmisc Structure And Fittings(P) Deck Eyes Of Anchor Strop (04 Nos.) , 00140Load Testingmisc Structure And Fittings(Q) D Shackle For Anchor Strop (04 Nos.) , 00140Load Testingmisc Structure And Fittings(R) Deck Eye(Foxle) (04 Nos.) , 00140Load Testingmisc Structure And Fittings(S) Deck Head Eye (Stp Lobby) (01 No.) , 00140Load Testingmisc Structure And Fittings(T) Ships Brow Aluminium (Small & Large) , 00140Load Testingmisc Structure And Fittings(U) Towing Hawser 48 Mm Pp Rope , 00140Load Testingmisc Structure And Fittings(V) Berthing Hawser Pp Rope , 00140Load Testingmisc Structure And Fittings(W) Larne Target Pp Rope , 00140Load Testingmisc Structure And Fittings(X) Pvc Coated Wire Rope (Guard Rail) (54 Nos.) , 00140Load Testingmisc Structure And Fittings(Y) Snatch Block (02 Nos) , 00140Load Testingmisc Structure And Fittings(Z) Llt Line (150 Mtr) , 00140Load Testingmisc Structure And Fittings(Aa) Messenger Line (110 Mtr) , 00140Load Testingmisc Structure And Fittings(Ab) Easing Out Recovery Rope (80 Mtr) , 00140Load Testingmisc Structure And Fittings(Ac) Distance Line (66 Mtr) , 00140Load Testingmisc Structure And Fittings(Ad) Life Line (36 Mtr) , 00141Canvas Coverrenewalscanvas Covers Of Crn 91 Gun, Lrad, Mushroom Heads, Anchor Windlass, Boat Davit Motors Perished. To Be Renewed. Mat- Canvas. Qty-09. , 00142Sea Boat Roperenewalsthimble Of Sea Boat Rope Of 4.7 Mtr Rib Corroded And Thinned. To Be Manufactured. Mat- Ms. Qty- 01. , 00143Wt Bulkheadrepairscorrosion And Pitting Observed Near Bimetallic Joint Of Port Side Bulkhead Of Stp Lobby. To Be Renewed. Mat- Ms. , 00144Misc Structrucal Fittingsrenewalsmanufacturing And Fitment Of Lockers In Electrical Office, Junior Sailor Mess, Senior Sailor Mess, Ships Office, Mcr And Dining Hall. Mat- Crca. Qty- 25. Wooden Table Tops To Be Changed With Crca. Qty- 05. , 00145Metallic Coversrenewalsmetallic Covers Of Anchor Windlas Motor, Capstan, Boat Davit Motors Corroded/ Holed/ Damaged. To Be Manufactured As Per Sample. Mat- Ms/ Gi Sheet. Qty-05. , 00146Securing Clampsrenewalssecuring Clamp Of Drain Lines Corroded/ Thinned. To Be Manufactured. Mat- Ms/ Al. Qty- 25 , 00147Wt Bulkheadsrepairspiercing Observed On Wt Bulkhead Of Stp Compartment And Dining Hall. To Be Repaired. , 00148Single Arm Boat Davitrepairsstructure Of Boat Davit Corroded/ Thinned And Holed. To Be Repaired. Mat- Ms. , 00149Fisherman Platesrenewalsmanufacturing Of 02 In No Fisherman Plates As Per Sample. Mat- Ms. Qty- 02. , 00150Partition Bulkheadsrenewalsgaps Between Partition Bulkheads To Be Covered. Job Involves Manufacturing And Fitment Of Frames. Qty- 20 Sqm. , 00151Inclining Laddersrenewalsrenewal Of Wooden Back Of Dining Hall Ladder. To Be Replaced With Metallic Sheet.Qty- 2 Sqm , 00152Habitability Repairsremoval Of Old Panel Supporting Brackets In Mcr And Fitment Of New Clamps For Securing Of Trunking. Qty- 04. , 00153Ventillation Arrangementgrease Filters02 In Nos Grease Filters Of Galley Damaged . To Be Manufactured As Per Sample. Mat- Frame- Gi, Wiremesh- Copper. , 00154Nwt Doorsrubber Beadingrubber Beading Of 05 In Nos Nwt Doors Perished. To Be Renewed. , 00155Garbage Disposal Unitrenewalsreplace Pulveriser Cutter Blades And Strainer Of Garbage Disposal Unit In Ships Galley Washbasin , 00156Misc Fittingsdining Hall Tabledining Hall Table In Dining Hall Damaged. To Be Renewed. Mat- Ss , 00157Fixed Shoring Arrangementrenewalsfixed Shoring Arangement At 11 Location Damaged/Perished. To Be Renewed. Mat- Ms. Qty- 11. , 00158Misc Fittingsmagazinemanufacturing And Fitment Of Additional Small Arm Racks On Port Side And Detonator Locker. Qty- 04. , 00159Igla Lockerrepairsigla Lockers Corroded/ Thinned And Holed. To Be Repaired . Mat- Ms , 00160Crn 91 Gunrepairsturret Platform Corroded, Thinned And Holed. To Be Repaired/ Renewed. Mat- Al , 00161Misc Fittingsgermanufacturing And Fitment Of Small Arms Racks For Lmg, Mmg, Hmg, 716 Sig Rifle And Securing Arrangement For Boxes With Butterfly Nuts. Qty- 22. , 00162Mosum Postchange Of Locationlocation Of Mosum Post To Be Changed. Mat- Ms. Qty- 02. , 00163Rollersrenewalsrollers For Guiding Anchor Chain Cable And Rope Corroded .To Be Renewed. Qty- 06. , 00164Fairleadrenewalsfairleads To Be Renewed As Per New Dimensions, Diameter Of Fairlead At Quarterdeck For Towing To Be Increased. Qty- 11. , 00165Misc Fittingssecuring Arrangementboxes In Rope And Canvas Store And Deck Store To Be Manufactured Andsecured With Butterfly Nuts.. Qty-10. Mat- Gi Sheet. , 00166Cable Lockerswoodenwood Of Cable Lockers Damaged. To Be Renewed. Area- 3 Sqm , 00167Misc Fittingsbridgewooden Furniture In Bridge Is To Be Replaced With Crca As Per Change Management Policy. , 00168Quartermaster Tablerenewalsgangway Quartermaster Table Broken. To Be Renewed.Mat- Wood. Qty- 01. , 00169Bridge Wing Pilorousheight Extensionheight Of Bridge Wing Pilorous Sight To Be Increased. Qty- 02. , 00170Gyrogyro Standlocation Of Gyro Stand To Be Changed Towards Aft Part Of Bridge. Job Involves Removal Of Existing Post And Fitment Aft Part Of Bridge As Observed During Ost 22. , 00171Bunksrenewalsbunks In Accomodation Spaces To Be Replaced With New Bunks. Mat- Crca. Qty-34 , 00172Wardroomrenewalsrenewal Of Sofa Set And Table In Wardroom. Mat- Crca/ Wood. Qty- 02 , 00173Co Cabinrenewalsrenewal Of Lockers And Table In Co Cabin. Mat- Wood. Qty- 04. , 00174Officers Cabinrenewalsrenewal Of Lockers And Table In Exo Cabin, Eo Cabin And No Cabin. Mat- Crca. Qty- 08. , 00175Notice Boardrenewals02 In Nos Notice Boards In Junior Sailor Dining Hall And Main Alleyway Damaged. To Be Renewed. Mat- Teak Ply. Qty- 02 , 00176Garbage Disposal Unitgarbage Disposal Unitgarbage Disposal Unit In Galley Not Working And Leakage Observed From Joints. Repair Of Gdu And Leakage Cheks And Repair To Be Carried Out. Qty - 01 Nos. , 00177Crca Lockercrca Locker1. Glass Of Crca Lockers Brokent. To Be Replaced. Location - Galley. Qty Of Glass - 04 Nos. , 00178Qtr Master State Boardsrenewalsrenewal Of Qtr Master State Boards And Stands As Per Sample. Material - Wood. Qty - 02 Nos. , 00179Ships Browrepairrepair Of Ships Brow. Material - Aluminium. Qty - 02 Nos. , 00180Stp Tank Exhaust Pipestp Tank Exhaust Pipe Corroded And Thinned. Repair/ Renewal To Be Carried Out. Location - Port Catwalk , 00181Wind Socs Baserenewalswind Socs Base Heavily Corroded And Thinned. Repair/ Renewal To Be Carried Out. , 00182Search Lightrenewalssearch Light Base Heavily Corroded And Thinned. Renewal To Be Carried Out. Location - Bridge Top. , 00183Quartermaster Chairrenewalsexisting Quartermaster Chair Damaged.Quartermaster Master Chair In Bridge To Be Renewed As Per Dimension/ Sample. Dimensions - , 00184Miscellaneousmiscellaneousassistance For Cutting Redundant Fittings At Various Locations. Bridge, Stbd & Port Bridge Wing. , 00185Magnetic Compassmagnetic Compassvibrations Observed On Magnetic Compass. Modification/ Repair Of Securing Arrangment Of Magnetic Compass Base. Welding Required. Location - Bridge , 00186Met Instrument Boxrenewalsrenewal Of Met Instrument Box As Per Dimensions - . Material - Aluminium , 00187Co Chairrenewalsrenewal Of Commanding Officers Chair In Bridge. , 00188Bridge Electrical Panelrenewalsrenewal Of Cover Plate Of Bridge Console Panels. , 00189Misc.Main Broadcast Boxassistance For Securing Of Main Broadcast Con Box In Bridge. , 00190Crcacrca Lockerfabrication Of Door Below Throttle Console And Nlcb Panel. Location - Bridge. , 00191Misc.Supporting Rod(A) Welding Of Supporting Rod Near Chart Table. Locaiton - Bridge , 00191Misc.Transformer Box(B) Renewal Of Transformer Box In Port Bridge Wing. Material - Ms. Dimensions - , 00191Weather Deck Lockers And Boxes(C) Fitment Of Flat Rubber Beading In Weather Deck Lockers And Boxes Including Pol Locker , 00192Paintingships Browpainting Of The Following : - (A) Ships Brow. , 00192Paintingships Brow(B) Ceremonial Life Buoy , 00193Ceremonial Lifebuoyceremonial Lifebuoyrope Renewal And Cloth Change Of Ships Ceremonial Lifebuoy , 00194Wooden Boardswooden Boardsmanufacturing Of Following Boards To Be Undertaken - , 00194Wooden Boardswooden Boardsmanufacturing Of Following Boards To Be Undertaken -(A) Machinery State Board , 00194Wooden Boardswooden Boardsmanufacturing Of Following Boards To Be Undertaken - (B) Met State Board , 00194Wooden Boardswooden Boardsmanufacturing Of Following Boards To Be Undertaken - (C) Locflot State Board , 00195Serviceability Checksserviceability Checksserviceability Checks Of The Following Equipments To Be Undertaken. , 00195Serviceability Checksserviceability Checksserviceability Checks Of The Following Equipments To Be Undertaken.(A) Roll And Pitch Indicator , 00195Serviceability Checksserviceability Checksserviceability Checks Of The Following Equipments To Be Undertaken.(B) Inclinometer , 00195Serviceability Checksserviceability Checksserviceability Checks Of The Following Equipments To Be Undertaken.(C) Batton Buoy , 00195Serviceability Checksserviceability Checksserviceability Checks Of The Following Equipments To Be Undertaken.(D) Sextent , 00195Serviceability Checksserviceability Checksserviceability Checks Of The Following Equipments To Be Undertaken.(E) Lrf , 00195Serviceability Checksserviceability Checksserviceability Checks Of The Following Equipments To Be Undertaken.(F) Binoculars , 00195Serviceability Checksserviceability Checksserviceability Checks Of The Following Equipments To Be Undertaken.(G) Nvd , 00195Serviceability Checksserviceability Checksserviceability Checks Of The Following Equipments To Be Undertaken.(H) Bearing Sight , 00195Serviceability Checksserviceability Checksserviceability Checks Of The Following Equipments To Be Undertaken.(J) Distance Meter , 00196Misc.Metallic Lockers(A) Equipment Rack Modification In Radio Room , 00196Misc.Metallic Lockers(B) File Rack Modification In Radio Room , 00196Misc.Metallic Lockers(C) Ncn (Tmfoc) Rack Modification On Flag Deck , 00196Misc.Metallic Lockers(D) Egg Locker Modification On Flag Deck , 00196Misc.Metallic Lockers(E) Ru Locker Modification On Flag Deck , 00196Misc.Metallic Lockers(F) Ru Locker Manufacture As Per Sample , 00196Misc.Metallic Lockers(G) Flag Locker Modification On Flag Deck , 00196Misc.Metallic Lockers(H) Alteration Of Racks In Radio Room , 00196Misc.Racks(J) Racks Modification In Deck Store , 00196Misc.Racks(K) Gun / Ammunition & Vbss Racks Alteration In Ger , 00196Misc.Racks(L) 51 Mm Mortar Foundation Degutting From Port & Stbd Catwalk And Rewelding On Bridge Top Port & Stbd , 00196Misc.Racks(M) Ru Locker Wooden Batten Modification As Per Inmer And Replacement Of Rubber Beading , 00196Misc.Racks(N) Modification And Relocation Of Mmg Post On Flag Deck Work Involves Degutting And Welding Of The Same , 00196Misc.Racks(P) Manufacture Of Wooden Gratings As Per Sample , 00197Machinery Spaces And Workshopsstructural Examination Of Compt.Examine Structure Not Covered By Lagging Or Deck Coverings, Paying Particular Attention To Decks, Deck Boundaries And Lower Areas Of Ships Side, Bulkheads (Ensuring All Limber Holes Are Clear) And Areasaround Side Scuttles. Portable Or Semi Portable Fittings That Obscure Structure Are To Be Removed For Examination Of Structure Behind. Structure Revealed By The Removal Of Semi -Portable Fittings Is To Berecoated As Per Approved Paint Scheme Before The Fittings Are Replaced , 00198Ventilation Systemventilation System Checksthoroughly Examine Exhaust Ventilation Trunking And Any Areas Liable To Be In Contact With Acid. Where Acid Resisting Composition On Structure Has Deteriorated, Clean By Hard Scraping And Wire Brushingfollowed By Washing With Dilute Caustic Soda Solution And Then Fresh Water. Thoroughly Dry These Exposed Surfaces And Recoat.Thoroughly Examine Lead Lined Sinks And Bench Tops For Fracture Or Wear.Note: - Caustic Soda Is On No Account To Be Used For Cleaning Intact Paint Surfaces. , 00199Funnelfunnelexamine Funnel Casing Both Internal And External, Paying Particular Attention. Examine Eye Plates And Surroundings Structure For Evidence Of Corrosion/ Pitting.Examine Funnel Structure And Semi Portable Fittings That Obscure Structure Are To Be Removed And To Be Recoated Before The Fittings Are Replaced In Accordance With Ncd, No 53/16 And Policy Directives. , 00200Electrical Compt.Structural Surveysurvey The Structure Including Dadoes,Decks, Deck Boundries, Lower Portion Of Bulkhead Ship Side For The Trace Of Corrosion And Flaking Of Paint. Carry Out Rectification Accordingly. , 00201Apt Clustersconduct Of Apt(A) Conduct Apt And Identify The Defects (Apt )May Be Carried Out Either By Vacuum Or Pressure Method Iaw Para 44 Of No 01/15. Note: All Outstanding Defects Affecting Water Tight Integrity Of W/T Compartments/ Clusters/ Tanks, Are To Be Projected In Defect List , 00201Tanks, Cofferdams , Seatubes(B) All Tanks, Cofferdams And Sea Tubes Which Are Repaired By Build-Up/Renewal Or Are Subjected To Hot Work For Welding Of Pad Piece/ Foundation On Any Of Their Boundaries Are To Be Air Pressure Tested. The Pressure Applied Should Never Exceed That Which Corresponds To A Pressure Of 0.2 Kg/Sq Cm (2Meters Of Water Or 0.20 Bars Or 2.1/2 Ibf/ Sq In). (14 Sea Tubes, 25 Obds, 04 Iccp Cofferdam, 01 Tank Cofferdam, 02 Void Space (Port & Stbd) & 09 Tanks , 00202Gduoverhaul And Repairoverhaul Complete Garbage Disposal Unit Including Pump And Pulveriser Motors. Renew All Gland Packings Seals, Pulveriser Cutter Blades,Strainers And All Worn Out Parts. Location - Galley , 00203Wt Doorsstructural Examination And Repair(A) Examine All Wt/Doors And Check Their Clips/Clips Mechanism For Looseness, Hinges For Excessive Play And Wedge Pieces For Sign Of Wear. Also Check Locking Arrangement Teflon/Neoprene Washer Washers, Toroidal Sealing Rings And Rubber Sealings For Warrant/Defects. Raise Specific Defects To Dockyard For Repairs. Wt Hatch - 12, Ees - 02, Wt Door - 12, Manholes - 12 , 00203Integrity Test(B) Carry Out Watertight Integrity Test Of All W.T. Doors Using Ultrasonic Leak Detector (Uld) Device. Identify The Leakages Through Watertight Seals With The Help Of Ultrasonic Leak Detecor And Raise Specific Defects To Yard For Rectification, If Any. Wt Hatch - 12, Ees - 02, Wt Door - 12, Manholes - 12 , 00204Nwt Doorsinspection And Repaircheck Clips, Hinges For Looseness, Locking Arrangement And Any Other Components For Wear And Damage. Examine Condition Of Rubber Gaskets, Door Structure And Kick Out Panel. Renew Worn Out/ Damaged Parts As Necessary , 00205Hatches & Manholeshatches & Manholes(A) Examine All Hatches And Check Their Clips, Closing Mechanism, Hinges For Looseness, Spring Mechanism, Hatch Holding Sliding Mechanism/ Retaining Clip And Wedge Pieces For Signs Of Wear And Worn Out. Check Neoprene/ Teflon Washers, Toroidal Sealing Rings, Rubber Sealings And Other Structural Damage/ Defects. Renew All Worn Out Parts As Necessary. Wt Hatch - 12, Ees - 02, Wt Door - 12, Manholes - 12 , 00205Hatches & Manholeshatches & Manholes(B) Carry Out Watertight Integrity Test Of All W.T. Hatches Using Ultrasonic Leak Detector (Uld) Device Post Rectification Of All Defects In The Presence Of Ss/Trial Agency. Wt Hatch - 12, Ees - 02, Wt Door - 12, Manholes - 12 , 00206Furnitureupholstery And Matteresses(A) Replace All Partition, Furniture Upholstery, Matteresses, Awnings Etc. And Repair/ Replace.Bunks - 39 & Awnings - 8 , 00206Furnituremess Furnitures(B) Survey The Following And Repair:(I) Bunks - Nos. 39(Ii) Lockers - 90(Iii) Chairs - 20(Iv) Stools - 10(V) Tables - 8(Vi) Ladders - 8Note:- Wood And Fabrics To Be Treated With Fire Retardant Chemicals Fr 881 And Fr 891 Respectively. , 00206Furniturecrca Locker(C) Renewal Of All Cupboards. Mat - Crca , 00207Laddersvertical Laddersregalvanise Ladders. Treads Of Galvanised Between Deck Ladders To Be Rewelded And Ladders Regalvanised , 00208Misc. Fittingsbrows Structural Survey And Repairbrows Are To Be Examined, Repaired As Necessary. Dockyard Testing Not More Than 16 Months.Note: Brows Are To Be Tested At The First Opportunity After Any Repairs Carried. , 00209Accomodatoin Spacesinspection Of Structure(A) Examine Structure Paying Particular Attention To Deck Boundaries, Lower Areas Of Ship-Sides/ Bulkheads (Dadoes) And Area Around Side Scuttles For Sign Of Corrosion, Pitting And Structural Weakness. Raise Specific Defect To Dockyard For Repairs And Renewal. Yard To Undertake Defect Rectification Of Projected Areas.List Of Compartments.Note:- Structural Defects Observed During Periodical Internal Survey Of Structure To Be Included In Defect List Together With A List Of Items, Fittings, Equipment And Lagging Which Will Be Required To Be De-Gutted/ Remove By Yard To Facilitate Survey. , 00209Accomodatoin Spacesstructure Covered With Underlay/ Insulation(B) Undertake Survey Of Mess Decks, Cabins And Offices In Accordance With No 01/15 And Ihq Mod (N)/ Dna Letter Nc/7631 Dated 01 Nov 22 As Mentioned:-Structure Covered With Underlay/ Insulation - Survey Of The Condition Of Underlay / Insulation Is To Be Carried Out. The Deck Covering Be Inspected For Cracks, Bulging/ Undulation, Mechanical Damage, Discoloration Etc. In Case Of Damage Observed, The Structure Underneath To Be Visually Surveyed Post Removal Of Underlay/ Insulation Of Affected Area. , 00209Accomodatoin Spaces(D) Usg Of Areas Found Corroded During Visual Survey, If Required. , 00209Accomodatoin Spacesunderlay And Without Underlay Compt. Inspection(E) 100% Visual And Usg Survey Of Dadoe Areas Of Wt Bulkheads At Each Deck Below Waterline , 00210Galley & Dining Hallgalley & Dining Hallsample Visual Survey Of Decks And Bulkhead Dadoes To Be Carried Out To Ascertain The Material State. Work Involves Degutting/ Removal Of Microtek Underlay At Indicated Locations And Relaying The Same On Completion Of Survey. Size Of Sample Microtek Underlay:2 Ft X 1Ft; No Of Samples: 02 Samples Each. Work Involves Removal Of And Refitment On Completion Of Survey/ Repairs. Ss Panneling , 00210Galley & Dining Hallgalley & Dining Hall(A) Visual And Hammer Survey Of Decks And Bulkhead Dadoes In Galley And Dining Hall At Indicated Sample Locations. , 00210Galley & Dining Hallgalley & Dining Hall(B) Renewal Of Defective Areas:- Areas Found Weak/ Degraded/ Deteriorated During The Structural Survey Are To Be Cropped By Approppriate Methods And Renewed. Material: Ms , 00210Galley & Dining Hallgalley & Dining Hall(C)Provisioning Of Inspection Window Along With Locking Mechanism Iaw Ihq Mod(N) Directives On Paneling. , 00210Galley & Dining Hallgalley & Dining Hall(D) Application Of Deck Covering In Dining Hall Iaw Ihq Directives , 00210Galley & Dining Hallgalley & Dining Hall(E) Provisioning Of Inspection Window Along With Locking Mechanism In Ward Room Iaw Ihq Directives On Paneling Note 1:- Job Includes Degutting And Regutting Of Lagging, Ss Panneling, Garbage Diposal Unit, Deep Freezer, Cooking Range And Other Portable/ Semi-Portable Fittings Etc. In Way Of Sample Areas Of Survey And In Way Of Structural Repairs. Fittings That Are Damaged During The De-Gutting Are To Be Renewed And Refitted In Situ Note 2:- Testing Of All Weld Joints By Dye Penetrant Test Once After Completion Of Root Run And Finally On Completion Of All Weld Runs Followed By Water Hose Test (3 Kg Pr)Note 3:- A Detailed Survey Report Of Structure Along With Recommendations For Repair/ Renewal Is To Be Prepared And Submitted For Necessary Action. The Structural Renewals Are To Be Marked On Deck Plans For Information And Record.

BOQ

Sl. No. Item TitleItem Description
1HULL SERVICES-INS BITRA NR-2700001Docking, cleaning & USG surveyDockingCarry out docking of ship in (NO STR 1/11 ) version i and version ii for complete renewal of underwater paint scheme. Last UW paint scheme renewal in MR 14. Last docking date: 12 Aug - 06 Sep 25 Version II at Varuna outer ND(V)HULL SERVICES-INS BITRA NR-2700001Docking, cleaning & USG surveyDockingCarry out docking of ship in (NO STR 1/11 ) version i and version ii for complete renewal of underwater paint scheme. Last UW paint scheme renewal in MR 14. Last docking date: 12 Aug - 06 Sep 25 Version II at Varuna outer ND(V)
200001Docking, cleaning & USG surveyCleaning(a) remove marine fouling from the hull using wooden scraper or hydro jetting with maximum pressure not exceeding 3000 psi.00001Docking, cleaning & USG surveyCleaning(a) remove marine fouling from the hull using wooden scraper or hydro jetting with maximum pressure not exceeding 3000 psi.
300001Docking, cleaning & USG survey(b) scrap and clean under water area and boot top area (including wind and water areas) to remove all loose paint film, rust etc. Wind water areas to be considered upto 500 mm above the boot top.00001Docking, cleaning & USG survey(b) scrap and clean under water area and boot top area (including wind and water areas) to remove all loose paint film, rust etc. Wind water areas to be considered upto 500 mm above the boot top.
400001Docking, cleaning & USG surveyUSG survey(c) carry out ultrasonic gauging of underwater hull areas and above water areas00001Docking, cleaning & USG surveyUSG survey(c) carry out ultrasonic gauging of underwater hull areas and above water areas
500001Docking, cleaning & USG surveyDocking reports(d) firm to provide 07 sets of docking form/ report in 379 duly filled (uw steel renewal, painting details, sacrifical anodes, uw valves, sea tubes/ sea chest, other details pertaining to water jet as mentioned etc.) On completion of the refit00001Docking, cleaning & USG surveyDocking reports(d) firm to provide 07 sets of docking form/ report in 379 duly filled (uw steel renewal, painting details, sacrifical anodes, uw valves, sea tubes/ sea chest, other details pertaining to water jet as mentioned etc.) On completion of the refit
600001Docking, cleaning & USG surveySurvey reportNote:- report of hull survey post completion be submitted to ss for reference.00001Docking, cleaning & USG surveySurvey reportNote:- report of hull survey post completion be submitted to ss for reference.
700002UW SHELL TOUCHING COMPT/ SPCACESHITU InspectionSS/ Refitting Firm is required to offer all U/W shell touching compartments/ tanks/ void spaces/ cofferdams in dry dock for inspection (for all refits) of preservation standards to HITU prior final undocking.00002UW SHELL TOUCHING COMPT/ SPCACESHITU InspectionSS/ Refitting Firm is required to offer all U/W shell touching compartments/ tanks/ void spaces/ cofferdams in dry dock for inspection (for all refits) of preservation standards to HITU prior final undocking.
800003Underwater Structuresurvey all underwater appendages(a) Survey all under water appendages/ fittings for pitting, corrosion or any damage paying particular attention to paint failure/ damage area to stern shaft bracket, ropeguard, eddy plates, eddy cones, stern tube, skeg, bilge keel plate, stabilizers fin etc. iaw NO 01/15. Undertake repair as necessary.(i) Rudder - 2, (ii) Reference electrodes - 2, (iii) ICCP anodes -2, (iv) Propellar - 2, (v) Echo souder - 1, (vi) EM Log - 1, (vii) Spray rails - 4, (viii) Shaft brackets - 2, (ix) sea tubes and gratings - 14.00003Underwater Structuresurvey all underwater appendages(a) Survey all under water appendages/ fittings for pitting, corrosion or any damage paying particular attention to paint failure/ damage area to stern shaft bracket, ropeguard, eddy plates, eddy cones, stern tube, skeg, bilge keel plate, stabilizers fin etc. iaw NO 01/15. Undertake repair as necessary.(i) Rudder - 2, (ii) Reference electrodes - 2, (iii) ICCP anodes -2, (iv) Propellar - 2, (v) Echo souder - 1, (vi) EM Log - 1, (vii) Spray rails - 4, (viii) Shaft brackets - 2, (ix) sea tubes and gratings - 14.
900003Underwater StructureOverhauling and examination of UW valves(b) Open up and remove minimum 50% of U/W valves and fittings for examination and also to facilitate survey of sea tubes as per MT 11620. All valves to be completed during each cycle in conjunction with NR1(22 (OBD Nos))00003Underwater StructureOverhauling and examination of UW valves(b) Open up and remove minimum 50% of U/W valves and fittings for examination and also to facilitate survey of sea tubes as per MT 11620. All valves to be completed during each cycle in conjunction with NR1(22 (OBD Nos))
1000003Underwater Structurepressure testing of box bilge keel(c) Carry out pressure testing of the box type spray rails to ensure watertight integrity of the structure post NDT of weld joints.00003Underwater Structurepressure testing of box bilge keel(c) Carry out pressure testing of the box type spray rails to ensure watertight integrity of the structure post NDT of weld joints.
1100003Underwater StructurePaint restoration and renewal(d) Clean to bare metal all corroded area and area of paint failure of U/W appendages and preserved in accordance with NO 53/16 and policy directives issued by NHQ/IHQ time to time.00003Underwater StructurePaint restoration and renewal(d) Clean to bare metal all corroded area and area of paint failure of U/W appendages and preserved in accordance with NO 53/16 and policy directives issued by NHQ/IHQ time to time.
1200003Underwater Structuredraught marking repair/ renewal and paint restoration(e) Check draught marks are in position and intact with ship structure. If not repair and renew.(NES-164/DEFSTAN 02-164 & BR 3001 Chapter 28 article 2811). Undertake painting of draft marks as per NO 53/16 and policy directives issued by IHQ/DNA. (Size -10 cm of thickness 8mm). Location -(i) Forward (ii) Midship, (iii) Aft. Qty - 50 Nos.00003Underwater Structuredraught marking repair/ renewal and paint restoration(e) Check draught marks are in position and intact with ship structure. If not repair and renew.(NES-164/DEFSTAN 02-164 & BR 3001 Chapter 28 article 2811). Undertake painting of draft marks as per NO 53/16 and policy directives issued by IHQ/DNA. (Size -10 cm of thickness 8mm). Location -(i) Forward (ii) Midship, (iii) Aft. Qty - 50 Nos.
1300003Underwater Structurefairing of UW appendages(f) Examine fairing of underwater appendages for roughness and unfairness or any damage paying particular attention to the shaft brackets, ropeguards and eddy plates etc. Renew/repair the unfaired/damaged fairing for their smoothness.00003Underwater Structurefairing of UW appendages(f) Examine fairing of underwater appendages for roughness and unfairness or any damage paying particular attention to the shaft brackets, ropeguards and eddy plates etc. Renew/repair the unfaired/damaged fairing for their smoothness.
1400003Underwater Structurestabilizers(g) Clean and repaint the sea side surface of stabilizer fin boxes. The fin wings extended and turned to maximum angle to the horizontal to give better access to the fin box (if applicable).00003Underwater Structurestabilizers(g) Clean and repaint the sea side surface of stabilizer fin boxes. The fin wings extended and turned to maximum angle to the horizontal to give better access to the fin box (if applicable).
1500003Underwater Structureshaft brackets(h) Recoat shaft brackets in accordance with NO 53/16.00003Underwater Structureshaft brackets(h) Recoat shaft brackets in accordance with NO 53/16.
1600003Underwater StructureNDT of weld joints(j) Carry out 100% NDT of the weld joints of spray rails.00003Underwater StructureNDT of weld joints(j) Carry out 100% NDT of the weld joints of spray rails.
1700004RUDDERabrasive blasting / scraping(a) Carry out abrasive blasting/scraping to bare metal of areas of corrosion/ paint damage. Restore the paint scheme as per ship's UW paint scheme in accordance with NO 53/1600004RUDDERabrasive blasting / scraping(a) Carry out abrasive blasting/scraping to bare metal of areas of corrosion/ paint damage. Restore the paint scheme as per ship's UW paint scheme in accordance with NO 53/16
1800004RUDDERstructural examination(b) Examine rudder structure in accordance with NO 01/15, paying particular attention to hull plating in the vicinity of rudder(s) and fittings up to the rudder head, for any signs of corrosion and any other defects/ damage00004RUDDERstructural examination(b) Examine rudder structure in accordance with NO 01/15, paying particular attention to hull plating in the vicinity of rudder(s) and fittings up to the rudder head, for any signs of corrosion and any other defects/ damage
1900004RUDDERexamine bearing and bushes(c) Examine and check clearances of lower and upper bearings or bushes, whichever is fitted, of rudder. Renew/ repack rudder bearings/ gland bushes, if required (BR 3000 art. 2811 & BR 3001 art. 2805 refers) .00004RUDDERexamine bearing and bushes(c) Examine and check clearances of lower and upper bearings or bushes, whichever is fitted, of rudder. Renew/ repack rudder bearings/ gland bushes, if required (BR 3000 art. 2811 & BR 3001 art. 2805 refers) .
2000004RUDDERsurvey and repair rudder stock housing(d) The rudder stock housing tube be surveyed, repaired and pressure tested to a pressure of 0.2 Kg/cm2.00004RUDDERsurvey and repair rudder stock housing(d) The rudder stock housing tube be surveyed, repaired and pressure tested to a pressure of 0.2 Kg/cm2.
2100004RUDDERexamine rudder pintle(e) Examine rudder pintle bearings to ensure that they are fully lubricated before undocking.00004RUDDERexamine rudder pintle(e) Examine rudder pintle bearings to ensure that they are fully lubricated before undocking.
2200005External underwater hullPreservation/ painting(a) carryout painting of underwater hull and boot topping area on completion of all hot work and hydro blasting/ grit blasting of underwater hull, with 10 years long life paint scheme (LLPS)00005External underwater hullPreservation/ painting(a) carryout painting of underwater hull and boot topping area on completion of all hot work and hydro blasting/ grit blasting of underwater hull, with 10 years long life paint scheme (LLPS)
2300005External underwater hullPreservation/ painting(b) shipyard to procure paints from navy approved paint suppliers [M/s Akzo Nobel coatings Pvt Ltd (Bangalore)00005External underwater hullPreservation/ painting(b) shipyard to procure paints from navy approved paint suppliers [M/s Akzo Nobel coatings Pvt Ltd (Bangalore)
2400005External underwater hullPreservation/ painting(c) painting to be carried out under supervision of paint manufacturer and guarantee for 10 years to be given by supplier (OEM), OEM certificate be issued post completion of painting.00005External underwater hullPreservation/ painting(c) painting to be carried out under supervision of paint manufacturer and guarantee for 10 years to be given by supplier (OEM), OEM certificate be issued post completion of painting.
2500005External underwater hullPreservation/ painting(d) LLPS paint scheme (Akzo Nobel)00005External underwater hullPreservation/ painting(d) LLPS paint scheme (Akzo Nobel)
2600005External underwater hullPreservation/ painting(d) LLPS paint scheme (Akzo Nobel)(i) 01 coat of Intergard 269 (red) primer to DFT 50 microns00005External underwater hullPreservation/ painting(d) LLPS paint scheme (Akzo Nobel)(i) 01 coat of Intergard 269 (red) primer to DFT 50 microns
2700005External underwater hullPreservation/ painting(d) LLPS paint scheme (Akzo Nobel)(ii) 02 coats of anti-corrosive intershield 300 colour aluminium and bronze DFT - 150 microns each coat00005External underwater hullPreservation/ painting(d) LLPS paint scheme (Akzo Nobel)(ii) 02 coats of anti-corrosive intershield 300 colour aluminium and bronze DFT - 150 microns each coat
2800006External UW Hull External UW Hull surveySurvey the structure in accordance with NO 01/15 and IHQ MoD (N)/ DNA letter NC/7631 dated 01 Nov 22 as mentioned:-(a) 100% visual survey and 100% USG of full external UW Hull Note:- Eye hooks if used for propeller or shaft removal/ fitment are to be removed before undocking and ground flushed. Pad pieces with fair edges may be retained except those with waterjets and surface drives00006External UW Hull External UW Hull surveySurvey the structure in accordance with NO 01/15 and IHQ MoD (N)/ DNA letter NC/7631 dated 01 Nov 22 as mentioned:-(a) 100% visual survey and 100% USG of full external UW Hull Note:- Eye hooks if used for propeller or shaft removal/ fitment are to be removed before undocking and ground flushed. Pad pieces with fair edges may be retained except those with waterjets and surface drives
2900007Underwater, above water, internal compts, mast / super structureSteel renewal & aluminium renewal(a) areas/ structure of decks found weak/ degraded/ deteriorated during the structural survey are to be cropped by appropriate methods and renewed as per hull survey report/ recommendations.00007Underwater, above water, internal compts, mast / super structureSteel renewal & aluminium renewal(a) areas/ structure of decks found weak/ degraded/ deteriorated during the structural survey are to be cropped by appropriate methods and renewed as per hull survey report/ recommendations.
3000007Underwater, above water, internal compts, mast / super structureSteel renewal & aluminium renewal(a) areas/ structure of decks found weak/ degraded/ deteriorated during the structural survey are to be cropped by appropriate methods and renewed as per hull survey report/ recommendations.(i) material of no.1 dk: 'b' quality mild steel conforming to 'abs' specification, 05 - 08 mm THK; cutting process: OXY-Acetylene gas cutting; weld process: MMAW00007Underwater, above water, internal compts, mast / super structureSteel renewal & aluminium renewal(a) areas/ structure of decks found weak/ degraded/ deteriorated during the structural survey are to be cropped by appropriate methods and renewed as per hull survey report/ recommendations.(i) material of no.1 dk: 'b' quality mild steel conforming to 'abs' specification, 05 - 08 mm THK; cutting process: OXY-Acetylene gas cutting; weld process: MMAW
3100007Underwater, above water, internal compts, mast / super structureSteel renewal & aluminium renewal(a) areas/ structure of decks found weak/ degraded/ deteriorated during the structural survey are to be cropped by appropriate methods and renewed as per hull survey report/ recommendations.(ii) material of 01 dk , 02 deck, MER & AER soft patches: aluminium plating conforming to 'abs' specification, 04 - 06 mm THK; cutting process: cold cutting by rotary cutting wheel; weld process: tig00007Underwater, above water, internal compts, mast / super structureSteel renewal & aluminium renewal(a) areas/ structure of decks found weak/ degraded/ deteriorated during the structural survey are to be cropped by appropriate methods and renewed as per hull survey report/ recommendations.(ii) material of 01 dk , 02 deck, MER & AER soft patches: aluminium plating conforming to 'abs' specification, 04 - 06 mm THK; cutting process: cold cutting by rotary cutting wheel; weld process: tig
3200007Underwater, above water, internal compts, mast / super structureSteel renewal & aluminium renewal(a) areas/ structure of decks found weak/ degraded/ deteriorated during the structural survey are to be cropped by appropriate methods and renewed as per hull survey report/ recommendations.Note 1:- quoted cost shall include cost of necessary degutting and regutting of portable and semi-portable fittings, lagging, panelling, tiling, macrotech and all in way jobs of renewal of the structure to be carried out as required. Fittings that are damaged during the de-gutting are to be renewed and refitted in situ00007Underwater, above water, internal compts, mast / super structureSteel renewal & aluminium renewal(a) areas/ structure of decks found weak/ degraded/ deteriorated during the structural survey are to be cropped by appropriate methods and renewed as per hull survey report/ recommendations.Note 1:- quoted cost shall include cost of necessary degutting and regutting of portable and semi-portable fittings, lagging, panelling, tiling, macrotech and all in way jobs of renewal of the structure to be carried out as required. Fittings that are damaged during the de-gutting are to be renewed and refitted in situ
3300007Underwater, above water, internal compts, mast / super structureSteel renewal & aluminium renewal(a) areas/ structure of decks found weak/ degraded/ deteriorated during the structural survey are to be cropped by appropriate methods and renewed as per hull survey report/ recommendations.Note 2:- testing of all weld joints by dye penetrant test once after completion of root run and finally on completion of all weld runs followed by water hose test (3 kg pr)00007Underwater, above water, internal compts, mast / super structureSteel renewal & aluminium renewal(a) areas/ structure of decks found weak/ degraded/ deteriorated during the structural survey are to be cropped by appropriate methods and renewed as per hull survey report/ recommendations.Note 2:- testing of all weld joints by dye penetrant test once after completion of root run and finally on completion of all weld runs followed by water hose test (3 kg pr)
3400007Underwater, above water, internal compts, mast / super structureSteel renewal & aluminium renewal(a) areas/ structure of decks found weak/ degraded/ deteriorated during the structural survey are to be cropped by appropriate methods and renewed as per hull survey report/ recommendations.Note 3:- details of structural renewals to be incorporated in respective deck plans giving all details and submitted for information and record.00007Underwater, above water, internal compts, mast / super structureSteel renewal & aluminium renewal(a) areas/ structure of decks found weak/ degraded/ deteriorated during the structural survey are to be cropped by appropriate methods and renewed as per hull survey report/ recommendations.Note 3:- details of structural renewals to be incorporated in respective deck plans giving all details and submitted for information and record.
3500008SACRIFICIAL ANODESSACRIFICIAL ANODESMAKE : CATHODIC CONTROL COMPANY PVT LTDQTY FITTED - 22 (SACRIFICIAL) 04 (ICCP ANODES AND RE)00008SACRIFICIAL ANODESSACRIFICIAL ANODESMAKE : CATHODIC CONTROL COMPANY PVT LTDQTY FITTED - 22 (SACRIFICIAL) 04 (ICCP ANODES AND RE)
3600008SACRIFICIAL ANODESSACRIFICIAL ANODESMAKE : CATHODIC CONTROL COMPANY PVT LTDQTY FITTED - 22 (SACRIFICIAL) 04 (ICCP ANODES AND RE)(a) CARRYOUT RENEWAL OF SACRIFICIAL ANODES OF 14 IN NOS SEA CHEST. JOB INVOLVES MILLING OF ZINC ANODES INTO CYLINDRICAL SHAPE AND THREADING AT ONE END TO ASCERTAIN FITMENT IN SEA CHEST00008SACRIFICIAL ANODESSACRIFICIAL ANODESMAKE : CATHODIC CONTROL COMPANY PVT LTDQTY FITTED - 22 (SACRIFICIAL) 04 (ICCP ANODES AND RE)(a) CARRYOUT RENEWAL OF SACRIFICIAL ANODES OF 14 IN NOS SEA CHEST. JOB INVOLVES MILLING OF ZINC ANODES INTO CYLINDRICAL SHAPE AND THREADING AT ONE END TO ASCERTAIN FITMENT IN SEA CHEST
3700008SACRIFICIAL ANODESSACRIFICIAL ANODESMAKE : CATHODIC CONTROL COMPANY PVT LTDQTY FITTED - 22 (SACRIFICIAL) 04 (ICCP ANODES AND RE)(b) Inspect sacrificial anodes fitted to underwater hull, rudders, rope gaurd, shaft tunnel, stern tubes, inlets and outlets, sea tubes, bilges and coffer dams. Renew those consumed 50% or more.Note:- For sacrificial anodes, a minimum of 4 mm gap between the hull and the anode is to be maintained. Old anode legs/ weld metal is to be flush ground, post removal and restored with the appropriate paint scheme prior fitment of new anodes.(On Rudder (P &S) - 08 Nos.On Sea tubes - 14 Nos00008SACRIFICIAL ANODESSACRIFICIAL ANODESMAKE : CATHODIC CONTROL COMPANY PVT LTDQTY FITTED - 22 (SACRIFICIAL) 04 (ICCP ANODES AND RE)(b) Inspect sacrificial anodes fitted to underwater hull, rudders, rope gaurd, shaft tunnel, stern tubes, inlets and outlets, sea tubes, bilges and coffer dams. Renew those consumed 50% or more.Note:- For sacrificial anodes, a minimum of 4 mm gap between the hull and the anode is to be maintained. Old anode legs/ weld metal is to be flush ground, post removal and restored with the appropriate paint scheme prior fitment of new anodes.(On Rudder (P &S) - 08 Nos.On Sea tubes - 14 Nos
3800008SACRIFICIAL ANODESSACRIFICIAL ANODESMAKE : CATHODIC CONTROL COMPANY PVT LTDQTY FITTED - 22 (SACRIFICIAL) 04 (ICCP ANODES AND RE)(c) CARRYOUT RENEWAL OF SACRIFICIAL ANODES OF RUDDER AND INLETS JOB INVOLVES REMOVAL AND FITMENT OF SACRIFICIAL ANODES.Sacrificial anodes details:On Rudder (P &S) - 08 Nos.On Sea tubes - 14 Nos00008SACRIFICIAL ANODESSACRIFICIAL ANODESMAKE : CATHODIC CONTROL COMPANY PVT LTDQTY FITTED - 22 (SACRIFICIAL) 04 (ICCP ANODES AND RE)(c) CARRYOUT RENEWAL OF SACRIFICIAL ANODES OF RUDDER AND INLETS JOB INVOLVES REMOVAL AND FITMENT OF SACRIFICIAL ANODES.Sacrificial anodes details:On Rudder (P &S) - 08 Nos.On Sea tubes - 14 Nos
3900009ICCP SYSTEMPRE DOCKING CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 0100009ICCP SYSTEMPRE DOCKING CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01
4000009ICCP SYSTEMPRE DOCKING CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(a) CARRY OUT PRE DOCKING CHECKS ON ANODES, REFERENCE ELECTRODES AND AUTO CONTROL UNITS IAW NO 03/21. RECTIFY DEFECTS IF ANY DURING DRY DOCKING PHASE. RE - 2 , ICCP ANODES - 2Note: REPORT OF PRE DOCKING CHECKS BE SUBMITTED TO SS AT THE EARLIEST.00009ICCP SYSTEMPRE DOCKING CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(a) CARRY OUT PRE DOCKING CHECKS ON ANODES, REFERENCE ELECTRODES AND AUTO CONTROL UNITS IAW NO 03/21. RECTIFY DEFECTS IF ANY DURING DRY DOCKING PHASE. RE - 2 , ICCP ANODES - 2Note: REPORT OF PRE DOCKING CHECKS BE SUBMITTED TO SS AT THE EARLIEST.
4100009ICCP SYSTEMPOST DOCKING (DRY DOCKING) CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(b) RENEW DIELECTRIC SHIELD (25SQFT AREA AROUND ANODES) IN ACCORDANCE WITH PARA 3.5, CHAPTER 3 OF INBR 372/83.00009ICCP SYSTEMPOST DOCKING (DRY DOCKING) CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(b) RENEW DIELECTRIC SHIELD (25SQFT AREA AROUND ANODES) IN ACCORDANCE WITH PARA 3.5, CHAPTER 3 OF INBR 372/83.
4200009ICCP SYSTEMPOST DOCKING (DRY DOCKING) CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(c) CHECK INSULATION OF ANODES TO HULL AND REFERENCE ELECTRODES TO HULL. RECTIFY DEECTS, IF ANY00009ICCP SYSTEMPOST DOCKING (DRY DOCKING) CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(c) CHECK INSULATION OF ANODES TO HULL AND REFERENCE ELECTRODES TO HULL. RECTIFY DEECTS, IF ANY
4300009ICCP SYSTEMPOST DOCKING (DRY DOCKING) CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(d) SCRAP RECESS OF SECURING BOLTS/ ANODES/ REFERENCE ELECTRODES WITH EMERY PAPER AND APPLY FRESH COAT OF ARALDITE PUTTY IN RECESS00009ICCP SYSTEMPOST DOCKING (DRY DOCKING) CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(d) SCRAP RECESS OF SECURING BOLTS/ ANODES/ REFERENCE ELECTRODES WITH EMERY PAPER AND APPLY FRESH COAT OF ARALDITE PUTTY IN RECESS
4400009ICCP SYSTEMPOST DOCKING (DRY DOCKING) CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(e) CARRY OUT DUMMY LOAD TEST OF AUTO CONTROL UNIT PANEL AS PER INSTRUCTION IN CHAPTER INBR 372/84 & NO 03/21.00009ICCP SYSTEMPOST DOCKING (DRY DOCKING) CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(e) CARRY OUT DUMMY LOAD TEST OF AUTO CONTROL UNIT PANEL AS PER INSTRUCTION IN CHAPTER INBR 372/84 & NO 03/21.
4500009ICCP SYSTEMPOST DOCKING (DRY DOCKING) CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(f) EXAMINE FOR LEAKAGE WHERE ICCP ANODES FITTED. RECTIFY LEAKAGES BY FILLING WITH PLASTIC COMPOUND.00009ICCP SYSTEMPOST DOCKING (DRY DOCKING) CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(f) EXAMINE FOR LEAKAGE WHERE ICCP ANODES FITTED. RECTIFY LEAKAGES BY FILLING WITH PLASTIC COMPOUND.
4600009ICCP SYSTEMPOST DOCKING (DRY DOCKING) CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(g) EXAMINE DI-ELECTRIC SHIELD AROUND ICCP ANODES AND REFERENCE ELECTRODES. PRESERVE DI-ELECTRIC SHIELD I.A.W NO 03/21. AREA COVERED BY ANTI-FOULING PAINT ON SHIPS HULL SHOULD ALSO INCLUDE AREA OF DI-ELECTRIC SHIELD LEAVING ONLY 300MM DISTANCE FROM ICCP ANODE/ REFERENCE ELECTRODE. A TIE COAT MAY BE NECESSARY BEFORE ANTI-FOULING PAINT APPLICATION ON TH DI-ELECTRIC SHIELD. NECESSARY PROTECTION/ COVER THE ANODES AND REFERENCE ELECTRODES DURING PAINTING IN VICINITY.00009ICCP SYSTEMPOST DOCKING (DRY DOCKING) CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(g) EXAMINE DI-ELECTRIC SHIELD AROUND ICCP ANODES AND REFERENCE ELECTRODES. PRESERVE DI-ELECTRIC SHIELD I.A.W NO 03/21. AREA COVERED BY ANTI-FOULING PAINT ON SHIPS HULL SHOULD ALSO INCLUDE AREA OF DI-ELECTRIC SHIELD LEAVING ONLY 300MM DISTANCE FROM ICCP ANODE/ REFERENCE ELECTRODE. A TIE COAT MAY BE NECESSARY BEFORE ANTI-FOULING PAINT APPLICATION ON TH DI-ELECTRIC SHIELD. NECESSARY PROTECTION/ COVER THE ANODES AND REFERENCE ELECTRODES DURING PAINTING IN VICINITY.
4700009ICCP SYSTEMPOST DOCKING (DRY DOCKING) CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(h) OPEN, INSPECT AND CLEAN THE ICCP COFFERDAMS DURING DRY DOCKING OF THE SHIP. TO PREVENT SEEPAGE OF WATER INTO COFFERDAMS, THE CABLE ENTRY GLAND, CABLE EXIT GLANDS AND COFFERDAM LID SHOULD BE MADE WATERTIGHT. AS AN ADDITIONAL MEASURE, POTTING WITH IHQ APPROVED/ NMRL DEVELOPED SILICONE COMPOUND IS TO BE CARRIED OUT AS PER PARA26 OF NO 03/21.00009ICCP SYSTEMPOST DOCKING (DRY DOCKING) CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(h) OPEN, INSPECT AND CLEAN THE ICCP COFFERDAMS DURING DRY DOCKING OF THE SHIP. TO PREVENT SEEPAGE OF WATER INTO COFFERDAMS, THE CABLE ENTRY GLAND, CABLE EXIT GLANDS AND COFFERDAM LID SHOULD BE MADE WATERTIGHT. AS AN ADDITIONAL MEASURE, POTTING WITH IHQ APPROVED/ NMRL DEVELOPED SILICONE COMPOUND IS TO BE CARRIED OUT AS PER PARA26 OF NO 03/21.
4800009ICCP SYSTEMPOST DOCKING (DRY DOCKING) CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(j) INSPECT JUNCTION BOXES/ COFFERDAMS FOR SIGNS OF CORROSION AND WT INTEGRITY, ESPECIALLY ON COVER AND CABLE GLAND.UNDERTAKE AIR PRESSURE TEST OF THE COFFERDAM POST STRUCTURE REPAIR/ RENEWAL ON COFFERDAM STRUCTURE PRIOR FITTMENT OF THE CABLE OF THE ANODE/ REFERENCE ELECTRODE, AS PER NORMS APPILICABLE FOR ANY COFFERDAM/ VOID SPACE ONBOARD.00009ICCP SYSTEMPOST DOCKING (DRY DOCKING) CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(j) INSPECT JUNCTION BOXES/ COFFERDAMS FOR SIGNS OF CORROSION AND WT INTEGRITY, ESPECIALLY ON COVER AND CABLE GLAND.UNDERTAKE AIR PRESSURE TEST OF THE COFFERDAM POST STRUCTURE REPAIR/ RENEWAL ON COFFERDAM STRUCTURE PRIOR FITTMENT OF THE CABLE OF THE ANODE/ REFERENCE ELECTRODE, AS PER NORMS APPILICABLE FOR ANY COFFERDAM/ VOID SPACE ONBOARD.
4900009ICCP SYSTEMPOST DOCKING (DRY DOCKING) CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(k) CARRY OUT SERVICEABILITY CHECKS OF ACU BY REFITTING AUTHORITY AS PER PARA 22© OF NO 03/21.NOTE : THE ICCP SYSTEM IS UNDER AMC AND PERIODIC CHECKS ARE BEING CARRIED OUT BY M/S CATHODIC CONTROLS PVT LIMITED, BANGALORE00009ICCP SYSTEMPOST DOCKING (DRY DOCKING) CHECKSMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(k) CARRY OUT SERVICEABILITY CHECKS OF ACU BY REFITTING AUTHORITY AS PER PARA 22© OF NO 03/21.NOTE : THE ICCP SYSTEM IS UNDER AMC AND PERIODIC CHECKS ARE BEING CARRIED OUT BY M/S CATHODIC CONTROLS PVT LIMITED, BANGALORE
5000009ICCP SYSTEMPOST UNDOCKING CHECKS MAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(l) CARRY OUT POST UNDOCKING CHECKS ON ANODES (04 nos), REFERENCE ELECTRODES (02 nos) AND AUTO CONTROL UNITS (01 no.) IAW NO 03/21.Note: REPORT OF POST UNDOCKING CHECKS BE SUBMITTED TO SS AT THE EARLIEST.00009ICCP SYSTEMPOST UNDOCKING CHECKS MAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(l) CARRY OUT POST UNDOCKING CHECKS ON ANODES (04 nos), REFERENCE ELECTRODES (02 nos) AND AUTO CONTROL UNITS (01 no.) IAW NO 03/21.Note: REPORT OF POST UNDOCKING CHECKS BE SUBMITTED TO SS AT THE EARLIEST.
5100009ICCP SYSTEMcheck bonding connection of propellar and rudderMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(m) Check bonding connections between propeller shaft & hull and rudder & hull for mechanical soundness and zero resistance.(Refer Para 3.11 of INBR 372/83)00009ICCP SYSTEMcheck bonding connection of propellar and rudderMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(m) Check bonding connections between propeller shaft & hull and rudder & hull for mechanical soundness and zero resistance.(Refer Para 3.11 of INBR 372/83)
5200009ICCP SYSTEMcheck cable glandsMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(n) Check ICCP cable glands for firm mechanical tightness of connections and ensure continuity of circuits. Check following(a) Cable entry into cofferdams.(b) Cable connections in controller.(c) Cable connections in junction box.(d) Cable runs in conduits.00009ICCP SYSTEMcheck cable glandsMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(n) Check ICCP cable glands for firm mechanical tightness of connections and ensure continuity of circuits. Check following(a) Cable entry into cofferdams.(b) Cable connections in controller.(c) Cable connections in junction box.(d) Cable runs in conduits.
5300009ICCP SYSTEMserviceability checks ACUMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(p) Carry out Serviceability checks of ACU by Refitting Authority as per para 22 (c) of NO 03/21.00009ICCP SYSTEMserviceability checks ACUMAKE : CATHODIC CONTROL COMPANY PVT LTD. QTY FITTED - 01(p) Carry out Serviceability checks of ACU by Refitting Authority as per para 22 (c) of NO 03/21.
5400010Plating above waterabove water ship side inspection(a) Examine above water shipside structure for deterioration of paint, corrosion & dents on shell plating at fendering positions and in the way of anchors where abrasion is probable. . Repair agency to carry out visual survey of projected above water plating for defects. USG of areas found corroded during visual survey to be undertaken, if required.00010Plating above waterabove water ship side inspection(a) Examine above water shipside structure for deterioration of paint, corrosion & dents on shell plating at fendering positions and in the way of anchors where abrasion is probable. . Repair agency to carry out visual survey of projected above water plating for defects. USG of areas found corroded during visual survey to be undertaken, if required.
5500010Plating above waterHYDROBLASTING/ GRIT BLASTING(b) Carryout abrasive blasting conforming to Swedish Std SA-2.5 STD/ Hydro blasting conforming to WJ-2L STD of all above water plating. Renew complete paint scheme inaccordance with NO 53/1600010Plating above waterHYDROBLASTING/ GRIT BLASTING(b) Carryout abrasive blasting conforming to Swedish Std SA-2.5 STD/ Hydro blasting conforming to WJ-2L STD of all above water plating. Renew complete paint scheme inaccordance with NO 53/16
5600010Plating above waterpainting of ship side(c) Carryout painting of above water area on completion of all hot work and blasting of above water hull, with M/s Akzo Nobel paint scheme. Provide OEM certificate of paint to ss on completion of painting job involves.(i) Intergard 269 - 40 (ii) Anticorrosive Paint Intergard 5600 (Grey) -60 (iii) Anticorrosive Paint Intergard 5600 (Red) - 20 (iv) Interthane 990 Polyurethane (PU) (Grey-RAL 7040) -120 (v) Interthane 990 Polyurethane (PU) black-RAL 9011 - 6000010Plating above waterpainting of ship side(c) Carryout painting of above water area on completion of all hot work and blasting of above water hull, with M/s Akzo Nobel paint scheme. Provide OEM certificate of paint to ss on completion of painting job involves.(i) Intergard 269 - 40 (ii) Anticorrosive Paint Intergard 5600 (Grey) -60 (iii) Anticorrosive Paint Intergard 5600 (Red) - 20 (iv) Interthane 990 Polyurethane (PU) (Grey-RAL 7040) -120 (v) Interthane 990 Polyurethane (PU) black-RAL 9011 - 60
5700011SEATUBESPRESSURE TESTINGALL SEA TUBES NOT ACCESSIBLE FOR SURVEY AND PAINTING BECAUSE OF SMALLER DIA ARE TO BE RENEWED WITH SEATUBES MADE UP OF DMR249A STEEL AND ARE TO BE AIR PRESSURE TESTED TO 2.5 KG/CM2 AFTER RENEWAL RESTORE PAINT SCHEME IN ACCORDANCE WITH NO 53/16 AND POLICY DIRECTIVES ISSUED BY IHQ/DNA FROM TIME TO TIME .00011SEATUBESPRESSURE TESTINGALL SEA TUBES NOT ACCESSIBLE FOR SURVEY AND PAINTING BECAUSE OF SMALLER DIA ARE TO BE RENEWED WITH SEATUBES MADE UP OF DMR249A STEEL AND ARE TO BE AIR PRESSURE TESTED TO 2.5 KG/CM2 AFTER RENEWAL RESTORE PAINT SCHEME IN ACCORDANCE WITH NO 53/16 AND POLICY DIRECTIVES ISSUED BY IHQ/DNA FROM TIME TO TIME .
5800012Sea Chest/ Sea tubes/ UW Inlets/ Outlets and OBDsSurvey Sea Chest/ Sea tubes/ UW Inlets/ Outlets and OBDsALL SEA TUBES ARE TO BE VISUALLY SURVEYED AND ULTRASONICALLY GAUGED AS PER NO 01/15 AND REPAIR/ RENEWAL IS TO BE UNDERTAKEN AS NECESSARY. ENDOSCOPIC SURVEY OF 100% OF SEATUBES TO BE CARRIED OUT.Note: 1. All seatubes are to be surveyed irrespective of their material.During survey of sea tubes, specific attention is to be paid to the neck region. All branch pipes/ flush through lines welded to sea chest/seatubes are to be surveyed as part of seatubes. In case of Talwar class of ships, the rubber lining of the sea tube shall be inspected for any deterioration and water entrapment.2. Conditional assessment of bimetallic joints is to be carried out whilst undertaking survey of the seatubes. 100% endoscopy of seatubes is to be carried out post repairs and application of coating prior to undocking of the ship.3. Sea tubes not accessible for survey and painting because of small diameter are to be renewed.00012Sea Chest/ Sea tubes/ UW Inlets/ Outlets and OBDsSurvey Sea Chest/ Sea tubes/ UW Inlets/ Outlets and OBDsALL SEA TUBES ARE TO BE VISUALLY SURVEYED AND ULTRASONICALLY GAUGED AS PER NO 01/15 AND REPAIR/ RENEWAL IS TO BE UNDERTAKEN AS NECESSARY. ENDOSCOPIC SURVEY OF 100% OF SEATUBES TO BE CARRIED OUT.Note: 1. All seatubes are to be surveyed irrespective of their material.During survey of sea tubes, specific attention is to be paid to the neck region. All branch pipes/ flush through lines welded to sea chest/seatubes are to be surveyed as part of seatubes. In case of Talwar class of ships, the rubber lining of the sea tube shall be inspected for any deterioration and water entrapment.2. Conditional assessment of bimetallic joints is to be carried out whilst undertaking survey of the seatubes. 100% endoscopy of seatubes is to be carried out post repairs and application of coating prior to undocking of the ship.3. Sea tubes not accessible for survey and painting because of small diameter are to be renewed.
5900013Internal UW hull structure & above water structure Structure covered with underlay/ insulation(a) Survey the structure in accordance with NO 01/15 and IHQ MoD (N)/ DNA letter NC/7631 dated 01 Nov 22 as mentioned:-Structure covered with underlay/ insulation - Survey of the condition of underlay / insulation is to be carried out. The deck covering be inspected for cracks, bulging/ undulation, mechanical damage, discoloration etc. In case of damage observed, the structure underneath to be visually surveyed post removal of underlay/ insulation of affected area.Compartments with deck covering:(i) CO toilet(ii) SS Bathroom(iii) JS Bathroom(iv) Officers Bathroom(v) AHU compt. (vi) STP compt.(vii) Galley(viii) Scullery00013Internal UW hull structure & above water structure Structure covered with underlay/ insulation(a) Survey the structure in accordance with NO 01/15 and IHQ MoD (N)/ DNA letter NC/7631 dated 01 Nov 22 as mentioned:-Structure covered with underlay/ insulation - Survey of the condition of underlay / insulation is to be carried out. The deck covering be inspected for cracks, bulging/ undulation, mechanical damage, discoloration etc. In case of damage observed, the structure underneath to be visually surveyed post removal of underlay/ insulation of affected area.Compartments with deck covering:(i) CO toilet(ii) SS Bathroom(iii) JS Bathroom(iv) Officers Bathroom(v) AHU compt. (vi) STP compt.(vii) Galley(viii) Scullery
6000013Internal UW hull structure & above water structure (b) USG of areas found corroded during visual survey in internal UW & above water structure00013Internal UW hull structure & above water structure (b) USG of areas found corroded during visual survey in internal UW & above water structure
6100013dadoe areas of WT bulkheads (c) 100% Visual and USG survey of dadoe areas of WT bulkheads at each deck below waterline. Note : Pulse Eddy Current Technology (PECT) may be adopted for survey of secondary structures as per IHQ-MoD(N)/DNA letter NC/4523 dated 26 Jul 22.20 UW compartments excluding tanks00013dadoe areas of WT bulkheads (c) 100% Visual and USG survey of dadoe areas of WT bulkheads at each deck below waterline. Note : Pulse Eddy Current Technology (PECT) may be adopted for survey of secondary structures as per IHQ-MoD(N)/DNA letter NC/4523 dated 26 Jul 22.20 UW compartments excluding tanks
6200013Internal UW hull structure & above water structure (d) All UW internal structure and above water structure to be visually inspected specific to be repaired.20 UW compartments00013Internal UW hull structure & above water structure (d) All UW internal structure and above water structure to be visually inspected specific to be repaired.20 UW compartments
6300014Above water structure and fittingsSurvey of bollards/ fairleads/ cleat deck eyes/ stanchion(a) Carry out survey and inspection of all bollards/fairleads/ cleats/ deck eyes/ staghorn and other deck fittings structure including stiffening members in the vicinity with non-destructive techniques, if required and include in the survey report. For towing and cable clench, check the efficacy of the attachment using non-destructive testing.47 deck fittings: Bollards, towing bollard, fairlead, cleat , bullring , rope real, bottle screw, roller with pulley , cable clench , towing slip etc.00014Above water structure and fittingsSurvey of bollards/ fairleads/ cleat deck eyes/ stanchion(a) Carry out survey and inspection of all bollards/fairleads/ cleats/ deck eyes/ staghorn and other deck fittings structure including stiffening members in the vicinity with non-destructive techniques, if required and include in the survey report. For towing and cable clench, check the efficacy of the attachment using non-destructive testing.47 deck fittings: Bollards, towing bollard, fairlead, cleat , bullring , rope real, bottle screw, roller with pulley , cable clench , towing slip etc.
6400015Air Pressure testing of tanks, cofferdams and sea tubesAir Pressure testing of tanks, cofferdams and sea tubesAll tanks, cofferdams and sea tubes which are repaired by build-up/renewal are to be air pressure tested iaw Para 47 of NO 01/15. The pressure testing is to be carried out by Refitting Firm in the presence of ship staff and Quality Control inspectors of the Refitting Firm. Under no circumstance, the procedure of running pressure test is to be used to confirm the structural integrity of these spaces.14 Sea tubes.25 OBDs04 ICCP cofferdam01 tank cofferdam02 void space (Port & Stbd)09 tanks00015Air Pressure testing of tanks, cofferdams and sea tubesAir Pressure testing of tanks, cofferdams and sea tubesAll tanks, cofferdams and sea tubes which are repaired by build-up/renewal are to be air pressure tested iaw Para 47 of NO 01/15. The pressure testing is to be carried out by Refitting Firm in the presence of ship staff and Quality Control inspectors of the Refitting Firm. Under no circumstance, the procedure of running pressure test is to be used to confirm the structural integrity of these spaces.14 Sea tubes.25 OBDs04 ICCP cofferdam01 tank cofferdam02 void space (Port & Stbd)09 tanks
6500016Tanks/Tank tops Tanks/Tank tops survey(a) Tanks/Tank tops: 100% Visual and 100% USG survey of all tanks.Note:- (a) USG of tank tops may be undertaken from inside the tank in case of degutting constraints, if any.Bilges, cofferdams, void spaces shaft recess, area in vicinity of suction strainers of educators.(b) Visual survey of all accessible areas.Tank Tops - Dinning Hall, pump room, STP lobby, SS Mess, Dirty water tank, dirty oil tank00016Tanks/Tank tops Tanks/Tank tops survey(a) Tanks/Tank tops: 100% Visual and 100% USG survey of all tanks.Note:- (a) USG of tank tops may be undertaken from inside the tank in case of degutting constraints, if any.Bilges, cofferdams, void spaces shaft recess, area in vicinity of suction strainers of educators.(b) Visual survey of all accessible areas.Tank Tops - Dinning Hall, pump room, STP lobby, SS Mess, Dirty water tank, dirty oil tank
6600016Tank TopsChipping & Cleaning of tank tops (c) Refitting firm to chip clean all tank tops, bilges of machinery spaces,cofferdams, shaft recess and other accessible internal surfaces of underwater hull up to and including area 500 mm above boot top line for hull survey inspection00016Tank TopsChipping & Cleaning of tank tops (c) Refitting firm to chip clean all tank tops, bilges of machinery spaces,cofferdams, shaft recess and other accessible internal surfaces of underwater hull up to and including area 500 mm above boot top line for hull survey inspection
6700017FRESH WATER TANKVisual Survey and USG survey of FW tanks(a) CARRY OUT 100% VISUAL SURVEY OF TANK INTERNALLY AND TANK TOPS FOR CORROSION/ RUST. CARRY OUT 100% ULTRASONIC THICKNESS GAUGING OF STRUCTURE, REPAIR/ REFIT AS NECESSARY AND CARRY OUT PRESSURE TEESTING ON COMPLETION OF REPAIRS.Note: - USG of tank tops may be undertaken from inside the tank in case of degutting constraints, if any.00017FRESH WATER TANKVisual Survey and USG survey of FW tanks(a) CARRY OUT 100% VISUAL SURVEY OF TANK INTERNALLY AND TANK TOPS FOR CORROSION/ RUST. CARRY OUT 100% ULTRASONIC THICKNESS GAUGING OF STRUCTURE, REPAIR/ REFIT AS NECESSARY AND CARRY OUT PRESSURE TEESTING ON COMPLETION OF REPAIRS.Note: - USG of tank tops may be undertaken from inside the tank in case of degutting constraints, if any.
6800017FRESH WATER TANKFW tank paint inspection(b) Examine all FW tanks paying particular attention to the paint coating specially areas not readily visible such as the underside of framing flanges for pitting, corrosion and otherstructural defects and damage. Note specific defects to yard for rectification. RESTORE / RENEW PAINT SCHEME IN ACCORDANCE WITH NCD 1491, NO 53/16 AND POLICY DIRECTIVE ISSUED BY IHQ/DNA AS APPLICABLE.00017FRESH WATER TANKFW tank paint inspection(b) Examine all FW tanks paying particular attention to the paint coating specially areas not readily visible such as the underside of framing flanges for pitting, corrosion and otherstructural defects and damage. Note specific defects to yard for rectification. RESTORE / RENEW PAINT SCHEME IN ACCORDANCE WITH NCD 1491, NO 53/16 AND POLICY DIRECTIVE ISSUED BY IHQ/DNA AS APPLICABLE.
6900017FRESH WATER TANKWashing of FW tank(c) Wash down completely interior paint layers of all fresh water tank including pipes and other fittings with fresh water.Remove dirt, sludge, debris and loose paint. Scrap clean corroded/ rusted areas to bare metal and prepare structure for survey/ inspection by yard/ trial agency.Note:- SS to obtain gas free certificate prior to entry in tanks as confined spaces iaw BR 3000.00017FRESH WATER TANKWashing of FW tank(c) Wash down completely interior paint layers of all fresh water tank including pipes and other fittings with fresh water.Remove dirt, sludge, debris and loose paint. Scrap clean corroded/ rusted areas to bare metal and prepare structure for survey/ inspection by yard/ trial agency.Note:- SS to obtain gas free certificate prior to entry in tanks as confined spaces iaw BR 3000.
7000017FRESH WATER TANKGas Free Certificate(d) Obtain gas free certificate prior to entry in tanks as confined spaces iaw BR 3000.00017FRESH WATER TANKGas Free Certificate(d) Obtain gas free certificate prior to entry in tanks as confined spaces iaw BR 3000.
7100017FRESH WATER TANKFW pipe line and fittings inside tank(e) Check the material condition of FW system pipe lines fitted inside tanks, bell mouths, sounding pipe including deck piece and brackets housing the FW system pipe lines. Raise specific defects to yard for rectification.00017FRESH WATER TANKFW pipe line and fittings inside tank(e) Check the material condition of FW system pipe lines fitted inside tanks, bell mouths, sounding pipe including deck piece and brackets housing the FW system pipe lines. Raise specific defects to yard for rectification.
7200017FRESH WATER TANKFW tank manhole cover/ coamings and securing arrangement(f) Examine manhole covers/ coamings, including securing arrangements and gaskets. All securing studs/ fasteners are to examine for their intactness and soundness. Projectspecific defects to yard for rectification00017FRESH WATER TANKFW tank manhole cover/ coamings and securing arrangement(f) Examine manhole covers/ coamings, including securing arrangements and gaskets. All securing studs/ fasteners are to examine for their intactness and soundness. Projectspecific defects to yard for rectification
7300017FRESH WATER TANKFW tank ladders/ rungs and brackets(g) Check the material condition of ladders/ rungs fitted inside the tanks including their brackets for intactness/ welding. Raise specific defects to yard for rectification00017FRESH WATER TANKFW tank ladders/ rungs and brackets(g) Check the material condition of ladders/ rungs fitted inside the tanks including their brackets for intactness/ welding. Raise specific defects to yard for rectification
7400017FRESH WATER TANKFW tank vent/ breather pipe lines(h) Breather of FW tank corroded and perished. Repair/ renewal to be carried out00017FRESH WATER TANKFW tank vent/ breather pipe lines(h) Breather of FW tank corroded and perished. Repair/ renewal to be carried out
7500017FRESH WATER TANKAir pressure testing of FW tanks(j) Undertake pressure testing of FW tanks which are repaired by build-up/ renewal iaw Para 47 of NO 01/15. The pressure testing is to be carried out by Refitting Authorities in the presence of ship staff and Quality Control inspectors of the Refitting Authority. Under no circumstance, the procedure of running pressure test is to be used to confirm the structural integrity of these spaces00017FRESH WATER TANKAir pressure testing of FW tanks(j) Undertake pressure testing of FW tanks which are repaired by build-up/ renewal iaw Para 47 of NO 01/15. The pressure testing is to be carried out by Refitting Authorities in the presence of ship staff and Quality Control inspectors of the Refitting Authority. Under no circumstance, the procedure of running pressure test is to be used to confirm the structural integrity of these spaces
7600017FRESH WATER TANKFW tank PS renewal and restoration(k) Restore / Renew paint scheme in accordance with NCD 1491, NO 53/16 and policy directive issued by IHQ/DNA as applicable.Note: (a) Inspection of Paint OEM be carried out wherever applicable.(b) Galvanised ladders are not to be painted. Ensure that suction strainer boxes are clear.(c) The surface preparation work and painting interiors of fresh water and distilled water tanks is required to be undertaken by healthy personnel, wearing clean outfits. On completion, of painting, each tank should be inspected to ensure that the coating/ paint film completely covers the surface, with particular attention to parts of the structures which are not readily visible.(d) The minimum time for filling the fresh water tank if freshly coated should be 7 days. The tanks should be washed out with fresh water and any sediment or dirt present should be removed and the covers are closed before the tanks are brought into use.(e) The water sample from the tank after 72 hours of immersion should be sent to NMRL or the Naval Dockyard laboratories for potability test prior to use of water for drinking purpose00017FRESH WATER TANKFW tank PS renewal and restoration(k) Restore / Renew paint scheme in accordance with NCD 1491, NO 53/16 and policy directive issued by IHQ/DNA as applicable.Note: (a) Inspection of Paint OEM be carried out wherever applicable.(b) Galvanised ladders are not to be painted. Ensure that suction strainer boxes are clear.(c) The surface preparation work and painting interiors of fresh water and distilled water tanks is required to be undertaken by healthy personnel, wearing clean outfits. On completion, of painting, each tank should be inspected to ensure that the coating/ paint film completely covers the surface, with particular attention to parts of the structures which are not readily visible.(d) The minimum time for filling the fresh water tank if freshly coated should be 7 days. The tanks should be washed out with fresh water and any sediment or dirt present should be removed and the covers are closed before the tanks are brought into use.(e) The water sample from the tank after 72 hours of immersion should be sent to NMRL or the Naval Dockyard laboratories for potability test prior to use of water for drinking purpose
7700018FUEL TANKS/ LUB OIL TANKSMECHANICAL CLEANING(a) Clean following Fuel/Lub oil tanks to remove dirt, sludge, debris and loose paint. Scrap chip clean corroded/ rusted areas to bare metal and prepare structure for survey/ inspection by yard/ trial agency and Ventilate.(i) FO TANK NO. 1: (SQ MTRS - 110)(ii) FO TANK NO. 2: (SQ MTRS - 125)(iii) DIRTY OIL TANK (SQ MTRS - 65)(iv) RU FO TANK (P): (SQ MTRS - 70)(v) RU FO TANK (S): (SQ MTRS - 70)(vi) DIRT WATER TANK (SQ MTRS - 40)(vii) LUB OIL TANK PORT & STBD (SQ MTRS - 70)00018FUEL TANKS/ LUB OIL TANKSMECHANICAL CLEANING(a) Clean following Fuel/Lub oil tanks to remove dirt, sludge, debris and loose paint. Scrap chip clean corroded/ rusted areas to bare metal and prepare structure for survey/ inspection by yard/ trial agency and Ventilate.(i) FO TANK NO. 1: (SQ MTRS - 110)(ii) FO TANK NO. 2: (SQ MTRS - 125)(iii) DIRTY OIL TANK (SQ MTRS - 65)(iv) RU FO TANK (P): (SQ MTRS - 70)(v) RU FO TANK (S): (SQ MTRS - 70)(vi) DIRT WATER TANK (SQ MTRS - 40)(vii) LUB OIL TANK PORT & STBD (SQ MTRS - 70)
7800018FUEL TANKS/ LUB OIL TANKS(b) PROVE AND PROVIDE GAS FREE CERTIFICATE FOR ALL FUEL TANKS FOR SURVEY AND MAINTENANCE00018FUEL TANKS/ LUB OIL TANKS(b) PROVE AND PROVIDE GAS FREE CERTIFICATE FOR ALL FUEL TANKS FOR SURVEY AND MAINTENANCE
7900018FUEL TANKS/ LUB OIL TANKS(c) PRESERVE THE SURFACES BY APPLICATION OF 01 COAT OF HEAVY FILTERED MINERAL OIL (OM750) IN 03 NOS FUEL OIL STORAGE TANKS. PROVIDE OEM CERTIFICATE OF OM 750 TO SS ON COMPLETION OF APPLICATION00018FUEL TANKS/ LUB OIL TANKS(c) PRESERVE THE SURFACES BY APPLICATION OF 01 COAT OF HEAVY FILTERED MINERAL OIL (OM750) IN 03 NOS FUEL OIL STORAGE TANKS. PROVIDE OEM CERTIFICATE OF OM 750 TO SS ON COMPLETION OF APPLICATION
8000018FUEL TANKS/ LUB OIL TANKSVisual Survey and USG survey of FW tanks(d) Survey the Fuel/ Lub oil tanks/ tank tops in accordance with NO 01/15 and IHQ MoD (N)/ DNA letter NC/7631 dated 01 Nov 22 as mentioned:-(i) 100% Visual and 100% USG survey of all tanks (For group D ships)Note:- USG of tank tops may be undertaken from inside the tank in case of degutting constraints, if any.00018FUEL TANKS/ LUB OIL TANKSVisual Survey and USG survey of FW tanks(d) Survey the Fuel/ Lub oil tanks/ tank tops in accordance with NO 01/15 and IHQ MoD (N)/ DNA letter NC/7631 dated 01 Nov 22 as mentioned:-(i) 100% Visual and 100% USG survey of all tanks (For group D ships)Note:- USG of tank tops may be undertaken from inside the tank in case of degutting constraints, if any.
8100018FUEL TANKS/ LUB OIL TANKSSpecific defects (Visual)(e) Examine & repair the structure of all Fuel/Lub oil tanks including tank tops for pitting, corrosion and other structural defects and damage.00018FUEL TANKS/ LUB OIL TANKSSpecific defects (Visual)(e) Examine & repair the structure of all Fuel/Lub oil tanks including tank tops for pitting, corrosion and other structural defects and damage.
8200018FUEL TANKS/ LUB OIL TANKSPaint restoration and renewal(f) Examine preservative coatings of tanks. Restore / Renew paint scheme in accordance with NCD 1491, NO 53/16 and policy directive issued by IHQ/DNA as applicable.Note:- (i) Inspection of Paint OEM be carried out wherever applicable. (ii) All precautions against fire explosion, toxic and obnoxious fumes are to be taken in accordance with B.R. 1754.Note: Inspection of Paint OEM be carried out wherever applicable.00018FUEL TANKS/ LUB OIL TANKSPaint restoration and renewal(f) Examine preservative coatings of tanks. Restore / Renew paint scheme in accordance with NCD 1491, NO 53/16 and policy directive issued by IHQ/DNA as applicable.Note:- (i) Inspection of Paint OEM be carried out wherever applicable. (ii) All precautions against fire explosion, toxic and obnoxious fumes are to be taken in accordance with B.R. 1754.Note: Inspection of Paint OEM be carried out wherever applicable.
8300018FUEL TANKS/ LUB OIL TANKSAir pressure testing of Fuel/ lub oil tanks(g) Undertake pressure testing of Fuel/Lub oil tanks which are repaired by build-up/ renewal iaw Para 47 of NO 01/15. The pressure testing is to be carried out in the presence of ship staff and Quality Control inspectors of the Refitting Authority. Under no circumstance, the procedure of running pressure test is to be used to confirm the structural integrity of these spaces.00018FUEL TANKS/ LUB OIL TANKSAir pressure testing of Fuel/ lub oil tanks(g) Undertake pressure testing of Fuel/Lub oil tanks which are repaired by build-up/ renewal iaw Para 47 of NO 01/15. The pressure testing is to be carried out in the presence of ship staff and Quality Control inspectors of the Refitting Authority. Under no circumstance, the procedure of running pressure test is to be used to confirm the structural integrity of these spaces.
8400019MISC. TANKScleaning(a) Clean all sludge and bilge tanks to remove all accumulated water, sludge, debris and loose paint. Scrape/ clean corroded/rusted areas to bare metal and prepare structure for survey/ inspection by yard/ trial agency.00019MISC. TANKScleaning(a) Clean all sludge and bilge tanks to remove all accumulated water, sludge, debris and loose paint. Scrape/ clean corroded/rusted areas to bare metal and prepare structure for survey/ inspection by yard/ trial agency.
8500019MISC. TANKSgas free certificate(b) obtain Gas free certificate prior entry of personnel into enclosed tanks iaw BR 3000.00019MISC. TANKSgas free certificate(b) obtain Gas free certificate prior entry of personnel into enclosed tanks iaw BR 3000.
8600019MISC. TANKSOffering of UW compartments (c) SS is required to offer all U/W shell touching compartments and tanks in dry dock for inspection (for all refits) of preservation standards to HITU prior final undocking.00019MISC. TANKSOffering of UW compartments (c) SS is required to offer all U/W shell touching compartments and tanks in dry dock for inspection (for all refits) of preservation standards to HITU prior final undocking.
8700019MISC. TANKSstructural examination(d) Undertake survey of all sludge and bilge tanks iaw NO 01/15 and IHQ MoD (N)/ DNA letter NC/7631 dated 01 Nov 22 as mentioned:-Tanks(i) 100% Visual and 100% USG survey of all sludge and bilge water tanks. (For group D ships).Tank Tops.(i) 100% visual survey of accessible area.(ii) USG of areas found corroded during visual survey.(iii) Structure covered with underlay/ insulation - survey of the condition of underlay / insulation is to be carried out. The deck covering is to be inspected for cracks, bulging/ undulation, mechanical damage, discoloration etc. In case of damage observed, the structure underneath to be visually surveyed post removal of underlay/ insulation of affected area.(iv) Special emphasis is to be given to inspection of manhole covers/ coamings, including securing arrangements. All securing studs and hinges are to examine for their intactness and soundness.(Manholes of following tanks:1. Fuel Tank 1 - 02 Nos.2. Fuel Tank 2 - 02 Nos.3. P & S RU tanks - 02 Nos.4. P&S lub tanks - 02 Nos.5. Dirty water tank - 01 Nos.6. Dirty oil tanks - 01 Nos.00019MISC. TANKSstructural examination(d) Undertake survey of all sludge and bilge tanks iaw NO 01/15 and IHQ MoD (N)/ DNA letter NC/7631 dated 01 Nov 22 as mentioned:-Tanks(i) 100% Visual and 100% USG survey of all sludge and bilge water tanks. (For group D ships).Tank Tops.(i) 100% visual survey of accessible area.(ii) USG of areas found corroded during visual survey.(iii) Structure covered with underlay/ insulation - survey of the condition of underlay / insulation is to be carried out. The deck covering is to be inspected for cracks, bulging/ undulation, mechanical damage, discoloration etc. In case of damage observed, the structure underneath to be visually surveyed post removal of underlay/ insulation of affected area.(iv) Special emphasis is to be given to inspection of manhole covers/ coamings, including securing arrangements. All securing studs and hinges are to examine for their intactness and soundness.(Manholes of following tanks:1. Fuel Tank 1 - 02 Nos.2. Fuel Tank 2 - 02 Nos.3. P & S RU tanks - 02 Nos.4. P&S lub tanks - 02 Nos.5. Dirty water tank - 01 Nos.6. Dirty oil tanks - 01 Nos.
8800019MISC. TANKSAir pressure testing of tanks(e) Undertake air pressure testing of all miscellaneous tanks such as sludge and bilge tanks which are repaired by build up/renewal iaw Para 47 of NO 01/15.Note: - The pressure testing is to be carried out by Refitting Authorities in the presence of ship staff and QC inspectors of the Refitting Authority. Under no circumstance, the procedure of running pressure test is to be used to confirmthe structural integrity of these spaces.00019MISC. TANKSAir pressure testing of tanks(e) Undertake air pressure testing of all miscellaneous tanks such as sludge and bilge tanks which are repaired by build up/renewal iaw Para 47 of NO 01/15.Note: - The pressure testing is to be carried out by Refitting Authorities in the presence of ship staff and QC inspectors of the Refitting Authority. Under no circumstance, the procedure of running pressure test is to be used to confirmthe structural integrity of these spaces.
8900019MISC. TANKSPaint scheme renewal and restoration(f) Carry out visual survey of all miscellaneous tanks such as sludge and bilge tanks and undertake the paint renewal/ restoration of paint scheme of all misc tanks such as sludge and bilge tanks, affected due to hotwork /plate renewal/ mechanical damage or any other defects in accordance with NO 53/16.00019MISC. TANKSPaint scheme renewal and restoration(f) Carry out visual survey of all miscellaneous tanks such as sludge and bilge tanks and undertake the paint renewal/ restoration of paint scheme of all misc tanks such as sludge and bilge tanks, affected due to hotwork /plate renewal/ mechanical damage or any other defects in accordance with NO 53/16.
9000020COFFERDAM & VOID SPACESMechanical Cleaning(a) Clean all cofferdams and void spaces to remove dirt, sludge,debris and loose paint. Scrap clean corroded rusted areas to bare metal and prepare structure for survey/ inspection by yard/ trial agency.Note:- SS is required to offer all U/W shell touching compart-ments/ tanks/ void spaces/ cofferdams in dry dock forinspection (for all refits) of preservation standards to HITU prior final undocking(Void Space - 02 Nos. ( Area - 40 Sqm)Cofferdam - 01 Nos. 20 Sqm)00020COFFERDAM & VOID SPACESMechanical Cleaning(a) Clean all cofferdams and void spaces to remove dirt, sludge,debris and loose paint. Scrap clean corroded rusted areas to bare metal and prepare structure for survey/ inspection by yard/ trial agency.Note:- SS is required to offer all U/W shell touching compart-ments/ tanks/ void spaces/ cofferdams in dry dock forinspection (for all refits) of preservation standards to HITU prior final undocking(Void Space - 02 Nos. ( Area - 40 Sqm)Cofferdam - 01 Nos. 20 Sqm)
9100020COFFERDAM & VOID SPACESGas Free Certificate(b) Obtain gas free certificate prior to entry in cofferdams and void spaces as confined spaces iaw BR3000.00020COFFERDAM & VOID SPACESGas Free Certificate(b) Obtain gas free certificate prior to entry in cofferdams and void spaces as confined spaces iaw BR3000.
9200020COFFERDAM & VOID SPACESSpecific defects ( Visual)(c) Exterior surfaces of cofferdam/ void spaces surveyed internally, during periodical survey of structure to be included in defect list together with a list of items / fittings of machinery and equipment which will be required to be lifted to facilitate survey.00020COFFERDAM & VOID SPACESSpecific defects ( Visual)(c) Exterior surfaces of cofferdam/ void spaces surveyed internally, during periodical survey of structure to be included in defect list together with a list of items / fittings of machinery and equipment which will be required to be lifted to facilitate survey.
9300020COFFERDAM & VOID SPACESVisual survey and USG survey of Cofferdams & Void spaces(d) Survey all cofferdam and void spaces in accordance with NO 01/15 and IHQ MoD (N)/ DNA letter NC/7631 dated 01 Nov 22 as mentioned:-(i) Tank tops - 100% visual survey of accessible area. (For all ships)..(ii) Tanks- 100% Visual survey of all cofferdam and void spaces. USG of areas found corroded during visual survey. (For all ships).Note: - USG of tank tops may be undertaken from inside the tank in case of degutting constraints, if any.00020COFFERDAM & VOID SPACESVisual survey and USG survey of Cofferdams & Void spaces(d) Survey all cofferdam and void spaces in accordance with NO 01/15 and IHQ MoD (N)/ DNA letter NC/7631 dated 01 Nov 22 as mentioned:-(i) Tank tops - 100% visual survey of accessible area. (For all ships)..(ii) Tanks- 100% Visual survey of all cofferdam and void spaces. USG of areas found corroded during visual survey. (For all ships).Note: - USG of tank tops may be undertaken from inside the tank in case of degutting constraints, if any.
9400020COFFERDAM & VOID SPACESSacrificial Anodes in cofferdams and void spaces(f) Examine the condition of sacrificial anode fitted inside the cofferdams/ void spaces, Renew sacrificial anode consumed beyond 50%, if any(M/s Akzo Nobel (LLPS)Intergard 269Intershield 300 AluminiumIntershield 300 bronze00020COFFERDAM & VOID SPACESSacrificial Anodes in cofferdams and void spaces(f) Examine the condition of sacrificial anode fitted inside the cofferdams/ void spaces, Renew sacrificial anode consumed beyond 50%, if any(M/s Akzo Nobel (LLPS)Intergard 269Intershield 300 AluminiumIntershield 300 bronze
9500020COFFERDAM & VOID SPACESPaint scheme renewal and restoration(g) Restore / renew complete paint scheme of cofferdams and void spaces post survey and renewal iaw NO 53/16/ NCD 1491 /policy directives issued by IHQ/DNA as applicable.Note: Inspection of Paint OEM be carried out wherever applicable in accordance with relevant NO and NCD.NOTE: OEM Certificate of paint be provided post completion of painting.00020COFFERDAM & VOID SPACESPaint scheme renewal and restoration(g) Restore / renew complete paint scheme of cofferdams and void spaces post survey and renewal iaw NO 53/16/ NCD 1491 /policy directives issued by IHQ/DNA as applicable.Note: Inspection of Paint OEM be carried out wherever applicable in accordance with relevant NO and NCD.NOTE: OEM Certificate of paint be provided post completion of painting.
9600020COFFERDAM & VOID SPACESAir Pressure testing of cofferdams and void spaces(h) Undertake pressure testing of all cofferdams and voidspaces which are repaired by build-up/ renewal iaw Para 47 of Nos. 01/15. The pressure testing is to be carried out by Refitting Authorities in the presence of ship staff and Quality Control inspectors of the Refitting Authority. Under Nos. circumstance, the procedure of running pressure test is to be used to confirm the structural integrity of these spacesBilges area (Approx)1. ASP - 35 Sq Mtr2. AER - 49 Sq Mtr3. MCR &MCR Lobby - 21 Sq Mtr4. MER - 74 Sq Mtr5. Port & Stbd Void Space - 40 Sq Mtr6. pump room-20 Sq Mtr7. Rope and Canvas store - 21 Sq Mtr.8. Ammo locker - 18 Sq Mtr9.Baggage Store - 54 Sq Mtr00020COFFERDAM & VOID SPACESAir Pressure testing of cofferdams and void spaces(h) Undertake pressure testing of all cofferdams and voidspaces which are repaired by build-up/ renewal iaw Para 47 of Nos. 01/15. The pressure testing is to be carried out by Refitting Authorities in the presence of ship staff and Quality Control inspectors of the Refitting Authority. Under Nos. circumstance, the procedure of running pressure test is to be used to confirm the structural integrity of these spacesBilges area (Approx)1. ASP - 35 Sq Mtr2. AER - 49 Sq Mtr3. MCR &MCR Lobby - 21 Sq Mtr4. MER - 74 Sq Mtr5. Port & Stbd Void Space - 40 Sq Mtr6. pump room-20 Sq Mtr7. Rope and Canvas store - 21 Sq Mtr.8. Ammo locker - 18 Sq Mtr9.Baggage Store - 54 Sq Mtr
9700021Machinery Compartment BilgesTanks/Tank tops survey(a) Visual survey of all accessible areas(b) USG of all internal accessible area of machinery compt bilges (For group D ships)00021Machinery Compartment BilgesTanks/Tank tops survey(a) Visual survey of all accessible areas(b) USG of all internal accessible area of machinery compt bilges (For group D ships)
9800021Machinery Compartment BilgesHYDROBLASTING/ GRIT BLASTING(c) ENTIRE UNDERWATER AREAS INCLUDING BOOT TOPPING AREA ARE TO BE BLASTED TO SA 2.5 STANDARD BY HYDROJET BLASTING/ GRIT BLASTING AS PER INSTRUCTIONS CONTAINED IN NO 1/15 . RENEWAL OF PAINT TO BE CARRIED OUT AS PER NO 53/16.00021Machinery Compartment BilgesHYDROBLASTING/ GRIT BLASTING(c) ENTIRE UNDERWATER AREAS INCLUDING BOOT TOPPING AREA ARE TO BE BLASTED TO SA 2.5 STANDARD BY HYDROJET BLASTING/ GRIT BLASTING AS PER INSTRUCTIONS CONTAINED IN NO 1/15 . RENEWAL OF PAINT TO BE CARRIED OUT AS PER NO 53/16.
9900022DECKS, ABOVE WATER AREA & SUPER STRUCTUREHYDROBLASTING/ GRIT BLASTINGENTIRE DECKS, DECK FITTINGS, ABOVE WATER AREA & SUPER STRUCTURE ARE TO BE BLASTED TO SA 2.5 STANDARD BY HYDROJET BLASTING TO FACILIATE SURVEY OF THE STRUCTURE FOR RENEWALS.00022DECKS, ABOVE WATER AREA & SUPER STRUCTUREHYDROBLASTING/ GRIT BLASTINGENTIRE DECKS, DECK FITTINGS, ABOVE WATER AREA & SUPER STRUCTURE ARE TO BE BLASTED TO SA 2.5 STANDARD BY HYDROJET BLASTING TO FACILIATE SURVEY OF THE STRUCTURE FOR RENEWALS.
10000022DECKS, ABOVE WATER AREA & SUPER STRUCTUREENTIRE DECKS, DECK FITTINGS, ABOVE WATER AREA & SUPER STRUCTURE AREA ARE TO BE BLASTED TO SA 2.5 STANDARD BY HYDROJET BLASTING AS PER INSTRUCTIONS CONTAINED IN NO 01/15 AND PREPARE SURFACES FOR PAINT SCHEME RENEWAL.00022DECKS, ABOVE WATER AREA & SUPER STRUCTUREENTIRE DECKS, DECK FITTINGS, ABOVE WATER AREA & SUPER STRUCTURE AREA ARE TO BE BLASTED TO SA 2.5 STANDARD BY HYDROJET BLASTING AS PER INSTRUCTIONS CONTAINED IN NO 01/15 AND PREPARE SURFACES FOR PAINT SCHEME RENEWAL.
10100023Weather Decks & Platformsstructural examination(a) Examine deck structure paying particular attention to deck boundaries, expansion joints, bimetallic joints, deck areas near foundation of eqpt./fittings for pitting, excessive corrosion and blistering/cracking for peeling of paint. Prepare surface and restore paint in accordance with NO 53/16 and policy issued by IHQ/DNA from time to time. Raise specific defects to dockyard for survey and repairs00023Weather Decks & Platformsstructural examination(a) Examine deck structure paying particular attention to deck boundaries, expansion joints, bimetallic joints, deck areas near foundation of eqpt./fittings for pitting, excessive corrosion and blistering/cracking for peeling of paint. Prepare surface and restore paint in accordance with NO 53/16 and policy issued by IHQ/DNA from time to time. Raise specific defects to dockyard for survey and repairs
10200023Weather Decks & Platformsdeck examination(b) Carry out surface preparation of steel decks by abrasive blasting & aluminium deck, as per instruction contained in para 11 of appendix \\"B\\" of NO 53/16. Restore paint scheme in accordance with NO 53/16 and policy issued by IHQ/DNA00023Weather Decks & Platformsdeck examination(b) Carry out surface preparation of steel decks by abrasive blasting & aluminium deck, as per instruction contained in para 11 of appendix \\"B\\" of NO 53/16. Restore paint scheme in accordance with NO 53/16 and policy issued by IHQ/DNA
10300023Weather Decks & PlatformsLOAD TESTING(c) Carry out load testing of all deck rings, time frame not exceeding more than 27 months(for carriers class)00023Weather Decks & PlatformsLOAD TESTING(c) Carry out load testing of all deck rings, time frame not exceeding more than 27 months(for carriers class)
10400023Weather Decks & Platformscompartment inspection(d) Dry compartments without deck covering: - To be subjected to visual survey.00023Weather Decks & Platformscompartment inspection(d) Dry compartments without deck covering: - To be subjected to visual survey.
10500023Weather Decks & Platformscompartment inspection(e) Dry compartments with deck covering: - The survey of the condition of the deck covering is to be carried out. The deck covering be inspected for cracks, bulging/undulations, mechanical damage etc. In case of damage observed, the deck underneath to be visually surveyed post renewal of affected area.NOTE: Permissible limits of Deformation for Underwater external hull: - Three times thickness of plate (3t). Permissible limits of Deformation for external hull above water, boot top and wind/water area, primary decks and bulkheads: - Five times thickness of plate (5t)00023Weather Decks & Platformscompartment inspection(e) Dry compartments with deck covering: - The survey of the condition of the deck covering is to be carried out. The deck covering be inspected for cracks, bulging/undulations, mechanical damage etc. In case of damage observed, the deck underneath to be visually surveyed post renewal of affected area.NOTE: Permissible limits of Deformation for Underwater external hull: - Three times thickness of plate (3t). Permissible limits of Deformation for external hull above water, boot top and wind/water area, primary decks and bulkheads: - Five times thickness of plate (5t)
10600023Weather Decks & Platformscompartment inspection(f) Scrap clean to bare metal on areas of loose paint, rust markscorrosion using hard wood or plastic scraper. Clean with detergent solution \\"labolene\\" and rinse with fresh water and preserve deck with adequate paint scheme.( M/s Akzo Nobel (LLPS)1.Intergard 2692.Intershield 300(Aluminum)3.Non Slip Epoxy D.A. Grey with hardener – Grey)00023Weather Decks & Platformscompartment inspection(f) Scrap clean to bare metal on areas of loose paint, rust markscorrosion using hard wood or plastic scraper. Clean with detergent solution \\"labolene\\" and rinse with fresh water and preserve deck with adequate paint scheme.( M/s Akzo Nobel (LLPS)1.Intergard 2692.Intershield 300(Aluminum)3.Non Slip Epoxy D.A. Grey with hardener – Grey)
10700024UPPER DECK (NO 1, 01 & 02)PRESERVATION/ PAINTINGCARRYOUT PAINTING OF MAIN DECK, 01 AND 02 DECK WITH M/S AKZO NOBEL PAINT SCHEME I.A.W NO 53/16. PROVIDE OEM CERTIFICATE OF PAINT TO SS ON COMPLETION OF PAINTING. JOB INVOLVES00024UPPER DECK (NO 1, 01 & 02)PRESERVATION/ PAINTINGCARRYOUT PAINTING OF MAIN DECK, 01 AND 02 DECK WITH M/S AKZO NOBEL PAINT SCHEME I.A.W NO 53/16. PROVIDE OEM CERTIFICATE OF PAINT TO SS ON COMPLETION OF PAINTING. JOB INVOLVES
10800024UPPER DECK (NO 1, 01 & 02)PRESERVATION/ PAINTING(A) MAIN DECK (MS) (i) APPLICATION OF 01 COAT OF EPOXY RED OXIDE PRIMER DFT 40 MICRONS ON BLASTING(ii) APPLICATION OF 03 SUCCESSIVE COATS OF EPOXY RED OXIDE PRIMER DFT 40 MICRONS EACH(iii) APPLICATION OF 02 SUCCESSIVE COATS OF EPOXY HEAVY DUTY NON SKID PAINT(DARK GREY) DFT 300 MICRONS EACH00024UPPER DECK (NO 1, 01 & 02)PRESERVATION/ PAINTING(A) MAIN DECK (MS) (i) APPLICATION OF 01 COAT OF EPOXY RED OXIDE PRIMER DFT 40 MICRONS ON BLASTING(ii) APPLICATION OF 03 SUCCESSIVE COATS OF EPOXY RED OXIDE PRIMER DFT 40 MICRONS EACH(iii) APPLICATION OF 02 SUCCESSIVE COATS OF EPOXY HEAVY DUTY NON SKID PAINT(DARK GREY) DFT 300 MICRONS EACH
10900024UPPER DECK (NO 1, 01 & 02)PRESERVATION/ PAINTING(B) ALUMINUM DECK (NO 01 AND 02)(i) 01 COAT OF EPOXY PRIMER DFT 75 MICRONS ON BLASTING(ii) 01 COAT OF EPOXY PRIMER DFT 75 MICRONS(iii) 02 SUCCESSIVE COATS OF EPOXY HEAVY DUTY NON SKID(DARK GREY) DFT 300 MICRONS EACHNOTE : THE INTERVAL BETWEEN APPLICATION OF EACH COAT OF PRIMER AND EPOXY HEAVY DUTY NON SKID IS NOT TO BE LESS THAN 16 HRS AND NOT TO EXCEED 72 HRS00024UPPER DECK (NO 1, 01 & 02)PRESERVATION/ PAINTING(B) ALUMINUM DECK (NO 01 AND 02)(i) 01 COAT OF EPOXY PRIMER DFT 75 MICRONS ON BLASTING(ii) 01 COAT OF EPOXY PRIMER DFT 75 MICRONS(iii) 02 SUCCESSIVE COATS OF EPOXY HEAVY DUTY NON SKID(DARK GREY) DFT 300 MICRONS EACHNOTE : THE INTERVAL BETWEEN APPLICATION OF EACH COAT OF PRIMER AND EPOXY HEAVY DUTY NON SKID IS NOT TO BE LESS THAN 16 HRS AND NOT TO EXCEED 72 HRS
11000025SUPERSTRUCTURE AND FITTINGSPRESERVATION/ PAINTING(a) CARRYOUT 100% VISUAL AND USG SURVEY PRIOR PAINTING OF SUPERSTRUCTURE, MAST, DECK FITTINGS, SOFT PATCHES, MUSHROOM HEADS AFTER BLASTING AND COMPLETION OF HOT WORKS WITH HIGH PERFORMANCE PAINT SCHEME UNDER SUPERVISION OF PAINT MANUFACTURER. PROVIDE OEM CERTIFICATE OF PAINT TO SS ON COMPLETION OF PAINTING. JOB INVOLVES00025SUPERSTRUCTURE AND FITTINGSPRESERVATION/ PAINTING(a) CARRYOUT 100% VISUAL AND USG SURVEY PRIOR PAINTING OF SUPERSTRUCTURE, MAST, DECK FITTINGS, SOFT PATCHES, MUSHROOM HEADS AFTER BLASTING AND COMPLETION OF HOT WORKS WITH HIGH PERFORMANCE PAINT SCHEME UNDER SUPERVISION OF PAINT MANUFACTURER. PROVIDE OEM CERTIFICATE OF PAINT TO SS ON COMPLETION OF PAINTING. JOB INVOLVES
11100025SUPERSTRUCTURE AND FITTINGSPRESERVATION/ PAINTING(a) CARRYOUT 100% VISUAL AND USG SURVEY PRIOR PAINTING OF SUPERSTRUCTURE, MAST, DECK FITTINGS, SOFT PATCHES, MUSHROOM HEADS AFTER BLASTING AND COMPLETION OF HOT WORKS WITH HIGH PERFORMANCE PAINT SCHEME UNDER SUPERVISION OF PAINT MANUFACTURER. PROVIDE OEM CERTIFICATE OF PAINT TO SS ON COMPLETION OF PAINTING. JOB INVOLVES(i) APPLICATION OF 01 COAT OF INTERGARD 269 PRIMER TO DFT 40 MICRONS ON BLASTING00025SUPERSTRUCTURE AND FITTINGSPRESERVATION/ PAINTING(a) CARRYOUT 100% VISUAL AND USG SURVEY PRIOR PAINTING OF SUPERSTRUCTURE, MAST, DECK FITTINGS, SOFT PATCHES, MUSHROOM HEADS AFTER BLASTING AND COMPLETION OF HOT WORKS WITH HIGH PERFORMANCE PAINT SCHEME UNDER SUPERVISION OF PAINT MANUFACTURER. PROVIDE OEM CERTIFICATE OF PAINT TO SS ON COMPLETION OF PAINTING. JOB INVOLVES(i) APPLICATION OF 01 COAT OF INTERGARD 269 PRIMER TO DFT 40 MICRONS ON BLASTING
11200025SUPERSTRUCTURE AND FITTINGSPRESERVATION/ PAINTING(a) CARRYOUT 100% VISUAL AND USG SURVEY PRIOR PAINTING OF SUPERSTRUCTURE, MAST, DECK FITTINGS, SOFT PATCHES, MUSHROOM HEADS AFTER BLASTING AND COMPLETION OF HOT WORKS WITH HIGH PERFORMANCE PAINT SCHEME UNDER SUPERVISION OF PAINT MANUFACTURER. PROVIDE OEM CERTIFICATE OF PAINT TO SS ON COMPLETION OF PAINTING. JOB INVOLVES(ii) APPLICATION OF 01 COAT OF INTERGARD 269 PRIMER TO DFT 40 MICRONS00025SUPERSTRUCTURE AND FITTINGSPRESERVATION/ PAINTING(a) CARRYOUT 100% VISUAL AND USG SURVEY PRIOR PAINTING OF SUPERSTRUCTURE, MAST, DECK FITTINGS, SOFT PATCHES, MUSHROOM HEADS AFTER BLASTING AND COMPLETION OF HOT WORKS WITH HIGH PERFORMANCE PAINT SCHEME UNDER SUPERVISION OF PAINT MANUFACTURER. PROVIDE OEM CERTIFICATE OF PAINT TO SS ON COMPLETION OF PAINTING. JOB INVOLVES(ii) APPLICATION OF 01 COAT OF INTERGARD 269 PRIMER TO DFT 40 MICRONS
11300025SUPERSTRUCTURE AND FITTINGSPRESERVATION/ PAINTING(a) CARRYOUT 100% VISUAL AND USG SURVEY PRIOR PAINTING OF SUPERSTRUCTURE, MAST, DECK FITTINGS, SOFT PATCHES, MUSHROOM HEADS AFTER BLASTING AND COMPLETION OF HOT WORKS WITH HIGH PERFORMANCE PAINT SCHEME UNDER SUPERVISION OF PAINT MANUFACTURER. PROVIDE OEM CERTIFICATE OF PAINT TO SS ON COMPLETION OF PAINTING. JOB INVOLVES(iii) APPLICATION OF 02 COATS OF INTERLAC 846 COLOR RAL 7040(LIGHT GREY) TO DFT 40 MICRONS EACH.00025SUPERSTRUCTURE AND FITTINGSPRESERVATION/ PAINTING(a) CARRYOUT 100% VISUAL AND USG SURVEY PRIOR PAINTING OF SUPERSTRUCTURE, MAST, DECK FITTINGS, SOFT PATCHES, MUSHROOM HEADS AFTER BLASTING AND COMPLETION OF HOT WORKS WITH HIGH PERFORMANCE PAINT SCHEME UNDER SUPERVISION OF PAINT MANUFACTURER. PROVIDE OEM CERTIFICATE OF PAINT TO SS ON COMPLETION OF PAINTING. JOB INVOLVES(iii) APPLICATION OF 02 COATS OF INTERLAC 846 COLOR RAL 7040(LIGHT GREY) TO DFT 40 MICRONS EACH.
11400026Superstructure (Aluminium)Structural examination and repairs(a) Examine complete superstructure for structural defects paying particular attention to inaccessible areas, bimetallic joints and dadoes area.USG of areas found corroded during visual survey to be undertaken, if required00026Superstructure (Aluminium)Structural examination and repairs(a) Examine complete superstructure for structural defects paying particular attention to inaccessible areas, bimetallic joints and dadoes area.USG of areas found corroded during visual survey to be undertaken, if required
11500026PRESERVATION/ PAINTING(b) On completion of structural repairs, undertake application of full paint scheme, with requisite surface preparation as per NO 53/16.00026PRESERVATION/ PAINTING(b) On completion of structural repairs, undertake application of full paint scheme, with requisite surface preparation as per NO 53/16.
11600026ModificationModification of yardarms of mast structure for resiting of COTS radar00026ModificationModification of yardarms of mast structure for resiting of COTS radar
11700027Mast and Riggingsstructural examination(a) Examine mast structure, whip aerial platforms and the surrounding structure on deck, eye plates, load carrying members for signs of corrosion. Examine bolted, riveted and intermittent welded structure connections for signs of fracture. Portable and semi portable fittings to be removed for closer examination of structure underneath. 9Lattice MastApprox. Area - 35 Sqm.)00027Mast and Riggingsstructural examination(a) Examine mast structure, whip aerial platforms and the surrounding structure on deck, eye plates, load carrying members for signs of corrosion. Examine bolted, riveted and intermittent welded structure connections for signs of fracture. Portable and semi portable fittings to be removed for closer examination of structure underneath. 9Lattice MastApprox. Area - 35 Sqm.)
11800027Mast and Riggingspainting of mast(b) Carry out complete survey of structure as per NO 19/06 and repair/renew as necessary. Paint the mast in accordance with NO 53/16, NCD 1493 and policy directives issued by IHQ/DNA from time to time.(M/s Akzo Nobel (LLPS)1. Intergard 2692.Anticorrosive Paint Intergard 5600 (Grey / Red)3.Interthane 990 Polyurethane (PU) (Grey-RAL 7040))00027Mast and Riggingspainting of mast(b) Carry out complete survey of structure as per NO 19/06 and repair/renew as necessary. Paint the mast in accordance with NO 53/16, NCD 1493 and policy directives issued by IHQ/DNA from time to time.(M/s Akzo Nobel (LLPS)1. Intergard 2692.Anticorrosive Paint Intergard 5600 (Grey / Red)3.Interthane 990 Polyurethane (PU) (Grey-RAL 7040))
11900027Mast and Riggings(c) Damaged paint to be restored as per paint scheme. Prepare surface and preserve in accordance with NO 53/16,00027Mast and Riggings(c) Damaged paint to be restored as per paint scheme. Prepare surface and preserve in accordance with NO 53/16,
12000027Mast and Riggingssurey and testing of running riggings(d) Survey and test all standing & running riggings fitted on mast structure along with associated fittings. Renew wire ropes and associated fittings as necessary00027Mast and Riggingssurey and testing of running riggings(d) Survey and test all standing & running riggings fitted on mast structure along with associated fittings. Renew wire ropes and associated fittings as necessary
12100028GUARD RAIL AND STANCHIONSPVC GUARDRAILS(a) SLACK OFF GUARD RAIL WIRES. CLEAN, LUBRICATE AND WORK THROUGH FULL LIMIT OF ALL BOTTLE SCREW AND SHACKLES. CLEAN AND LUBRICATE ALL STANCHION STAYS AND HEEL FITTING. CHECK FOR CORRECT POSITIONING OF STANCHION AND DROP NOSE PINS. CLEAN AND LUBRICATE VICE HEADED BOLTS. EXAMINE PVC COATED STEEL WIRES FOR DAMAGE, WEAR OR CORROSION. RENEW IF NECESSARY. CLEAN AND RECOAT WITH BOILED LINSEED OIL.00028GUARD RAIL AND STANCHIONSPVC GUARDRAILS(a) SLACK OFF GUARD RAIL WIRES. CLEAN, LUBRICATE AND WORK THROUGH FULL LIMIT OF ALL BOTTLE SCREW AND SHACKLES. CLEAN AND LUBRICATE ALL STANCHION STAYS AND HEEL FITTING. CHECK FOR CORRECT POSITIONING OF STANCHION AND DROP NOSE PINS. CLEAN AND LUBRICATE VICE HEADED BOLTS. EXAMINE PVC COATED STEEL WIRES FOR DAMAGE, WEAR OR CORROSION. RENEW IF NECESSARY. CLEAN AND RECOAT WITH BOILED LINSEED OIL.
12200028GUARD RAIL AND STANCHIONSPVC GUARDRAILS(i) TULIPS00028GUARD RAIL AND STANCHIONSPVC GUARDRAILS(i) TULIPS
12300028GUARD RAIL AND STANCHIONSPVC GUARDRAILS(ii) BOTTLE SCREW SLIPS00028GUARD RAIL AND STANCHIONSPVC GUARDRAILS(ii) BOTTLE SCREW SLIPS
12400028GUARD RAIL AND STANCHIONSPVC GUARDRAILS(iii) D SHACKLES00028GUARD RAIL AND STANCHIONSPVC GUARDRAILS(iii) D SHACKLES
12500028GUARD RAIL AND STANCHIONSPVC GUARDRAILS(iv) GUARD RAILS (WIRE ROPE)00028GUARD RAIL AND STANCHIONSPVC GUARDRAILS(iv) GUARD RAILS (WIRE ROPE)
12600028GUARD RAIL AND STANCHIONSPVC GUARDRAILS(v) LOAD TESTING OF GUARD RAIL WITH 750 KG IAW INBR 1552 RANDOMLY.00028GUARD RAIL AND STANCHIONSPVC GUARDRAILS(v) LOAD TESTING OF GUARD RAIL WITH 750 KG IAW INBR 1552 RANDOMLY.
12700028GUARD RAIL AND STANCHIONSFIXED/ PORTABLE GUARDRAIL STANCHION(b) VISUAL SURVEY/ HAMMER SURVE OF PORTABLE AND FIXED GUARDRAIL STANCHIONS. FOLLOWING JOB INVOLVES:00028GUARD RAIL AND STANCHIONSFIXED/ PORTABLE GUARDRAIL STANCHION(b) VISUAL SURVEY/ HAMMER SURVE OF PORTABLE AND FIXED GUARDRAIL STANCHIONS. FOLLOWING JOB INVOLVES:
12800028GUARD RAIL AND STANCHIONS(c) CHECKS/ REPLACEMENT, IF ANY DEFECT, THE CONDITION OF EYES FOR GUARDRAILS00028GUARD RAIL AND STANCHIONS(c) CHECKS/ REPLACEMENT, IF ANY DEFECT, THE CONDITION OF EYES FOR GUARDRAILS
12900028GUARD RAIL AND STANCHIONS(d) REPLACEMENT OF STANCHION SHOES WITH SECURING NUTS & BOLTS, IF ANY DEFECT00028GUARD RAIL AND STANCHIONS(d) REPLACEMENT OF STANCHION SHOES WITH SECURING NUTS & BOLTS, IF ANY DEFECT
13000028GUARD RAIL AND STANCHIONS(e) REPLACEMENT OF PORTABLE STANCHION, IF ANY DEFECT00028GUARD RAIL AND STANCHIONS(e) REPLACEMENT OF PORTABLE STANCHION, IF ANY DEFECT
13100028GUARD RAIL AND STANCHIONS(f) REPALCEMENT OF FIXED GUARDRAIL STANCHION, IF ANY DEFECT00028GUARD RAIL AND STANCHIONS(f) REPALCEMENT OF FIXED GUARDRAIL STANCHION, IF ANY DEFECT
13200028GUARD RAIL AND STANCHIONS(g) REPLACEMENT OF SUPPORTING PIPES OF FIXED GUARDRAIL ON BRIGDE TOP, IF ANY DEFECT00028GUARD RAIL AND STANCHIONS(g) REPLACEMENT OF SUPPORTING PIPES OF FIXED GUARDRAIL ON BRIGDE TOP, IF ANY DEFECT
13300028GUARD RAIL AND STANCHIONSStanchions (h) Apply lightly grease on stanchion sockets, boom heel fittings and screwed connectors. Grease to be used:- XG- 27400028GUARD RAIL AND STANCHIONSStanchions (h) Apply lightly grease on stanchion sockets, boom heel fittings and screwed connectors. Grease to be used:- XG- 274
13400028GUARD RAIL AND STANCHIONSearthing connections(j) Replace/renew defective/ broken/ corroded earthing connections as projected by SS00028GUARD RAIL AND STANCHIONSearthing connections(j) Replace/renew defective/ broken/ corroded earthing connections as projected by SS
13500028GUARD RAIL AND STANCHIONSMisc. Fittings (k) Examine entire guard rail assembly viz guard rail stanchions, PVC coated wire, SS fittings, eye plates and guard rail stanchion heel fittings . Raise specific defects to yard forrectifications.00028GUARD RAIL AND STANCHIONSMisc. Fittings (k) Examine entire guard rail assembly viz guard rail stanchions, PVC coated wire, SS fittings, eye plates and guard rail stanchion heel fittings . Raise specific defects to yard forrectifications.
13600028GUARD RAIL AND STANCHIONSbottle screw slip and stanchions(l) Check that pins are fitted to tongues of bottle screw slips and that pins are housed. Clean anodised aluminium guard stanchions, tubular guard rails and PVC coated guard wireswith a weak detergent solution. Use no abrasive.Oil and grease, stains to be removed with a clean rag dipped in white spirit00028GUARD RAIL AND STANCHIONSbottle screw slip and stanchions(l) Check that pins are fitted to tongues of bottle screw slips and that pins are housed. Clean anodised aluminium guard stanchions, tubular guard rails and PVC coated guard wireswith a weak detergent solution. Use no abrasive.Oil and grease, stains to be removed with a clean rag dipped in white spirit
13700028GUARD RAIL AND STANCHIONSTubular guard rails(m) Inspect tubular guard rails and stanchions for corrosion and distortion, paying particular attention to welded joints and heel fittings. Repair/ renew as necessary.00028GUARD RAIL AND STANCHIONSTubular guard rails(m) Inspect tubular guard rails and stanchions for corrosion and distortion, paying particular attention to welded joints and heel fittings. Repair/ renew as necessary.
13800029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(a) Carry out pre-refit trials and project specific defects to dockyard for the following:(i) Slippage of brake(ii) Noise in drive.(iii) Leakage of oil from gear box.(iv) Overheating of gear box/bearing.(v) Gear box vibrations.(vi) SPM checks of motor00029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(a) Carry out pre-refit trials and project specific defects to dockyard for the following:(i) Slippage of brake(ii) Noise in drive.(iii) Leakage of oil from gear box.(iv) Overheating of gear box/bearing.(v) Gear box vibrations.(vi) SPM checks of motor
13900029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(b) Strip and inspect cable holder brake mechanism, paying particular attention to the trunnion nut and bevel gears of hand wheel unit.(i) Examine brake linings, pins and bushes for wear.(ii) Drain oil from hand wheel unit oil bath and refill with fresh oil.(iii) Examine ferrodo linings, pins and bushes for wear.Renew as necessary00029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(b) Strip and inspect cable holder brake mechanism, paying particular attention to the trunnion nut and bevel gears of hand wheel unit.(i) Examine brake linings, pins and bushes for wear.(ii) Drain oil from hand wheel unit oil bath and refill with fresh oil.(iii) Examine ferrodo linings, pins and bushes for wear.Renew as necessary
14000029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(c) CARRY OUT THE FOLLOWING INSPECTION ON BRAKE: -00029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(c) CARRY OUT THE FOLLOWING INSPECTION ON BRAKE: -
14100029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(i) STRIP, INSPECT AND OVERHAUL CABLE HOLDER MANUAL BRAKE MECHANISM PAYING PARTICULAR ATTENTION TO THE TRUNNION NUT AND BEVEL GEARS OF HAND WHEEL UNIT.00029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(i) STRIP, INSPECT AND OVERHAUL CABLE HOLDER MANUAL BRAKE MECHANISM PAYING PARTICULAR ATTENTION TO THE TRUNNION NUT AND BEVEL GEARS OF HAND WHEEL UNIT.
14200029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(ii) RENEW FERRODO BRAKE LININGS, PINS AND BUSHES AS PER SAMPLE. MATERIAL SPECS OF BRAKE LINING - LENGTH: 1 MTR., WIDTH- 50 MM00029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(ii) RENEW FERRODO BRAKE LININGS, PINS AND BUSHES AS PER SAMPLE. MATERIAL SPECS OF BRAKE LINING - LENGTH: 1 MTR., WIDTH- 50 MM
14300029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(iii) DRAIN OIL FROM HAND WHEEL UNIT OIL BATH AND REFILL WITH CLEAN OIL SERVO SYSTEM 32000029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(iii) DRAIN OIL FROM HAND WHEEL UNIT OIL BATH AND REFILL WITH CLEAN OIL SERVO SYSTEM 320
14400029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(d) EXAMINE THE WINDLASS/ CABLE HOLDER GEAR AND ITS FITTINGS. CHECK THE OIL SEALS FOR LEAKAGE. SPECIFIC DEFECTS IF ANY, TO BE RECTIFIED. JOB INCLUDES FOLLOWING ALSO:-00029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(d) EXAMINE THE WINDLASS/ CABLE HOLDER GEAR AND ITS FITTINGS. CHECK THE OIL SEALS FOR LEAKAGE. SPECIFIC DEFECTS IF ANY, TO BE RECTIFIED. JOB INCLUDES FOLLOWING ALSO:-
14500029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(i) DISMANTLE THE CAPSTAN DRUM, CABLE HOLDER AND ITS FITTINGS.00029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(i) DISMANTLE THE CAPSTAN DRUM, CABLE HOLDER AND ITS FITTINGS.
14600029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(ii) CHECK THE OIL SEALS FOR LEAKAGES, BUSH BEARINGS FOR WEAR AND INCREASED CLEARANCES. RENEW DEEFCTIVE COMPONENTS AS NECESASRY.00029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(ii) CHECK THE OIL SEALS FOR LEAKAGES, BUSH BEARINGS FOR WEAR AND INCREASED CLEARANCES. RENEW DEEFCTIVE COMPONENTS AS NECESASRY.
14700029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(iii) CHECK THE EXTENT OF WEAR OF SNUGS OF CABLE HOLDER. RENEW THE CABLE HOLDER IF THE SNUGS ARE FOUND EXCESSIVELY WORN CAUSING SLIPPAGE OF CABLE.00029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(iii) CHECK THE EXTENT OF WEAR OF SNUGS OF CABLE HOLDER. RENEW THE CABLE HOLDER IF THE SNUGS ARE FOUND EXCESSIVELY WORN CAUSING SLIPPAGE OF CABLE.
14800029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(iv) SPARES NOT HELD WITH SHIP'S STAFF AND ALL NECESSARY SPARES FOR REPAIR/ OVERHAUL OF EQUIPMENT ARE TO BE CATERED BY THE REPAIRING FIRM.00029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(iv) SPARES NOT HELD WITH SHIP'S STAFF AND ALL NECESSARY SPARES FOR REPAIR/ OVERHAUL OF EQUIPMENT ARE TO BE CATERED BY THE REPAIRING FIRM.
14900029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(e) REMOVE GEAR CASES AND EXAMINE SECONDARY & PRIMARY WORM AND WORM WHEEL DRIVE. STRIP AND EXAMINE ALL THRUST AND ROLLER BEARINGS. EXAMINE SLIPPING CLUTCH AND MAGNETIC BRAKES. EXAMINE FLEXIBLE COUPLINGS BETWEEN MOTOR AND CLUTCHES. ADJUST THE SLIPPING CLUTCH AS NECESSARY. RECTIFY THE DEFECTS, RENEW AS REQUIRED.00029ANCHOR WINDLASS AND CABLE HOLDERANCHOR WINDLASS AND CABLE HOLDER(e) REMOVE GEAR CASES AND EXAMINE SECONDARY & PRIMARY WORM AND WORM WHEEL DRIVE. STRIP AND EXAMINE ALL THRUST AND ROLLER BEARINGS. EXAMINE SLIPPING CLUTCH AND MAGNETIC BRAKES. EXAMINE FLEXIBLE COUPLINGS BETWEEN MOTOR AND CLUTCHES. ADJUST THE SLIPPING CLUTCH AS NECESSARY. RECTIFY THE DEFECTS, RENEW AS REQUIRED.
15000030CAPSTAN AND CABLE HOLDERSPre refit trials (a) Carry out pre-refit trials and project specific defects to dockyard for the following: -(i) Slippage of brake.(ii) Noise in drive.(iii) Leakage of oil from gear box.(iv) Overheating of gear box/ bearing.(v) Gearbox vibrations.(vi) SPM checks of motor.00030CAPSTAN AND CABLE HOLDERSPre refit trials (a) Carry out pre-refit trials and project specific defects to dockyard for the following: -(i) Slippage of brake.(ii) Noise in drive.(iii) Leakage of oil from gear box.(iv) Overheating of gear box/ bearing.(v) Gearbox vibrations.(vi) SPM checks of motor.
15100030CAPSTAN AND CABLE HOLDERSchecks(b) Strip and inspect cable holder brake mechanism, paying particular attention to the trunnion nut and bevel gears of hand wheel unit.(c) Examine brake linings, pins and bushes for wear.(d) Examine ferrodo linings, pins and bushes for wear. Renew as necessary00030CAPSTAN AND CABLE HOLDERSchecks(b) Strip and inspect cable holder brake mechanism, paying particular attention to the trunnion nut and bevel gears of hand wheel unit.(c) Examine brake linings, pins and bushes for wear.(d) Examine ferrodo linings, pins and bushes for wear. Renew as necessary
15200030CAPSTAN AND CABLE HOLDERSFull load trials(e) Carry out full load trials and observe for any abnormal noise. Defect to be rectified if any.00030CAPSTAN AND CABLE HOLDERSFull load trials(e) Carry out full load trials and observe for any abnormal noise. Defect to be rectified if any.
15300030CAPSTAN AND CABLE HOLDERSworm gears and wheels(f) Remove gear cases and examine secondary and primary worm and worm wheel drive. Strip and examine all thrust and roller bearings. Examine slipping clutch and magnetic brakes. Examine flexible couplings between motor and clutches. Adjust the slipping clutch as necessary. Rectify the defects, renew as required.00030CAPSTAN AND CABLE HOLDERSworm gears and wheels(f) Remove gear cases and examine secondary and primary worm and worm wheel drive. Strip and examine all thrust and roller bearings. Examine slipping clutch and magnetic brakes. Examine flexible couplings between motor and clutches. Adjust the slipping clutch as necessary. Rectify the defects, renew as required.
15400030CAPSTAN AND CABLE HOLDERSElectromagnetic break(g) Adjust the electromagnetic brake in accordance with equipment manual. Adjust clutch and air gap of electromagnetic brake (Air gap should be 0.5 mm - 1 mm). Renew friction disc if lines are worn out. Examine ferrodo brake lining. Renew if worn out.00030CAPSTAN AND CABLE HOLDERSElectromagnetic break(g) Adjust the electromagnetic brake in accordance with equipment manual. Adjust clutch and air gap of electromagnetic brake (Air gap should be 0.5 mm - 1 mm). Renew friction disc if lines are worn out. Examine ferrodo brake lining. Renew if worn out.
15500030CAPSTAN AND CABLE HOLDERSOverhauling(h) Overhaul capstan motor, subject to SPM checks. Renew bearings and apply fresh grease.00030CAPSTAN AND CABLE HOLDERSOverhauling(h) Overhaul capstan motor, subject to SPM checks. Renew bearings and apply fresh grease.
15600031UNDER SLUNG ELECTRIC MOORING CAPSTANMOORING CAPSTANMAKE : M/S CYCLO TRANSMISSIONS, PUNE QTY FITTED - 01 NOS00031UNDER SLUNG ELECTRIC MOORING CAPSTANMOORING CAPSTANMAKE : M/S CYCLO TRANSMISSIONS, PUNE QTY FITTED - 01 NOS
15700031UNDER SLUNG ELECTRIC MOORING CAPSTANMOORING CAPSTANMAKE : M/S CYCLO TRANSMISSIONS, PUNE QTY FITTED - 01 NOSDISMANTLE THE CAPSTAN ASSEMBLY AND CARRY OUT COMPLETE OVERHAULING OF THE CAPSTAN AND PROVE FOR SATISFACTORY OPERATION. CARRYOUT LOAD TESTING OF CAPSTAN TO 1.5 TONNES AND ISSUE NECESSARY CERTIFICATE.NOTE - SPARES NOT HELD WITH SHIP STAFF. ALL NECESSARY SPARES RENEWED DURING OVERHAULING TO BE CATERED BY FIRM00031UNDER SLUNG ELECTRIC MOORING CAPSTANMOORING CAPSTANMAKE : M/S CYCLO TRANSMISSIONS, PUNE QTY FITTED - 01 NOSDISMANTLE THE CAPSTAN ASSEMBLY AND CARRY OUT COMPLETE OVERHAULING OF THE CAPSTAN AND PROVE FOR SATISFACTORY OPERATION. CARRYOUT LOAD TESTING OF CAPSTAN TO 1.5 TONNES AND ISSUE NECESSARY CERTIFICATE.NOTE - SPARES NOT HELD WITH SHIP STAFF. ALL NECESSARY SPARES RENEWED DURING OVERHAULING TO BE CATERED BY FIRM
158000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVITMAKE : DECK MACHINERY DEPARTMENT, GRSEQTY FITTED - 01 NO(a) DISMANTLE COMPLETE STRUCTURE AND CARRY OUT COMPLETE OVERHAULING OF DAVIT ASSEMBLY AND ITS SUB-COMPONENTS . RENEW WORN OUT PARTS/ DEFECTIVE COMPONENTS. THE WORK INVOLVES THE FOLLOWING: -000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVITMAKE : DECK MACHINERY DEPARTMENT, GRSEQTY FITTED - 01 NO(a) DISMANTLE COMPLETE STRUCTURE AND CARRY OUT COMPLETE OVERHAULING OF DAVIT ASSEMBLY AND ITS SUB-COMPONENTS . RENEW WORN OUT PARTS/ DEFECTIVE COMPONENTS. THE WORK INVOLVES THE FOLLOWING: -
159000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVIT(i) DISMANTLE AND STRIP OPEN HOIST & SLEWING GEAR BOX ASSEMBLIES. OPEN THE BEARING HOUSINGS AND INSPECT BEARINGS FOR PLAY AND WEAR. INSPECT THE SHAFTS, WORM WHEEL ASSEMBLY FOR ANY WEAR AND PRESENCE OF METALLIC PARTICLES. CHECK OIL IN GEAR CASE AND EXAMINE GEAR TEETH FOR BREAKAGE AND PRESENCE OF FOREIGN MATTER. CHECK BEARINGS FOR COLLAPSE AND SHAFT FOR RUST AND CORROSION.000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVIT(i) DISMANTLE AND STRIP OPEN HOIST & SLEWING GEAR BOX ASSEMBLIES. OPEN THE BEARING HOUSINGS AND INSPECT BEARINGS FOR PLAY AND WEAR. INSPECT THE SHAFTS, WORM WHEEL ASSEMBLY FOR ANY WEAR AND PRESENCE OF METALLIC PARTICLES. CHECK OIL IN GEAR CASE AND EXAMINE GEAR TEETH FOR BREAKAGE AND PRESENCE OF FOREIGN MATTER. CHECK BEARINGS FOR COLLAPSE AND SHAFT FOR RUST AND CORROSION.
160000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVIT(ii) OVERHAUL SLEW AND HOIST MOTORS. CHECK WEAR OF ROTOR FRICTION LININGS. MEASURE THE ROTOR THICKNESSES AND COMPARE TO THE MINIMUM PERMISSIBLE LIMITS. IF NECESSARY REPLACE THE ROTOR. MEASURE AND ADJUST THE AIR GAP BETWEEN THE ARMATURE PLATE AND STATOR TO PERMISSIBLE LIMITS. HOIST MOTOR: 1.5 HP,415 V, 50 HZ, 3 PH, 132S FRAME MARINE DUTY MOTOR; SLEW MOTOR:3 HP,415 V, 50 HZ, 3 PH, 100L FRAME MARINE DUTY MOTOR; DEGREE OF PROTECTION: IP56000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVIT(ii) OVERHAUL SLEW AND HOIST MOTORS. CHECK WEAR OF ROTOR FRICTION LININGS. MEASURE THE ROTOR THICKNESSES AND COMPARE TO THE MINIMUM PERMISSIBLE LIMITS. IF NECESSARY REPLACE THE ROTOR. MEASURE AND ADJUST THE AIR GAP BETWEEN THE ARMATURE PLATE AND STATOR TO PERMISSIBLE LIMITS. HOIST MOTOR: 1.5 HP,415 V, 50 HZ, 3 PH, 132S FRAME MARINE DUTY MOTOR; SLEW MOTOR:3 HP,415 V, 50 HZ, 3 PH, 100L FRAME MARINE DUTY MOTOR; DEGREE OF PROTECTION: IP56
161000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVIT(iii) OVERHAUL ELECTROMAGNETIC RELEASE SPRING-APPLIED BRAKE FITTED ON HOIST MOTOR. INSPECT THE WORN WHEEL ASSEMBLY FOR ANY WEAR AND PRESENCE OF METALLIC PARTICLES.000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVIT(iii) OVERHAUL ELECTROMAGNETIC RELEASE SPRING-APPLIED BRAKE FITTED ON HOIST MOTOR. INSPECT THE WORN WHEEL ASSEMBLY FOR ANY WEAR AND PRESENCE OF METALLIC PARTICLES.
162000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVIT(iv) INSPECT THE FRICTION LININGS OF THE BRAKE ON HOIST WINCH MOTOR AND RENEW IF WORN OUT000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVIT(iv) INSPECT THE FRICTION LININGS OF THE BRAKE ON HOIST WINCH MOTOR AND RENEW IF WORN OUT
163000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVIT(v) ON COMPLETION OF OVERHAULING, CARRY OUT LOAD TESTING OF THE EQUIPMENT. SWL: 1.2 T, RUNNING LOAD: 1.8 T, STATIC LOAD: 2.4 T000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVIT(v) ON COMPLETION OF OVERHAULING, CARRY OUT LOAD TESTING OF THE EQUIPMENT. SWL: 1.2 T, RUNNING LOAD: 1.8 T, STATIC LOAD: 2.4 T
164000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVIT(vi) PRE-REFIT AND POST REFIT TRIALS TO BE CARRIED OUT.000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVIT(vi) PRE-REFIT AND POST REFIT TRIALS TO BE CARRIED OUT.
165000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVIT(vii) CHECK OIL IN GEAR CASE AND EXAMINE GEAR TEETH FOR BREAKAGE AND PRESENCE OF FORGIEN MATTER.000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVIT(vii) CHECK OIL IN GEAR CASE AND EXAMINE GEAR TEETH FOR BREAKAGE AND PRESENCE OF FORGIEN MATTER.
166000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVIT(viii) AFTER COMPLETION OF LOAD TEST, EXAMINE THE COMPLETE DAVIT STRUCTURE AND ASSOCIATED LIFTING GEARS FOR FLAWS DISTORTION, DEFECAUTION ETC. FLAWS MUST BE EXAMINED BY NDT TECHNIQUES AND CARRY OUT REPAIRS IF NECESSARY AND RETEST. RECORD RESULTS OF TEST AND EXAMINATION000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVIT(viii) AFTER COMPLETION OF LOAD TEST, EXAMINE THE COMPLETE DAVIT STRUCTURE AND ASSOCIATED LIFTING GEARS FOR FLAWS DISTORTION, DEFECAUTION ETC. FLAWS MUST BE EXAMINED BY NDT TECHNIQUES AND CARRY OUT REPAIRS IF NECESSARY AND RETEST. RECORD RESULTS OF TEST AND EXAMINATION
167000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVIT(ix) CARRYOUT ANNUAL SERVICING OF ARH (AUTO RELEASE HOOK) AS PER STANDARD SPECIICATIONS.NOTE - ARH TO BE SERVICED AND CERTIFICATION TO BE PROVIDED BY M/S VANSON ENGG PVT LTD (OEM AND NAVY AUTHORISED SUPPLIER OF THE EQUIPMENT)000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVIT(ix) CARRYOUT ANNUAL SERVICING OF ARH (AUTO RELEASE HOOK) AS PER STANDARD SPECIICATIONS.NOTE - ARH TO BE SERVICED AND CERTIFICATION TO BE PROVIDED BY M/S VANSON ENGG PVT LTD (OEM AND NAVY AUTHORISED SUPPLIER OF THE EQUIPMENT)
168000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVIT(x) UNDERTAKE REPLACEMENT OF BOAT DAVIT FALLS.NOTE:- ALL NECESSARY SPARES FOR REPAIR/ OVERHAUL OF EQUIPMENT ARE TO BE CATERED BY THE REPAIRING FIRM.000321.2 T SINGLE ARM RADIAL DAVIT1.2 T SINGLE ARM RADIAL DAVIT(x) UNDERTAKE REPLACEMENT OF BOAT DAVIT FALLS.NOTE:- ALL NECESSARY SPARES FOR REPAIR/ OVERHAUL OF EQUIPMENT ARE TO BE CATERED BY THE REPAIRING FIRM.
169000321.2 T SINGLE ARM RADIAL DAVITEFSWR RENEWAL(b) RENEW THE EXTRA FLEXIBLE STEEL WIRE ROPE (EFSWR) OF BOAT DAVIT FROM END TO END AS PER SAMPLE AFTER VISUAL SURVEY AND THE SAME TO BE RIGGED UP ON BOAT DAVIT. WIRE ROPE DIA: 12 MM. JOB INVOLVES FOLLOWING :-000321.2 T SINGLE ARM RADIAL DAVITEFSWR RENEWAL(b) RENEW THE EXTRA FLEXIBLE STEEL WIRE ROPE (EFSWR) OF BOAT DAVIT FROM END TO END AS PER SAMPLE AFTER VISUAL SURVEY AND THE SAME TO BE RIGGED UP ON BOAT DAVIT. WIRE ROPE DIA: 12 MM. JOB INVOLVES FOLLOWING :-
170000321.2 T SINGLE ARM RADIAL DAVIT(i) REMOVAL OF EFSWR FROM THE DAVIT000321.2 T SINGLE ARM RADIAL DAVIT(i) REMOVAL OF EFSWR FROM THE DAVIT
171000321.2 T SINGLE ARM RADIAL DAVIT(ii) Connection of thimnle and splicing of the new EFSWR on to the thimble at standing end.000321.2 T SINGLE ARM RADIAL DAVIT(ii) Connection of thimnle and splicing of the new EFSWR on to the thimble at standing end.
172000321.2 T SINGLE ARM RADIAL DAVIT(iii) RIGGING UP OF NEW EFSWR ON TO THE DAVIT.000321.2 T SINGLE ARM RADIAL DAVIT(iii) RIGGING UP OF NEW EFSWR ON TO THE DAVIT.
173000321.2 T SINGLE ARM RADIAL DAVIT(iv) Calibrate the over-load mechanism of starter000321.2 T SINGLE ARM RADIAL DAVIT(iv) Calibrate the over-load mechanism of starter
174000321.2 T SINGLE ARM RADIAL DAVIT(v) Examine entire assembly including brake lining ,brake shoe,brake disc and associated fittings. renew brake lining and shoe of excessively worn down000321.2 T SINGLE ARM RADIAL DAVIT(v) Examine entire assembly including brake lining ,brake shoe,brake disc and associated fittings. renew brake lining and shoe of excessively worn down
175000321.2 T SINGLE ARM RADIAL DAVIT(vi) Survey all wire ropes, spare gear and other associated lifting gears. renew as necessary.000321.2 T SINGLE ARM RADIAL DAVIT(vi) Survey all wire ropes, spare gear and other associated lifting gears. renew as necessary.
176000321.2 T SINGLE ARM RADIAL DAVIT(vii) Carry out SPM checks on electrical motor. Lubricate/replace bearing as necessary.000321.2 T SINGLE ARM RADIAL DAVIT(vii) Carry out SPM checks on electrical motor. Lubricate/replace bearing as necessary.
177000321.2 T SINGLE ARM RADIAL DAVIT(viii) Overhaul electric motor subject to QC check.Carry out trials on completion of repairs.000321.2 T SINGLE ARM RADIAL DAVIT(viii) Overhaul electric motor subject to QC check.Carry out trials on completion of repairs.
178000321.2 T SINGLE ARM RADIAL DAVIT(ix) Open slewing assembly bearing housing and inspect bearing for play. Renew components viz gears bearings if necessary. Renew O Rings and Oil Seals000321.2 T SINGLE ARM RADIAL DAVIT(ix) Open slewing assembly bearing housing and inspect bearing for play. Renew components viz gears bearings if necessary. Renew O Rings and Oil Seals
179000321.2 T SINGLE ARM RADIAL DAVIT(x) Inspect the worm wheel assembly for any wear and presence of metallic particles.000321.2 T SINGLE ARM RADIAL DAVIT(x) Inspect the worm wheel assembly for any wear and presence of metallic particles.
180000321.2 T SINGLE ARM RADIAL DAVIT(xi) Check oil in gear case and examine gear teeth for breakage and presence of foreign matter.Check bearings for collapse and shaft for rust and corrosion.Renew/repair as necessary.000321.2 T SINGLE ARM RADIAL DAVIT(xi) Check oil in gear case and examine gear teeth for breakage and presence of foreign matter.Check bearings for collapse and shaft for rust and corrosion.Renew/repair as necessary.
181000321.2 T SINGLE ARM RADIAL DAVIT(xii) Record Volt/Amps/Speed parameters of davit and associated systems during load test. Record load test details.000321.2 T SINGLE ARM RADIAL DAVIT(xii) Record Volt/Amps/Speed parameters of davit and associated systems during load test. Record load test details.
182000321.2 T SINGLE ARM RADIAL DAVIT(xiii) Check brake lining on winch and change liner if damaged.000321.2 T SINGLE ARM RADIAL DAVIT(xiii) Check brake lining on winch and change liner if damaged.
183000321.2 T SINGLE ARM RADIAL DAVIT(xiv) Check all rotating parts, lever etc for free movement.000321.2 T SINGLE ARM RADIAL DAVIT(xiv) Check all rotating parts, lever etc for free movement.
18400033ANCHOR WINDLASSANCHOR WINDLASS(a) STRIP AND EXAMINE SHAFT FOR WEAR AND ALIGNMENT CHECK AND CLEAR LUBRICATION POINT AND REASSEMBLE THE FITTINGS00033ANCHOR WINDLASSANCHOR WINDLASS(a) STRIP AND EXAMINE SHAFT FOR WEAR AND ALIGNMENT CHECK AND CLEAR LUBRICATION POINT AND REASSEMBLE THE FITTINGS
18500033ANCHOR WINDLASSANCHOR WINDLASS(b) HAND WHEEL AND WARPING DRUMS TO BE REMOVED. EXAMINE SLIT KEEP PLATE AND SCREW FOR WEAR AND DETERIORATION. CABLE HOLDER SPINDERS, BUSHES AND SHAFTS TO BE EXAMINED FOR WAR AND DEFECTS.00033ANCHOR WINDLASSANCHOR WINDLASS(b) HAND WHEEL AND WARPING DRUMS TO BE REMOVED. EXAMINE SLIT KEEP PLATE AND SCREW FOR WEAR AND DETERIORATION. CABLE HOLDER SPINDERS, BUSHES AND SHAFTS TO BE EXAMINED FOR WAR AND DEFECTS.
18600033ANCHOR WINDLASSANCHOR WINDLASS(c) DISMANTLE BRAKES, EXAMINE CONDITIONS OF BRAKE LININGS. RENEW LININGS , BRAKES IS TO BE AJUSTABLE ON COMPLETION.00033ANCHOR WINDLASSANCHOR WINDLASS(c) DISMANTLE BRAKES, EXAMINE CONDITIONS OF BRAKE LININGS. RENEW LININGS , BRAKES IS TO BE AJUSTABLE ON COMPLETION.
18700033ANCHOR WINDLASSANCHOR WINDLASS(d) EXAMINE SLIPPING CLUTH, MAGNECTIC BRAKES AND COUPLINGS RENEW ID NECESSARY. REPLENMISH SYSTEM WITH NEW CLEAN OIL OC 300.00033ANCHOR WINDLASSANCHOR WINDLASS(d) EXAMINE SLIPPING CLUTH, MAGNECTIC BRAKES AND COUPLINGS RENEW ID NECESSARY. REPLENMISH SYSTEM WITH NEW CLEAN OIL OC 300.
18800033ANCHOR WINDLASSANCHOR WINDLASS(e) INSPECT THE CONDITION OF DECK PLATING UNDER WINDLASS FOUNDATION. REPAIR IF NECESSARY. PRESERVE IN ACCORDANCE WITH NO 53/16.00033ANCHOR WINDLASSANCHOR WINDLASS(e) INSPECT THE CONDITION OF DECK PLATING UNDER WINDLASS FOUNDATION. REPAIR IF NECESSARY. PRESERVE IN ACCORDANCE WITH NO 53/16.
18900033ANCHOR WINDLASSANCHOR WINDLASS(f) CARRY OUT COMPLETE OVERHAUL OF ANCHOR WINDLASS AND CARRY OUT TRAILS TO ENSURE CORRECT PERFORMANCE ON COMPLETION OF OVERHAUL.00033ANCHOR WINDLASSANCHOR WINDLASS(f) CARRY OUT COMPLETE OVERHAUL OF ANCHOR WINDLASS AND CARRY OUT TRAILS TO ENSURE CORRECT PERFORMANCE ON COMPLETION OF OVERHAUL.
19000034ANCHOR AND CABLE / LOCKERSCHAIN CABLE/ LOCKERSMAKE : CHAKRAVORTY TRADERS ENGG, KOLKATA00034ANCHOR AND CABLE / LOCKERSCHAIN CABLE/ LOCKERSMAKE : CHAKRAVORTY TRADERS ENGG, KOLKATA
19100034ANCHOR AND CABLE / LOCKERSCHAIN CABLE/ LOCKERS(a) ANCHOR CHAIN CABLE AND ACCESSORIES TO BE HYDROJET BLASTED TO BARE METAL SURFACE SO AS TO FACILITATE SURVEY BY DOCKYARD. Mechanical chipping, scrapping, wire brushing etc in inaccessible areas, if additionally required by DYD. 02 HALF SHACKLES, 12 FULL SHACKLES, 02 ANCHOR, 02 BOTTLE SCREW SLIP, 04 SWIVEL ADAPTORS00034ANCHOR AND CABLE / LOCKERSCHAIN CABLE/ LOCKERS(a) ANCHOR CHAIN CABLE AND ACCESSORIES TO BE HYDROJET BLASTED TO BARE METAL SURFACE SO AS TO FACILITATE SURVEY BY DOCKYARD. Mechanical chipping, scrapping, wire brushing etc in inaccessible areas, if additionally required by DYD. 02 HALF SHACKLES, 12 FULL SHACKLES, 02 ANCHOR, 02 BOTTLE SCREW SLIP, 04 SWIVEL ADAPTORS
19200034ANCHOR AND CABLE / LOCKERSCHAIN CABLE/ LOCKERS(i) STUD LINK CHAIN CABLE HALF SHACKLES- 13.25 MTRS EACH00034ANCHOR AND CABLE / LOCKERSCHAIN CABLE/ LOCKERS(i) STUD LINK CHAIN CABLE HALF SHACKLES- 13.25 MTRS EACH
19300034ANCHOR AND CABLE / LOCKERSCHAIN CABLE/ LOCKERS(ii) STUD LINK CHAIN CABLE FULL SHACKLES- 27.5 MTRS EACH00034ANCHOR AND CABLE / LOCKERSCHAIN CABLE/ LOCKERS(ii) STUD LINK CHAIN CABLE FULL SHACKLES- 27.5 MTRS EACH
19400034ANCHOR AND CABLE / LOCKERSCHAIN CABLE/ LOCKERS(iii) US DANFORTH ANCHOR00034ANCHOR AND CABLE / LOCKERSCHAIN CABLE/ LOCKERS(iii) US DANFORTH ANCHOR
19500034ANCHOR AND CABLE / LOCKERSCHAIN CABLE/ LOCKERS(iv) BLAKE SLIP00034ANCHOR AND CABLE / LOCKERSCHAIN CABLE/ LOCKERS(iv) BLAKE SLIP
19600034ANCHOR AND CABLE / LOCKERSCHAIN CABLE/ LOCKERS(v) BOTTLE SCREW SLIP00034ANCHOR AND CABLE / LOCKERSCHAIN CABLE/ LOCKERS(v) BOTTLE SCREW SLIP
19700034ANCHOR AND CABLE / LOCKERSCHAIN CABLE/ LOCKERS(vi) SWIVEL ADAPTERS00034ANCHOR AND CABLE / LOCKERSCHAIN CABLE/ LOCKERS(vi) SWIVEL ADAPTERS
19800034ANCHOR CHAIN CABLE & ACCESSORIESANCHOR CHAIN CABLE & ACCESSORIES MAKE : INDIAN CHAIN PVT LTD(b) CARRY OUT SURVEY OF ANCHOR CHAIN CABLE ACCESSORIES AS PER NO 02/2100034ANCHOR CHAIN CABLE & ACCESSORIESANCHOR CHAIN CABLE & ACCESSORIES MAKE : INDIAN CHAIN PVT LTD(b) CARRY OUT SURVEY OF ANCHOR CHAIN CABLE ACCESSORIES AS PER NO 02/21
19900034ANCHOR CHAIN CABLE & ACCESSORIESANCHOR CHAIN CABLE & ACCESSORIES (I) STUD LINK CHAIN CABLE HALF SHACKLES- 17.25 MTRS EACH00034ANCHOR CHAIN CABLE & ACCESSORIESANCHOR CHAIN CABLE & ACCESSORIES (I) STUD LINK CHAIN CABLE HALF SHACKLES- 17.25 MTRS EACH
20000034ANCHOR CHAIN CABLE & ACCESSORIESANCHOR CHAIN CABLE & ACCESSORIES (II) STUD LINK CHAIN CABLE FULL SHACKLES- 27.5 MTRS EACH00034ANCHOR CHAIN CABLE & ACCESSORIESANCHOR CHAIN CABLE & ACCESSORIES (II) STUD LINK CHAIN CABLE FULL SHACKLES- 27.5 MTRS EACH
20100034ANCHOR CHAIN CABLE & ACCESSORIESANCHOR CHAIN CABLE & ACCESSORIES (III) ANCHOR00034ANCHOR CHAIN CABLE & ACCESSORIESANCHOR CHAIN CABLE & ACCESSORIES (III) ANCHOR
20200034ANCHOR CHAIN CABLE & ACCESSORIESANCHOR CHAIN CABLE & ACCESSORIES (IV) D SHACKLE00034ANCHOR CHAIN CABLE & ACCESSORIESANCHOR CHAIN CABLE & ACCESSORIES (IV) D SHACKLE
20300034ANCHOR CHAIN CABLE & ACCESSORIESANCHOR CHAIN CABLE & ACCESSORIES (V) BOTTLE SCREW SLIP00034ANCHOR CHAIN CABLE & ACCESSORIESANCHOR CHAIN CABLE & ACCESSORIES (V) BOTTLE SCREW SLIP
20400034ANCHOR CHAIN CABLE & ACCESSORIESANCHOR CHAIN CABLE & ACCESSORIES (VI) SWIVEL ADAPTERS00034ANCHOR CHAIN CABLE & ACCESSORIESANCHOR CHAIN CABLE & ACCESSORIES (VI) SWIVEL ADAPTERS
20500034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (c) All lugless joining shackles, anchor shackles, locker lugged shackles and swivel pieces are to be disconnected before cleaning/chipping to remove all paint and rust. . Clean and grease Trunnion pin and ho using. Grease to be used:- LG-280 Patt No 0474/910-0502 NOTE:- If there is likelihood of the twelve month period being exceeded, the machined surfaces of the joints of lugless joining shackles are to be examined for corrosion, all such shackles being stripped, greased and re-assembled by ship staff.00034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (c) All lugless joining shackles, anchor shackles, locker lugged shackles and swivel pieces are to be disconnected before cleaning/chipping to remove all paint and rust. . Clean and grease Trunnion pin and ho using. Grease to be used:- LG-280 Patt No 0474/910-0502 NOTE:- If there is likelihood of the twelve month period being exceeded, the machined surfaces of the joints of lugless joining shackles are to be examined for corrosion, all such shackles being stripped, greased and re-assembled by ship staff.
20600034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (d) cleaning/chipping to remove all paint and rust from all disconnected parts.00034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (d) cleaning/chipping to remove all paint and rust from all disconnected parts.
20700034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (e) Lay out all cables/ anchor ropes. Break, clean and grease all joining shackles. Strip and grease slip in cable locker. Re-arrange cable length to ensure equality of wear.Re-mark cable length.00034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (e) Lay out all cables/ anchor ropes. Break, clean and grease all joining shackles. Strip and grease slip in cable locker. Re-arrange cable length to ensure equality of wear.Re-mark cable length.
20800034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (f) Examine hull associated fittings.Examine all spare chain cable and fittings, clean and coat with cold bituminous paint.Dismantle anchor00034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (f) Examine hull associated fittings.Examine all spare chain cable and fittings, clean and coat with cold bituminous paint.Dismantle anchor
20900034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (g) Unscrew bottle slip/ compressor whereas fitted to its fullest extent and thoroughly clean and grease threads before assembly.00034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (g) Unscrew bottle slip/ compressor whereas fitted to its fullest extent and thoroughly clean and grease threads before assembly.
21000034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (h) Undertake survey of adapter piece for cracks or wear and undertake repair as per NO 02/2100034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (h) Undertake survey of adapter piece for cracks or wear and undertake repair as per NO 02/21
21100034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (j) Undertake survey of adapter piece for cracks or wear and undertake repair as per NO 02/2100034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (j) Undertake survey of adapter piece for cracks or wear and undertake repair as per NO 02/21
21200034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (k) Survey all deck fittings associated with anchor chain cable arrangement ie deck eyes/ eye plates including gulletine/ gulletine roller, compressor with complete structure whereas fitted paying particular attention eye plates/ eye bolts etc for wear, corrosion/ deterioration and ovality of hole. Undertake repair/ renewal iaw NO 02/200034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (k) Survey all deck fittings associated with anchor chain cable arrangement ie deck eyes/ eye plates including gulletine/ gulletine roller, compressor with complete structure whereas fitted paying particular attention eye plates/ eye bolts etc for wear, corrosion/ deterioration and ovality of hole. Undertake repair/ renewal iaw NO 02/2
21300034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (l) Survey anchor, chain cable, swivel adaptor, shackles and all associated fittings (An experienced Dockyard blacksmith is to assist the survey).Break, clean and grease all joining shackles. Undertake repair/ renewal as applicable iaw NO 02/21. Forward a report on IN 305/ NSO 269(b) to authorities as mentioned in para 15 of NO 02/21.00034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (l) Survey anchor, chain cable, swivel adaptor, shackles and all associated fittings (An experienced Dockyard blacksmith is to assist the survey).Break, clean and grease all joining shackles. Undertake repair/ renewal as applicable iaw NO 02/21. Forward a report on IN 305/ NSO 269(b) to authorities as mentioned in para 15 of NO 02/21.
21400034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (m) Check original dia of each parts of anchor , chain cable and accessories from rigging warrant & offer them survey to DYD along with IN 305 & anchor test certificate.00034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (m) Check original dia of each parts of anchor , chain cable and accessories from rigging warrant & offer them survey to DYD along with IN 305 & anchor test certificate.
21500034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (n) Undertake survey and load test of all steel wire rope associated with stern anchor. Survey and load test of steel wire ropes associated with Stern anchor are to be in accordance with Para 13 (c)- (h) of NO 02/21. unwind the steel wire rope from the windlass drum and range on the area designated by the refitting authority. Prior to restoring, entire steel wire rope is to be cleaned, dried and lubricated.00034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (n) Undertake survey and load test of all steel wire rope associated with stern anchor. Survey and load test of steel wire ropes associated with Stern anchor are to be in accordance with Para 13 (c)- (h) of NO 02/21. unwind the steel wire rope from the windlass drum and range on the area designated by the refitting authority. Prior to restoring, entire steel wire rope is to be cleaned, dried and lubricated.
21600034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (p) Retest and examination of cable in accordance with BR 367, Article 13 and NO 02/21.00034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (p) Retest and examination of cable in accordance with BR 367, Article 13 and NO 02/21.
21700034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (q) Examine the condition of paint of cable lockers for sign of any deterioration/ damage of paint. Clean, remove damaged paint and rust using mechanical chipping or scraping or wire brush tools. Paint the cable locker iaw NO 53/16 and policy directive issued by IHQ/DNA from time to tim00034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (q) Examine the condition of paint of cable lockers for sign of any deterioration/ damage of paint. Clean, remove damaged paint and rust using mechanical chipping or scraping or wire brush tools. Paint the cable locker iaw NO 53/16 and policy directive issued by IHQ/DNA from time to tim
21800034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (r) Undertake preservation of the anchor chain cable and accessories held onboard, by application of cold bituminous/ PS60 paint iaw Appendix ‘E’ of NO 53/1600034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (r) Undertake preservation of the anchor chain cable and accessories held onboard, by application of cold bituminous/ PS60 paint iaw Appendix ‘E’ of NO 53/16
21900034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (s) Assistance required for dismantling of 12 no. lugless joining shackles, 04 Lugged shackles, 04 D-Shackles of slips.00034ANCHOR AND CABLE / LOCKERSANCHOR AND CABLE / LOCKERS (s) Assistance required for dismantling of 12 no. lugless joining shackles, 04 Lugged shackles, 04 D-Shackles of slips.
22000035STPOperational checks(a) Undertake complete functional and operational checks of entire sewage treatment plants and check specific defects for yard for rectification.00035STPOperational checks(a) Undertake complete functional and operational checks of entire sewage treatment plants and check specific defects for yard for rectification.
22100035STPPVC lines and plug(b) Undertake renewal of all PVC pipelines and PVC plug cock valves00035STPPVC lines and plug(b) Undertake renewal of all PVC pipelines and PVC plug cock valves
22200035STPsystem lines(c) Overhaul/ chemical clean all sewage/ system pipelines.00035STPsystem lines(c) Overhaul/ chemical clean all sewage/ system pipelines.
22300035STPvisual survey sewage tanks(d) Undertake visual survey of V1 & V2 tanks. If the corrosion is found to be excessive,undertake USG survey of tanks. Undertake repairs as necessary00035STPvisual survey sewage tanks(d) Undertake visual survey of V1 & V2 tanks. If the corrosion is found to be excessive,undertake USG survey of tanks. Undertake repairs as necessary
22400035STPSoil pipes(e) Undertake chemical cleaning of soil pipes.00035STPSoil pipes(e) Undertake chemical cleaning of soil pipes.
22500035STPMotors and starters(f) Overhauling of all motors and starters00035STPMotors and starters(f) Overhauling of all motors and starters
22600035STPSurvey and painting of sewage tanks(g) Carry out cleaning / Survey of V1 and V2 tanks and repair as necessary. Inspect the Internal and external Paint coating and recoat with appropriate paint scheme after completion of repairs and surfacepreparation00035STPSurvey and painting of sewage tanks(g) Carry out cleaning / Survey of V1 and V2 tanks and repair as necessary. Inspect the Internal and external Paint coating and recoat with appropriate paint scheme after completion of repairs and surfacepreparation
22700035STPLevel indicator checks(h) Check function of control panel and carryout out calibration of level switches of V1 and V2 tanks. Replace if necessary00035STPLevel indicator checks(h) Check function of control panel and carryout out calibration of level switches of V1 and V2 tanks. Replace if necessary
22800035STPOverhauling(j) Overhaul / repair the following :(i) Overboard pump(ii) Discharge pump(iii) Macerator pump(iv) IMO pump (If fitted)(v) Rotary Air Compressor00035STPOverhauling(j) Overhaul / repair the following :(i) Overboard pump(ii) Discharge pump(iii) Macerator pump(iv) IMO pump (If fitted)(v) Rotary Air Compressor
22900035STPsystem lines(k) Undertake over haul / repair of 100% of system valves (Non-PVC) fitted in the system.00035STPsystem lines(k) Undertake over haul / repair of 100% of system valves (Non-PVC) fitted in the system.
23000035STPV1 AND V2 TANKS(l) Inspect freeness of vent line of V1 and V2 tanks by blowing throughwith air. Project defects if any00035STPV1 AND V2 TANKS(l) Inspect freeness of vent line of V1 and V2 tanks by blowing throughwith air. Project defects if any
23100035STPISPP certificate(m) If renewal of certificate is due, Obtain international Sewage Pollution Prevention Certificate valid for duration of five years from a state authorised accredited agencies as specified in MEPC 115(51) AND 227(64) for the ship adopted on 01 Apr 04 as per Regulation 5 of Revised Annex IV of MARPOL 73/78 (NCD 3930, issue 3, Sep 16 isrelevant)00035STPISPP certificate(m) If renewal of certificate is due, Obtain international Sewage Pollution Prevention Certificate valid for duration of five years from a state authorised accredited agencies as specified in MEPC 115(51) AND 227(64) for the ship adopted on 01 Apr 04 as per Regulation 5 of Revised Annex IV of MARPOL 73/78 (NCD 3930, issue 3, Sep 16 isrelevant)
23200035STPEffluent test(n) Carry out effluent test of sewage discharge.00035STPEffluent test(n) Carry out effluent test of sewage discharge.
23300036SEWAGE TREATMENT PLANTSEWAGE TREATMENT PLANTMAKE : M/S HI POINT PVT LTD, MUMBAI, MODEL : OMNIPURE 6 MCQTY FITTED - 0100036SEWAGE TREATMENT PLANTSEWAGE TREATMENT PLANTMAKE : M/S HI POINT PVT LTD, MUMBAI, MODEL : OMNIPURE 6 MCQTY FITTED - 01
23400036SEWAGE TREATMENT PLANTSEWAGE TREATMENT PLANTMAKE : M/S HI POINT PVT LTD, MUMBAI, MODEL : OMNIPURE 6 MCQTY FITTED - 01 (A) OPEN, EXAMINE AND OVERHAUL MACERATOR AND OBD PUMP AND PROVE FOR SATISFACTORY OPERATION POST OVERHAUL. EXAMINE FOR WEAR AND CLOGGING. CLEAN CLOGGED PARTS. CHECK PROPER FACE CLEARANCE BETWEEN AXIAL AND CUTTER. CARRY OUT CUTTER ADJUSTMENT. CHECK SLEEVE BEARING AND SHAFT FOR WEAR. EXAMINE BALL BEARINGS FOR RUST AND WEAR AND MECHANICAL SEAL OF PUMP FOR DAMAGE. REPLACE WORN OUT CUTTERS, BEARINGS, O-RINGS, MECHANICAL SEAL AND OTHER SUB-COMPONENTS. SPARES NOT HELD WITH SHIPS STAFF.00036SEWAGE TREATMENT PLANTSEWAGE TREATMENT PLANTMAKE : M/S HI POINT PVT LTD, MUMBAI, MODEL : OMNIPURE 6 MCQTY FITTED - 01 (A) OPEN, EXAMINE AND OVERHAUL MACERATOR AND OBD PUMP AND PROVE FOR SATISFACTORY OPERATION POST OVERHAUL. EXAMINE FOR WEAR AND CLOGGING. CLEAN CLOGGED PARTS. CHECK PROPER FACE CLEARANCE BETWEEN AXIAL AND CUTTER. CARRY OUT CUTTER ADJUSTMENT. CHECK SLEEVE BEARING AND SHAFT FOR WEAR. EXAMINE BALL BEARINGS FOR RUST AND WEAR AND MECHANICAL SEAL OF PUMP FOR DAMAGE. REPLACE WORN OUT CUTTERS, BEARINGS, O-RINGS, MECHANICAL SEAL AND OTHER SUB-COMPONENTS. SPARES NOT HELD WITH SHIPS STAFF.
23500036SEWAGE TREATMENT PLANTSEWAGE TREATMENT PLANTMAKE : M/S HI POINT PVT LTD, MUMBAI, MODEL : OMNIPURE 6 MCQTY FITTED - 01 (B) ALL NECESSARY SPARES FOR REPAIR/ OVERHAUL OF EQUIPMENT ARE TO BE CATERED BY THE REPAIRING FIRM THROUGH OEM (M/S HI POINT SERVICES PVT LTD, MUMBAI)00036SEWAGE TREATMENT PLANTSEWAGE TREATMENT PLANTMAKE : M/S HI POINT PVT LTD, MUMBAI, MODEL : OMNIPURE 6 MCQTY FITTED - 01 (B) ALL NECESSARY SPARES FOR REPAIR/ OVERHAUL OF EQUIPMENT ARE TO BE CATERED BY THE REPAIRING FIRM THROUGH OEM (M/S HI POINT SERVICES PVT LTD, MUMBAI)
23600036SEWAGE TREATMENT PLANTSEWAGE TREATMENT PLANTMAKE : M/S HI POINT PVT LTD, MUMBAI, MODEL : OMNIPURE 6 MCQTY FITTED - 01 (C) UNDERTAKE RENEWAL OF ALL PVC PIPELINES AND PVC PLUG COCK VALVES. OVERHAULING OF ALL SEWAGE SYSTEM PIPESLINES.00036SEWAGE TREATMENT PLANTSEWAGE TREATMENT PLANTMAKE : M/S HI POINT PVT LTD, MUMBAI, MODEL : OMNIPURE 6 MCQTY FITTED - 01 (C) UNDERTAKE RENEWAL OF ALL PVC PIPELINES AND PVC PLUG COCK VALVES. OVERHAULING OF ALL SEWAGE SYSTEM PIPESLINES.
23700036SEWAGE TREATMENT PLANTSEWAGE TREATMENT PLANTMAKE : M/S HI POINT PVT LTD, MUMBAI, MODEL : OMNIPURE 6 MCQTY FITTED - 01 (D) UNDERTAKE CHEMICAL CLANING OF SOIL PIPES.00036SEWAGE TREATMENT PLANTSEWAGE TREATMENT PLANTMAKE : M/S HI POINT PVT LTD, MUMBAI, MODEL : OMNIPURE 6 MCQTY FITTED - 01 (D) UNDERTAKE CHEMICAL CLANING OF SOIL PIPES.
23800036SEWAGE TREATMENT PLANTSEWAGE TREATMENT PLANTMAKE : M/S HI POINT PVT LTD, MUMBAI, MODEL : OMNIPURE 6 MCQTY FITTED - 01 (E) OVERHAULING OF ALL MOTORS AND STARTERS. AND PIPE LINES.00036SEWAGE TREATMENT PLANTSEWAGE TREATMENT PLANTMAKE : M/S HI POINT PVT LTD, MUMBAI, MODEL : OMNIPURE 6 MCQTY FITTED - 01 (E) OVERHAULING OF ALL MOTORS AND STARTERS. AND PIPE LINES.
23900036SEWAGE TREATMENT PLANTSEWAGE TREATMENT PLANTMAKE : M/S HI POINT PVT LTD, MUMBAI, MODEL : OMNIPURE 6 MCQTY FITTED - 01 (F) OVERHAUL / REPAIR THE FOLLWING:- (I) OVERBOARD PUMP- 1 no, (II) DISCHARGE PUMP - 1 no, (III) MACERATOR PUMP - 1 no00036SEWAGE TREATMENT PLANTSEWAGE TREATMENT PLANTMAKE : M/S HI POINT PVT LTD, MUMBAI, MODEL : OMNIPURE 6 MCQTY FITTED - 01 (F) OVERHAUL / REPAIR THE FOLLWING:- (I) OVERBOARD PUMP- 1 no, (II) DISCHARGE PUMP - 1 no, (III) MACERATOR PUMP - 1 no
24000036SEWAGE TREATMENT PLANTV1 AND V1 TANKSMAKE : M/S HI POINT PVT LTD, MUMBAI, MODEL : OMNIPURE 6 MCQTY FITTED - 01 (f) CARRYOUT CLEANING/ SURVEY OF V1 AND V2 TANKS AND REPAIR AS NECESSARY. INSPECT THE INTERNAL AND EXTERNAL PAINT COATING AND RECOAT WITH APPROPIATE PAINT SCHEME AFTER COMPLETION OF REPAIRS AND SURFACE PREPARATION.WITH. AREA - 10 SQ.MTRS00036SEWAGE TREATMENT PLANTV1 AND V1 TANKSMAKE : M/S HI POINT PVT LTD, MUMBAI, MODEL : OMNIPURE 6 MCQTY FITTED - 01 (f) CARRYOUT CLEANING/ SURVEY OF V1 AND V2 TANKS AND REPAIR AS NECESSARY. INSPECT THE INTERNAL AND EXTERNAL PAINT COATING AND RECOAT WITH APPROPIATE PAINT SCHEME AFTER COMPLETION OF REPAIRS AND SURFACE PREPARATION.WITH. AREA - 10 SQ.MTRS
24100036SEWAGE TREATMENT PLANTMAKE : M/S HI POINT PVT LTD, MUMBAI, MODEL : OMNIPURE 6 MCQTY FITTED - 01 (g) CHECK FUNCTION OF CONTROL PANEL AND CARRYOUT CALIBRATION OF LEVEL SWITCHES OF V1 AND V2 TANKS. REPLACE IF NECESSARY00036SEWAGE TREATMENT PLANTMAKE : M/S HI POINT PVT LTD, MUMBAI, MODEL : OMNIPURE 6 MCQTY FITTED - 01 (g) CHECK FUNCTION OF CONTROL PANEL AND CARRYOUT CALIBRATION OF LEVEL SWITCHES OF V1 AND V2 TANKS. REPLACE IF NECESSARY
24200036SEWAGE TREATMENT PLANTFORCE EHAUST BLOWER MOTORMAKE : M/S HI POINT PVT LTD, MUMBAI, MODEL : OMNIPURE 6 MCQTY FITTED - 01 (h) DISMANTLE AND OVERHAUL EXHAUST BLOWER MOTOR . EXAMINE THE BEARINGS AND SEALS AND RENEW IF NECESSARY. SPARES NOT HELD WITH SHIPS STAFF. ALL NECESSARY SPARES FOR REPAIR/ OVERHAUL OF EQUIPMENT ARE TO BE CATERED BY THE REPAIRING FIRM.00036SEWAGE TREATMENT PLANTFORCE EHAUST BLOWER MOTORMAKE : M/S HI POINT PVT LTD, MUMBAI, MODEL : OMNIPURE 6 MCQTY FITTED - 01 (h) DISMANTLE AND OVERHAUL EXHAUST BLOWER MOTOR . EXAMINE THE BEARINGS AND SEALS AND RENEW IF NECESSARY. SPARES NOT HELD WITH SHIPS STAFF. ALL NECESSARY SPARES FOR REPAIR/ OVERHAUL OF EQUIPMENT ARE TO BE CATERED BY THE REPAIRING FIRM.
24300037SANITARY SYSTEMSANITARY SYSTEM(a) DISMANTLE ALL SOIL AND URINAL DRAIN PIPE AN UNDERTAKE RE-GALVANIZING.00037SANITARY SYSTEMSANITARY SYSTEM(a) DISMANTLE ALL SOIL AND URINAL DRAIN PIPE AN UNDERTAKE RE-GALVANIZING.
24400037SANITARY SYSTEMSANITARY SYSTEM(b) STRIP, CLEAN AND OVERHAULING OF 100% WC AND URINAL FLUSHING VALVES, REDUCING VALVES AND REDUCER.00037SANITARY SYSTEMSANITARY SYSTEM(b) STRIP, CLEAN AND OVERHAULING OF 100% WC AND URINAL FLUSHING VALVES, REDUCING VALVES AND REDUCER.
24500037SANITARY SYSTEMSANITARY SYSTEM(c) Strip and clean 100% of soil and urinal drain pipe. Re- galvanise where required.00037SANITARY SYSTEMSANITARY SYSTEM(c) Strip and clean 100% of soil and urinal drain pipe. Re- galvanise where required.
24600038SEWAGE SYSTEMSTORM VALVESDISMANTLE AND OVERHAUL STORM VALVES OF GALLEY DRAIN AND STP DRAIN. RECTIFY THE DEFECTS AND PRESSURE TEST TO 2 KG PRESSURE ON COMPLETION OF REPAIRS. VALVE SIZE: 65 MM NB00038SEWAGE SYSTEMSTORM VALVESDISMANTLE AND OVERHAUL STORM VALVES OF GALLEY DRAIN AND STP DRAIN. RECTIFY THE DEFECTS AND PRESSURE TEST TO 2 KG PRESSURE ON COMPLETION OF REPAIRS. VALVE SIZE: 65 MM NB
24700039DRAINAGE SYSTEMSTORM VALVESDISMANTLE AND OVERHAUL STORM VALVES OF DECK DRAINS IN MESS DECKS DRAIN. RECTIFY THE DEFECTS AND PRESSURE TEST TO 2 KG PRESSURE ON COMPLETION OF REPAIRS, IF ANY. WORK INVOLVES REMOVAL& REFITMENT OF LAGGING & PANNELING ON SHIP SIDE IN SR.SLS MESS AND WASH SPACES. VALVE SIZE: 65 MM NB00039DRAINAGE SYSTEMSTORM VALVESDISMANTLE AND OVERHAUL STORM VALVES OF DECK DRAINS IN MESS DECKS DRAIN. RECTIFY THE DEFECTS AND PRESSURE TEST TO 2 KG PRESSURE ON COMPLETION OF REPAIRS, IF ANY. WORK INVOLVES REMOVAL& REFITMENT OF LAGGING & PANNELING ON SHIP SIDE IN SR.SLS MESS AND WASH SPACES. VALVE SIZE: 65 MM NB
24800039DRAINAGE SYSTEMDRAIN PIPES(A) DISMANTLE THE ENTIRE STRETCH OF DRAIN PIPES FROM DECK DRAINS. CHEMICALLY CLEAN THE PIPINGS FREE OF SOLID DEPOSITS AND REFIT THE SAME ON COMPLETION. MATERIAL: GI, 2 1/2\\"00039DRAINAGE SYSTEMDRAIN PIPES(A) DISMANTLE THE ENTIRE STRETCH OF DRAIN PIPES FROM DECK DRAINS. CHEMICALLY CLEAN THE PIPINGS FREE OF SOLID DEPOSITS AND REFIT THE SAME ON COMPLETION. MATERIAL: GI, 2 1/2\\"
24900039DRAINAGE SYSTEMDRAIN PIPES(B) ALSO QUOTE FOR RENEWAL OF ABOVE PIPE LINE AT DAMAGED LOCATIONS. MATERIAL: GI , DIA: 2 1/2\\"00039DRAINAGE SYSTEMDRAIN PIPES(B) ALSO QUOTE FOR RENEWAL OF ABOVE PIPE LINE AT DAMAGED LOCATIONS. MATERIAL: GI , DIA: 2 1/2\\"
25000040VENTILATION SYSTEMATU 2 - 6 TR(a) DEGUTTING/ REGUTTING OF AIR TREATMENT UNITS 2 (FCU)TO BE UNDERTAKEN. FOLLOWING JOB INVOLVED:-00040VENTILATION SYSTEMATU 2 - 6 TR(a) DEGUTTING/ REGUTTING OF AIR TREATMENT UNITS 2 (FCU)TO BE UNDERTAKEN. FOLLOWING JOB INVOLVED:-
25100040VENTILATION SYSTEMATU 2 - 6 TR(a) DEGUTTING/ REGUTTING OF AIR TREATMENT UNITS 2 (FCU)TO BE UNDERTAKEN. FOLLOWING JOB INVOLVED:-(i) DEGUTTING/ DISMANTLING OF 01 NOS AIR TREATMENT UNITs 01 NO IN MER - 6 TR ( FOR MCR ONLY)00040VENTILATION SYSTEMATU 2 - 6 TR(a) DEGUTTING/ REGUTTING OF AIR TREATMENT UNITS 2 (FCU)TO BE UNDERTAKEN. FOLLOWING JOB INVOLVED:-(i) DEGUTTING/ DISMANTLING OF 01 NOS AIR TREATMENT UNITs 01 NO IN MER - 6 TR ( FOR MCR ONLY)
25200040VENTILATION SYSTEMATU 2 - 6 TR(a) DEGUTTING/ REGUTTING OF AIR TREATMENT UNITS 2 (FCU)TO BE UNDERTAKEN. FOLLOWING JOB INVOLVED:-(ii) REGUTTING/ FITMENT OF BELOW MENTIONED PARTS OF ATUs (FCU ) TO BE UNDERTAKEN:00040VENTILATION SYSTEMATU 2 - 6 TR(a) DEGUTTING/ REGUTTING OF AIR TREATMENT UNITS 2 (FCU)TO BE UNDERTAKEN. FOLLOWING JOB INVOLVED:-(ii) REGUTTING/ FITMENT OF BELOW MENTIONED PARTS OF ATUs (FCU ) TO BE UNDERTAKEN:
25300040VENTILATION SYSTEMATU 2 - 6 TR(a) DEGUTTING/ REGUTTING OF AIR TREATMENT UNITS 2 (FCU)TO BE UNDERTAKEN. FOLLOWING JOB INVOLVED:-(iii) DEGUTTING AND REGUTTING OF ADJACENT FITTINGS AND PUMPS : POWER PANEL, DA PANEL NO. 3, FOT 1 & 2 PUMP , CENTRIFUGE (1 &2 ) AND ACCESSORIES.00040VENTILATION SYSTEMATU 2 - 6 TR(a) DEGUTTING/ REGUTTING OF AIR TREATMENT UNITS 2 (FCU)TO BE UNDERTAKEN. FOLLOWING JOB INVOLVED:-(iii) DEGUTTING AND REGUTTING OF ADJACENT FITTINGS AND PUMPS : POWER PANEL, DA PANEL NO. 3, FOT 1 & 2 PUMP , CENTRIFUGE (1 &2 ) AND ACCESSORIES.
25400040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-00040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-
25500040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(i) AHU FRAME - SS316L00040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(i) AHU FRAME - SS316L
25600040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(ii) AHU BASE FRAME - STAINLESS STEEL GR - 316 1 MM00040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(ii) AHU BASE FRAME - STAINLESS STEEL GR - 316 1 MM
25700040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(iii) MOTOR/ BLOWER BASE FRAME - SS00040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(iii) MOTOR/ BLOWER BASE FRAME - SS
25800040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(iv) VIBRATION PAD - NEOPRENE RUBBER00040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(iv) VIBRATION PAD - NEOPRENE RUBBER
25900040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(v) FRAME CORNERS - SS00040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(v) FRAME CORNERS - SS
26000040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(vi) AHU PANEL OUTER - SS316 L00040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(vi) AHU PANEL OUTER - SS316 L
26100040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(vii) AHU PANEL INNER - SS 316L00040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(vii) AHU PANEL INNER - SS 316L
26200040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(viii) INSULATION - PUF42 KG /M300040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(viii) INSULATION - PUF42 KG /M3
26300040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(ix) DRAIN TRAY - SS316L00040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(ix) DRAIN TRAY - SS316L
26400040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(x) BLOWER - KRUGER : MODEL BDB 25000040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(x) BLOWER - KRUGER : MODEL BDB 250
26500040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(xi) MOTOR - MEGHA ROTOTECH : 0.75 KW00040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(xi) MOTOR - MEGHA ROTOTECH : 0.75 KW
26600040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(xii) DRIVE BELT - SPB 121000040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(xii) DRIVE BELT - SPB 1210
26700040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(xiii) FAN PULLEY - SPB 158/ 2500040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(xiii) FAN PULLEY - SPB 158/ 25
26800040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(xiv) MOTOR PULLEY - SPB 146/2000040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(xiv) MOTOR PULLEY - SPB 146/20
26900040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(xv) COOLING COIL (DX) - TUBES - COPPER, FINS - COPPER00040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(xv) COOLING COIL (DX) - TUBES - COPPER, FINS - COPPER
27000040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(xvi) FILTER FRAME - SS316 L00040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(xvi) FILTER FRAME - SS316 L
27100040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(xvii) FILTER MEDIA - HDPE00040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(xvii) FILTER MEDIA - HDPE
27200040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(xviii) GASKET - RUBBER00040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(xviii) GASKET - RUBBER
27300040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(xix) FLEXIBLE CONNECTION - WOVEN FIBER GLASS WITH NEOPRENE COATING00040VENTILATION SYSTEMATU 2 - 6 TR(b) FITMENT OF FOLLOWING PARTS OF ATU 2 (FCU) TO BE UNDERTAKEN:-(xix) FLEXIBLE CONNECTION - WOVEN FIBER GLASS WITH NEOPRENE COATING
27400040VENTILATION SYSTEM GALLEY EXHAUSTMAKE : HEINEN AND HOPEMAN ENGG00040VENTILATION SYSTEM GALLEY EXHAUSTMAKE : HEINEN AND HOPEMAN ENGG
27500040VENTILATION SYSTEM GALLEY EXHAUSTMAKE : HEINEN AND HOPEMAN ENGG (c) EXHAUST TRUNKING: INTERNAL SURFACES OF THE GALLEY CHIMNEY AND TRUNKING ARE TO BE THOROUGHLY DEGREASED AND CLEANED. WORK INVOLVES REMOVAL OF MUSHROOM HEAD-BLOWER ASSEMBLY AND REFITMENT ON COMPLETION OF CLEANING00040VENTILATION SYSTEM GALLEY EXHAUSTMAKE : HEINEN AND HOPEMAN ENGG (c) EXHAUST TRUNKING: INTERNAL SURFACES OF THE GALLEY CHIMNEY AND TRUNKING ARE TO BE THOROUGHLY DEGREASED AND CLEANED. WORK INVOLVES REMOVAL OF MUSHROOM HEAD-BLOWER ASSEMBLY AND REFITMENT ON COMPLETION OF CLEANING
27600040MAKE : HEINEN AND HOPEMAN ENGG (e) CARRYOUT TRIALS OF A/C & VENTILATION SYSTEM TO ENSURE SATICFACTORY PERFORMANCE. EXAMINE AND TEST ONE WAY, TWO WAY, RECIRCULATION FLAPS WHEREAS APPLICABLE TO SHIP. DEFECTS TO BE RECTIFIED. RENEW RUBBER SEATINGS AND CARRYOUT CHALK TEST FOR AIR TIGHTNESS00040MAKE : HEINEN AND HOPEMAN ENGG (e) CARRYOUT TRIALS OF A/C & VENTILATION SYSTEM TO ENSURE SATICFACTORY PERFORMANCE. EXAMINE AND TEST ONE WAY, TWO WAY, RECIRCULATION FLAPS WHEREAS APPLICABLE TO SHIP. DEFECTS TO BE RECTIFIED. RENEW RUBBER SEATINGS AND CARRYOUT CHALK TEST FOR AIR TIGHTNESS
27700040VENTILATION SYSTEM AIR HANDLING UNITS(f) CHEMICALLY CLEAN HEAT EXCHANGER FINS AND COILS. JOB INCLUDES FOLLOWING :-00040VENTILATION SYSTEM AIR HANDLING UNITS(f) CHEMICALLY CLEAN HEAT EXCHANGER FINS AND COILS. JOB INCLUDES FOLLOWING :-
27800040VENTILATION SYSTEM AIR HANDLING UNITS(g) DISMANTLING OF HEAT EXCHANGER UNITS OF 02 NOS ATUs (i) 01 NO IN STP LOBBY CAP - STP LOBBY ATU- 22 TR (MAIN ATU NO 1) (ii) 01 NO IN MER CAPACITY ATU- 8 TR (MCR ATU NO 2)00040VENTILATION SYSTEM AIR HANDLING UNITS(g) DISMANTLING OF HEAT EXCHANGER UNITS OF 02 NOS ATUs (i) 01 NO IN STP LOBBY CAP - STP LOBBY ATU- 22 TR (MAIN ATU NO 1) (ii) 01 NO IN MER CAPACITY ATU- 8 TR (MCR ATU NO 2)
27900040VENTILATION SYSTEM AIR HANDLING UNITS(h) CHEMICAL CLEANING OF HEAT EXCHANGER FINS AND COILS AND RENEWAL OF 50% DAMAGED COPPER TUBES OF ATU'S00040VENTILATION SYSTEM AIR HANDLING UNITS(h) CHEMICAL CLEANING OF HEAT EXCHANGER FINS AND COILS AND RENEWAL OF 50% DAMAGED COPPER TUBES OF ATU'S
28000040VENTILATION SYSTEM AIR HANDLING UNITS(j) SURVEY AND RENEWAL OF ATU CASING STRUCTURE AND HEAT EXCHANGER STRUCTURE(BOTTOM PLATES AND BODY CASING PLATES) OF MAIN AHU MAT - MOULDED ZN SHEETS THICKNESS 2MM(FOR MAIN ATU ONLY)00040VENTILATION SYSTEM AIR HANDLING UNITS(j) SURVEY AND RENEWAL OF ATU CASING STRUCTURE AND HEAT EXCHANGER STRUCTURE(BOTTOM PLATES AND BODY CASING PLATES) OF MAIN AHU MAT - MOULDED ZN SHEETS THICKNESS 2MM(FOR MAIN ATU ONLY)
28100040VENTILATION SYSTEM AIR HANDLING UNITS(k) RENEW 02 IN NOS FAN BEARINGS AS PER SAMPLE IN BLOWER FAN OF MAIN AHU00040VENTILATION SYSTEM AIR HANDLING UNITS(k) RENEW 02 IN NOS FAN BEARINGS AS PER SAMPLE IN BLOWER FAN OF MAIN AHU
28200040VENTILATION SYSTEM AIR HANDLING UNITS(l) PRESSURE TEST THE HEAT EXCHANGER UNITS TO 12 KG PR FOR AHU 1 AND 2.00040VENTILATION SYSTEM AIR HANDLING UNITS(l) PRESSURE TEST THE HEAT EXCHANGER UNITS TO 12 KG PR FOR AHU 1 AND 2.
28300040VENTILATION SYSTEM AIR HANDLING UNITS(m) JOB INVOLVES DEGUTTING AND REGUTTING OF FOLLOWING : (6 TR ATU) (i) ATU CASING BOX(ii) VENTILATION BLOWER - 01 NOS(iii) VENTILATION DAMPERS - 02 NOS(iv) CHILLED GAS LINE - 5 RMT (v) COLD LAGGING - 06 SQM(vi) MFMB LAGGING - 10 SQM00040VENTILATION SYSTEM AIR HANDLING UNITS(m) JOB INVOLVES DEGUTTING AND REGUTTING OF FOLLOWING : (6 TR ATU) (i) ATU CASING BOX(ii) VENTILATION BLOWER - 01 NOS(iii) VENTILATION DAMPERS - 02 NOS(iv) CHILLED GAS LINE - 5 RMT (v) COLD LAGGING - 06 SQM(vi) MFMB LAGGING - 10 SQM
28400040VENTILATION SYSTEM AIR HANDLING UNITS(n) DEGUTTING/ REGUTTING OF EXISTING 6 TR ATU00040VENTILATION SYSTEM AIR HANDLING UNITS(n) DEGUTTING/ REGUTTING OF EXISTING 6 TR ATU
28500040VENTILATION SYSTEM AIR HANDLING UNITS(p) WORK INVOLVES REMOVAL OF MER SOFT PATCH DURING DOCKING FOR REMOVAL OF 6 TR ATU AND REFITMENT : JOB TO BE UNDERTAKEN DURING DOCKING PERIOD00040VENTILATION SYSTEM AIR HANDLING UNITS(p) WORK INVOLVES REMOVAL OF MER SOFT PATCH DURING DOCKING FOR REMOVAL OF 6 TR ATU AND REFITMENT : JOB TO BE UNDERTAKEN DURING DOCKING PERIOD
28600040VENTILATION SYSTEM VENTILATION SYSTEM(q) CHECK AIR PRESSURE DROP THROUGH THE ATU USING MANOMETER CONNECTION.00040VENTILATION SYSTEM VENTILATION SYSTEM(q) CHECK AIR PRESSURE DROP THROUGH THE ATU USING MANOMETER CONNECTION.
28700040VENTILATION SYSTEM VENTILATION SYSTEM(r) OVERHAUL MOTORS AND BLOWERS AS INDICATED BY SHIP. GREASE FILTERS OF EXHAUST TRUNKING IN GALLEY TO BE CLEANED AND PRESERVED. ECAMINE AND CARRY OUT OVERHAULING OF ROD GEARING CONNECTED WITH ASSOCIATEDD VENTILATIONS VALVES, ALSO REPLACE GLANDS AS NECESSARY AND SURVEY THE AREA IN VIVINITY.00040VENTILATION SYSTEM VENTILATION SYSTEM(r) OVERHAUL MOTORS AND BLOWERS AS INDICATED BY SHIP. GREASE FILTERS OF EXHAUST TRUNKING IN GALLEY TO BE CLEANED AND PRESERVED. ECAMINE AND CARRY OUT OVERHAULING OF ROD GEARING CONNECTED WITH ASSOCIATEDD VENTILATIONS VALVES, ALSO REPLACE GLANDS AS NECESSARY AND SURVEY THE AREA IN VIVINITY.
28800040VENTILATION SYSTEM VENTILATION SYSTEM(s) CHALK TEST OF WT COVERS SEALS. PACKS/ RENEW SEALS AS NECESSARY. NWT COVER SEALS AND HINGES LOUVERS TO BE EXAMINED TESTED. RAISE SPECFIC DEFECTS TO DOCKYARD FOR REPAIRS.00040VENTILATION SYSTEM VENTILATION SYSTEM(s) CHALK TEST OF WT COVERS SEALS. PACKS/ RENEW SEALS AS NECESSARY. NWT COVER SEALS AND HINGES LOUVERS TO BE EXAMINED TESTED. RAISE SPECFIC DEFECTS TO DOCKYARD FOR REPAIRS.
28900040VENTILATION SYSTEM VENTILATION SYSTEM(t) MODIFICATION OF VENTILALTION TRUNKING TO CATER FOR AC REPLACEMENT VIEW INCREASE IN AIR FLOW CAPACITY AND COOLING CAPACITY. DIMENSION 180MM TO 200MM THICKNESS THROUGHT THE SHIP00040VENTILATION SYSTEM VENTILATION SYSTEM(t) MODIFICATION OF VENTILALTION TRUNKING TO CATER FOR AC REPLACEMENT VIEW INCREASE IN AIR FLOW CAPACITY AND COOLING CAPACITY. DIMENSION 180MM TO 200MM THICKNESS THROUGHT THE SHIP
29000040VENTILATION SYSTEM VENTILATION SYSTEM(u) PRE REFIT AND POST REFIT VENTILATION TRIALS BE UNDERTAKEN AS PART OF REFIT ROUTINES( MAINTOPS)00040VENTILATION SYSTEM VENTILATION SYSTEM(u) PRE REFIT AND POST REFIT VENTILATION TRIALS BE UNDERTAKEN AS PART OF REFIT ROUTINES( MAINTOPS)
29100041Ventilation FlapsRenewals(a) Ventilation flaps along with frame and grills corroded and perished near MER soft Patch to be manufactured and replaced. Qty- 10, Mat. - MS.00041Ventilation FlapsRenewals(a) Ventilation flaps along with frame and grills corroded and perished near MER soft Patch to be manufactured and replaced. Qty- 10, Mat. - MS.
29200041Ventilation FlapsRubber Beading(b) Rubber beading of ventilation flap damaged and perished to be renewed. Qty - 35 RMT.00041Ventilation FlapsRubber Beading(b) Rubber beading of ventilation flap damaged and perished to be renewed. Qty - 35 RMT.
29300041Ventilation FlapsButterfly Nuts(c) Butterfly nuts of various vent flaps damaged to be renewed. Mat - SS,00041Ventilation FlapsButterfly Nuts(c) Butterfly nuts of various vent flaps damaged to be renewed. Mat - SS,
29400042Wire MeshRenewalsWire mesh of various supply and exhaust trunkings corroded and damaged to be manufactured as per sample. Mat - GI, Qty - .5 Sqm.00042Wire MeshRenewalsWire mesh of various supply and exhaust trunkings corroded and damaged to be manufactured as per sample. Mat - GI, Qty - .5 Sqm.
29500043AC TrunkingRepair(a) Air leakage observed from AC trunkings near ATU Compartment and Main Alleyway (Feeding to Bridge and Radio Room) to be repaired/ renewed. Work involves - Removal of lagging, repair/ renewal of trunking, refitment of lagging. Qty- 10 RMT, Mat. - GI.00043AC TrunkingRepair(a) Air leakage observed from AC trunkings near ATU Compartment and Main Alleyway (Feeding to Bridge and Radio Room) to be repaired/ renewed. Work involves - Removal of lagging, repair/ renewal of trunking, refitment of lagging. Qty- 10 RMT, Mat. - GI.
29600043AC TrunkingLagging(b) Chilled lagging of AC trunking damaged/ perished at ATU Compartment, Main Alleyway, lower deck lobby and Galley. Lagging to be undertaken with 1 inch of Chilled lagging to avoid condensation and to be coated with white canvas cloth. Qty. - 20 SQM00043AC TrunkingLagging(b) Chilled lagging of AC trunking damaged/ perished at ATU Compartment, Main Alleyway, lower deck lobby and Galley. Lagging to be undertaken with 1 inch of Chilled lagging to avoid condensation and to be coated with white canvas cloth. Qty. - 20 SQM
29700043AC TrunkingExhaust Trunking(c) Exhaust trunking in STP compartment, Rope and Canvas Store, JS Bathroom and ASP corroded and holed at indicated location to be repaired/ renewed. Mat. - AL/GI, Qty. - 15 RMT00043AC TrunkingExhaust Trunking(c) Exhaust trunking in STP compartment, Rope and Canvas Store, JS Bathroom and ASP corroded and holed at indicated location to be repaired/ renewed. Mat. - AL/GI, Qty. - 15 RMT
29800044TOWING HOOKOVERHAULINGMAKE : INDIA NETS, INDORE QTY FITTED - 01 NOS00044TOWING HOOKOVERHAULINGMAKE : INDIA NETS, INDORE QTY FITTED - 01 NOS
29900044TOWING HOOKOVERHAULINGMAKE : INDIA NETS, INDORE QTY FITTED - 01 NOS(a) 7.5 TONNE SWL TOWING HOOK TO BE DISMANTLED AND THOROUGLY OVERHAULED. REPLACE, DEFECTIVE COMPONENTS AND REFIT THE TOWING HOOK ON COMPLETION. NOTE: THE LOCK PLATE SECURING THE TOWING HOOK SWIVEL TO THE FOUNDATION BRACKET IS NOT TO BE WELDED AND IS TO BE FASTENED WITH THE BOLTS SCREWED ON TO THE THREADED HOLES TO BE DRILLED ON FOUNDATION BRACKET.00044TOWING HOOKOVERHAULINGMAKE : INDIA NETS, INDORE QTY FITTED - 01 NOS(a) 7.5 TONNE SWL TOWING HOOK TO BE DISMANTLED AND THOROUGLY OVERHAULED. REPLACE, DEFECTIVE COMPONENTS AND REFIT THE TOWING HOOK ON COMPLETION. NOTE: THE LOCK PLATE SECURING THE TOWING HOOK SWIVEL TO THE FOUNDATION BRACKET IS NOT TO BE WELDED AND IS TO BE FASTENED WITH THE BOLTS SCREWED ON TO THE THREADED HOLES TO BE DRILLED ON FOUNDATION BRACKET.
30000044TOWING HOOKLOAD TESTINGMAKE : INDIA NETS, INDORE QTY FITTED - 01 NOS(b) TOWING HOOK TO BE LOAD TESTED TO A PROOF LOAD OF 7.5 TON ON COMPLETION OF OVERHAULING. PREVIOUS LOAD TEST CERTIFICATE AND LOAD TEST PROFORMA WILL BE SUBMITTED BY THE SHIP'S STAFF.00044TOWING HOOKLOAD TESTINGMAKE : INDIA NETS, INDORE QTY FITTED - 01 NOS(b) TOWING HOOK TO BE LOAD TESTED TO A PROOF LOAD OF 7.5 TON ON COMPLETION OF OVERHAULING. PREVIOUS LOAD TEST CERTIFICATE AND LOAD TEST PROFORMA WILL BE SUBMITTED BY THE SHIP'S STAFF.
30100044WT HATCHESSUPPORTING BRACKETSMAKE : EASTERN ENTERPRISE00044WT HATCHESSUPPORTING BRACKETSMAKE : EASTERN ENTERPRISE
30200045WT HATCHESSUPPORTING BRACKETSMAKE : EASTERN ENTERPRISESUPPORTING BRACKETS ONTO WHICH RETAINING CATCHES OF HATCHES ARE SECURED TO BE RENEWED IN MAIN DECK HATCHES. MAT: 'I' SECTION (FABRICATED) 10 MM THICK, WEB: 3\\" WIDE, RIDER: 3\\" WIDE & LENGTH OF BRACKET: 1 MTR00045WT HATCHESSUPPORTING BRACKETSMAKE : EASTERN ENTERPRISESUPPORTING BRACKETS ONTO WHICH RETAINING CATCHES OF HATCHES ARE SECURED TO BE RENEWED IN MAIN DECK HATCHES. MAT: 'I' SECTION (FABRICATED) 10 MM THICK, WEB: 3\\" WIDE, RIDER: 3\\" WIDE & LENGTH OF BRACKET: 1 MTR
30300046DECK FITTINGSHULL SURVEYTHE FOLLOWING DECK FITTINGS TO BE VISUALLY SURVEYED AND AREAS FOUND EXCESSIVEY DETERIORATED ARE TO BE ULTRASONICALLY GUAGED: AREA TO BE RENEWED AS PER SURVEY REPORTS. SURVEY REPORT POST COMPLETEION OF HULL SURVEY BE PROVIDED TO SS.NOTE: STEEL RENEWAL TO BE UNDERTAKEN00046DECK FITTINGSHULL SURVEYTHE FOLLOWING DECK FITTINGS TO BE VISUALLY SURVEYED AND AREAS FOUND EXCESSIVEY DETERIORATED ARE TO BE ULTRASONICALLY GUAGED: AREA TO BE RENEWED AS PER SURVEY REPORTS. SURVEY REPORT POST COMPLETEION OF HULL SURVEY BE PROVIDED TO SS.NOTE: STEEL RENEWAL TO BE UNDERTAKEN
30400046DECK FITTINGSHULL SURVEY(A) TWIN BOLLARDS - 08 NOS00046DECK FITTINGSHULL SURVEY(A) TWIN BOLLARDS - 08 NOS
30500046DECK FITTINGSHULL SURVEY(B) FAIR LEADS- 08 NOS00046DECK FITTINGSHULL SURVEY(B) FAIR LEADS- 08 NOS
30600046DECK FITTINGSHULL SURVEY(C) BULL RINGS - 02 NOS00046DECK FITTINGSHULL SURVEY(C) BULL RINGS - 02 NOS
30700046DECK FITTINGSHULL SURVEY(D) CLEATS- 12 NOS00046DECK FITTINGSHULL SURVEY(D) CLEATS- 12 NOS
30800046DECK FITTINGSHULL SURVEY(E) TOWING BOLARD- 01 NO00046DECK FITTINGSHULL SURVEY(E) TOWING BOLARD- 01 NO
30900046DECK FITTINGSHULL SURVEY(F) CABLE CLENCH- 01 NO00046DECK FITTINGSHULL SURVEY(F) CABLE CLENCH- 01 NO
31000046DECK FITTINGSHULL SURVEY(G) TOWING HOOK FOUNDATION BRACKET- 01 NO00046DECK FITTINGSHULL SURVEY(G) TOWING HOOK FOUNDATION BRACKET- 01 NO
31100046DECK FITTINGSHULL SURVEY(H) BROWS - NOS -0100046DECK FITTINGSHULL SURVEY(H) BROWS - NOS -01
31200046DECK FITTINGSHULL SURVEY(J) DECK EYES BLAKE AND SCREWSLIPS- 02 NOS00046DECK FITTINGSHULL SURVEY(J) DECK EYES BLAKE AND SCREWSLIPS- 02 NOS
31300046DECK FITTINGSHULL SURVEY(K) DECK EYES OF ANCHOR STROP- 02 NOS00046DECK FITTINGSHULL SURVEY(K) DECK EYES OF ANCHOR STROP- 02 NOS
31400046DECK FITTINGSHULL SURVEY(L) MISCELLANEOUS DECK EYES - 08 NOS00046DECK FITTINGSHULL SURVEY(L) MISCELLANEOUS DECK EYES - 08 NOS
31500047WATERTIGHT SCUTTLESWATERTIGHT SCUTTLESMAKE : D S ENGG WORKSQTY FITTED - 13 NOS00047WATERTIGHT SCUTTLESWATERTIGHT SCUTTLESMAKE : D S ENGG WORKSQTY FITTED - 13 NOS
31600047WATERTIGHT SCUTTLESWATERTIGHT SCUTTLESMAKE : D S ENGG WORKSQTY FITTED - 13 NOSWT SCUTTLES ON SUPERSTRUCTURE TO BE CHECKED WITH HOSE TEST FOR INTACT WATERTIGHT INTEGRITY. FOLLOWING JOBS TO BE CARRIED OUT IN 13 IN NOS SCUTTLES:-00047WATERTIGHT SCUTTLESWATERTIGHT SCUTTLESMAKE : D S ENGG WORKSQTY FITTED - 13 NOSWT SCUTTLES ON SUPERSTRUCTURE TO BE CHECKED WITH HOSE TEST FOR INTACT WATERTIGHT INTEGRITY. FOLLOWING JOBS TO BE CARRIED OUT IN 13 IN NOS SCUTTLES:-
31700047WATERTIGHT SCUTTLESWATERTIGHT SCUTTLESMAKE : D S ENGG WORKSQTY FITTED - 13 NOS(A) MANUFACTURE AND FITMENT OF LOCKING RINGS AS PER SAMPLE. RING OUTER DIA: 12 INCHES; MAT: GUNMETAL00047WATERTIGHT SCUTTLESWATERTIGHT SCUTTLESMAKE : D S ENGG WORKSQTY FITTED - 13 NOS(A) MANUFACTURE AND FITMENT OF LOCKING RINGS AS PER SAMPLE. RING OUTER DIA: 12 INCHES; MAT: GUNMETAL
31800047WATERTIGHT SCUTTLESWATERTIGHT SCUTTLESMAKE : D S ENGG WORKSQTY FITTED - 13 NOS(B) ILLUMINATOR FRAMES TO BE MANUFACTURED AND RENEWED AS PER SAMPLE. FRAME OUTER DIA: 14 INCHES; MAT: BRASS00047WATERTIGHT SCUTTLESWATERTIGHT SCUTTLESMAKE : D S ENGG WORKSQTY FITTED - 13 NOS(B) ILLUMINATOR FRAMES TO BE MANUFACTURED AND RENEWED AS PER SAMPLE. FRAME OUTER DIA: 14 INCHES; MAT: BRASS
31900047WATERTIGHT SCUTTLESWATERTIGHT SCUTTLESMAKE : D S ENGG WORKSQTY FITTED - 13 NOS(C) RENEWAL OF GASKETS AS PER SAMPLE. MAT: SILICON RUBBER 1.5 MM THK00047WATERTIGHT SCUTTLESWATERTIGHT SCUTTLESMAKE : D S ENGG WORKSQTY FITTED - 13 NOS(C) RENEWAL OF GASKETS AS PER SAMPLE. MAT: SILICON RUBBER 1.5 MM THK
32000047WATERTIGHT SCUTTLESWATERTIGHT SCUTTLESMAKE : D S ENGG WORKSQTY FITTED - 13 NOS(D) BOXING UP OF ILLUMINATOR ASSEMBLY AFTER RENEWAL OF THE ABOVE.00047WATERTIGHT SCUTTLESWATERTIGHT SCUTTLESMAKE : D S ENGG WORKSQTY FITTED - 13 NOS(D) BOXING UP OF ILLUMINATOR ASSEMBLY AFTER RENEWAL OF THE ABOVE.
32100047WATERTIGHT SCUTTLESWATERTIGHT SCUTTLESMAKE : D S ENGG WORKSQTY FITTED - 13 NOS(E) RAIN COAMING FOR ALL SCUTTLES TO BE MANUFACTURED AND WELDED ON BULKHEAD. MAT - AL00047WATERTIGHT SCUTTLESWATERTIGHT SCUTTLESMAKE : D S ENGG WORKSQTY FITTED - 13 NOS(E) RAIN COAMING FOR ALL SCUTTLES TO BE MANUFACTURED AND WELDED ON BULKHEAD. MAT - AL
32200047WATERTIGHT SCUTTLESWATERTIGHT SCUTTLESMAKE : D S ENGG WORKSQTY FITTED - 13 NOS(F ) LUBRICATE AND CARRY OUT CHALK TEST OF ALL WATERTIGHT SCUTTLES00047WATERTIGHT SCUTTLESWATERTIGHT SCUTTLESMAKE : D S ENGG WORKSQTY FITTED - 13 NOS(F ) LUBRICATE AND CARRY OUT CHALK TEST OF ALL WATERTIGHT SCUTTLES
32300048SHIP'S SIDE SCUPPER SHIP'S SIDE SCUPPER 06 PAIRS OF SCUPPER LIPS ON WEATHER DECKS/ SHIP'S SIDE AT INDICATED LOCATIONS BE CROPPED AND RENEWED AND FITTED WITH MS PLATE AND RUBBER LIPS.00048SHIP'S SIDE SCUPPER SHIP'S SIDE SCUPPER 06 PAIRS OF SCUPPER LIPS ON WEATHER DECKS/ SHIP'S SIDE AT INDICATED LOCATIONS BE CROPPED AND RENEWED AND FITTED WITH MS PLATE AND RUBBER LIPS.
32400049VENTILATION SYSTEM MUSHROOM HEADSSPINDLES OF 08 IN NO MUSHROOM HEADS ON WEATHER DECKS TO BE SURVEYED AND CHECKED FOR FREE OPERATION. CARRYOUT RENEWAL OF SCREW SHAFTS, WIRE MESH (18 GUAGE) AND RUBBER BEADING AND REFITMENT IN SITU. THE DETAILS ARE AS FOLLOWS00049VENTILATION SYSTEM MUSHROOM HEADSSPINDLES OF 08 IN NO MUSHROOM HEADS ON WEATHER DECKS TO BE SURVEYED AND CHECKED FOR FREE OPERATION. CARRYOUT RENEWAL OF SCREW SHAFTS, WIRE MESH (18 GUAGE) AND RUBBER BEADING AND REFITMENT IN SITU. THE DETAILS ARE AS FOLLOWS
32500049VENTILATION SYSTEM MUSHROOM HEADS(A) DISMANTLING OF MUSHROOM HEADS, OVERHAULING AND REFITMENT ON COMPLETION00049VENTILATION SYSTEM MUSHROOM HEADS(A) DISMANTLING OF MUSHROOM HEADS, OVERHAULING AND REFITMENT ON COMPLETION
32600049VENTILATION SYSTEM MUSHROOM HEADS(B) RENEWAL OF SCREW SHAFTS AS PER SAMPLE. MAT: EN8. DIM: 25 MM DIA, 18 INCHES LONG AND SQUARE THREADS ON IT.00049VENTILATION SYSTEM MUSHROOM HEADS(B) RENEWAL OF SCREW SHAFTS AS PER SAMPLE. MAT: EN8. DIM: 25 MM DIA, 18 INCHES LONG AND SQUARE THREADS ON IT.
32700049VENTILATION SYSTEM MUSHROOM HEADS(C) RENEWAL OF WIRE MESH GUARDS ON THE MUSHROOM HEADS00049VENTILATION SYSTEM MUSHROOM HEADS(C) RENEWAL OF WIRE MESH GUARDS ON THE MUSHROOM HEADS
32800049VENTILATION SYSTEM MUSHROOM HEADS(D) RENEWAL OF RUBBER BEADING ON THE WT FLAPS OF MUSHROOM HEAD AS PER SAMPLE00049VENTILATION SYSTEM MUSHROOM HEADS(D) RENEWAL OF RUBBER BEADING ON THE WT FLAPS OF MUSHROOM HEAD AS PER SAMPLE
32900050WCs AND WASH PLACESMODULAR PANELLINGSFOLLWING JOBS BE UNDERTAKEN : (A) MODULAR SS PANNELING IN JR & SR SAILORS WC AND BATHROOMS AND OFFICERS BATHROOM/ WC TO BE RENEWED, FITTED AND SEALED WATER TIGHT IN SITU. MAT: SS SHEET, 18 GUAGE, MOULDED TO SHAPE; SILICON SEALING COMPOUND AND SS MOULDED BEADINGS. (B) PROVISIONING OF INSPECTION WINDOW FOR EVERY 1 MTR IAW IHQ MoD (N) DIRECTIVES ALONG WITH LOCKING MECHANISM. QTY - 1000050WCs AND WASH PLACESMODULAR PANELLINGSFOLLWING JOBS BE UNDERTAKEN : (A) MODULAR SS PANNELING IN JR & SR SAILORS WC AND BATHROOMS AND OFFICERS BATHROOM/ WC TO BE RENEWED, FITTED AND SEALED WATER TIGHT IN SITU. MAT: SS SHEET, 18 GUAGE, MOULDED TO SHAPE; SILICON SEALING COMPOUND AND SS MOULDED BEADINGS. (B) PROVISIONING OF INSPECTION WINDOW FOR EVERY 1 MTR IAW IHQ MoD (N) DIRECTIVES ALONG WITH LOCKING MECHANISM. QTY - 10
33000051VENTILATION SYSTEMROBOTIC/ CHEMICAL CLEANING(A) CARRY OUT ROBOTIC CLEANING OF ENTIRE LENGTH OF TRUNKINGS IN MESS DECKS, OFFICE SPACES, ALLEWAYS, GALLEY AND STORES. WORK INVOLVES REGUTTING AND DEGUTTING OF MODULAR SS PANNELINGS. PANELLING DAMAGED DURING DEGUTTING ARE TO BE RENEWED.00051VENTILATION SYSTEMROBOTIC/ CHEMICAL CLEANING(A) CARRY OUT ROBOTIC CLEANING OF ENTIRE LENGTH OF TRUNKINGS IN MESS DECKS, OFFICE SPACES, ALLEWAYS, GALLEY AND STORES. WORK INVOLVES REGUTTING AND DEGUTTING OF MODULAR SS PANNELINGS. PANELLING DAMAGED DURING DEGUTTING ARE TO BE RENEWED.
33100051VENTILATION SYSTEMPanelling (B) PANELING TO BE DEGUTTED AND REGUTTED AS ENVISAGED, APPROX 200 SQM00051VENTILATION SYSTEMPanelling (B) PANELING TO BE DEGUTTED AND REGUTTED AS ENVISAGED, APPROX 200 SQM
33200051VENTILATION SYSTEMChemical cleaning(C)REMOVAL/ REFITMENT AND CHEMICAL CLEANING OF GALLEY GREASE FILTERS BE UNDERTAKEN00051VENTILATION SYSTEMChemical cleaning(C)REMOVAL/ REFITMENT AND CHEMICAL CLEANING OF GALLEY GREASE FILTERS BE UNDERTAKEN
33300051VENTILATION SYSTEMVENTILATION DIFFUSERS(d) CARRYOUT CLEANING/ OVERHAULING OF ALL VENTILATION DIFFUSERS IN MESS DECKS, DINING HALL, OFFICERS'S CABINS, OFFICES AND WARDROOM.JOB INVOLVES RENEWAL OF DEFECTIVE DIFFUSERS AS PER EXISTING ONES. MATERIAL OF KNOB : PLASTIC MOULDED00051VENTILATION SYSTEMVENTILATION DIFFUSERS(d) CARRYOUT CLEANING/ OVERHAULING OF ALL VENTILATION DIFFUSERS IN MESS DECKS, DINING HALL, OFFICERS'S CABINS, OFFICES AND WARDROOM.JOB INVOLVES RENEWAL OF DEFECTIVE DIFFUSERS AS PER EXISTING ONES. MATERIAL OF KNOB : PLASTIC MOULDED
33400051VENTILATION SYSTEMVENTILATION DIFFUSERS(e) CARRYOUT CLEANING/ OVERHAULING OF ALL VENTILATION DIFFUSERS IN BRIDGE, GER, MCR AND GALLEY.JOB INVOLVES RENEWAL OF DEFECTIVE DIFFUSERS AS PER EXISTING ONES AS PER SAMPLE00051VENTILATION SYSTEMVENTILATION DIFFUSERS(e) CARRYOUT CLEANING/ OVERHAULING OF ALL VENTILATION DIFFUSERS IN BRIDGE, GER, MCR AND GALLEY.JOB INVOLVES RENEWAL OF DEFECTIVE DIFFUSERS AS PER EXISTING ONES AS PER SAMPLE
33500052WT STRUCTURERUBBER BEADINGSRUBBER GASKETS (BEADINGS) OF FOLLOWING WATERTIGHT STRUCTURE TO BE RENEWED AS PER SAMPLE:00052WT STRUCTURERUBBER BEADINGSRUBBER GASKETS (BEADINGS) OF FOLLOWING WATERTIGHT STRUCTURE TO BE RENEWED AS PER SAMPLE:
33600052WT STRUCTURERUBBER BEADINGS(A) MER SOFT PATCH00052WT STRUCTURERUBBER BEADINGS(A) MER SOFT PATCH
33700052WT STRUCTURERUBBER BEADINGS(B) AER SOFT PATCH00052WT STRUCTURERUBBER BEADINGS(B) AER SOFT PATCH
33800052WT STRUCTURERUBBER BEADINGS(C) CIRCULAR/ RECTANGULAR FLAPS ON SUPER STRUCTURE00052WT STRUCTURERUBBER BEADINGS(C) CIRCULAR/ RECTANGULAR FLAPS ON SUPER STRUCTURE
33900053WT HATCHESWT HATCHES(A) VISUAL SURVEY OF STRUCTURE OF WT HATCH SILLS AND WT HATCH COVERS ON WEATHER DECKS TO BE CARRIED OUT PAYING PARTICULAR ATTENTION TO THE REGION ADJOINING THE RUBBER BEADING AND HATCH HINGES. AREAS FOUND DETERIORATED ARE TO BE CROPPED AND RENEWED.00053WT HATCHESWT HATCHES(A) VISUAL SURVEY OF STRUCTURE OF WT HATCH SILLS AND WT HATCH COVERS ON WEATHER DECKS TO BE CARRIED OUT PAYING PARTICULAR ATTENTION TO THE REGION ADJOINING THE RUBBER BEADING AND HATCH HINGES. AREAS FOUND DETERIORATED ARE TO BE CROPPED AND RENEWED.
34000053WT HATCHESChalk test(B) CARRY OUT CHALK TEST OF ALL WT HATCHES.00053WT HATCHESChalk test(B) CARRY OUT CHALK TEST OF ALL WT HATCHES.
34100053WT HATCHESRETAINER CLIPS/ SECURING ARRAGAMENT(c) RETAINER CLIPS/ SECURING ARRAGEMENT OF WT HATCHES OF WEATHER DECK JAMMED. TO BE REPLACED WITH NEW SPRING ASSISTED RETAINER CLIPS AS PER SAMPLE.00053WT HATCHESRETAINER CLIPS/ SECURING ARRAGAMENT(c) RETAINER CLIPS/ SECURING ARRAGEMENT OF WT HATCHES OF WEATHER DECK JAMMED. TO BE REPLACED WITH NEW SPRING ASSISTED RETAINER CLIPS AS PER SAMPLE.
34200054NWT METALLIC DORSLOCKS AND DOOR CLOSURES23 IN NO 7-LEVER DOUBLE LOCKING GODREJ MORTISE LOCKS OF MODULAR SS DOOR PANELS TO BE RENEWED AND FITTED ONTO DOORS. LOCKS NOT INCATTED AND NOT AVAILABLE WITH SHIP'S STAFF.HYDRAULIC DOOR CLOSURES (MAKE - GODREJ) TO BE RENEWED IN 23 IN NOS DOORS.MAKE - GODREJ00054NWT METALLIC DORSLOCKS AND DOOR CLOSURES23 IN NO 7-LEVER DOUBLE LOCKING GODREJ MORTISE LOCKS OF MODULAR SS DOOR PANELS TO BE RENEWED AND FITTED ONTO DOORS. LOCKS NOT INCATTED AND NOT AVAILABLE WITH SHIP'S STAFF.HYDRAULIC DOOR CLOSURES (MAKE - GODREJ) TO BE RENEWED IN 23 IN NOS DOORS.MAKE - GODREJ
34300054NWT METALLIC DORSLOCKS AND DOOR CLOSURES(A) RH LOCKS- 08 LH LOCKS- 1500054NWT METALLIC DORSLOCKS AND DOOR CLOSURES(A) RH LOCKS- 08 LH LOCKS- 15
34400054NWT METALLIC DORSLOCKS AND DOOR CLOSURES(B) DOOR CLOSURES - 2300054NWT METALLIC DORSLOCKS AND DOOR CLOSURES(B) DOOR CLOSURES - 23
34500055APT APT (a) ALL TANKS, SEA ATUBES AND COFFERDAMS ARE TO BE AIR PRESSURE TESTED.14 Sea tubes. 25 OBDs, 04 ICCP cofferdam, 01 tank cofferdam, 02 void space (Port & Stbd)09 tanks00055APT APT (a) ALL TANKS, SEA ATUBES AND COFFERDAMS ARE TO BE AIR PRESSURE TESTED.14 Sea tubes. 25 OBDs, 04 ICCP cofferdam, 01 tank cofferdam, 02 void space (Port & Stbd)09 tanks
34600055APT APT (b) CARRY OUT PRESSURE TESTING OF TANKS AND SEA TUBES TO 0.2 KG/CM2 WHICH ARE REPAIRED 14 Sea tubes. 25 OBDs, 04 ICCP cofferdam, 01 tank cofferdam, 02 void space (Port & Stbd)09 tanks00055APT APT (b) CARRY OUT PRESSURE TESTING OF TANKS AND SEA TUBES TO 0.2 KG/CM2 WHICH ARE REPAIRED 14 Sea tubes. 25 OBDs, 04 ICCP cofferdam, 01 tank cofferdam, 02 void space (Port & Stbd)09 tanks
34700055APT APT (c) UNDERTAKE APT OF ALL WATER TIGHT CLUSTERS VIEW IHQ FAC NC/5173/FAC DATED 19 JUN 14.00055APT APT (c) UNDERTAKE APT OF ALL WATER TIGHT CLUSTERS VIEW IHQ FAC NC/5173/FAC DATED 19 JUN 14.
34800056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(A) THE FOLLOWING STANDING RIGGING, SEAMANSHIP EQUIPMENT AND LIFTING APPLIANCES ARE TO BE LOAD TESTED AS PER SPECIFICATIONS GIVEN BY SHIP'S STAFF:00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(A) THE FOLLOWING STANDING RIGGING, SEAMANSHIP EQUIPMENT AND LIFTING APPLIANCES ARE TO BE LOAD TESTED AS PER SPECIFICATIONS GIVEN BY SHIP'S STAFF:
34900056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(I) ANCHOR STROPS00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(I) ANCHOR STROPS
35000056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(II) DECK EYES OF BLAKE AND BOTTLE SCREW SLIPS00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(II) DECK EYES OF BLAKE AND BOTTLE SCREW SLIPS
35100056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(III) DECK EYES OF ANCHOR STROPS00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(III) DECK EYES OF ANCHOR STROPS
35200056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(IV) LEADSMAN PLATFORM00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(IV) LEADSMAN PLATFORM
35300056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(V) PREVENTER SAFETY CHAIN HOOK00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(V) PREVENTER SAFETY CHAIN HOOK
35400056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(VI) TOWING PENDANT DIA 24 MM FSWR, 7.5 MTR00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(VI) TOWING PENDANT DIA 24 MM FSWR, 7.5 MTR
35500056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(VII) BOLLARD STROP 24 MM DIA FSWR 2 MTR00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(VII) BOLLARD STROP 24 MM DIA FSWR 2 MTR
35600056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(VIII) TOWING SHACKLES (STRAIGHT SHACKLE WITH SCREW BOLT)00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(VIII) TOWING SHACKLES (STRAIGHT SHACKLE WITH SCREW BOLT)
35700056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(IX) BOW SHACKLES00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(IX) BOW SHACKLES
35800056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(X) SENHOUSE SLIP FOR TOWINNG00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(X) SENHOUSE SLIP FOR TOWINNG
35900056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XI) SENHOUSE SLIP GENERAL PURPOSE00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XI) SENHOUSE SLIP GENERAL PURPOSE
36000056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XII) STRAIGHT SHACKLE00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XII) STRAIGHT SHACKLE
36100056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XIII) BOW SHACKLE00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XIII) BOW SHACKLE
36200056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XIV) EYE PLATES OF LIGHT JACKSTAY ON BULKHEAD00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XIV) EYE PLATES OF LIGHT JACKSTAY ON BULKHEAD
36300056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XV) DECK EYES FOR LIGHT JACKSTAY00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XV) DECK EYES FOR LIGHT JACKSTAY
36400056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XVI) SHIP'S BROW00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XVI) SHIP'S BROW
36500056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XVII) DECK EYES FOR RAS POINTS00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XVII) DECK EYES FOR RAS POINTS
36600056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XVIII) ARH00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XVIII) ARH
36700056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XIX) SNATCH BLOCK & TOWING PENDANT00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XIX) SNATCH BLOCK & TOWING PENDANT
36800056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XX) IB BLOCK00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XX) IB BLOCK
36900056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XXI) GUARDRAILS OF DIFFERENT LENGTH WITH 10 MM DIA00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XXI) GUARDRAILS OF DIFFERENT LENGTH WITH 10 MM DIA
37000056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XXII) CRIMPING OF GUARDRAILS00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XXII) CRIMPING OF GUARDRAILS
37100056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XXIII) BOAT SLINGS00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XXIII) BOAT SLINGS
37200056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XXIV) BRADLE RING OF SEA BOAT ROPE00056STANDING RIGGING AND LIFTING APPLIANCESLOAD TESTING(XXIV) BRADLE RING OF SEA BOAT ROPE
37300056STANDING RIGGING AND LIFTING APPLIANCESVISUAL INSPECTION(b) EASING OUT RECOVERY ROPE 24 MM PP ROPE00056STANDING RIGGING AND LIFTING APPLIANCESVISUAL INSPECTION(b) EASING OUT RECOVERY ROPE 24 MM PP ROPE
37400056STANDING RIGGING AND LIFTING APPLIANCESVISUAL INSPECTION(c) LIFE LINE 24 MM PP ROPE00056STANDING RIGGING AND LIFTING APPLIANCESVISUAL INSPECTION(c) LIFE LINE 24 MM PP ROPE
37500056STANDING RIGGING AND LIFTING APPLIANCESVISUAL INSPECTION(d) LLT LINE 16 MM PP ROPE00056STANDING RIGGING AND LIFTING APPLIANCESVISUAL INSPECTION(d) LLT LINE 16 MM PP ROPE
37600056STANDING RIGGING AND LIFTING APPLIANCESVISUAL INSPECTION(e) RECOVERY LINE 16 MM PP ROPE00056STANDING RIGGING AND LIFTING APPLIANCESVISUAL INSPECTION(e) RECOVERY LINE 16 MM PP ROPE
37700056STANDING RIGGING AND LIFTING APPLIANCESVISUAL INSPECTION(f) SKBDL LINE 12 MM ROPE00056STANDING RIGGING AND LIFTING APPLIANCESVISUAL INSPECTION(f) SKBDL LINE 12 MM ROPE
37800056STANDING RIGGING AND LIFTING APPLIANCESVISUAL INSPECTION(g) BERTHING HOUSER 32 MM00056STANDING RIGGING AND LIFTING APPLIANCESVISUAL INSPECTION(g) BERTHING HOUSER 32 MM
37900056STANDING RIGGING AND LIFTING APPLIANCESVISUAL INSPECTION(h) TOWING HOUSER 48 MM PP00056STANDING RIGGING AND LIFTING APPLIANCESVISUAL INSPECTION(h) TOWING HOUSER 48 MM PP
38000056STANDING RIGGING AND LIFTING APPLIANCESVISUAL INSPECTION(j) TOWING PENDANT 16 MM00056STANDING RIGGING AND LIFTING APPLIANCESVISUAL INSPECTION(j) TOWING PENDANT 16 MM
38100056STANDING RIGGING AND LIFTING APPLIANCESVISUAL INSPECTION(k) LARNE TARGET ROPE 32 MM00056STANDING RIGGING AND LIFTING APPLIANCESVISUAL INSPECTION(k) LARNE TARGET ROPE 32 MM
38200056STANDING RIGGING AND LIFTING APPLIANCESVISUAL INSPECTION(l) SEA BOAT ROPE 32 MM00056STANDING RIGGING AND LIFTING APPLIANCESVISUAL INSPECTION(l) SEA BOAT ROPE 32 MM
38300057DRAUGHT MARKSDRAUGHT MARKSSHIPS DRAUGHT MARKS TO BE BUILD UP/ RENEWED AS PER EXISTING DIMENTIONS AT FWD, MID AND AFT SECTIONS OF SHIP. COUNTOR OF ALL LETTERS AND NUMBERS TO BE WELDED INTERMITTENTLY. ALL FIGURES ARE CONTAINED IN AN 80 MM WIDTH X 100 MM HIGH RECTANGLE. LETTER \\"M\\" IS CONTAINED IN AN 90 MM WIDTH X 100 MM HIGH RECTANGLE. HORIZONTAL SEPARATIONS BETWEEN LETTERS AND NUMERALS IS TO BE 20 MM. SS WILL PROVIDE DRAWINGS.00057DRAUGHT MARKSDRAUGHT MARKSSHIPS DRAUGHT MARKS TO BE BUILD UP/ RENEWED AS PER EXISTING DIMENTIONS AT FWD, MID AND AFT SECTIONS OF SHIP. COUNTOR OF ALL LETTERS AND NUMBERS TO BE WELDED INTERMITTENTLY. ALL FIGURES ARE CONTAINED IN AN 80 MM WIDTH X 100 MM HIGH RECTANGLE. LETTER \\"M\\" IS CONTAINED IN AN 90 MM WIDTH X 100 MM HIGH RECTANGLE. HORIZONTAL SEPARATIONS BETWEEN LETTERS AND NUMERALS IS TO BE 20 MM. SS WILL PROVIDE DRAWINGS.
38400058WT DOORS AND HATCHES RUBBER BEADINGS(a) RUBBER BEADING OF 14 IN NOS WT DOORS AND 14 WT HATCHES TO BE RENEWED AS PER STANDARDISED SPECIFICATIONS. MAT: SILICON RUBBER. CARRYOUT CHALK TEST OF ALL BEADINGS POST RENEWAL.00058WT DOORS AND HATCHES RUBBER BEADINGS(a) RUBBER BEADING OF 14 IN NOS WT DOORS AND 14 WT HATCHES TO BE RENEWED AS PER STANDARDISED SPECIFICATIONS. MAT: SILICON RUBBER. CARRYOUT CHALK TEST OF ALL BEADINGS POST RENEWAL.
38500058WT DOORS AND HATCHES WT DOORS(b) THOROUGHLY SURVEY OF 15 WT DOORS AND COAMING, IF REQUIRED REQUISITE PLATE RENEWAL/ BUILDUP OF THE SAME BE UNDERTAKEN. MAT - MS00058WT DOORS AND HATCHES WT DOORS(b) THOROUGHLY SURVEY OF 15 WT DOORS AND COAMING, IF REQUIRED REQUISITE PLATE RENEWAL/ BUILDUP OF THE SAME BE UNDERTAKEN. MAT - MS
38600058WT DOORS AND HATCHES SECURING HANDLES/ CLIPS(c) FOLLOWING JOBS BE UNDERTAKEN:- (I) SURVEY OF SECURING HANDLES/ CLIPS (12 HANDLES EACH DOORS) (II) OVERHAULING AND REPLACEMENT OF SECURING HANDLE/ CLIPS OF 15 WT DOORS BE UNDERTAKEN.00058WT DOORS AND HATCHES SECURING HANDLES/ CLIPS(c) FOLLOWING JOBS BE UNDERTAKEN:- (I) SURVEY OF SECURING HANDLES/ CLIPS (12 HANDLES EACH DOORS) (II) OVERHAULING AND REPLACEMENT OF SECURING HANDLE/ CLIPS OF 15 WT DOORS BE UNDERTAKEN.
38700058WT DOORS AND HATCHES HINGES (d) OVERHAULING AND REPLACEMENT OF WASHERS FOR 14 WT DOORS HINGES AS PER SAMPLE VIEW DAMAGED/ BROKEN. MAT - SS, TEFLON.00058WT DOORS AND HATCHES HINGES (d) OVERHAULING AND REPLACEMENT OF WASHERS FOR 14 WT DOORS HINGES AS PER SAMPLE VIEW DAMAGED/ BROKEN. MAT - SS, TEFLON.
38800058WT DOORS AND HATCHES SPRING MECHANISM(e) REPLACEMENT OF SPRING MECHANISM ALONG WITH SHAFT SPINDLE OF 14 WT HATCHES VIEW CORRODED. REFITMENT THE SPRING IAW FOST SAFETY GUIDELINES. MAT - MS00058WT DOORS AND HATCHES SPRING MECHANISM(e) REPLACEMENT OF SPRING MECHANISM ALONG WITH SHAFT SPINDLE OF 14 WT HATCHES VIEW CORRODED. REFITMENT THE SPRING IAW FOST SAFETY GUIDELINES. MAT - MS
38900059LIFEBUOY STANDLIFEBUOY STANDCARRYOUT MANUFACTURING OF 02 IN NOS CEREMONIAL LIFEBOUYS AS PER SAMPLE. MAT: TEAK WOOD WITH PERPEX SHEET.00059LIFEBUOY STANDLIFEBUOY STANDCARRYOUT MANUFACTURING OF 02 IN NOS CEREMONIAL LIFEBOUYS AS PER SAMPLE. MAT: TEAK WOOD WITH PERPEX SHEET.
39000060VENTILATION SYSTEMAIR AND GREASE FILTERS(a) WIRE MESHES OF THE FOLLOWING AIR FILTERS OF ATUs AND GREASE FILTERS OF GALLEY CHIMNEY PERISHED. TO BE RENEWED AS PER SAMPLE.00060VENTILATION SYSTEMAIR AND GREASE FILTERS(a) WIRE MESHES OF THE FOLLOWING AIR FILTERS OF ATUs AND GREASE FILTERS OF GALLEY CHIMNEY PERISHED. TO BE RENEWED AS PER SAMPLE.
39100060VENTILATION SYSTEMVENTILATION SYSTEM(i) 2 FT X 2FT FILTERS FOR ATU NO.1 - 08 NOS, MAT: GI FRAME WITH FINE WIRE MESH GRID00060VENTILATION SYSTEMVENTILATION SYSTEM(i) 2 FT X 2FT FILTERS FOR ATU NO.1 - 08 NOS, MAT: GI FRAME WITH FINE WIRE MESH GRID
39200060VENTILATION SYSTEMVENTILATION SYSTEM(ii) 4\\" x 12\\" FILTERS- 04 NOS FOR ATU-2 RECIRCULATED AIR SUCTION DUCT, MAT: GI FRAME WITH FINE WIRE MESH GRID00060VENTILATION SYSTEMVENTILATION SYSTEM(ii) 4\\" x 12\\" FILTERS- 04 NOS FOR ATU-2 RECIRCULATED AIR SUCTION DUCT, MAT: GI FRAME WITH FINE WIRE MESH GRID
39300060VENTILATION SYSTEMVENTILATION SYSTEM(iii) 4\\" x 8\\" FILTERS- 04 NOS FOR ATU-2 FRESH AIR SUCTION DUCT, MAT: GI FRAME WITH FINE WIRE MESH GRID00060VENTILATION SYSTEMVENTILATION SYSTEM(iii) 4\\" x 8\\" FILTERS- 04 NOS FOR ATU-2 FRESH AIR SUCTION DUCT, MAT: GI FRAME WITH FINE WIRE MESH GRID
39400060VENTILATION SYSTEMVENTILATION SYSTEM(b) CARRY OUT TRAILS OF A/C & VENTILATION SYSTEM TO ENSURE SATISFFACTORY PERFORMANCE00060VENTILATION SYSTEMVENTILATION SYSTEM(b) CARRY OUT TRAILS OF A/C & VENTILATION SYSTEM TO ENSURE SATISFFACTORY PERFORMANCE
39500060VENTILATION SYSTEMVENTILATION SYSTEM(c) CARRYOUT OVERHAULING OF 100% WTSVs / WTBVs OR ANY OTHER VENTILATION VALVES.00060VENTILATION SYSTEMVENTILATION SYSTEM(c) CARRYOUT OVERHAULING OF 100% WTSVs / WTBVs OR ANY OTHER VENTILATION VALVES.
39600060VENTILATION SYSTEMVENTILATION SYSTEM(d) EXAMINE AND TEST RECIRCULATION FLAPS , DEFECTS TO BE RECTIFIED. NEW RUBBER SEATING'S AND CARRY OUT CHALK TEST FOR AIR TIGHTNESS.00060VENTILATION SYSTEMVENTILATION SYSTEM(d) EXAMINE AND TEST RECIRCULATION FLAPS , DEFECTS TO BE RECTIFIED. NEW RUBBER SEATING'S AND CARRY OUT CHALK TEST FOR AIR TIGHTNESS.
39700060VENTILATION SYSTEMVENTILATION SYSTEM(e) CARRY OUT INTERNAL CLEANING OF 100% VENTILATION TRUNKING AND 100% TRUNKING OF GALLEY EXHAUST TRUNKING AS PER BR 2203AND CHECK WATERTIGHT SLUICE VALVES FOR AIR TIGHTNESS AS PER BR 2170.00060VENTILATION SYSTEMVENTILATION SYSTEM(e) CARRY OUT INTERNAL CLEANING OF 100% VENTILATION TRUNKING AND 100% TRUNKING OF GALLEY EXHAUST TRUNKING AS PER BR 2203AND CHECK WATERTIGHT SLUICE VALVES FOR AIR TIGHTNESS AS PER BR 2170.
39800061GANGWAY APRONSGANGWAY APRONS02 PAIRS OF GANGWAY APRONS TORN AND PERISHED. TO BE RENEWED AS PER SAMPLE AND APRONS TO BE PAINTED WITH NAME AND SHIP'S CREST. DETAILS AS FOLLOWS:-00061GANGWAY APRONSGANGWAY APRONS02 PAIRS OF GANGWAY APRONS TORN AND PERISHED. TO BE RENEWED AS PER SAMPLE AND APRONS TO BE PAINTED WITH NAME AND SHIP'S CREST. DETAILS AS FOLLOWS:-
39900061GANGWAY APRONSGANGWAY APRONS(A) STITCHING OF APRONS AS PER SAMPLE PROVIDED BY SHIPS STAFF. MAT: WHITE SYNTHETIC CANVAS, SIZE: 3 MTR X 1 MTR00061GANGWAY APRONSGANGWAY APRONS(A) STITCHING OF APRONS AS PER SAMPLE PROVIDED BY SHIPS STAFF. MAT: WHITE SYNTHETIC CANVAS, SIZE: 3 MTR X 1 MTR
40000061GANGWAY APRONSGANGWAY APRONS(B) FITMENT OF BRASS SECURING EYES ON THE APRON00061GANGWAY APRONSGANGWAY APRONS(B) FITMENT OF BRASS SECURING EYES ON THE APRON
40100061GANGWAY APRONSGANGWAY APRONS(C) PAINTING OF SHIP'S NAME AND CREST ON THE APRONS00061GANGWAY APRONSGANGWAY APRONS(C) PAINTING OF SHIP'S NAME AND CREST ON THE APRONS
402000624.7 M RIB4.7 M RIBMAKE : POLY GLASS FIBRE INDUSTRIESQTY HELD - 01 NOS000624.7 M RIB4.7 M RIBMAKE : POLY GLASS FIBRE INDUSTRIESQTY HELD - 01 NOS
403000624.7 M RIB4.7 M RIB(a) TEST DISENGAGING GEAR/ BOATS FALLS. PERIOD OF TEST SHOULD NOT EXCEED 27 MONTHS. (I) EXAMINE ALL EQUIPMENT AND ASSOCIATED FITTING INCLUDING POLYESTER WEBBINGS SLINGS AND GEMINI SLINGS AND EYE PLATES. (II) ANY PART AFFECTING THE STRENGTH OF THE EQUIPMEWNT BECOMS DEFECTIVE AND IS TO BE RENEWED OR REPAIRED/ REPAINTED, SHIP STAFF TO TEST BEFORE FURTHER USE AND ARRANGE FOR STANDARD DOCKYARD TEST AT THE FIRST OPPORTUNITY.000624.7 M RIB4.7 M RIB(a) TEST DISENGAGING GEAR/ BOATS FALLS. PERIOD OF TEST SHOULD NOT EXCEED 27 MONTHS. (I) EXAMINE ALL EQUIPMENT AND ASSOCIATED FITTING INCLUDING POLYESTER WEBBINGS SLINGS AND GEMINI SLINGS AND EYE PLATES. (II) ANY PART AFFECTING THE STRENGTH OF THE EQUIPMEWNT BECOMS DEFECTIVE AND IS TO BE RENEWED OR REPAIRED/ REPAINTED, SHIP STAFF TO TEST BEFORE FURTHER USE AND ARRANGE FOR STANDARD DOCKYARD TEST AT THE FIRST OPPORTUNITY.
404000624.7 M RIB4.7 M RIB(b) SURVEY OF FOUR POINT LIFTING PLATES FITTED ON DECK (INCLUDING BACKUP PLATES, NUT, BOLTS) AS PER PARA 5 OF APPENDIX B OF NO 03/18.000624.7 M RIB4.7 M RIB(b) SURVEY OF FOUR POINT LIFTING PLATES FITTED ON DECK (INCLUDING BACKUP PLATES, NUT, BOLTS) AS PER PARA 5 OF APPENDIX B OF NO 03/18.
405000624.7 M RIB4.7 M RIB(c) ALL EXTERNAL SURFACE OF BOAT BE COATED WITH GEL COAT PIGENTED WITH LIGHT GREY SHADE TO RAL 7040 TO PRIOVIDE SMOOTH FINISH TO THE RIB.000624.7 M RIB4.7 M RIB(c) ALL EXTERNAL SURFACE OF BOAT BE COATED WITH GEL COAT PIGENTED WITH LIGHT GREY SHADE TO RAL 7040 TO PRIOVIDE SMOOTH FINISH TO THE RIB.
406000624.7 M RIB4.7 M RIB(d) WEIGH THE RIB AND COMPARE WITH IDEAL WEIGHT. RECORD THE SAME IN BOAT LOG BOOK. UNDUE INCREASE OF WEIGHT, IF ANY BE REPORTED FOR DETAILED EXAMINATION. CARRY OUT LEAK TEST OF FUEL TANK BY LP AIR WITH ASSISTANCE FROM REPAIR YARDS.000624.7 M RIB4.7 M RIB(d) WEIGH THE RIB AND COMPARE WITH IDEAL WEIGHT. RECORD THE SAME IN BOAT LOG BOOK. UNDUE INCREASE OF WEIGHT, IF ANY BE REPORTED FOR DETAILED EXAMINATION. CARRY OUT LEAK TEST OF FUEL TANK BY LP AIR WITH ASSISTANCE FROM REPAIR YARDS.
407000624.7 M RIB4.7 M RIB(e) CARRYOUT INSPECTION OF GRP HULL FOR CHIPPING, DELAMINATION, CRACKS ETC. CARRYOUT REPAIRS AS NECESSARY000624.7 M RIB4.7 M RIB(e) CARRYOUT INSPECTION OF GRP HULL FOR CHIPPING, DELAMINATION, CRACKS ETC. CARRYOUT REPAIRS AS NECESSARY
408000624.7 M RIB4.7 M RIB(f) All external surface of boat be coated with gel coat pigmented with light grey shade to RAL 7040 to provide smooth finish to the RIB.000624.7 M RIB4.7 M RIB(f) All external surface of boat be coated with gel coat pigmented with light grey shade to RAL 7040 to provide smooth finish to the RIB.
40900063FURNITUREDINING HALL(a) CARRYOUT RENEWAL OF 02 IN NOS DINING TABLES AND 02 IN NOS BENCHES IN JR SAILORS DINING HALL AS PER EXISTING SAMPLE00063FURNITUREDINING HALL(a) CARRYOUT RENEWAL OF 02 IN NOS DINING TABLES AND 02 IN NOS BENCHES IN JR SAILORS DINING HALL AS PER EXISTING SAMPLE
41000063FURNITURE(i) TABLE - 6' X 1 1/2 ' CRCA STEEL IAW IHQ DIRECTIVES - 02 NOS.00063FURNITURE(i) TABLE - 6' X 1 1/2 ' CRCA STEEL IAW IHQ DIRECTIVES - 02 NOS.
41100063FURNITURE(ii) BENCHES - 6' X 1 1/2' CRCA STEEL IAW IHQ DIRECTIVES00063FURNITURE(ii) BENCHES - 6' X 1 1/2' CRCA STEEL IAW IHQ DIRECTIVES
41200063FURNITURE(b) CARRYOUT RENEWAL OF SECURING ARRAGEMENT OF MICRO OVEN, BREAD TOASTER, WATER COOLER AND WASH BASHIN AS PER DIMENSION. MAT - MS00063FURNITURE(b) CARRYOUT RENEWAL OF SECURING ARRAGEMENT OF MICRO OVEN, BREAD TOASTER, WATER COOLER AND WASH BASHIN AS PER DIMENSION. MAT - MS
41300063FURNITUREOFFICES (c) CARRY OUT RENEWAL OF PC TABLE ALONG WITH PORVISIONING OF RACKS FOR STOWAGE AS REFERENCE OF EXISTING SAMPLE WITH CRCA STEEL IAW EXTANT POLICY.00063FURNITUREOFFICES (c) CARRY OUT RENEWAL OF PC TABLE ALONG WITH PORVISIONING OF RACKS FOR STOWAGE AS REFERENCE OF EXISTING SAMPLE WITH CRCA STEEL IAW EXTANT POLICY.
41400063FURNITURE(d) REPLACEMENT/ REPAIR OF EXISTING LOCKERS WITH CRCA APPROVED MATERIALS AS PER SAMPLE OF EXISTING ONE IAW EXTANT IHQ POLICY.00063FURNITURE(d) REPLACEMENT/ REPAIR OF EXISTING LOCKERS WITH CRCA APPROVED MATERIALS AS PER SAMPLE OF EXISTING ONE IAW EXTANT IHQ POLICY.
41500063FURNITUREJS MESS AND SS MESS(e) CUTTING AND WELDING OF EXISTING BUNKS TI INCREASE HEIGHT FROM BASE PLATE.00063FURNITUREJS MESS AND SS MESS(e) CUTTING AND WELDING OF EXISTING BUNKS TI INCREASE HEIGHT FROM BASE PLATE.
41600063FURNITURESS MESS(f) CARRYOUT RENEWAL OF DINING TABLE (SIZE - 4' X 3' ) AND TABLE (SIZE - 4' X 2.5') AS PER SAMPLE. MAT - CRCA STEEL.00063FURNITURESS MESS(f) CARRYOUT RENEWAL OF DINING TABLE (SIZE - 4' X 3' ) AND TABLE (SIZE - 4' X 2.5') AS PER SAMPLE. MAT - CRCA STEEL.
41700063FURNITUREWARDROOM(g) CARRYOUT RENEWAL OF WOODEN TABLE WITH CRCA STEEL AS PER EXISTING DIMENSION.00063FURNITUREWARDROOM(g) CARRYOUT RENEWAL OF WOODEN TABLE WITH CRCA STEEL AS PER EXISTING DIMENSION.
41800064BONDING STRAPSSCATTERED LOCATIONSTHE BONDING STRAPS AT SEVERAL LOCATIONS TO BE RENEWED AND WELDED IN SITU. DETAILS ARE AS FOLLOWS:-00064BONDING STRAPSSCATTERED LOCATIONSTHE BONDING STRAPS AT SEVERAL LOCATIONS TO BE RENEWED AND WELDED IN SITU. DETAILS ARE AS FOLLOWS:-
41900064BONDING STRAPSSCATTERED LOCATIONS(A) WELDING OF BONDING STRAPS AT INDICATED LOCATIONS00064BONDING STRAPSSCATTERED LOCATIONS(A) WELDING OF BONDING STRAPS AT INDICATED LOCATIONS
42000064BONDING STRAPSSCATTERED LOCATIONS(i) MS-MS BONDING STRAPS ON NO.1 DECK- 70 NOS00064BONDING STRAPSSCATTERED LOCATIONS(i) MS-MS BONDING STRAPS ON NO.1 DECK- 70 NOS
42100064BONDING STRAPSSCATTERED LOCATIONS (ii) MS- AL BONDING STRAPS ON NO.1 DECK- 40 NOS00064BONDING STRAPSSCATTERED LOCATIONS (ii) MS- AL BONDING STRAPS ON NO.1 DECK- 40 NOS
42200064BONDING STRAPSSCATTERED LOCATIONS(iii) AL-AL BONDING STRAPS ON SUPERSTRUCTURE- 40 NOSNOTE: ALUMINIUM STRAPS ARE TO BE WELDED BY TIG WELDING PROCESS. THE DRILLED END IS TO BE FASTENED WITH NUT AND BOLT ARRANGEMENT( FIRM SUPPLY) WHEREIN THE BOLT WILL BE WELDED ON THE REMOVABLE PART OF STRUCTURE. BONDING STRAPS WILL BE SUPPLIED BY SHIP STAFF.00064BONDING STRAPSSCATTERED LOCATIONS(iii) AL-AL BONDING STRAPS ON SUPERSTRUCTURE- 40 NOSNOTE: ALUMINIUM STRAPS ARE TO BE WELDED BY TIG WELDING PROCESS. THE DRILLED END IS TO BE FASTENED WITH NUT AND BOLT ARRANGEMENT( FIRM SUPPLY) WHEREIN THE BOLT WILL BE WELDED ON THE REMOVABLE PART OF STRUCTURE. BONDING STRAPS WILL BE SUPPLIED BY SHIP STAFF.
42300065DECK TALLIESMAIN DECKTHE FOLLOWING BRASS DECK TALLIES ARE TO BE RENEWED AS PER DETAILS PROVIDED BY SHIPS STAFF AND FITTED IN SITU.THE WORK INVOLVES MANUFACTURE & WELDING OF 05 MM THICK MS PAD PIECES WITH 02 THREADED HOLES FOR SECURING TALLIES ON DECK AND MANUFACTURE OF BRASS TALLIES WITH DETAILS ENGRAVED ON THEM.00065DECK TALLIESMAIN DECKTHE FOLLOWING BRASS DECK TALLIES ARE TO BE RENEWED AS PER DETAILS PROVIDED BY SHIPS STAFF AND FITTED IN SITU.THE WORK INVOLVES MANUFACTURE & WELDING OF 05 MM THICK MS PAD PIECES WITH 02 THREADED HOLES FOR SECURING TALLIES ON DECK AND MANUFACTURE OF BRASS TALLIES WITH DETAILS ENGRAVED ON THEM.
42400065DECK TALLIESMAIN DECK(A) 4\\" X 1\\" X 1.5 MM THK TALLIES- 18 NOS00065DECK TALLIESMAIN DECK(A) 4\\" X 1\\" X 1.5 MM THK TALLIES- 18 NOS
42500065DECK TALLIESMAIN DECK(B) 2 1/2 \\" X 8\\" X 1.5 MM THK TALLIES- 08 NOS00065DECK TALLIESMAIN DECK(B) 2 1/2 \\" X 8\\" X 1.5 MM THK TALLIES- 08 NOS
42600065DECK TALLIESMAIN DECK(C) 3\\" X 1\\" X 1.5 MM THK TALLIES- 12 NOS00065DECK TALLIESMAIN DECK(C) 3\\" X 1\\" X 1.5 MM THK TALLIES- 12 NOS
42700065DECK TALLIESMAIN DECK(D) MANUFACTURE OF 06 MM THICK PAD PIECES AS PER DIMENSIONS OF TALLEYS MENTIONED ABOVE AND WELDING THEM AT INDICATED LOCATIONS. MAT: MS00065DECK TALLIESMAIN DECK(D) MANUFACTURE OF 06 MM THICK PAD PIECES AS PER DIMENSIONS OF TALLEYS MENTIONED ABOVE AND WELDING THEM AT INDICATED LOCATIONS. MAT: MS
42800065DECK TALLIESMAIN DECK(E) DRILLING OF HOLES ON EITHER ENDS OF PLATES AND TAPPING OF THE THREADS INSIDE THE HOLES FOR SCREWING IN THE BOLTS SECURING THE TALLEYS ONTO DECK.00065DECK TALLIESMAIN DECK(E) DRILLING OF HOLES ON EITHER ENDS OF PLATES AND TAPPING OF THE THREADS INSIDE THE HOLES FOR SCREWING IN THE BOLTS SECURING THE TALLEYS ONTO DECK.
42900065DECK TALLIESMAIN DECK(F) FABRICATION OF BRASS TALLEYS AS PER DIMENSIONS MENTIONED ABOVE00065DECK TALLIESMAIN DECK(F) FABRICATION OF BRASS TALLEYS AS PER DIMENSIONS MENTIONED ABOVE
43000065DECK TALLIESMAIN DECK(G) ENGRAVING OF DETAILS ON THE TALLEYS AS GIVEN BY SHIP'S STAFF AND SECURING THEM IN SITU BY BOLTS.00065DECK TALLIESMAIN DECK(G) ENGRAVING OF DETAILS ON THE TALLEYS AS GIVEN BY SHIP'S STAFF AND SECURING THEM IN SITU BY BOLTS.
43100066AIR HOSE TESTINGMACHINERY SPACESASSISTANCE REQUIRED FOR SURFACE PREPARATION OF ALL WELDED JOINTS ON SHELL PLATING AND WT BULKHEADS TO BARE METAL SURFACE BY MECHANICAL METHODS FOR CONDUCT OF AIR HOSE TESTING. PORTABLE AND SEMI PORTABLE FITTINGS OBSCURING THE ACCESSIBILITY TO THE WELDED JOINTS TO BE DEGUTTED AND REGUTTED ON COMPLETION OF THE TESTING.00066AIR HOSE TESTINGMACHINERY SPACESASSISTANCE REQUIRED FOR SURFACE PREPARATION OF ALL WELDED JOINTS ON SHELL PLATING AND WT BULKHEADS TO BARE METAL SURFACE BY MECHANICAL METHODS FOR CONDUCT OF AIR HOSE TESTING. PORTABLE AND SEMI PORTABLE FITTINGS OBSCURING THE ACCESSIBILITY TO THE WELDED JOINTS TO BE DEGUTTED AND REGUTTED ON COMPLETION OF THE TESTING.
43200067FURNITUREWOODEN GRATINGS(a) WOODEN GRATINGS OF 02 HMG, 02 MMG AND 01 REPEATER AND 02 BATHROOMS POST AT BRIDGE TOP DETERIORATED. TO BE RENEWED AS PER SAMPLE. MAT: TEAK WOOD00067FURNITUREWOODEN GRATINGS(a) WOODEN GRATINGS OF 02 HMG, 02 MMG AND 01 REPEATER AND 02 BATHROOMS POST AT BRIDGE TOP DETERIORATED. TO BE RENEWED AS PER SAMPLE. MAT: TEAK WOOD
43300067FURNITUREQTR MASTER STATE BOARDS(b) SUNMICA AND BEADING OF 02 DUTY STATE BOARD AND 02 OFFICERS STATE BOARD CRACKED AND UPROOTED. ENGRAVING FADED/ WORN SLIDERS CRACKED/ UPROOTED AND PLY DELAMINATED. TO BE MANUFACTURED AS PER SAMPLE. SIZE: 1MTR X 0.8 MTR00067FURNITUREQTR MASTER STATE BOARDS(b) SUNMICA AND BEADING OF 02 DUTY STATE BOARD AND 02 OFFICERS STATE BOARD CRACKED AND UPROOTED. ENGRAVING FADED/ WORN SLIDERS CRACKED/ UPROOTED AND PLY DELAMINATED. TO BE MANUFACTURED AS PER SAMPLE. SIZE: 1MTR X 0.8 MTR
43400068MODULAR ACCOMMODATIONMETALLIC LOCKERS(a) LOCKING ARRANGEMENTS OF 40 IN NOS LOCKERS IN MESS DECKS (JR SLR AND SR SLR) DEFECTIVE. ALL LOCKERS DAMAGED AND FOUND DETERIORATED AT SCATTERED AREAS VIEW PROLONGED USAGE. LOCKERS TO BE RENEWED AS PER SPECIFIC STANDARDS AND FITTED AT MESS DECKS. MAT - HIGH GRADE ALUMINUM WITH EXTRA TENSILE STRENGTHMAKE - GODREJ00068MODULAR ACCOMMODATIONMETALLIC LOCKERS(a) LOCKING ARRANGEMENTS OF 40 IN NOS LOCKERS IN MESS DECKS (JR SLR AND SR SLR) DEFECTIVE. ALL LOCKERS DAMAGED AND FOUND DETERIORATED AT SCATTERED AREAS VIEW PROLONGED USAGE. LOCKERS TO BE RENEWED AS PER SPECIFIC STANDARDS AND FITTED AT MESS DECKS. MAT - HIGH GRADE ALUMINUM WITH EXTRA TENSILE STRENGTHMAKE - GODREJ
43500068MODULAR ACCOMMODATIONSHOE RACKS(b) CARRYOUT FITMENT OF NEW WALL MOUNTED ENCLOSED SHOE RACKS IN JS MESS, SS MESS, CAPTAINS CABIN AND 04 OFFICERS CABINS6' X 12\\" X 3 MM AL SHEETMAKE - GODREJ00068MODULAR ACCOMMODATIONSHOE RACKS(b) CARRYOUT FITMENT OF NEW WALL MOUNTED ENCLOSED SHOE RACKS IN JS MESS, SS MESS, CAPTAINS CABIN AND 04 OFFICERS CABINS6' X 12\\" X 3 MM AL SHEETMAKE - GODREJ
43600068MODULAR ACCOMMODATIONMETAL PANELLING(c) METAL PANELLING DETERIORATED/ DAMAGED AT DINING HALL, MAIN ALLEY WAY AND SCATTERED LOCATIONS IN MESS DECKS TO BE RENEWED AND FITTED INSITU. MAT - AL MODULAR PANELS 18 GUAGE.00068MODULAR ACCOMMODATIONMETAL PANELLING(c) METAL PANELLING DETERIORATED/ DAMAGED AT DINING HALL, MAIN ALLEY WAY AND SCATTERED LOCATIONS IN MESS DECKS TO BE RENEWED AND FITTED INSITU. MAT - AL MODULAR PANELS 18 GUAGE.
43700069MODULAR ACCOMMODATIONBATHROOM FITTINGSCARRYOUT RENEWAL OF FOLLOWING SANITARY FITTINGS IN BATHROOMS AND WC'S MAKE - JAGUAR00069MODULAR ACCOMMODATIONBATHROOM FITTINGSCARRYOUT RENEWAL OF FOLLOWING SANITARY FITTINGS IN BATHROOMS AND WC'S MAKE - JAGUAR
43800069MODULAR ACCOMMODATIONBATHROOM FITTINGS(A) SHOWER MIXER VALVE00069MODULAR ACCOMMODATIONBATHROOM FITTINGS(A) SHOWER MIXER VALVE
43900069MODULAR ACCOMMODATIONBATHROOM FITTINGS(B) WALL MOUNTED SCREW DOWN COCK00069MODULAR ACCOMMODATIONBATHROOM FITTINGS(B) WALL MOUNTED SCREW DOWN COCK
44000069MODULAR ACCOMMODATIONBATHROOM FITTINGS(C ) WASH BASIN (SS)00069MODULAR ACCOMMODATIONBATHROOM FITTINGS(C ) WASH BASIN (SS)
44100069MODULAR ACCOMMODATIONBATHROOM FITTINGS(D) HAND SHOWER IN WC'S00069MODULAR ACCOMMODATIONBATHROOM FITTINGS(D) HAND SHOWER IN WC'S
44200069MODULAR ACCOMMODATIONBATHROOM FITTINGS(E) COCK TAP FITTINGS00069MODULAR ACCOMMODATIONBATHROOM FITTINGS(E) COCK TAP FITTINGS
44300069MODULAR ACCOMMODATIONBATHROOM FITTINGS(F) FLEXIBLE HOSES FOR HOT WATER CONNECTIONS (1.5 MTR) CRIMPED AT EITHER ENDS00069MODULAR ACCOMMODATIONBATHROOM FITTINGS(F) FLEXIBLE HOSES FOR HOT WATER CONNECTIONS (1.5 MTR) CRIMPED AT EITHER ENDS
44400069MODULAR ACCOMMODATIONBATHROOM FITTINGS(G) SHOWER UNIT(H) SOAP STAND(J) CURTAIN RODS(K) SOAP DISPENSAR(L) CLOTH HANGING HOOKS(5 EACH)00069MODULAR ACCOMMODATIONBATHROOM FITTINGS(G) SHOWER UNIT(H) SOAP STAND(J) CURTAIN RODS(K) SOAP DISPENSAR(L) CLOTH HANGING HOOKS(5 EACH)
44500070FURNITURESHIP'S NAME BOARDSHIPS NAME BOARD TO BE MANUFACTURED AS PER SAMPLE AND FITTED ON BOTH SIDES AS INDICATED BY SHIP STAFF. LETTERS ARE TO BE MADE IN BOTH HINDI AND ENGLISH (HINDI ABOVE ENG) FROM 2 MM THICK SS PLATE AND TO BE NI-CHROME COATED.LETTERS TO BE FIXED ON GOOD COMMERCIAL TEAK WOOD BOARD BY M4 CSK SS/ WOOD SCREWS. SS WILL PROVIDE DRAWINGS00070FURNITURESHIP'S NAME BOARDSHIPS NAME BOARD TO BE MANUFACTURED AS PER SAMPLE AND FITTED ON BOTH SIDES AS INDICATED BY SHIP STAFF. LETTERS ARE TO BE MADE IN BOTH HINDI AND ENGLISH (HINDI ABOVE ENG) FROM 2 MM THICK SS PLATE AND TO BE NI-CHROME COATED.LETTERS TO BE FIXED ON GOOD COMMERCIAL TEAK WOOD BOARD BY M4 CSK SS/ WOOD SCREWS. SS WILL PROVIDE DRAWINGS
44600071DECK FITTINGSROPE REELS(a) FLANGE PLATES OF 04 NO ROPE REELS OF FOXLE/ QUARTER DECK DEFORMED HEAVILY, PAWL AND RATCHET ARRANGEMENT BROKEN AND PLUMMER BEARINGS JAMMED. TO BE REPAIRED. WORK INVOLVES RENEWAL OF PLUMMER BEARINGS, MFG & FITMENT OF PAWL AND RATCHET ARRANGEMENT AS PER SAMPLE AND REMOVAL OF SETTING OF DEFORMED FLANGES. MAT: ALUMINIUM. DETAILS ARE AS FOLLOWS:-00071DECK FITTINGSROPE REELS(a) FLANGE PLATES OF 04 NO ROPE REELS OF FOXLE/ QUARTER DECK DEFORMED HEAVILY, PAWL AND RATCHET ARRANGEMENT BROKEN AND PLUMMER BEARINGS JAMMED. TO BE REPAIRED. WORK INVOLVES RENEWAL OF PLUMMER BEARINGS, MFG & FITMENT OF PAWL AND RATCHET ARRANGEMENT AS PER SAMPLE AND REMOVAL OF SETTING OF DEFORMED FLANGES. MAT: ALUMINIUM. DETAILS ARE AS FOLLOWS:-
44700071DECK FITTINGSROPE REELS(b) STRAIGHTENING/ REMOVAL OF DEFORMATION IN FLANGES OF ROPE REELS00071DECK FITTINGSROPE REELS(b) STRAIGHTENING/ REMOVAL OF DEFORMATION IN FLANGES OF ROPE REELS
44800071DECK FITTINGSROPE REELS(c) MANUFACTURE AND FITMENT OF PAWL AND RATCHET ARRANGEMENT AS PER SAMPLE. MAT: MS00071DECK FITTINGSROPE REELS(c) MANUFACTURE AND FITMENT OF PAWL AND RATCHET ARRANGEMENT AS PER SAMPLE. MAT: MS
44900071DECK FITTINGSROPE REELS(d) RENEWAL AND FITMENT OF PLUMMER BEARINGS OF ROPE REELS00071DECK FITTINGSROPE REELS(d) RENEWAL AND FITMENT OF PLUMMER BEARINGS OF ROPE REELS
45000072LIFERAFTTLIFERAFTTINSPECT AND TEST FOR WEIGH TEST, FLOTATON TEST, DROP TEST, LIFTING TEST. DEMAND FROM DOCKYARD REPLACEMENT FOR LIFERATS WHICH HAVE A BALANCE FURTHER EXPECTED LIFE OF LESS THAN ONE YEAR, STATING IN THE DEMAND THE PRIORITY OF SUPPLY.00072LIFERAFTTLIFERAFTTINSPECT AND TEST FOR WEIGH TEST, FLOTATON TEST, DROP TEST, LIFTING TEST. DEMAND FROM DOCKYARD REPLACEMENT FOR LIFERATS WHICH HAVE A BALANCE FURTHER EXPECTED LIFE OF LESS THAN ONE YEAR, STATING IN THE DEMAND THE PRIORITY OF SUPPLY.
45100073HABITABILITYHABITABILITYTHOROUGHLY SURVEY OF 40 BUNKS OF MESS DECKS/ OFFICER CABINS/ CAPTAIN CABIN. JOBS INVLOVES00073HABITABILITYHABITABILITYTHOROUGHLY SURVEY OF 40 BUNKS OF MESS DECKS/ OFFICER CABINS/ CAPTAIN CABIN. JOBS INVLOVES
45200073HABITABILITYHABITABILITY(A) REPLACEMENT/ FITMENT OF GUARD RAILS OF BUNKS OF ALL BUNKS00073HABITABILITYHABITABILITY(A) REPLACEMENT/ FITMENT OF GUARD RAILS OF BUNKS OF ALL BUNKS
45300073HABITABILITYHABITABILITY(B) REPAIR OF STEEL PLATES OF BUNKS00073HABITABILITYHABITABILITY(B) REPAIR OF STEEL PLATES OF BUNKS
45400073HABITABILITYHABITABILITY(C)REPAIR/ REPLACEMENT OF BUNKS SUPPORTING STRUCTURE00073HABITABILITYHABITABILITY(C)REPAIR/ REPLACEMENT OF BUNKS SUPPORTING STRUCTURE
45500073HABITABILITYHABITABILITY(D) RELOCATION AND MODIFICATION OF BUNKS, LOCKERS, AND SHOE RACK DINNING TABLE FOR EXTRA SPACE.00073HABITABILITYHABITABILITY(D) RELOCATION AND MODIFICATION OF BUNKS, LOCKERS, AND SHOE RACK DINNING TABLE FOR EXTRA SPACE.
45600074NWT DOORSNWT DOOR METTALIC COATING (a) SURVEY DOOR STRUCTURE/DOOR FRAME FOR DETERIORATION/ DAMAGE. INSPECT DOOR GASKETS, HINGES, LOCKING ARRANGEMENTS , SLIDING WAYS & RUNNERS FOR CORRECTNESS. REPAIR/ RENEW ASA NECESSARY. CHECK CLIPS AND HINGS FOR LOOSENESS AND SIGNS OF WEAR. RENEW WORN OUT PARTS AS NECESSAY.00074NWT DOORSNWT DOOR METTALIC COATING (a) SURVEY DOOR STRUCTURE/DOOR FRAME FOR DETERIORATION/ DAMAGE. INSPECT DOOR GASKETS, HINGES, LOCKING ARRANGEMENTS , SLIDING WAYS & RUNNERS FOR CORRECTNESS. REPAIR/ RENEW ASA NECESSARY. CHECK CLIPS AND HINGS FOR LOOSENESS AND SIGNS OF WEAR. RENEW WORN OUT PARTS AS NECESSAY.
45700074NWT DOORS (SLIDING)NWT DOORS (SLIDING)(b) SLIDING CHANNELS OF SLIDING NWT DOOR OF GALLEY. DAMAGED. TO BE REPAIRED/ REPLACED.00074NWT DOORS (SLIDING)NWT DOORS (SLIDING)(b) SLIDING CHANNELS OF SLIDING NWT DOOR OF GALLEY. DAMAGED. TO BE REPAIRED/ REPLACED.
45800074(c) DOOR HANDLES OF GALLEY AND SHIPS OFFICE DOOR DAMAGED. TO BE REPLACED00074(c) DOOR HANDLES OF GALLEY AND SHIPS OFFICE DOOR DAMAGED. TO BE REPLACED
45900074NWT DOORS(d) PROVISION STORE DOOR HANDLES DAMAGED. TO BE REPLACED.00074NWT DOORS(d) PROVISION STORE DOOR HANDLES DAMAGED. TO BE REPLACED.
46000075PORTABLE H2S GAS SENSORPORTABLE H2S GAS SENSOR SERVICEABILITY CHECKS/ CALIBRATION OF PORTABLE H2S SENSOR BE UNDERTAKEN.00075PORTABLE H2S GAS SENSORPORTABLE H2S GAS SENSOR SERVICEABILITY CHECKS/ CALIBRATION OF PORTABLE H2S SENSOR BE UNDERTAKEN.
46100076FIXED H2S GAS DETECTION SYSTEMFIXED H2S GAS DETECTION SYSTEM(a) SERVICEABILITY CHECKS/ CALIBRATION OF FIXED H2S GAS SENSORS BE UNDERTAKEN.00076FIXED H2S GAS DETECTION SYSTEMFIXED H2S GAS DETECTION SYSTEM(a) SERVICEABILITY CHECKS/ CALIBRATION OF FIXED H2S GAS SENSORS BE UNDERTAKEN.
46200076FIXED H2S GAS DETECTION SYSTEMFIXED H2S GAS DETECTION SYSTEM(b) SERVICEABILITY CHECKS OF FIXED H2S GAS DETECTION SYSTEM BE UNDERTAKEN. RECTIFY IF ANY DEFECT00076FIXED H2S GAS DETECTION SYSTEMFIXED H2S GAS DETECTION SYSTEM(b) SERVICEABILITY CHECKS OF FIXED H2S GAS DETECTION SYSTEM BE UNDERTAKEN. RECTIFY IF ANY DEFECT
46300076FIXED H2S GAS DETECTION SYSTEMFIXED H2S GAS DETECTION SYSTEM(c) PROVISIONING OF BACK UP SUPPLY OF FIXED H2S GAS DETECTION SYSTEM FITTED IN STP AND MCR.00076FIXED H2S GAS DETECTION SYSTEMFIXED H2S GAS DETECTION SYSTEM(c) PROVISIONING OF BACK UP SUPPLY OF FIXED H2S GAS DETECTION SYSTEM FITTED IN STP AND MCR.
46400077JACK STAFF/ AFT STAFFJACK STAFF AND AFT STAFFTHOROUGHLY HULL SURVEY OF JACK STAFF AND AFT STAFF TOP BE UNDERTAKEN. REPAIR/ RENEWAL OF PIPES BE UNDERTAKEN IF ANY DEFECT OBSERVED. PAINT RENEWAL BE UNDERTAKEN AFTER HYDROBLASTING CLEANING.00077JACK STAFF/ AFT STAFFJACK STAFF AND AFT STAFFTHOROUGHLY HULL SURVEY OF JACK STAFF AND AFT STAFF TOP BE UNDERTAKEN. REPAIR/ RENEWAL OF PIPES BE UNDERTAKEN IF ANY DEFECT OBSERVED. PAINT RENEWAL BE UNDERTAKEN AFTER HYDROBLASTING CLEANING.
46500078MFMB LAGGINGMFMB LAGGINGDEGUTTING OF MFMB LAGGING FOR HOT WORK/ HULL SURVEY AND REGUTTING POST COMPLETION OF HOT WORK & SURVEY BE UNDERTAKEN AT INDICATED LOCATION BY SS.00078MFMB LAGGINGMFMB LAGGINGDEGUTTING OF MFMB LAGGING FOR HOT WORK/ HULL SURVEY AND REGUTTING POST COMPLETION OF HOT WORK & SURVEY BE UNDERTAKEN AT INDICATED LOCATION BY SS.
46600079FAIRLEADFAIRLEADTHOROUGHLY VISUAL SURVEY OF SINGLE FAIRLEAD OF BOTH PORT AND STBD QUATERDECK AND FOXLE TO BE UNDERTAKEN. NECESSARY DEFECT RECTIFICATION BE CARRIED OUT, IF ANY DEFECT00079FAIRLEADFAIRLEADTHOROUGHLY VISUAL SURVEY OF SINGLE FAIRLEAD OF BOTH PORT AND STBD QUATERDECK AND FOXLE TO BE UNDERTAKEN. NECESSARY DEFECT RECTIFICATION BE CARRIED OUT, IF ANY DEFECT
46700080VERTICAL LADDERVERTICAL LADDERTHOROUGHLY VISUAL SURVEY OF VERTICAL LADDER OF ALL THE COMPARTMENT BE UNDERTAKEN. FOLLOWING JOB INVOLVES:00080VERTICAL LADDERVERTICAL LADDERTHOROUGHLY VISUAL SURVEY OF VERTICAL LADDER OF ALL THE COMPARTMENT BE UNDERTAKEN. FOLLOWING JOB INVOLVES:
46800080VERTICAL LADDERVERTICAL LADDER(A) REPLACEMENT OF FOOT STEPS, IF ANY DEFECT .REPLACEMENT OF LADDER STRUCTURE, IF ANY DEFECT00080VERTICAL LADDERVERTICAL LADDER(A) REPLACEMENT OF FOOT STEPS, IF ANY DEFECT .REPLACEMENT OF LADDER STRUCTURE, IF ANY DEFECT
46900080VERTICAL LADDERVERTICAL LADDER(B) INSPECT AND RENEW TREADS- DECK LADDERS. INSPECT AND RENEW AS NECESSARY, PORATABLE ALLUMINIUM TREADS OF BETWEEN DECK LADDERS.00080VERTICAL LADDERVERTICAL LADDER(B) INSPECT AND RENEW TREADS- DECK LADDERS. INSPECT AND RENEW AS NECESSARY, PORATABLE ALLUMINIUM TREADS OF BETWEEN DECK LADDERS.
47000080VERTICAL LADDERVERTICAL LADDER(C) REPLACEMENT OF SECURING EYE AND DECK EYE, NUTS & BOLT, IF ANY00080VERTICAL LADDERVERTICAL LADDER(C) REPLACEMENT OF SECURING EYE AND DECK EYE, NUTS & BOLT, IF ANY
47100081VERTICAL LADDERREGALVANISE LADDERS LADDER TREADS OF GALAVANISED BETWEEN DECK LADDRS TO BE REWELDED AND LADDERS REGALVANISHED00081VERTICAL LADDERREGALVANISE LADDERS LADDER TREADS OF GALAVANISED BETWEEN DECK LADDRS TO BE REWELDED AND LADDERS REGALVANISHED
47200082BETWEEN DECK LADDER INCLINED BETWEEN DECK LADDER THOROUGHLY VISUAL SURVEY OF ALL THE INCLINED BETWEEN DECK LADDER BE UNDERTAKEN. FOLLOWING JOBS INVLOVES:00082BETWEEN DECK LADDER INCLINED BETWEEN DECK LADDER THOROUGHLY VISUAL SURVEY OF ALL THE INCLINED BETWEEN DECK LADDER BE UNDERTAKEN. FOLLOWING JOBS INVLOVES:
47300082BETWEEN DECK LADDER INCLINED BETWEEN DECK LADDER (A) REPLACEMENT OF FOOT STEPS WITH PROVISION OF NON-SKID, IF ANY DEFECT00082BETWEEN DECK LADDER INCLINED BETWEEN DECK LADDER (A) REPLACEMENT OF FOOT STEPS WITH PROVISION OF NON-SKID, IF ANY DEFECT
47400082BETWEEN DECK LADDER INCLINED BETWEEN DECK LADDER (B) REPLACEMENT OF NON-SKID RUBBER STEPS, IF ANY DEFECT00082BETWEEN DECK LADDER INCLINED BETWEEN DECK LADDER (B) REPLACEMENT OF NON-SKID RUBBER STEPS, IF ANY DEFECT
47500082BETWEEN DECK LADDER INCLINED BETWEEN DECK LADDER (C) REPLACEMENT OF SECURING EYE AND DECK EYE, NUTS & BOLT, IF ANY DEFECT00082BETWEEN DECK LADDER INCLINED BETWEEN DECK LADDER (C) REPLACEMENT OF SECURING EYE AND DECK EYE, NUTS & BOLT, IF ANY DEFECT
47600082BETWEEN DECK LADDER INCLINED BETWEEN DECK LADDER (D) REPLACEMENT OF SUPPORTING RAILING AND SECURING ARRANGEMENT, IF ANY DEFECT00082BETWEEN DECK LADDER INCLINED BETWEEN DECK LADDER (D) REPLACEMENT OF SUPPORTING RAILING AND SECURING ARRANGEMENT, IF ANY DEFECT
47700083SUPPORTING RAILS WEATHER DECK SUPPORTING RAILTHOROUGHLY VISUAL/ HAMMER SURVEY OF WEATHER DECK SUPPORT/ GUIDE RAILS ON BOTH PORT & STBD CATWALK SUPERSTRUCTURE PLATING BE CARRIED OUT. JOBS INVOLVE:00083SUPPORTING RAILS WEATHER DECK SUPPORTING RAILTHOROUGHLY VISUAL/ HAMMER SURVEY OF WEATHER DECK SUPPORT/ GUIDE RAILS ON BOTH PORT & STBD CATWALK SUPERSTRUCTURE PLATING BE CARRIED OUT. JOBS INVOLVE:
47800083SUPPORTING RAILS WEATHER DECK SUPPORTING RAIL(A) REPLACEMENT OF SUPPORTING PIPES/ RAILS ON BOTH PORT & STBD SIDE, IF ANY DEFECT00083SUPPORTING RAILS WEATHER DECK SUPPORTING RAIL(A) REPLACEMENT OF SUPPORTING PIPES/ RAILS ON BOTH PORT & STBD SIDE, IF ANY DEFECT
47900083SUPPORTING RAILS WEATHER DECK SUPPORTING RAIL(B) REPLACEMENT OF SUPPORTING RAIL BRACKET ON BOTH PORT AND STBD SIDE00083SUPPORTING RAILS WEATHER DECK SUPPORTING RAIL(B) REPLACEMENT OF SUPPORTING RAIL BRACKET ON BOTH PORT AND STBD SIDE
48000084NAVAL PIPE NAVAL PIPE THOROUGHLY VISUAL/ HAMMER SURVEY OF NAVAL PIPE BE CARRIED OUT. JOBS INVOLVE:(A) CUTTING/ WELDING/ REPLACEMENT OF PLATES, IF ANY DEFECT00084NAVAL PIPE NAVAL PIPE THOROUGHLY VISUAL/ HAMMER SURVEY OF NAVAL PIPE BE CARRIED OUT. JOBS INVOLVE:(A) CUTTING/ WELDING/ REPLACEMENT OF PLATES, IF ANY DEFECT
48100085HOUSE PIPE HAWSE PIPE THOROUGHLY VISUAL/ HAMMER SURVEY OF HOUSE PIPE BE CARRIED OUT. JOBS INVOLVE:(A) CUTTING/ WELDING/ REPLACEMENT OF PLATES, IF ANY DEFECT00085HOUSE PIPE HAWSE PIPE THOROUGHLY VISUAL/ HAMMER SURVEY OF HOUSE PIPE BE CARRIED OUT. JOBS INVOLVE:(A) CUTTING/ WELDING/ REPLACEMENT OF PLATES, IF ANY DEFECT
48200085HOUSE PIPE HAWSE PIPE (B) REPLACEMENT OF HOUSE PIPE COVER, IF ANY DEFECT00085HOUSE PIPE HAWSE PIPE (B) REPLACEMENT OF HOUSE PIPE COVER, IF ANY DEFECT
48300086GERRACKSMANUFACTURING OF CRCA RACKS IN GER COMPARTMENT FOR SECURING OF DIVATOR SETS.00086GERRACKSMANUFACTURING OF CRCA RACKS IN GER COMPARTMENT FOR SECURING OF DIVATOR SETS.
48400087CRN 91CRN 91REPAIR/ RENEWAL OF GUNNER CHAIR IN CRN 91. INSTALLTION OF SECURING ARRANGEMENT OF CO2 BOTTLE IN CRN 91.00087CRN 91CRN 91REPAIR/ RENEWAL OF GUNNER CHAIR IN CRN 91. INSTALLTION OF SECURING ARRANGEMENT OF CO2 BOTTLE IN CRN 91.
48500088MISCMISC(a) REPAIR OF WINDSOAKS STAND . NOS 2(b) REPLACEMENT OF CAPTAIN CHAIR. NOS 1(c) ELECTROPLATING OF EMBLEM. NOS 03(d) SHIP'S BELL NOS 01(e) GRSE BOARD NOS 0100088MISCMISC(a) REPAIR OF WINDSOAKS STAND . NOS 2(b) REPLACEMENT OF CAPTAIN CHAIR. NOS 1(c) ELECTROPLATING OF EMBLEM. NOS 03(d) SHIP'S BELL NOS 01(e) GRSE BOARD NOS 01
48600089Misc FittingsInstruction TalleyDescription plates and instruction talleys of following equipments damaged and uprooted: (A) Single Arm Boat Davit. (B) Anchor Windlass. (C) Warping Capstan. (D) ICCP System. (E) Sewage Treatment Plant. (F) 4.7 M RIB. (G) Anchor Chain Cable. (Tallies to be manufactured as per sample. Mat- Brass).00089Misc FittingsInstruction TalleyDescription plates and instruction talleys of following equipments damaged and uprooted: (A) Single Arm Boat Davit. (B) Anchor Windlass. (C) Warping Capstan. (D) ICCP System. (E) Sewage Treatment Plant. (F) 4.7 M RIB. (G) Anchor Chain Cable. (Tallies to be manufactured as per sample. Mat- Brass).
48700090WT DoorsRubber Beading(a) Rubber beading of watertight doors damaged and perished to be replaced with new rubber beading. Qty. - 100 RMT. Mat. Silicon Rubber Beading. C41800090WT DoorsRubber Beading(a) Rubber beading of watertight doors damaged and perished to be replaced with new rubber beading. Qty. - 100 RMT. Mat. Silicon Rubber Beading. C418
48800090WT DoorsRenewals(b) Door coaming of WT doors on upper deck corroded and deformed. Renewal of doors to be carried out post survey of structure. Mat - MS/ AL, Qty-08 .00090WT DoorsRenewals(b) Door coaming of WT doors on upper deck corroded and deformed. Renewal of doors to be carried out post survey of structure. Mat - MS/ AL, Qty-08 .
48900090WT DoorsStructural Coaming(c) Structural coaming of WT door corroded and holed to be repaired/ renewed. Mat. - MS, Qty. - 0600090WT DoorsStructural Coaming(c) Structural coaming of WT door corroded and holed to be repaired/ renewed. Mat. - MS, Qty. - 06
49000091WT HatchesRetaining SpringRetaining Springs of WT hatch corroded and broken to be repaired/ renewed. Calibration of spring to be undertaken post repairs. Mat- MS , Qty-12nos.00091WT HatchesRetaining SpringRetaining Springs of WT hatch corroded and broken to be repaired/ renewed. Calibration of spring to be undertaken post repairs. Mat- MS , Qty-12nos.
49100092ScuttlesRenewals(a) Structure coaming of scuttles fitted on superstructure cracked/ broken. Renewal of scuttles to be carried out post survey. Mat - Brass, Qty. - 1300092ScuttlesRenewals(a) Structure coaming of scuttles fitted on superstructure cracked/ broken. Renewal of scuttles to be carried out post survey. Mat - Brass, Qty. - 13
49200092ScuttlesRubber Beading(b) Rubber beading of Scuttles damaged and perished to be replaced with new rubber beading. Qty. - 50 RMT. Mat. Silicon Rubber Beading.00092ScuttlesRubber Beading(b) Rubber beading of Scuttles damaged and perished to be replaced with new rubber beading. Qty. - 50 RMT. Mat. Silicon Rubber Beading.
49300093Indicator test plugManufacturing Indicator Test Plugs of WT hatches and doors corroded and damaged to be manufactured as per sample. Mat- SS, Qty - 16.00093Indicator test plugManufacturing Indicator Test Plugs of WT hatches and doors corroded and damaged to be manufactured as per sample. Mat- SS, Qty - 16.
49400094Bridge WindowsRenewals(a) Water leakage observed from bridge windows. Rubber beading damaged/ perished. To be renewed. Qty. 40 RMT.00094Bridge WindowsRenewals(a) Water leakage observed from bridge windows. Rubber beading damaged/ perished. To be renewed. Qty. 40 RMT.
49500094Bridge WindowsStructure Coaming(b) Structure coaming of bridge windows corroded and thinned to be repaired/ renewed. Mat. - AL, Qty.- 0700094Bridge WindowsStructure Coaming(b) Structure coaming of bridge windows corroded and thinned to be repaired/ renewed. Mat. - AL, Qty.- 07
49600094Bridge WindowsToughened Glass(c) Bridge window glass faded and cracked to be renewed. Mat. - Toughened Glass. Qty. - 07.00094Bridge WindowsToughened Glass(c) Bridge window glass faded and cracked to be renewed. Mat. - Toughened Glass. Qty. - 07.
49700095Window WiperFresh Water LineExtension of fresh water line of window wiper over bridge windows on both Port and stbd side. Material - Copper lines.00095Window WiperFresh Water LineExtension of fresh water line of window wiper over bridge windows on both Port and stbd side. Material - Copper lines.
49800096Bonding StrapsRenewalsBonding straps fitted on weather deck fittings damaged and broken to be renewed along with securing eye. Qty. - 200. Bonding straps will be provided by SS. Mat- MS & AL.00096Bonding StrapsRenewalsBonding straps fitted on weather deck fittings damaged and broken to be renewed along with securing eye. Qty. - 200. Bonding straps will be provided by SS. Mat- MS & AL.
49900097Rope ReelRenewalsRope reel flange fitted on upper deck corroded and perished to be repaired/ renewed. Mat. - MS, Qty. - 04 Nos.00097Rope ReelRenewalsRope reel flange fitted on upper deck corroded and perished to be repaired/ renewed. Mat. - MS, Qty. - 04 Nos.
50000098Air Treatment UnitATU Casing(a) Air Leakage observed from ATU casing and body at indicated locations needs to be arrested. Job involves repair of ATU casing and renewal of rubber coaming.00098Air Treatment UnitATU Casing(a) Air Leakage observed from ATU casing and body at indicated locations needs to be arrested. Job involves repair of ATU casing and renewal of rubber coaming.
50100098Air Treatment UnitATU Filter(b) ATU filters corroded/ damaged to be manufactured as per sample. Mat:- Frame-GI, Wire Mesh-Copper. Qty - 0200098Air Treatment UnitATU Filter(b) ATU filters corroded/ damaged to be manufactured as per sample. Mat:- Frame-GI, Wire Mesh-Copper. Qty - 02
50200099Mushroom HeadOverhauling(a) Spindle and diaphram of Mushroom Heads jammed,corroded, and thinned. Work involves Overhauling of mechanism and renewal of rubber beading. Mat- MS, Qty - 09.00099Mushroom HeadOverhauling(a) Spindle and diaphram of Mushroom Heads jammed,corroded, and thinned. Work involves Overhauling of mechanism and renewal of rubber beading. Mat- MS, Qty - 09.
50300099Mushroom HeadRenewals(b) Wire mesh of mushroom head corroded and broken. Wire mesh to be renewed. Mat- MS, Qty - 09.00099Mushroom HeadRenewals(b) Wire mesh of mushroom head corroded and broken. Wire mesh to be renewed. Mat- MS, Qty - 09.
50400099Mushroom HeadRepair(c) Mushroom head cover along with foundation thinned and holed to be renewed. Mat- MS, Qty - 09.00099Mushroom HeadRepair(c) Mushroom head cover along with foundation thinned and holed to be renewed. Mat- MS, Qty - 09.
50500100Misc FittingScupper DrainDeck drain strainer fitted on upper deck corroded, thinned and broken to be manufactured and welded back in situ. Mat - MS, Qty - 10 Nos.00100Misc FittingScupper DrainDeck drain strainer fitted on upper deck corroded, thinned and broken to be manufactured and welded back in situ. Mat - MS, Qty - 10 Nos.
50600101Galley Drainage Pipe LineOverhaulingDeck drain inside ship's galley covered with deck covering. Drain to be cleared. Work involves de-gutting of adjcent area , clearing of deck covering and application of deck covering post repairs. Qty 05 RMT.00101Galley Drainage Pipe LineOverhaulingDeck drain inside ship's galley covered with deck covering. Drain to be cleared. Work involves de-gutting of adjcent area , clearing of deck covering and application of deck covering post repairs. Qty 05 RMT.
50700102Deck drainOverhaulingDeck drain line of Junior sailor bathroom clogged to be overhauled. Work involves removal, cleaning and refitment of pipe. Qty- 15 RMT, Mat. - MS.00102Deck drainOverhaulingDeck drain line of Junior sailor bathroom clogged to be overhauled. Work involves removal, cleaning and refitment of pipe. Qty- 15 RMT, Mat. - MS.
50800103WCRenewals WCs cracked/ damaged to be renwed with new WC iaw latest guidelines. Qty. - 05 Nos. Mat- Ceramic/ Stainless steel.00103WCRenewals WCs cracked/ damaged to be renwed with new WC iaw latest guidelines. Qty. - 05 Nos. Mat- Ceramic/ Stainless steel.
50900104MirrorRenewalsMirrors fitted in bathroom faded and damaged to be renewed. Mat. - SS 304 (0.9mm thick) sheet, Qty -05 Nos.00104MirrorRenewalsMirrors fitted in bathroom faded and damaged to be renewed. Mat. - SS 304 (0.9mm thick) sheet, Qty -05 Nos.
51000105Wash BasinSecuring BracketsWash basin and securing arrangement in Captain cabin bathroom, dining hall, Officer's Bathroom, Junior Sailor bathroom, senior sailor bathroom and ship's galley damaged to be repaired. Mat - MS. Qty- 06.00105Wash BasinSecuring BracketsWash basin and securing arrangement in Captain cabin bathroom, dining hall, Officer's Bathroom, Junior Sailor bathroom, senior sailor bathroom and ship's galley damaged to be repaired. Mat - MS. Qty- 06.
51100106MFMB LaggingRenewalsMFMB lagging at indicated locations(Bridge near window glass, Radio room and NO Cabin, Dining hall, Rope & Canvas store and messes) perished to be renewed in situ. Area - 100 Sqm00106MFMB LaggingRenewalsMFMB lagging at indicated locations(Bridge near window glass, Radio room and NO Cabin, Dining hall, Rope & Canvas store and messes) perished to be renewed in situ. Area - 100 Sqm
51200107Deck CoveringRenewalsDeck Covering along with Dadoe casting cracked and broken at ATU Compt, STP, Officer Bath and WC, Sr Sailor Bath and WC Junior Sailor Bath and WC, Ship's Galley And CO Bathroom. Deck covering to be renewed in accordance with NCD 3717 issue 3. Area - 50 Sqm.00107Deck CoveringRenewalsDeck Covering along with Dadoe casting cracked and broken at ATU Compt, STP, Officer Bath and WC, Sr Sailor Bath and WC Junior Sailor Bath and WC, Ship's Galley And CO Bathroom. Deck covering to be renewed in accordance with NCD 3717 issue 3. Area - 50 Sqm.
51300108SS Paneling RenewalsSS paneling in wet compartment damaged/ perished to be repaired/ renewed. Mat. SS, Area- 50 Sqm.00108SS Paneling RenewalsSS paneling in wet compartment damaged/ perished to be repaired/ renewed. Mat. SS, Area- 50 Sqm.
51400109CRCA Shoe lockerRepairsCRCA shoe locker fitted below bunks in Junior sailor, senior sailor mess and officers cabin damaged/ broken to be repaired/ renewed. Work involves renewal of Sliding channel and locking mechanism. Qty. - 3600109CRCA Shoe lockerRepairsCRCA shoe locker fitted below bunks in Junior sailor, senior sailor mess and officers cabin damaged/ broken to be repaired/ renewed. Work involves renewal of Sliding channel and locking mechanism. Qty. - 36
51500110Chart TableChart TableExisting chart table damaged and corroded. Drawer channel damaged. Modification/ renewal to be carried out as per extra space available. Exiting Dimension - . Proposed dimension -00110Chart TableChart TableExisting chart table damaged and corroded. Drawer channel damaged. Modification/ renewal to be carried out as per extra space available. Exiting Dimension - . Proposed dimension -
51600111Habitability Gunnery OfficeExisting wooden locker to be replaced with CRCA steel iaw NC/Policy/ H-121/ Equipment dated 05 Apr 17. Size - 900x 1000x600mm, Qty - 0100111Habitability Gunnery OfficeExisting wooden locker to be replaced with CRCA steel iaw NC/Policy/ H-121/ Equipment dated 05 Apr 17. Size - 900x 1000x600mm, Qty - 01
51700112Misc FurnitureCRCA locker(a) Doors of CRCA locker fitted in sailors mess uprooted from hinges to be repaired/ renewed. Qty. - 30. Size - 900x 1000 x 600mm00112Misc FurnitureCRCA locker(a) Doors of CRCA locker fitted in sailors mess uprooted from hinges to be repaired/ renewed. Qty. - 30. Size - 900x 1000 x 600mm
51800112Misc FurnitureMCR(b) Fixed wooden locker in MER broken and perished to be repaierd/renewed along with locking arrangement in situ. Mat - CRCA, Qty- 02 Nos.00112Misc FurnitureMCR(b) Fixed wooden locker in MER broken and perished to be repaierd/renewed along with locking arrangement in situ. Mat - CRCA, Qty- 02 Nos.
51900113Mortise lockRenewalsMortise locks of various non watertight door broken/ damaged to be renewed. Make - Godrej, Qty. - 22 Nos.00113Mortise lockRenewalsMortise locks of various non watertight door broken/ damaged to be renewed. Make - Godrej, Qty. - 22 Nos.
52000114Hydraulic Door CloserRenewalsHydraulic door closer of various non watertight door broken/ damaged to be renewed. Make - Godrej, Qty. - 22 Nos.00114Hydraulic Door CloserRenewalsHydraulic door closer of various non watertight door broken/ damaged to be renewed. Make - Godrej, Qty. - 22 Nos.
52100115Kickout PanelRenewalsKick out panels of NWT door damaged/ perished to be manufactured and fitted. Mat. - CRCA, Qty. -22 Nos.00115Kickout PanelRenewalsKick out panels of NWT door damaged/ perished to be manufactured and fitted. Mat. - CRCA, Qty. -22 Nos.
52200116Bathroom DoorRenewalsFour in no. bathroom door alongwith locking mechanism damaged and not closing properly to be repaired/ renewed. Mat. CRCA (B15 and equivalent), Qty - 02 Nos.00116Bathroom DoorRenewalsFour in no. bathroom door alongwith locking mechanism damaged and not closing properly to be repaired/ renewed. Mat. CRCA (B15 and equivalent), Qty - 02 Nos.
52300117Alleyway DoorRenewalsDoors in main alleyway, Gunnery Office and MCR along with locking mechanism damaged and not closing properly to be renewed. Mat. CRCA (B15 and equivalent). Qty - 0500117Alleyway DoorRenewalsDoors in main alleyway, Gunnery Office and MCR along with locking mechanism damaged and not closing properly to be renewed. Mat. CRCA (B15 and equivalent). Qty - 05
52400118Bridge Wing DoorRenewalsThree in no. NWT door fitted in bridge alongwith locking mechanism damaged and not closing properly to be repaired/ renewed. Mat. - CRCA (B15 and equivalent), Qty- 02 Nos.00118Bridge Wing DoorRenewalsThree in no. NWT door fitted in bridge alongwith locking mechanism damaged and not closing properly to be repaired/ renewed. Mat. - CRCA (B15 and equivalent), Qty- 02 Nos.
52500119RIBRepair(a) Increase in weight of RIB observed. Suspect water ingress from bottom hull. To be repaired. Work involves removal of collar and deck floor, identify the source of leakage and defect rectification..00119RIBRepair(a) Increase in weight of RIB observed. Suspect water ingress from bottom hull. To be repaired. Work involves removal of collar and deck floor, identify the source of leakage and defect rectification..
52600119RIBSeating Arrangement(b) Seating arrangement along with foundation uprooted from base to be renewed. Mat. GRP. Work involves: - (i) Crop and remove old seating (ii) Eraction of GRP foundation (iii) Install new Seating arragngement as per exisiting arrangement.(iii) Renew covers provided for stowage along with hinges.00119RIBSeating Arrangement(b) Seating arrangement along with foundation uprooted from base to be renewed. Mat. GRP. Work involves: - (i) Crop and remove old seating (ii) Eraction of GRP foundation (iii) Install new Seating arragngement as per exisiting arrangement.(iii) Renew covers provided for stowage along with hinges.
52700119RIBRIB Cradle(c) Seating of RIB cradle damaged/ perished to be renewed. Mat. Soft Wood with sponge and canvas cover.00119RIBRIB Cradle(c) Seating of RIB cradle damaged/ perished to be renewed. Mat. Soft Wood with sponge and canvas cover.
52800120Rope ReelRenewals(a) Rope reel flange fitted on upper deck corroded and perished to be repaired/ renewed. Mat. - MS, Qty. - 04 Nos.00120Rope ReelRenewals(a) Rope reel flange fitted on upper deck corroded and perished to be repaired/ renewed. Mat. - MS, Qty. - 04 Nos.
52900120Rope ReelRenewals(b) Rope reel foundation structure corroded thinned and holed to be repaired / renewed. Mat. - MS, Qty. - 04 Nos.00120Rope ReelRenewals(b) Rope reel foundation structure corroded thinned and holed to be repaired / renewed. Mat. - MS, Qty. - 04 Nos.
53000121PVC Guard RailsRenewals10 mm PVC guard rails near gangway and quarter deck damaged and broken. Assistance required for crimping of PVC guard rails with Tulips. Qty-54 Nos.00121PVC Guard RailsRenewals10 mm PVC guard rails near gangway and quarter deck damaged and broken. Assistance required for crimping of PVC guard rails with Tulips. Qty-54 Nos.
53100122Bonding StrapsRenewalsBonding straps fitted on weather deck fittings damaged and broken to be renewed along with securing eye. Qty. - 200. Bonding straps will be provided by SS. Mat- MS & AL.00122Bonding StrapsRenewalsBonding straps fitted on weather deck fittings damaged and broken to be renewed along with securing eye. Qty. - 200. Bonding straps will be provided by SS. Mat- MS & AL.
53200123Deck EyesRenewalsDeck eyes fitted on weather deck thinned and perished to be renewed. Mat - MS, Qty. - 2000123Deck EyesRenewalsDeck eyes fitted on weather deck thinned and perished to be renewed. Mat - MS, Qty. - 20
53300124ElectroplatingElectroplatingThe following ceremonial fittings to be electroplated: -00124ElectroplatingElectroplatingThe following ceremonial fittings to be electroplated: -
53400124ElectroplatingElectroplatingThe following ceremonial fittings to be electroplated: - (a) Ships Bell - 02 Nos.00124ElectroplatingElectroplatingThe following ceremonial fittings to be electroplated: - (a) Ships Bell - 02 Nos.
53500124ElectroplatingElectroplatingThe following ceremonial fittings to be electroplated: - (b) Cremonial dice stanchions - 08 Nos.00124ElectroplatingElectroplatingThe following ceremonial fittings to be electroplated: - (b) Cremonial dice stanchions - 08 Nos.
53600124ElectroplatingElectroplatingThe following ceremonial fittings to be electroplated: - (c) Ceremonial stanchion securing chain - 12 Nos00124ElectroplatingElectroplatingThe following ceremonial fittings to be electroplated: - (c) Ceremonial stanchion securing chain - 12 Nos
53700124ElectroplatingElectroplatingThe following ceremonial fittings to be electroplated: - (d) Emblem- 03 Nos.00124ElectroplatingElectroplatingThe following ceremonial fittings to be electroplated: - (d) Emblem- 03 Nos.
53800124ElectroplatingElectroplatingThe following ceremonial fittings to be electroplated: - (e) Ship's Name Plate- 02.00124ElectroplatingElectroplatingThe following ceremonial fittings to be electroplated: - (e) Ship's Name Plate- 02.
53900124ElectroplatingElectroplatingThe following ceremonial fittings to be electroplated: - . (g) Ship's Commisioning Plate- 01.00124ElectroplatingElectroplatingThe following ceremonial fittings to be electroplated: - . (g) Ship's Commisioning Plate- 01.
54000125Brass TalleyFrame Station Frame station tallies fitted on weather deck corroded and thinned to be manufactured and fitted. Qty - 44 Nos.00125Brass TalleyFrame Station Frame station tallies fitted on weather deck corroded and thinned to be manufactured and fitted. Qty - 44 Nos.
54100126Small Arms PostOverhauling and renewalsRotating mechanism of LMG at quarterdeck to be renewed. Qty- 01.00126Small Arms PostOverhauling and renewalsRotating mechanism of LMG at quarterdeck to be renewed. Qty- 01.
54200127Minor PlatformRenewalsCat walk structure and railing to be erected on superstructure in front of Bridge for accessing windows from superstructure. Work involves:- Manufacture of metallic grating of width 400 mm covering entire bridge window. Length- 10 m(40 rungs)00127Minor PlatformRenewalsCat walk structure and railing to be erected on superstructure in front of Bridge for accessing windows from superstructure. Work involves:- Manufacture of metallic grating of width 400 mm covering entire bridge window. Length- 10 m(40 rungs)
54300128Towing HookOverhaulingTowing hook assembly on quarter deck corroded and jammed. Heating assisstance required. Mat. - MS, Qty. - 01 No.00128Towing HookOverhaulingTowing hook assembly on quarter deck corroded and jammed. Heating assisstance required. Mat. - MS, Qty. - 01 No.
54400129Grenade RU LockerRenewalsRU locker fitted on weather deck corroded/ thinned. To be manufactured as per specifications in Art 1209 INMER VOL I. Work involves manufacturing of RU locker with lagging internally and have sheet metal cladding fitted over the tops and sides to form a 25 mm air gap for full circulation of air. Qty One. Auth IHQ MOD (N) letter WP/2664 dated 08 Jul 15.00129Grenade RU LockerRenewalsRU locker fitted on weather deck corroded/ thinned. To be manufactured as per specifications in Art 1209 INMER VOL I. Work involves manufacturing of RU locker with lagging internally and have sheet metal cladding fitted over the tops and sides to form a 25 mm air gap for full circulation of air. Qty One. Auth IHQ MOD (N) letter WP/2664 dated 08 Jul 15.
54500130Watertight / GT Control Marking PaintingPainting of Watertight and Gas tight markings ( alphabets) namely X/Y/Z and A/M/R on all WT doors, WT Hatches, Mushroom head and vent Flaps to be undertaken as per existing policy. Qty - 100 Nos.00130Watertight / GT Control Marking PaintingPainting of Watertight and Gas tight markings ( alphabets) namely X/Y/Z and A/M/R on all WT doors, WT Hatches, Mushroom head and vent Flaps to be undertaken as per existing policy. Qty - 100 Nos.
54600131Key BoardRepairRepair of existing keyboards to be undertaken. Qty Required - 04 Nos. Defects are - Locking arrangement and faded Sunmica Duplicate key board in main alleyway, Electrical Key Board, Engine room key board, EXO Cabin00131Key BoardRepairRepair of existing keyboards to be undertaken. Qty Required - 04 Nos. Defects are - Locking arrangement and faded Sunmica Duplicate key board in main alleyway, Electrical Key Board, Engine room key board, EXO Cabin
54700132Gangway ApronRenewals02 sets Gangway apron damaged/ perished. Length 09 mtr, width -01 mtr. Material : Synthetic with screen printing.00132Gangway ApronRenewals02 sets Gangway apron damaged/ perished. Length 09 mtr, width -01 mtr. Material : Synthetic with screen printing.
54800133Wooden GratingsRenewalsWooden gratings for securing of hawsers, Larne target rope and shore supply cable damaged to be maunfactured. Mat. - Wood with GRP coating, Qty. - 08. Size 1000mm x 1000mm00133Wooden GratingsRenewalsWooden gratings for securing of hawsers, Larne target rope and shore supply cable damaged to be maunfactured. Mat. - Wood with GRP coating, Qty. - 08. Size 1000mm x 1000mm
54900134Penant NoPaintingPainting of penant no. to be carried out as specified by ship staff as per existing policy.00134Penant NoPaintingPainting of penant no. to be carried out as specified by ship staff as per existing policy.
55000135Flag LockerRenewalsDoors of flag locker fitted in flag deck corroded and holed to be renewed along with locking mechanism as per drawing. Mat - Aluminium.00135Flag LockerRenewalsDoors of flag locker fitted in flag deck corroded and holed to be renewed along with locking mechanism as per drawing. Mat - Aluminium.
55100136Fresh Water LineRenewalsFresh water pipe line in bridge and bridge wing along with securing brackets corroded and thinned. To be renewed. Mat. - Cu-Ni, Qty. - 10 RMT00136Fresh Water LineRenewalsFresh water pipe line in bridge and bridge wing along with securing brackets corroded and thinned. To be renewed. Mat. - Cu-Ni, Qty. - 10 RMT
55200137Gangway state boardRepairsWooden gangway stateboard damaged and broken to be repaired along with stand. Mat - Wood, Qty - 04.00137Gangway state boardRepairsWooden gangway stateboard damaged and broken to be repaired along with stand. Mat - Wood, Qty - 04.
55300138Portable FF ExtinguisherSecuring BracketsSecuring brackets of following portable extinguisher corroded and perished to be manufactured and fitted. Mat. - MS, (a) 9 Ltr AFFF - 20 Nos. (b) 2 Kg. CO2 - 15 Nos. (c) 10 Kg. DCP - 02 Nos.00138Portable FF ExtinguisherSecuring BracketsSecuring brackets of following portable extinguisher corroded and perished to be manufactured and fitted. Mat. - MS, (a) 9 Ltr AFFF - 20 Nos. (b) 2 Kg. CO2 - 15 Nos. (c) 10 Kg. DCP - 02 Nos.
55400139BA Controller BoardRenewalsBA controller board of ship damaged/ broken to be manufactured as per specifications. Mat. Wood.00139BA Controller BoardRenewalsBA controller board of ship damaged/ broken to be manufactured as per specifications. Mat. Wood.
55500140Load TestingMisc Structure and Fittings(a) Bollards (16 Nos.)00140Load TestingMisc Structure and Fittings(a) Bollards (16 Nos.)
55600140Load TestingMisc Structure and Fittings(b) Towing Bollard (01 No.)00140Load TestingMisc Structure and Fittings(b) Towing Bollard (01 No.)
55700140Load TestingMisc Structure and Fittings(c) Cleats (12 Nos.)00140Load TestingMisc Structure and Fittings(c) Cleats (12 Nos.)
55800140Load TestingMisc Structure and Fittings(d) Fairleads (10 Nos.)00140Load TestingMisc Structure and Fittings(d) Fairleads (10 Nos.)
55900140Load TestingMisc Structure and Fittings(e) Bullring (02 Nos.)00140Load TestingMisc Structure and Fittings(e) Bullring (02 Nos.)
56000140Load TestingMisc Structure and Fittings(f) Deck Clenches ( 02 Nos)00140Load TestingMisc Structure and Fittings(f) Deck Clenches ( 02 Nos)
56100140Load TestingMisc Structure and Fittings(g) Cable Clench (02 Nos.)00140Load TestingMisc Structure and Fittings(g) Cable Clench (02 Nos.)
56200140Load TestingMisc Structure and Fittings(h) Towing Hook (01 No.)00140Load TestingMisc Structure and Fittings(h) Towing Hook (01 No.)
56300140Load TestingMisc Structure and Fittings(j) Towing Pendant (02 No.)00140Load TestingMisc Structure and Fittings(j) Towing Pendant (02 No.)
56400140Load TestingMisc Structure and Fittings(k) Towing Shackle (01 No.)00140Load TestingMisc Structure and Fittings(k) Towing Shackle (01 No.)
56500140Load TestingMisc Structure and Fittings(l) Bottle Screw Slip Deck Eye (02 No.)00140Load TestingMisc Structure and Fittings(l) Bottle Screw Slip Deck Eye (02 No.)
56600140Load TestingMisc Structure and Fittings(m) Bottle Screw SlipD Shackles (02 Nos.)00140Load TestingMisc Structure and Fittings(m) Bottle Screw SlipD Shackles (02 Nos.)
56700140Load TestingMisc Structure and Fittings(n) Anchor Strop (02 Nos.)00140Load TestingMisc Structure and Fittings(n) Anchor Strop (02 Nos.)
56800140Load TestingMisc Structure and Fittings(p) Deck Eyes of Anchor strop (04 Nos.)00140Load TestingMisc Structure and Fittings(p) Deck Eyes of Anchor strop (04 Nos.)
56900140Load TestingMisc Structure and Fittings(q) D Shackle for Anchor Strop (04 Nos.)00140Load TestingMisc Structure and Fittings(q) D Shackle for Anchor Strop (04 Nos.)
57000140Load TestingMisc Structure and Fittings(r) Deck Eye(Foxle) (04 Nos.)00140Load TestingMisc Structure and Fittings(r) Deck Eye(Foxle) (04 Nos.)
57100140Load TestingMisc Structure and Fittings(s) Deck Head Eye (STP Lobby) (01 No.)00140Load TestingMisc Structure and Fittings(s) Deck Head Eye (STP Lobby) (01 No.)
57200140Load TestingMisc Structure and Fittings(t) Ships Brow Aluminium (Small & Large)00140Load TestingMisc Structure and Fittings(t) Ships Brow Aluminium (Small & Large)
57300140Load TestingMisc Structure and Fittings(u) Towing Hawser 48 mm PP Rope00140Load TestingMisc Structure and Fittings(u) Towing Hawser 48 mm PP Rope
57400140Load TestingMisc Structure and Fittings(v) Berthing Hawser PP Rope00140Load TestingMisc Structure and Fittings(v) Berthing Hawser PP Rope
57500140Load TestingMisc Structure and Fittings(w) Larne Target PP Rope00140Load TestingMisc Structure and Fittings(w) Larne Target PP Rope
57600140Load TestingMisc Structure and Fittings(x) PVC Coated Wire Rope (Guard rail) (54 Nos.)00140Load TestingMisc Structure and Fittings(x) PVC Coated Wire Rope (Guard rail) (54 Nos.)
57700140Load TestingMisc Structure and Fittings(y) Snatch Block (02 Nos)00140Load TestingMisc Structure and Fittings(y) Snatch Block (02 Nos)
57800140Load TestingMisc Structure and Fittings(z) LLT Line (150 mtr)00140Load TestingMisc Structure and Fittings(z) LLT Line (150 mtr)
57900140Load TestingMisc Structure and Fittings(aa) Messenger Line (110 mtr)00140Load TestingMisc Structure and Fittings(aa) Messenger Line (110 mtr)
58000140Load TestingMisc Structure and Fittings(ab) Easing out recovery rope (80 mtr)00140Load TestingMisc Structure and Fittings(ab) Easing out recovery rope (80 mtr)
58100140Load TestingMisc Structure and Fittings(ac) Distance Line (66 mtr)00140Load TestingMisc Structure and Fittings(ac) Distance Line (66 mtr)
58200140Load TestingMisc Structure and Fittings(ad) Life Line (36 mtr)00140Load TestingMisc Structure and Fittings(ad) Life Line (36 mtr)
58300141CANVAS COVERRenewalsCanvas covers of CRN 91 Gun, LRAD, Mushroom Heads, Anchor Windlass, Boat Davit Motors perished. To be renewed. Mat- Canvas. Qty-09.00141CANVAS COVERRenewalsCanvas covers of CRN 91 Gun, LRAD, Mushroom Heads, Anchor Windlass, Boat Davit Motors perished. To be renewed. Mat- Canvas. Qty-09.
58400142Sea Boat RopeRenewalsThimble of Sea boat rope of 4.7 mtr RIB corroded and thinned. To be manufactured. Mat- MS. Qty- 01.00142Sea Boat RopeRenewalsThimble of Sea boat rope of 4.7 mtr RIB corroded and thinned. To be manufactured. Mat- MS. Qty- 01.
58500143WT BulkheadRepairsCorrosion and pitting observed near bimetallic joint of Port side bulkhead of STP lobby. To be renewed. Mat- MS.00143WT BulkheadRepairsCorrosion and pitting observed near bimetallic joint of Port side bulkhead of STP lobby. To be renewed. Mat- MS.
58600144Misc Structrucal FittingsRenewalsManufacturing and fitment of lockers in Electrical office, Junior Sailor mess, Senior sailor mess, Ship's Office, MCR and Dining Hall. Mat- CRCA. Qty- 25. Wooden Table tops to be changed with CRCA. Qty- 05.00144Misc Structrucal FittingsRenewalsManufacturing and fitment of lockers in Electrical office, Junior Sailor mess, Senior sailor mess, Ship's Office, MCR and Dining Hall. Mat- CRCA. Qty- 25. Wooden Table tops to be changed with CRCA. Qty- 05.
58700145Metallic CoversRenewalsMetallic Covers of Anchor windlas motor, Capstan, Boat Davit motors corroded/ holed/ damaged. To be manufactured as per sample. Mat- MS/ GI Sheet. Qty-05.00145Metallic CoversRenewalsMetallic Covers of Anchor windlas motor, Capstan, Boat Davit motors corroded/ holed/ damaged. To be manufactured as per sample. Mat- MS/ GI Sheet. Qty-05.
58800146Securing ClampsRenewalsSecuring Clamp of Drain lines corroded/ thinned. To be manufactured. Mat- MS/ AL. Qty- 2500146Securing ClampsRenewalsSecuring Clamp of Drain lines corroded/ thinned. To be manufactured. Mat- MS/ AL. Qty- 25
58900147WT BulkheadsRepairsPiercing observed on WT bulkhead of STP compartment and Dining Hall. To be repaired.00147WT BulkheadsRepairsPiercing observed on WT bulkhead of STP compartment and Dining Hall. To be repaired.
59000148Single Arm Boat DavitRepairsStructure of Boat Davit corroded/ thinned and holed. To be repaired. Mat- MS.00148Single Arm Boat DavitRepairsStructure of Boat Davit corroded/ thinned and holed. To be repaired. Mat- MS.
59100149Fisherman PlatesRenewalsManufacturing of 02 in no Fisherman plates as per sample. Mat- MS. Qty- 02.00149Fisherman PlatesRenewalsManufacturing of 02 in no Fisherman plates as per sample. Mat- MS. Qty- 02.
59200150Partition BulkheadsRenewalsGaps between Partition Bulkheads to be covered. Job involves manufacturing and fitment of frames. Qty- 20 Sqm.00150Partition BulkheadsRenewalsGaps between Partition Bulkheads to be covered. Job involves manufacturing and fitment of frames. Qty- 20 Sqm.
59300151Inclining LaddersRenewalsRenewal of Wooden back of Dining Hall Ladder. To be replaced with metallic sheet.Qty- 2 Sqm00151Inclining LaddersRenewalsRenewal of Wooden back of Dining Hall Ladder. To be replaced with metallic sheet.Qty- 2 Sqm
59400152Habitability RepairsRemoval of Old panel supporting brackets in MCR and fitment of new clamps for securing of trunking. Qty- 04.00152Habitability RepairsRemoval of Old panel supporting brackets in MCR and fitment of new clamps for securing of trunking. Qty- 04.
59500153Ventillation ArrangementGrease Filters02 in Nos Grease filters of Galley Damaged . To be manufactured as per sample. Mat- Frame- GI, Wiremesh- Copper.00153Ventillation ArrangementGrease Filters02 in Nos Grease filters of Galley Damaged . To be manufactured as per sample. Mat- Frame- GI, Wiremesh- Copper.
59600154NWT DoorsRubber BeadingRubber beading of 05 in Nos NWT doors perished. To be renewed.00154NWT DoorsRubber BeadingRubber beading of 05 in Nos NWT doors perished. To be renewed.
59700155Garbage Disposal UnitRenewalsReplace Pulveriser cutter blades and strainer of Garbage Disposal Unit in ship's galley washbasin00155Garbage Disposal UnitRenewalsReplace Pulveriser cutter blades and strainer of Garbage Disposal Unit in ship's galley washbasin
59800156Misc FittingsDining Hall TableDining Hall Table in Dining Hall Damaged. To Be renewed. Mat- SS00156Misc FittingsDining Hall TableDining Hall Table in Dining Hall Damaged. To Be renewed. Mat- SS
59900157Fixed Shoring ArrangementRenewalsFixed Shoring arangement at 11 Location Damaged/perished. To be renewed. Mat- MS. Qty- 11.00157Fixed Shoring ArrangementRenewalsFixed Shoring arangement at 11 Location Damaged/perished. To be renewed. Mat- MS. Qty- 11.
60000158Misc FittingsMagazineManufacturing and fitment of additional small arm racks on Port side and Detonator Locker. Qty- 04.00158Misc FittingsMagazineManufacturing and fitment of additional small arm racks on Port side and Detonator Locker. Qty- 04.
60100159IGLA LockerRepairsIGLA Lockers corroded/ thinned and holed. To be repaired . Mat- MS00159IGLA LockerRepairsIGLA Lockers corroded/ thinned and holed. To be repaired . Mat- MS
60200160CRN 91 GUNRepairsTurret Platform corroded, thinned and holed. To be repaired/ renewed. Mat- AL00160CRN 91 GUNRepairsTurret Platform corroded, thinned and holed. To be repaired/ renewed. Mat- AL
60300161Misc FittingsGERManufacturing and fitment of Small Arms racks for LMG, MMG, HMG, 716 SIG Rifle and securing arrangement for boxes with butterfly nuts. Qty- 22.00161Misc FittingsGERManufacturing and fitment of Small Arms racks for LMG, MMG, HMG, 716 SIG Rifle and securing arrangement for boxes with butterfly nuts. Qty- 22.
60400162Mosum PostChange of LocationLocation of MOSUM post to be changed. Mat- MS. Qty- 02.00162Mosum PostChange of LocationLocation of MOSUM post to be changed. Mat- MS. Qty- 02.
60500163RollersRenewalsRollers for guiding anchor chain cable and rope corroded .To be renewed. Qty- 06.00163RollersRenewalsRollers for guiding anchor chain cable and rope corroded .To be renewed. Qty- 06.
60600164FairleadRenewalsFairleads to be renewed as per new dimensions, Diameter of fairlead at quarterdeck for towing to be increased. Qty- 11.00164FairleadRenewalsFairleads to be renewed as per new dimensions, Diameter of fairlead at quarterdeck for towing to be increased. Qty- 11.
60700165Misc FittingsSecuring ArrangementBoxes in Rope and canvas Store and Deck store to be manufactured andsecured with butterfly nuts.. Qty-10. Mat- GI sheet.00165Misc FittingsSecuring ArrangementBoxes in Rope and canvas Store and Deck store to be manufactured andsecured with butterfly nuts.. Qty-10. Mat- GI sheet.
60800166Cable LockersWoodenWood of Cable lockers damaged. To be renewed. Area- 3 Sqm00166Cable LockersWoodenWood of Cable lockers damaged. To be renewed. Area- 3 Sqm
60900167Misc FittingsBridgeWooden furniture in Bridge is to be replaced with CRCA as per change management policy.00167Misc FittingsBridgeWooden furniture in Bridge is to be replaced with CRCA as per change management policy.
61000168Quartermaster TableRenewalsGangway Quartermaster table broken. To be renewed.mat- Wood. Qty- 01.00168Quartermaster TableRenewalsGangway Quartermaster table broken. To be renewed.mat- Wood. Qty- 01.
61100169Bridge wing PilorousHeight extensionHeight of Bridge wing pilorous sight to be increased. Qty- 02.00169Bridge wing PilorousHeight extensionHeight of Bridge wing pilorous sight to be increased. Qty- 02.
61200170GyroGyro standLocation of gyro stand to be changed towards aft part of bridge. Job involves removal of existing post and fitment aft part of bridge as observed during OST 22.00170GyroGyro standLocation of gyro stand to be changed towards aft part of bridge. Job involves removal of existing post and fitment aft part of bridge as observed during OST 22.
61300171BunksRenewalsBunks in accomodation spaces to be replaced with new bunks. Mat- CRCA. Qty-3400171BunksRenewalsBunks in accomodation spaces to be replaced with new bunks. Mat- CRCA. Qty-34
61400172WardroomRenewalsRenewal of Sofa set and table in Wardroom. Mat- CRCA/ Wood. Qty- 0200172WardroomRenewalsRenewal of Sofa set and table in Wardroom. Mat- CRCA/ Wood. Qty- 02
61500173CO CabinRenewalsRenewal of lockers and table in CO cabin. Mat- Wood. Qty- 04.00173CO CabinRenewalsRenewal of lockers and table in CO cabin. Mat- Wood. Qty- 04.
61600174Officers CabinRenewalsRenewal of Lockers and table in EXO cabin, EO cabin and NO Cabin. Mat- CRCA. Qty- 08.00174Officers CabinRenewalsRenewal of Lockers and table in EXO cabin, EO cabin and NO Cabin. Mat- CRCA. Qty- 08.
61700175Notice BoardRenewals02 in Nos Notice Boards in Junior Sailor Dining Hall and Main Alleyway damaged. To be renewed. Mat- Teak Ply. Qty- 0200175Notice BoardRenewals02 in Nos Notice Boards in Junior Sailor Dining Hall and Main Alleyway damaged. To be renewed. Mat- Teak Ply. Qty- 02
61800176GARBAGE DISPOSAL UNITGARBAGE DISPOSAL UNITGARBAGE DISPOSAL UNIT IN GALLEY NOT WORKING AND LEAKAGE OBSERVED FROM JOINTS. REPAIR OF GDU AND LEAKAGE CHEKS AND REPAIR TO BE CARRIED OUT. QTY - 01 NOS.00176GARBAGE DISPOSAL UNITGARBAGE DISPOSAL UNITGARBAGE DISPOSAL UNIT IN GALLEY NOT WORKING AND LEAKAGE OBSERVED FROM JOINTS. REPAIR OF GDU AND LEAKAGE CHEKS AND REPAIR TO BE CARRIED OUT. QTY - 01 NOS.
61900177CRCA LOCKERCRCA LOCKER1. GLASS OF CRCA LOCKERS BROKENT. TO BE REPLACED. LOCATION - GALLEY. QTY OF GLASS - 04 NOS.00177CRCA LOCKERCRCA LOCKER1. GLASS OF CRCA LOCKERS BROKENT. TO BE REPLACED. LOCATION - GALLEY. QTY OF GLASS - 04 NOS.
62000178QTR MASTER STATE BOARDSRenewalsRenewal of Qtr Master State Boards and Stands as per sample. Material - Wood. Qty - 02 Nos.00178QTR MASTER STATE BOARDSRenewalsRenewal of Qtr Master State Boards and Stands as per sample. Material - Wood. Qty - 02 Nos.
62100179Ship's BrowRepairRepair of Ship's brow. Material - Aluminium. Qty - 02 Nos.00179Ship's BrowRepairRepair of Ship's brow. Material - Aluminium. Qty - 02 Nos.
62200180STP Tank Exhaust PipeSTP tank exhaust pipe corroded and thinned. Repair/ renewal to be carried out. Location - Port Catwalk00180STP Tank Exhaust PipeSTP tank exhaust pipe corroded and thinned. Repair/ renewal to be carried out. Location - Port Catwalk
62300181Wind Socs baseRenewalsWind socs base heavily corroded and thinned. Repair/ renewal to be carried out.00181Wind Socs baseRenewalsWind socs base heavily corroded and thinned. Repair/ renewal to be carried out.
62400182Search LightRenewalsSearch Light base heavily corroded and thinned. Renewal to be carried out. Location - Bridge Top.00182Search LightRenewalsSearch Light base heavily corroded and thinned. Renewal to be carried out. Location - Bridge Top.
62500183Quartermaster ChairRenewalsExisting quartermaster chair damaged.Quartermaster master chair in bridge to be renewed as per dimension/ sample. Dimensions -00183Quartermaster ChairRenewalsExisting quartermaster chair damaged.Quartermaster master chair in bridge to be renewed as per dimension/ sample. Dimensions -
62600184MiscellaneousMiscellaneousAssistance for cutting redundant fittings at various locations. Bridge, Stbd & Port bridge wing.00184MiscellaneousMiscellaneousAssistance for cutting redundant fittings at various locations. Bridge, Stbd & Port bridge wing.
62700185Magnetic CompassMagnetic CompassVibrations observed on Magnetic compass. Modification/ repair of securing arrangment of magnetic compass base. Welding required. Location - Bridge00185Magnetic CompassMagnetic CompassVibrations observed on Magnetic compass. Modification/ repair of securing arrangment of magnetic compass base. Welding required. Location - Bridge
62800186MET Instrument BoxRenewalsRenewal of MET instrument box as per dimensions - . Material - Aluminium00186MET Instrument BoxRenewalsRenewal of MET instrument box as per dimensions - . Material - Aluminium
62900187CO ChairRenewalsRenewal of Commanding Officer's Chair in Bridge.00187CO ChairRenewalsRenewal of Commanding Officer's Chair in Bridge.
63000188Bridge Electrical PanelRenewalsRenewal of cover plate of Bridge console panels.00188Bridge Electrical PanelRenewalsRenewal of cover plate of Bridge console panels.
63100189Misc.Main Broadcast boxAssistance for securing of Main Broadcast con box in bridge.00189Misc.Main Broadcast boxAssistance for securing of Main Broadcast con box in bridge.
63200190CRCACRCA LOCKERFabrication of door below throttle console and NLCB panel. Location - Bridge.00190CRCACRCA LOCKERFabrication of door below throttle console and NLCB panel. Location - Bridge.
63300191Misc.Supporting rod(a) welding of supporting rod near Chart table. Locaiton - Bridge00191Misc.Supporting rod(a) welding of supporting rod near Chart table. Locaiton - Bridge
63400191Misc.Transformer box(b) Renewal of transformer box in port Bridge wing. Material - MS. Dimensions -00191Misc.Transformer box(b) Renewal of transformer box in port Bridge wing. Material - MS. Dimensions -
63500191weather deck lockers and boxes(c) fitment of flat rubber beading in weather deck lockers and boxes including POL locker00191weather deck lockers and boxes(c) fitment of flat rubber beading in weather deck lockers and boxes including POL locker
63600192PaintingShips BrowPainting of the following : - (a) Ship's brow.00192PaintingShips BrowPainting of the following : - (a) Ship's brow.
63700192PaintingShips Brow(b) Ceremonial life buoy00192PaintingShips Brow(b) Ceremonial life buoy
63800193Ceremonial LifebuoyCeremonial LifebuoyRope renewal and cloth change of ships ceremonial lifebuoy00193Ceremonial LifebuoyCeremonial LifebuoyRope renewal and cloth change of ships ceremonial lifebuoy
63900194Wooden BoardsWooden BoardsManufacturing of following boards to be undertaken -00194Wooden BoardsWooden BoardsManufacturing of following boards to be undertaken -
64000194Wooden BoardsWooden BoardsManufacturing of following boards to be undertaken -(a) Machinery State Board00194Wooden BoardsWooden BoardsManufacturing of following boards to be undertaken -(a) Machinery State Board
64100194Wooden BoardsWooden BoardsManufacturing of following boards to be undertaken - (b) MET state board00194Wooden BoardsWooden BoardsManufacturing of following boards to be undertaken - (b) MET state board
64200194Wooden BoardsWooden BoardsManufacturing of following boards to be undertaken - (c) LOCFLOT state board00194Wooden BoardsWooden BoardsManufacturing of following boards to be undertaken - (c) LOCFLOT state board
64300195Serviceability ChecksServiceability ChecksServiceability checks of the following equipments to be undertaken.00195Serviceability ChecksServiceability ChecksServiceability checks of the following equipments to be undertaken.
64400195Serviceability ChecksServiceability ChecksServiceability checks of the following equipments to be undertaken.(a) Roll and Pitch indicator00195Serviceability ChecksServiceability ChecksServiceability checks of the following equipments to be undertaken.(a) Roll and Pitch indicator
64500195Serviceability ChecksServiceability ChecksServiceability checks of the following equipments to be undertaken.(b) Inclinometer00195Serviceability ChecksServiceability ChecksServiceability checks of the following equipments to be undertaken.(b) Inclinometer
64600195Serviceability ChecksServiceability ChecksServiceability checks of the following equipments to be undertaken.(c) Batton buoy00195Serviceability ChecksServiceability ChecksServiceability checks of the following equipments to be undertaken.(c) Batton buoy
64700195Serviceability ChecksServiceability ChecksServiceability checks of the following equipments to be undertaken.(d) Sextent00195Serviceability ChecksServiceability ChecksServiceability checks of the following equipments to be undertaken.(d) Sextent
64800195Serviceability ChecksServiceability ChecksServiceability checks of the following equipments to be undertaken.(e) LRF00195Serviceability ChecksServiceability ChecksServiceability checks of the following equipments to be undertaken.(e) LRF
64900195Serviceability ChecksServiceability ChecksServiceability checks of the following equipments to be undertaken.(f) Binoculars00195Serviceability ChecksServiceability ChecksServiceability checks of the following equipments to be undertaken.(f) Binoculars
65000195Serviceability ChecksServiceability ChecksServiceability checks of the following equipments to be undertaken.(g) NVD00195Serviceability ChecksServiceability ChecksServiceability checks of the following equipments to be undertaken.(g) NVD
65100195Serviceability ChecksServiceability ChecksServiceability checks of the following equipments to be undertaken.(h) Bearing Sight00195Serviceability ChecksServiceability ChecksServiceability checks of the following equipments to be undertaken.(h) Bearing Sight
65200195Serviceability ChecksServiceability ChecksServiceability checks of the following equipments to be undertaken.(j) Distance meter00195Serviceability ChecksServiceability ChecksServiceability checks of the following equipments to be undertaken.(j) Distance meter
65300196MISC.METALLIC LOCKERS(a) Equipment rack modification in Radio Room00196MISC.METALLIC LOCKERS(a) Equipment rack modification in Radio Room
65400196MISC.METALLIC LOCKERS(b) File rack Modification in Radio Room00196MISC.METALLIC LOCKERS(b) File rack Modification in Radio Room
65500196MISC.METALLIC LOCKERS(c) NCN (TMFOC) rack modification on Flag Deck00196MISC.METALLIC LOCKERS(c) NCN (TMFOC) rack modification on Flag Deck
65600196MISC.METALLIC LOCKERS(d) Egg locker modification on Flag Deck00196MISC.METALLIC LOCKERS(d) Egg locker modification on Flag Deck
65700196MISC.METALLIC LOCKERS(e) RU Locker Modification on Flag Deck00196MISC.METALLIC LOCKERS(e) RU Locker Modification on Flag Deck
65800196MISC.METALLIC LOCKERS(f) RU Locker Manufacture as per sample00196MISC.METALLIC LOCKERS(f) RU Locker Manufacture as per sample
65900196MISC.METALLIC LOCKERS(g) Flag Locker Modification on Flag Deck00196MISC.METALLIC LOCKERS(g) Flag Locker Modification on Flag Deck
66000196MISC.METALLIC LOCKERS(h) Alteration of racks in Radio Room00196MISC.METALLIC LOCKERS(h) Alteration of racks in Radio Room
66100196MISC.RACKS(j) Racks Modification in Deck Store00196MISC.RACKS(j) Racks Modification in Deck Store
66200196MISC.RACKS(k) GUN / Ammunition & VBSS Racks Alteration in GER00196MISC.RACKS(k) GUN / Ammunition & VBSS Racks Alteration in GER
66300196MISC.RACKS(l) 51 MM Mortar foundation degutting from PORT & STBD Catwalk and Rewelding on Bridge Top PORT & STBD00196MISC.RACKS(l) 51 MM Mortar foundation degutting from PORT & STBD Catwalk and Rewelding on Bridge Top PORT & STBD
66400196MISC.RACKS(m) RU Locker wooden batten modification as per INMER and Replacement of Rubber Beading00196MISC.RACKS(m) RU Locker wooden batten modification as per INMER and Replacement of Rubber Beading
66500196MISC.RACKS(n) Modification and Relocation of MMG Post On Flag Deck Work involves Degutting and Welding of the same00196MISC.RACKS(n) Modification and Relocation of MMG Post On Flag Deck Work involves Degutting and Welding of the same
66600196MISC.RACKS(p) Manufacture of Wooden Gratings as per Sample00196MISC.RACKS(p) Manufacture of Wooden Gratings as per Sample
66700197MACHINERY SPACES AND WORKSHOPSStructural Examination of Compt.Examine structure not covered by lagging or deck coverings, paying particular attention to decks, deck boundaries and lower areas of ships side, bulkheads (ensuring all limber holes are clear) and areasaround side scuttles. Portable or semi portable fittings that obscure structure are to be removed for examination of structure behind. Structure revealed by the removal of semi -portable fittings is to berecoated as per approved paint scheme before the fittings are replaced00197MACHINERY SPACES AND WORKSHOPSStructural Examination of Compt.Examine structure not covered by lagging or deck coverings, paying particular attention to decks, deck boundaries and lower areas of ships side, bulkheads (ensuring all limber holes are clear) and areasaround side scuttles. Portable or semi portable fittings that obscure structure are to be removed for examination of structure behind. Structure revealed by the removal of semi -portable fittings is to berecoated as per approved paint scheme before the fittings are replaced
66800198Ventilation systemVentilation system checksThoroughly examine exhaust ventilation trunking and any areas liable to be in contact with acid. Where acid resisting composition on structure has deteriorated, clean by hard scraping and wire brushingfollowed by washing with dilute caustic soda solution and then fresh water. Thoroughly dry these exposed surfaces and recoat.Thoroughly examine lead lined sinks and bench tops for fracture or wear.NOTE: - Caustic soda is on no account to be used for cleaning intact paint surfaces.00198Ventilation systemVentilation system checksThoroughly examine exhaust ventilation trunking and any areas liable to be in contact with acid. Where acid resisting composition on structure has deteriorated, clean by hard scraping and wire brushingfollowed by washing with dilute caustic soda solution and then fresh water. Thoroughly dry these exposed surfaces and recoat.Thoroughly examine lead lined sinks and bench tops for fracture or wear.NOTE: - Caustic soda is on no account to be used for cleaning intact paint surfaces.
66900199FUNNELFUNNELEXAMINE FUNNEL CASING BOTH INTERNAL AND EXTERNAL, PAYING PARTICULAR ATTENTION. EXAMINE EYE PLATES AND SURROUNDINGS STRUCTURE FOR EVIDENCE OF CORROSION/ PITTING.EXAMINE FUNNEL STRUCTURE AND SEMI PORTABLE FITTINGS THAT OBSCURE STRUCTURE ARE TO BE REMOVED AND TO BE RECOATED BEFORE THE FITTINGS ARE REPLACED IN ACCORDANCE WITH NCD, NO 53/16 AND POLICY DIRECTIVES.00199FUNNELFUNNELEXAMINE FUNNEL CASING BOTH INTERNAL AND EXTERNAL, PAYING PARTICULAR ATTENTION. EXAMINE EYE PLATES AND SURROUNDINGS STRUCTURE FOR EVIDENCE OF CORROSION/ PITTING.EXAMINE FUNNEL STRUCTURE AND SEMI PORTABLE FITTINGS THAT OBSCURE STRUCTURE ARE TO BE REMOVED AND TO BE RECOATED BEFORE THE FITTINGS ARE REPLACED IN ACCORDANCE WITH NCD, NO 53/16 AND POLICY DIRECTIVES.
67000200Electrical compt.structural surveySurvey the structure including dadoes,decks, deck boundries, lower portion of bulkhead ship side for the trace of corrosion and flaking of paint. Carry out rectification accordingly.00200Electrical compt.structural surveySurvey the structure including dadoes,decks, deck boundries, lower portion of bulkhead ship side for the trace of corrosion and flaking of paint. Carry out rectification accordingly.
67100201APT CLUSTERSconduct of APT(a) Conduct APT and identify the defects (APT )may be carried out either by vacuum or pressure method iaw para 44 of NO 01/15. Note: All outstanding defects affecting water tight integrity of W/T compartments/ clusters/ tanks, are to be projected in Defect List00201APT CLUSTERSconduct of APT(a) Conduct APT and identify the defects (APT )may be carried out either by vacuum or pressure method iaw para 44 of NO 01/15. Note: All outstanding defects affecting water tight integrity of W/T compartments/ clusters/ tanks, are to be projected in Defect List
67200201Tanks, cofferdams , seatubes(b) All tanks, cofferdams and sea tubes which are repaired by build-up/renewal or are subjected to hot work for welding of pad piece/ foundation on any of their boundaries are to be air pressure tested. The pressure applied should never exceed that which corresponds to a pressure of 0.2 kg/sq cm (2meters of water or 0.20 bars or 2.1/2 ibf/ sq in). (14 Sea tubes, 25 OBDs, 04 ICCP cofferdam, 01 tank cofferdam, 02 void space (Port & Stbd) & 09 tanks00201Tanks, cofferdams , seatubes(b) All tanks, cofferdams and sea tubes which are repaired by build-up/renewal or are subjected to hot work for welding of pad piece/ foundation on any of their boundaries are to be air pressure tested. The pressure applied should never exceed that which corresponds to a pressure of 0.2 kg/sq cm (2meters of water or 0.20 bars or 2.1/2 ibf/ sq in). (14 Sea tubes, 25 OBDs, 04 ICCP cofferdam, 01 tank cofferdam, 02 void space (Port & Stbd) & 09 tanks
67300202GDUOverhaul and repairOverhaul complete garbage disposal unit including pump and pulveriser motors. Renew all gland packings seals, pulveriser cutter blades,strainers and all worn out parts. location - Galley00202GDUOverhaul and repairOverhaul complete garbage disposal unit including pump and pulveriser motors. Renew all gland packings seals, pulveriser cutter blades,strainers and all worn out parts. location - Galley
67400203WT DOORSStructural Examination and repair(a) Examine all WT/Doors and check their Clips/Clips mechanism for looseness, hinges for excessive play and wedge pieces for sign of wear. Also check locking arrangement teflon/neoprene washer washers, toroidal sealing rings and rubber sealings for warrant/defects. Raise specific defects to dockyard for repairs. WT Hatch - 12, EES - 02, WT Door - 12, Manholes - 1200203WT DOORSStructural Examination and repair(a) Examine all WT/Doors and check their Clips/Clips mechanism for looseness, hinges for excessive play and wedge pieces for sign of wear. Also check locking arrangement teflon/neoprene washer washers, toroidal sealing rings and rubber sealings for warrant/defects. Raise specific defects to dockyard for repairs. WT Hatch - 12, EES - 02, WT Door - 12, Manholes - 12
67500203Integrity test(b) Carry out watertight integrity test of all W.T. doors using Ultrasonic Leak Detector (ULD) device. Identify the leakages through watertight seals with the help of Ultrasonic Leak Detecor and raise specific defects to yard for rectification, if any. WT Hatch - 12, EES - 02, WT Door - 12, Manholes - 1200203Integrity test(b) Carry out watertight integrity test of all W.T. doors using Ultrasonic Leak Detector (ULD) device. Identify the leakages through watertight seals with the help of Ultrasonic Leak Detecor and raise specific defects to yard for rectification, if any. WT Hatch - 12, EES - 02, WT Door - 12, Manholes - 12
67600204NWT DOORSInspection and repairCheck clips, hinges for looseness, locking arrangement and any other components for wear and damage. Examine condition of rubber gaskets, door structure and kick out panel. Renew worn out/ damaged parts as necessary00204NWT DOORSInspection and repairCheck clips, hinges for looseness, locking arrangement and any other components for wear and damage. Examine condition of rubber gaskets, door structure and kick out panel. Renew worn out/ damaged parts as necessary
67700205HATCHES & MANHOLESHATCHES & MANHOLES(a) Examine all hatches and check their clips, closing mechanism, hinges for looseness, spring mechanism, hatch holding sliding mechanism/ retaining clip and wedge pieces for signs of wear and worn out. Check neoprene/ teflon washers, toroidal sealing rings, rubber sealings and other structural damage/ defects. Renew all worn out parts as necessary. WT Hatch - 12, EES - 02, WT Door - 12, Manholes - 1200205HATCHES & MANHOLESHATCHES & MANHOLES(a) Examine all hatches and check their clips, closing mechanism, hinges for looseness, spring mechanism, hatch holding sliding mechanism/ retaining clip and wedge pieces for signs of wear and worn out. Check neoprene/ teflon washers, toroidal sealing rings, rubber sealings and other structural damage/ defects. Renew all worn out parts as necessary. WT Hatch - 12, EES - 02, WT Door - 12, Manholes - 12
67800205HATCHES & MANHOLESHATCHES & MANHOLES(b) Carry out watertight integrity test of all W.T. hatches using Ultrasonic Leak Detector (ULD) device post rectification of all defects in the presence of SS/Trial agency. WT Hatch - 12, EES - 02, WT Door - 12, Manholes - 1200205HATCHES & MANHOLESHATCHES & MANHOLES(b) Carry out watertight integrity test of all W.T. hatches using Ultrasonic Leak Detector (ULD) device post rectification of all defects in the presence of SS/Trial agency. WT Hatch - 12, EES - 02, WT Door - 12, Manholes - 12
67900206FurnitureUpholstery and matteresses(a) Replace all partition, furniture upholstery, matteresses, awnings etc. and repair/ replace.Bunks - 39 & Awnings - 800206FurnitureUpholstery and matteresses(a) Replace all partition, furniture upholstery, matteresses, awnings etc. and repair/ replace.Bunks - 39 & Awnings - 8
68000206FurnitureMess Furnitures(b) Survey the following and repair:(i) Bunks - Nos. 39(ii) Lockers - 90(iii) Chairs - 20(iv) Stools - 10(v) Tables - 8(vi) Ladders - 8NOTE:- Wood and Fabrics to be treated with fire retardant chemicals FR 881 and FR 891 respectively.00206FurnitureMess Furnitures(b) Survey the following and repair:(i) Bunks - Nos. 39(ii) Lockers - 90(iii) Chairs - 20(iv) Stools - 10(v) Tables - 8(vi) Ladders - 8NOTE:- Wood and Fabrics to be treated with fire retardant chemicals FR 881 and FR 891 respectively.
68100206FurnitureCRCA LOCKER(c) Renewal of all cupboards. Mat - CRCA00206FurnitureCRCA LOCKER(c) Renewal of all cupboards. Mat - CRCA
68200207LADDERSVertical laddersREGALVANISE LADDERS. Treads of galvanised between deck ladders to be rewelded and ladders regalvanised00207LADDERSVertical laddersREGALVANISE LADDERS. Treads of galvanised between deck ladders to be rewelded and ladders regalvanised
68300208MISC. FITTINGSBrows structural survey and repairBrows are to be examined, repaired as necessary. Dockyard testing not more than 16 months.NOTE: Brows are to be tested at the first opportunity after any repairs carried.00208MISC. FITTINGSBrows structural survey and repairBrows are to be examined, repaired as necessary. Dockyard testing not more than 16 months.NOTE: Brows are to be tested at the first opportunity after any repairs carried.
68400209Accomodatoin spacesInspection of structure(a) Examine structure paying particular attention to deck boundaries, lower areas of ship-sides/ bulkheads (dadoes) and area around side scuttles for sign of corrosion, pitting and structural weakness. Raise specific defect to dockyard for repairs and renewal. Yard to undertake defect rectification of projected areas.List of compartments.Note:- Structural defects observed during periodical internal survey of structure to be included in defect list together with a list of items, fittings, equipment and lagging which will be required to be de-gutted/ remove by yard to facilitate survey.00209Accomodatoin spacesInspection of structure(a) Examine structure paying particular attention to deck boundaries, lower areas of ship-sides/ bulkheads (dadoes) and area around side scuttles for sign of corrosion, pitting and structural weakness. Raise specific defect to dockyard for repairs and renewal. Yard to undertake defect rectification of projected areas.List of compartments.Note:- Structural defects observed during periodical internal survey of structure to be included in defect list together with a list of items, fittings, equipment and lagging which will be required to be de-gutted/ remove by yard to facilitate survey.
68500209Accomodatoin spacesStructure covered with underlay/ insulation(b) Undertake survey of Mess Decks, Cabins and Offices in accordance with NO 01/15 and IHQ MoD (N)/ DNA letter NC/7631 dated 01 Nov 22 as mentioned:-Structure covered with underlay/ insulation - Survey of the condition of underlay / insulation is to be carried out. The deck covering be inspected for cracks, bulging/ undulation, mechanical damage, discoloration etc. In case of damage observed, the structure underneath to be visually surveyed post removal of underlay/ insulation of affected area.00209Accomodatoin spacesStructure covered with underlay/ insulation(b) Undertake survey of Mess Decks, Cabins and Offices in accordance with NO 01/15 and IHQ MoD (N)/ DNA letter NC/7631 dated 01 Nov 22 as mentioned:-Structure covered with underlay/ insulation - Survey of the condition of underlay / insulation is to be carried out. The deck covering be inspected for cracks, bulging/ undulation, mechanical damage, discoloration etc. In case of damage observed, the structure underneath to be visually surveyed post removal of underlay/ insulation of affected area.
68600209Accomodatoin spaces(d) USG of areas found corroded during visual survey, if required.00209Accomodatoin spaces(d) USG of areas found corroded during visual survey, if required.
68700209Accomodatoin spacesunderlay and without underlay compt. Inspection(e) 100% Visual and USG survey of dadoe areas of WT bulkheads at each deck below waterline00209Accomodatoin spacesunderlay and without underlay compt. Inspection(e) 100% Visual and USG survey of dadoe areas of WT bulkheads at each deck below waterline
68800210GALLEY & DINING HALLGALLEY & DINING HALLSAMPLE VISUAL SURVEY OF DECKS AND BULKHEAD DADOES TO BE CARRIED OUT TO ASCERTAIN THE MATERIAL STATE. WORK INVOLVES DEGUTTING/ REMOVAL OF MICROTEK UNDERLAY AT INDICATED LOCATIONS AND RELAYING THE SAME ON COMPLETION OF SURVEY. SIZE OF SAMPLE MICROTEK UNDERLAY:2 FT x 1FT; NO OF SAMPLES: 02 SAMPLES EACH. WORK INVOLVES REMOVAL OF AND REFITMENT ON COMPLETION OF SURVEY/ REPAIRS. SS PANNELING00210GALLEY & DINING HALLGALLEY & DINING HALLSAMPLE VISUAL SURVEY OF DECKS AND BULKHEAD DADOES TO BE CARRIED OUT TO ASCERTAIN THE MATERIAL STATE. WORK INVOLVES DEGUTTING/ REMOVAL OF MICROTEK UNDERLAY AT INDICATED LOCATIONS AND RELAYING THE SAME ON COMPLETION OF SURVEY. SIZE OF SAMPLE MICROTEK UNDERLAY:2 FT x 1FT; NO OF SAMPLES: 02 SAMPLES EACH. WORK INVOLVES REMOVAL OF AND REFITMENT ON COMPLETION OF SURVEY/ REPAIRS. SS PANNELING
68900210GALLEY & DINING HALLGALLEY & DINING HALL(A) VISUAL AND HAMMER SURVEY OF DECKS AND BULKHEAD DADOES IN GALLEY AND DINING HALL AT INDICATED SAMPLE LOCATIONS.00210GALLEY & DINING HALLGALLEY & DINING HALL(A) VISUAL AND HAMMER SURVEY OF DECKS AND BULKHEAD DADOES IN GALLEY AND DINING HALL AT INDICATED SAMPLE LOCATIONS.
69000210GALLEY & DINING HALLGALLEY & DINING HALL(B) RENEWAL OF DEFECTIVE AREAS:- AREAS FOUND WEAK/ DEGRADED/ DETERIORATED DURING THE STRUCTURAL SURVEY ARE TO BE CROPPED BY APPROPPRIATE METHODS AND RENEWED. MATERIAL: MS00210GALLEY & DINING HALLGALLEY & DINING HALL(B) RENEWAL OF DEFECTIVE AREAS:- AREAS FOUND WEAK/ DEGRADED/ DETERIORATED DURING THE STRUCTURAL SURVEY ARE TO BE CROPPED BY APPROPPRIATE METHODS AND RENEWED. MATERIAL: MS
69100210GALLEY & DINING HALLGALLEY & DINING HALL(C)PROVISIONING OF INSPECTION WINDOW ALONG WITH LOCKING MECHANISM IAW IHQ MoD(N) DIRECTIVES ON PANELING.00210GALLEY & DINING HALLGALLEY & DINING HALL(C)PROVISIONING OF INSPECTION WINDOW ALONG WITH LOCKING MECHANISM IAW IHQ MoD(N) DIRECTIVES ON PANELING.
69200210GALLEY & DINING HALLGALLEY & DINING HALL(D) APPLICATION OF DECK COVERING IN DINING HALL IAW IHQ DIRECTIVES00210GALLEY & DINING HALLGALLEY & DINING HALL(D) APPLICATION OF DECK COVERING IN DINING HALL IAW IHQ DIRECTIVES
69300210GALLEY & DINING HALLGALLEY & DINING HALL(E) PROVISIONING OF INSPECTION WINDOW ALONG WITH LOCKING MECHANISM IN WARD ROOM IAW IHQ DIRECTIVES ON PANELING NOTE 1:- JOB INCLUDES DEGUTTING AND REGUTTING OF LAGGING, SS PANNELING, GARBAGE DIPOSAL UNIT, DEEP FREEZER, COOKING RANGE AND OTHER PORTABLE/ SEMI-PORTABLE FITTINGS ETC. IN WAY OF SAMPLE AREAS OF SURVEY AND IN WAY OF STRUCTURAL REPAIRS. FITTINGS THAT ARE DAMAGED DURING THE DE-GUTTING ARE TO BE RENEWED AND REFITTED IN SITU NOTE 2:- TESTING OF ALL WELD JOINTS BY DYE PENETRANT TEST ONCE AFTER COMPLETION OF ROOT RUN AND FINALLY ON COMPLETION OF ALL WELD RUNS FOLLOWED BY WATER HOSE TEST (3 KG PR)NOTE 3:- A DETAILED SURVEY REPORT OF STRUCTURE ALONG WITH RECOMMENDATIONS FOR REPAIR/ RENEWAL IS TO BE PREPARED AND SUBMITTED FOR NECESSARY ACTION. THE STRUCTURAL RENEWALS ARE TO BE MARKED ON DECK PLANS FOR INFORMATION AND RECORD.00210GALLEY & DINING HALLGALLEY & DINING HALL(E) PROVISIONING OF INSPECTION WINDOW ALONG WITH LOCKING MECHANISM IN WARD ROOM IAW IHQ DIRECTIVES ON PANELING NOTE 1:- JOB INCLUDES DEGUTTING AND REGUTTING OF LAGGING, SS PANNELING, GARBAGE DIPOSAL UNIT, DEEP FREEZER, COOKING RANGE AND OTHER PORTABLE/ SEMI-PORTABLE FITTINGS ETC. IN WAY OF SAMPLE AREAS OF SURVEY AND IN WAY OF STRUCTURAL REPAIRS. FITTINGS THAT ARE DAMAGED DURING THE DE-GUTTING ARE TO BE RENEWED AND REFITTED IN SITU NOTE 2:- TESTING OF ALL WELD JOINTS BY DYE PENETRANT TEST ONCE AFTER COMPLETION OF ROOT RUN AND FINALLY ON COMPLETION OF ALL WELD RUNS FOLLOWED BY WATER HOSE TEST (3 KG PR)NOTE 3:- A DETAILED SURVEY REPORT OF STRUCTURE ALONG WITH RECOMMENDATIONS FOR REPAIR/ RENEWAL IS TO BE PREPARED AND SUBMITTED FOR NECESSARY ACTION. THE STRUCTURAL RENEWALS ARE TO BE MARKED ON DECK PLANS FOR INFORMATION AND RECORD.

AI Tender Summary

OUR REF NO 58513841
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 14-12-2026
Authority
Authority Name Indian Navy
Work Description Bids Are invited for Repair And Overhauling Service - Normal Refit Of In Assetcom/0351/Bitra/Nr O/L-27/A; Any Other Suitable Brand; Yes; Buyer Premises, Service Provider Premises - Hull Services-Ins Bitra Nr-2700001Docking, Cleaning & Usg Surveydockingcarry Out Docking Of Ship In (No Str 1/11 ) Version I And Version Ii For Complete Renewal Of Underwater Paint Scheme. Last Uw Paint Scheme Renewal In Mr 14. Last Docking Date: 12 Aug - 06 Sep 25 Version Ii At Varuna Outer Nd(V) , 00001Docking, Cleaning & Usg Surveycleaning(A) Remove Marine Fouling From The Hull Using Wooden Scraper Or Hydro Jetting With Maximum Pressure Not Exceeding 3000 Psi. , 00001Docking, Cleaning & Usg Survey(B) Scrap And Clean Under Water Area And Boot Top Area (Including Wind And Water Areas) To Remove All Loose Paint Film, Rust Etc. Wind Water Areas To Be Considered Upto 500 Mm Above The Boot Top. , 00001Docking, Cleaning & Usg Surveyusg Survey(C) Carry Out Ultrasonic Gauging Of Underwater Hull Areas And Above Water Areas , 00001Docking, Cleaning & Usg Surveydocking Reports(D) Firm To Provide 07 Sets Of Docking Form/ Report In 379 Duly Filled (Uw Steel Renewal, Painting Details, Sacrifical Anodes, Uw Valves, Sea Tubes/ Sea Chest, Other Details Pertaining To Water Jet As Mentioned Etc.) On Completion Of The Refit , 00001Docking, Cleaning & Usg Surveysurvey Reportnote:- Report Of Hull Survey Post Completion Be Submitted To Ss For Reference. , 00002Uw Shell Touching Compt/ Spcaceshitu Inspectionss/ Refitting Firm Is Required To Offer All U/W Shell Touching Compartments/ Tanks/ Void Spaces/ Cofferdams In Dry Dock For Inspection (For All Refits) Of Preservation Standards To Hitu Prior Final Undocking. , 00003Underwater Structuresurvey All Underwater Appendages(A) Survey All Under Water Appendages/ Fittings For Pitting, Corrosion Or Any Damage Paying Particular Attention To Paint Failure/ Damage Area To Stern Shaft Bracket, Ropeguard, Eddy Plates, Eddy Cones, Stern Tube, Skeg, Bilge Keel Plate, Stabilizers Fin Etc. Iaw No 01/15. Undertake Repair As Necessary.(I) Rudder - 2, (Ii) Reference Electrodes - 2, (Iii) Iccp Anodes -2, (Iv) Propellar - 2, (V) Echo Souder - 1, (Vi) Em Log - 1, (Vii) Spray Rails - 4, (Viii) Shaft Brackets - 2, (Ix) Sea Tubes And Gratings - 14. , 00003Underwater Structureoverhauling And Examination Of Uw Valves(B) Open Up And Remove Minimum 50% Of U/W Valves And Fittings For Examination And Also To Facilitate Survey Of Sea Tubes As Per Mt 11620. All Valves To Be Completed During Each Cycle In Conjunction With Nr1(22 (Obd Nos)) , 00003Underwater Structurepressure Testing Of Box Bilge Keel(C) Carry Out Pressure Testing Of The Box Type Spray Rails To Ensure Watertight Integrity Of The Structure Post Ndt Of Weld Joints. , 00003Underwater Structurepaint Restoration And Renewal(D) Clean To Bare Metal All Corroded Area And Area Of Paint Failure Of U/W Appendages And Preserved In Accordance With No 53/16 And Policy Directives Issued By Nhq/Ihq Time To Time. , 00003Underwater Structuredraught Marking Repair/ Renewal And Paint Restoration(E) Check Draught Marks Are In Position And Intact With Ship Structure. If Not Repair And Renew.(Nes-164/Defstan 02-164 & Br 3001 Chapter 28 Article 2811). Undertake Painting Of Draft Marks As Per No 53/16 And Policy Directives Issued By Ihq/Dna. (Size -10 Cm Of Thickness 8Mm). Location -(I) Forward (Ii) Midship, (Iii) Aft. Qty - 50 Nos. , 00003Underwater Structurefairing Of Uw Appendages(F) Examine Fairing Of Underwater Appendages For Roughness And Unfairness Or Any Damage Paying Particular Attention To The Shaft Brackets, Ropeguards And Eddy Plates Etc. Renew/Repair The Unfaired/Damaged Fairing For Their Smoothness. , 00003Underwater Structurestabilizers(G) Clean And Repaint The Sea Side Surface Of Stabilizer Fin Boxes. The Fin Wings Extended And Turned To Maximum Angle To The Horizontal To Give Better Access To The Fin Box (If Applicable). , 00003Underwater Structureshaft Brackets(H) Recoat Shaft Brackets In Accordance With No 53/16. , 00003Underwater Structurendt Of Weld Joints(J) Carry Out 100% Ndt Of The Weld Joints Of Spray Rails. , 00004Rudderabrasive Blasting / Scraping(A) Carry Out Abrasive Blasting/Scraping To Bare Metal Of Areas Of Corrosion/ Paint Damage. Restore The Paint Scheme As Per Ships Uw Paint Scheme In Accordance With No 53/16 , 00004Rudderstructural Examination(B) Examine Rudder Structure In Accordance With No 01/15, Paying Particular Attention To Hull Plating In The Vicinity Of Rudder(S) And Fittings Up To The Rudder Head, For Any Signs Of Corrosion And Any Other Defects/ Damage , 00004Rudderexamine Bearing And Bushes(C) Examine And Check Clearances Of Lower And Upper Bearings Or Bushes, Whichever Is Fitted, Of Rudder. Renew/ Repack Rudder Bearings/ Gland Bushes, If Required (Br 3000 Art. 2811 & Br 3001 Art. 2805 Refers) . , 00004Ruddersurvey And Repair Rudder Stock Housing(D) The Rudder Stock Housing Tube Be Surveyed, Repaired And Pressure Tested To A Pressure Of 0.2 Kg/Cm2. , 00004Rudderexamine Rudder Pintle(E) Examine Rudder Pintle Bearings To Ensure That They Are Fully Lubricated Before Undocking. , 00005External Underwater Hullpreservation/ Painting(A) Carryout Painting Of Underwater Hull And Boot Topping Area On Completion Of All Hot Work And Hydro Blasting/ Grit Blasting Of Underwater Hull, With 10 Years Long Life Paint Scheme (Llps) , 00005External Underwater Hullpreservation/ Painting(B) Shipyard To Procure Paints From Navy Approved Paint Suppliers [M/S Akzo Nobel Coatings Pvt Ltd (Bangalore) , 00005External Underwater Hullpreservation/ Painting(C) Painting To Be Carried Out Under Supervision Of Paint Manufacturer And Guarantee For 10 Years To Be Given By Supplier (Oem), Oem Certificate Be Issued Post Completion Of Painting. , 00005External Underwater Hullpreservation/ Painting(D) Llps Paint Scheme (Akzo Nobel) , 00005External Underwater Hullpreservation/ Painting(D) Llps Paint Scheme (Akzo Nobel)(I) 01 Coat Of Intergard 269 (Red) Primer To Dft 50 Microns , 00005External Underwater Hullpreservation/ Painting(D) Llps Paint Scheme (Akzo Nobel)(Ii) 02 Coats Of Anti-Corrosive Intershield 300 Colour Aluminium And Bronze Dft - 150 Microns Each Coat , 00006External Uw Hull External Uw Hull Surveysurvey The Structure In Accordance With No 01/15 And Ihq Mod (N)/ Dna Letter Nc/7631 Dated 01 Nov 22 As Mentioned:-(A) 100% Visual Survey And 100% Usg Of Full External Uw Hull Note:- Eye Hooks If Used For Propeller Or Shaft Removal/ Fitment Are To Be Removed Before Undocking And Ground Flushed. Pad Pieces With Fair Edges May Be Retained Except Those With Waterjets And Surface Drives , 00007Underwater, Above Water, Internal Compts, Mast / Super Structuresteel Renewal & Aluminium Renewal(A) Areas/ Structure Of Decks Found Weak/ Degraded/ Deteriorated During The Structural Survey Are To Be Cropped By Appropriate Methods And Renewed As Per Hull Survey Report/ Recommendations. , 00007Underwater, Above Water, Internal Compts, Mast / Super Structuresteel Renewal & Aluminium Renewal(A) Areas/ Structure Of Decks Found Weak/ Degraded/ Deteriorated During The Structural Survey Are To Be Cropped By Appropriate Methods And Renewed As Per Hull Survey Report/ Recommendations.(I) Material Of No.1 Dk: B Quality Mild Steel Conforming To Abs Specification, 05 - 08 Mm Thk; Cutting Process: Oxy-Acetylene Gas Cutting; Weld Process: Mmaw , 00007Underwater, Above Water, Internal Compts, Mast / Super Structuresteel Renewal & Aluminium Renewal(A) Areas/ Structure Of Decks Found Weak/ Degraded/ Deteriorated During The Structural Survey Are To Be Cropped By Appropriate Methods And Renewed As Per Hull Survey Report/ Recommendations.(Ii) Material Of 01 Dk , 02 Deck, Mer & Aer Soft Patches: Aluminium Plating Conforming To Abs Specification, 04 - 06 Mm Thk; Cutting Process: Cold Cutting By Rotary Cutting Wheel; Weld Process: Tig , 00007Underwater, Above Water, Internal Compts, Mast / Super Structuresteel Renewal & Aluminium Renewal(A) Areas/ Structure Of Decks Found Weak/ Degraded/ Deteriorated During The Structural Survey Are To Be Cropped By Appropriate Methods And Renewed As Per Hull Survey Report/ Recommendations.Note 1:- Quoted Cost Shall Include Cost Of Necessary Degutting And Regutting Of Portable And Semi-Portable Fittings, Lagging, Panelling, Tiling, Macrotech And All In Way Jobs Of Renewal Of The Structure To Be Carried Out As Required. Fittings That Are Damaged During The De-Gutting Are To Be Renewed And Refitted In Situ , 00007Underwater, Above Water, Internal Compts, Mast / Super Structuresteel Renewal & Aluminium Renewal(A) Areas/ Structure Of Decks Found Weak/ Degraded/ Deteriorated During The Structural Survey Are To Be Cropped By Appropriate Methods And Renewed As Per Hull Survey Report/ Recommendations.Note 2:- Testing Of All Weld Joints By Dye Penetrant Test Once After Completion Of Root Run And Finally On Completion Of All Weld Runs Followed By Water Hose Test (3 Kg Pr) , 00007Underwater, Above Water, Internal Compts, Mast / Super Structuresteel Renewal & Aluminium Renewal(A) Areas/ Structure Of Decks Found Weak/ Degraded/ Deteriorated During The Structural Survey Are To Be Cropped By Appropriate Methods And Renewed As Per Hull Survey Report/ Recommendations.Note 3:- Details Of Structural Renewals To Be Incorporated In Respective Deck Plans Giving All Details And Submitted For Information And Record. , 00008Sacrificial Anodessacrificial Anodesmake : Cathodic Control Company Pvt Ltdqty Fitted - 22 (Sacrificial) 04 (Iccp Anodes And Re) , 00008Sacrificial Anodessacrificial Anodesmake : Cathodic Control Company Pvt Ltdqty Fitted - 22 (Sacrificial) 04 (Iccp Anodes And Re)(A) Carryout Renewal Of Sacrificial Anodes Of 14 In Nos Sea Chest. Job Involves Milling Of Zinc Anodes Into Cylindrical Shape And Threading At One End To Ascertain Fitment In Sea Chest , 00008Sacrificial Anodessacrificial Anodesmake : Cathodic Control Company Pvt Ltdqty Fitted - 22 (Sacrificial) 04 (Iccp Anodes And Re)(B) Inspect Sacrificial Anodes Fitted To Underwater Hull, Rudders, Rope Gaurd, Shaft Tunnel, Stern Tubes, Inlets And Outlets, Sea Tubes, Bilges And Coffer Dams. Renew Those Consumed 50% Or More.Note:- For Sacrificial Anodes, A Minimum Of 4 Mm Gap Between The Hull And The Anode Is To Be Maintained. Old Anode Legs/ Weld Metal Is To Be Flush Ground, Post Removal And Restored With The Appropriate Paint Scheme Prior Fitment Of New Anodes.(On Rudder (P &S) - 08 Nos.On Sea Tubes - 14 Nos , 00008Sacrificial Anodessacrificial Anodesmake : Cathodic Control Company Pvt Ltdqty Fitted - 22 (Sacrificial) 04 (Iccp Anodes And Re)(C) Carryout Renewal Of Sacrificial Anodes Of Rudder And Inlets Job Involves Removal And Fitment Of Sacrificial Anodes.Sacrificial Anodes Details:On Rudder (P &S) - 08 Nos.On Sea Tubes - 14 Nos , 00009Iccp Systempre Docking Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01 , 00009Iccp Systempre Docking Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(A) Carry Out Pre Docking Checks On Anodes, Reference Electrodes And Auto Control Units Iaw No 03/21. Rectify Defects If Any During Dry Docking Phase. Re - 2 , Iccp Anodes - 2Note: Report Of Pre Docking Checks Be Submitted To Ss At The Earliest. , 00009Iccp Systempost Docking (Dry Docking) Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(B) Renew Dielectric Shield (25Sqft Area Around Anodes) In Accordance With Para 3.5, Chapter 3 Of Inbr 372/83. , 00009Iccp Systempost Docking (Dry Docking) Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(C) Check Insulation Of Anodes To Hull And Reference Electrodes To Hull. Rectify Deects, If Any , 00009Iccp Systempost Docking (Dry Docking) Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(D) Scrap Recess Of Securing Bolts/ Anodes/ Reference Electrodes With Emery Paper And Apply Fresh Coat Of Araldite Putty In Recess , 00009Iccp Systempost Docking (Dry Docking) Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(E) Carry Out Dummy Load Test Of Auto Control Unit Panel As Per Instruction In Chapter Inbr 372/84 & No 03/21. , 00009Iccp Systempost Docking (Dry Docking) Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(F) Examine For Leakage Where Iccp Anodes Fitted. Rectify Leakages By Filling With Plastic Compound. , 00009Iccp Systempost Docking (Dry Docking) Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(G) Examine Di-Electric Shield Around Iccp Anodes And Reference Electrodes. Preserve Di-Electric Shield I.A.W No 03/21. Area Covered By Anti-Fouling Paint On Ships Hull Should Also Include Area Of Di-Electric Shield Leaving Only 300Mm Distance From Iccp Anode/ Reference Electrode. A Tie Coat May Be Necessary Before Anti-Fouling Paint Application On Th Di-Electric Shield. Necessary Protection/ Cover The Anodes And Reference Electrodes During Painting In Vicinity. , 00009Iccp Systempost Docking (Dry Docking) Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(H) Open, Inspect And Clean The Iccp Cofferdams During Dry Docking Of The Ship. To Prevent Seepage Of Water Into Cofferdams, The Cable Entry Gland, Cable Exit Glands And Cofferdam Lid Should Be Made Watertight. As An Additional Measure, Potting With Ihq Approved/ Nmrl Developed Silicone Compound Is To Be Carried Out As Per Para26 Of No 03/21. , 00009Iccp Systempost Docking (Dry Docking) Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(J) Inspect Junction Boxes/ Cofferdams For Signs Of Corrosion And Wt Integrity, Especially On Cover And Cable Gland.Undertake Air Pressure Test Of The Cofferdam Post Structure Repair/ Renewal On Cofferdam Structure Prior Fittment Of The Cable Of The Anode/ Reference Electrode, As Per Norms Appilicable For Any Cofferdam/ Void Space Onboard. , 00009Iccp Systempost Docking (Dry Docking) Checksmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(K) Carry Out Serviceability Checks Of Acu By Refitting Authority As Per Para 22© Of No 03/21.Note : The Iccp System Is Under Amc And Periodic Checks Are Being Carried Out By M/S Cathodic Controls Pvt Limited, Bangalore , 00009Iccp Systempost Undocking Checks Make : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(L) Carry Out Post Undocking Checks On Anodes (04 Nos), Reference Electrodes (02 Nos) And Auto Control Units (01 No.) Iaw No 03/21.Note: Report Of Post Undocking Checks Be Submitted To Ss At The Earliest. , 00009Iccp Systemcheck Bonding Connection Of Propellar And Ruddermake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(M) Check Bonding Connections Between Propeller Shaft & Hull And Rudder & Hull For Mechanical Soundness And Zero Resistance.(Refer Para 3.11 Of Inbr 372/83) , 00009Iccp Systemcheck Cable Glandsmake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(N) Check Iccp Cable Glands For Firm Mechanical Tightness Of Connections And Ensure Continuity Of Circuits. Check Following(A) Cable Entry Into Cofferdams.(B) Cable Connections In Controller.(C) Cable Connections In Junction Box.(D) Cable Runs In Conduits. , 00009Iccp Systemserviceability Checks Acumake : Cathodic Control Company Pvt Ltd. Qty Fitted - 01(P) Carry Out Serviceability Checks Of Acu By Refitting Authority As Per Para 22 (C) Of No 03/21. , 00010Plating Above Waterabove Water Ship Side Inspection(A) Examine Above Water Shipside Structure For Deterioration Of Paint, Corrosion & Dents On Shell Plating At Fendering Positions And In The Way Of Anchors Where Abrasion Is Probable. . Repair Agency To Carry Out Visual Survey Of Projected Above Water Plating For Defects. Usg Of Areas Found Corroded During Visual Survey To Be Undertaken, If Required. , 00010Plating Above Waterhydroblasting/ Grit Blasting(B) Carryout Abrasive Blasting Conforming To Swedish Std Sa-2.5 Std/ Hydro Blasting Conforming To Wj-2L Std Of All Above Water Plating. Renew Complete Paint Scheme Inaccordance With No 53/16 , 00010Plating Above Waterpainting Of Ship Side(C) Carryout Painting Of Above Water Area On Completion Of All Hot Work And Blasting Of Above Water Hull, With M/S Akzo Nobel Paint Scheme. Provide Oem Certificate Of Paint To Ss On Completion Of Painting Job Involves.(I) Intergard 269 - 40 (Ii) Anticorrosive Paint Intergard 5600 (Grey) -60 (Iii) Anticorrosive Paint Intergard 5600 (Red) - 20 (Iv) Interthane 990 Polyurethane (Pu) (Grey-Ral 7040) -120 (V) Interthane 990 Polyurethane (Pu) Black-Ral 9011 - 60 , 00011Seatubespressure Testingall Sea Tubes Not Accessible For Survey And Painting Because Of Smaller Dia Are To Be Renewed With Seatubes Made Up Of Dmr249a Steel And Are To Be Air Pressure Tested To 2.5 Kg/Cm2 After Renewal Restore Paint Scheme In Accordance With No 53/16 And Policy Directives Issued By Ihq/Dna From Time To Time . , 00012Sea Chest/ Sea Tubes/ Uw Inlets/ Outlets And Obdssurvey Sea Chest/ Sea Tubes/ Uw Inlets/ Outlets And Obdsall Sea Tubes Are To Be Visually Surveyed And Ultrasonically Gauged As Per No 01/15 And Repair/ Renewal Is To Be Undertaken As Necessary. Endoscopic Survey Of 100% Of Seatubes To Be Carried Out.Note: 1. All Seatubes Are To Be Surveyed Irrespective Of Their Material.During Survey Of Sea Tubes, Specific Attention Is To Be Paid To The Neck Region. All Branch Pipes/ Flush Through Lines Welded To Sea Chest/Seatubes Are To Be Surveyed As Part Of Seatubes. In Case Of Talwar Class Of Ships, The Rubber Lining Of The Sea Tube Shall Be Inspected For Any Deterioration And Water Entrapment.2. Conditional Assessment Of Bimetallic Joints Is To Be Carried Out Whilst Undertaking Survey Of The Seatubes. 100% Endoscopy Of Seatubes Is To Be Carried Out Post Repairs And Application Of Coating Prior To Undocking Of The Ship.3. Sea Tubes Not Accessible For Survey And Painting Because Of Small Diameter Are To Be Renewed. , 00013Internal Uw Hull Structure & Above Water Structure Structure Covered With Underlay/ Insulation(A) Survey The Structure In Accordance With No 01/15 And Ihq Mod (N)/ Dna Letter Nc/7631 Dated 01 Nov 22 As Mentioned:-Structure Covered With Underlay/ Insulation - Survey Of The Condition Of Underlay / Insulation Is To Be Carried Out. The Deck Covering Be Inspected For Cracks, Bulging/ Undulation, Mechanical Damage, Discoloration Etc. In Case Of Damage Observed, The Structure Underneath To Be Visually Surveyed Post Removal Of Underlay/ Insulation Of Affected Area.Compartments With Deck Covering:(I) Co Toilet(Ii) Ss Bathroom(Iii) Js Bathroom(Iv) Officers Bathroom(V) Ahu Compt. (Vi) Stp Compt.(Vii) Galley(Viii) Scullery , 00013Internal Uw Hull Structure & Above Water Structure (B) Usg Of Areas Found Corroded During Visual Survey In Internal Uw & Above Water Structure , 00013Dadoe Areas Of Wt Bulkheads (C) 100% Visual And Usg Survey Of Dadoe Areas Of Wt Bulkheads At Each Deck Below Waterline. Note : Pulse Eddy Current Technology (Pect) May Be Adopted For Survey Of Secondary Structures As Per Ihq-Mod(N)/Dna Letter Nc/4523 Dated 26 Jul 22.20 Uw Compartments Excluding Tanks , 00013Internal Uw Hull Structure & Above Water Structure (D) All Uw Internal Structure And Above Water Structure To Be Visually Inspected Specific To Be Repaired.20 Uw Compartments , 00014Above Water Structure And Fittingssurvey Of Bollards/ Fairleads/ Cleat Deck Eyes/ Stanchion(A) Carry Out Survey And Inspection Of All Bollards/Fairleads/ Cleats/ Deck Eyes/ Staghorn And Other Deck Fittings Structure Including Stiffening Members In The Vicinity With Non-Destructive Techniques, If Required And Include In The Survey Report. For Towing And Cable Clench, Check The Efficacy Of The Attachment Using Non-Destructive Testing.47 Deck Fittings: Bollards, Towing Bollard, Fairlead, Cleat , Bullring , Rope Real, Bottle Screw, Roller With Pulley , Cable Clench , Towing Slip Etc. , 00015Air Pressure Testing Of Tanks, Cofferdams And Sea Tubesair Pressure Testing Of Tanks, Cofferdams And Sea Tubesall Tanks, Cofferdams And Sea Tubes Which Are Repaired By Build-Up/Renewal Are To Be Air Pressure Tested Iaw Para 47 Of No 01/15. The Pressure Testing Is To Be Carried Out By Refitting Firm In The Presence Of Ship Staff And Quality Control Inspectors Of The Refitting Firm. Under No Circumstance, The Procedure Of Running Pressure Test Is To Be Used To Confirm The Structural Integrity Of These Spaces.14 Sea Tubes.25 Obds04 Iccp Cofferdam01 Tank Cofferdam02 Void Space (Port & Stbd)09 Tanks , 00016Tanks/Tank Tops Tanks/Tank Tops Survey(A) Tanks/Tank Tops: 100% Visual And 100% Usg Survey Of All Tanks.Note:- (A) Usg Of Tank Tops May Be Undertaken From Inside The Tank In Case Of Degutting Constraints, If Any.Bilges, Cofferdams, Void Spaces Shaft Recess, Area In Vicinity Of Suction Strainers Of Educators.(B) Visual Survey Of All Accessible Areas.Tank Tops - Dinning Hall, Pump Room, Stp Lobby, Ss Mess, Dirty Water Tank, Dirty Oil Tank , 00016Tank Topschipping & Cleaning Of Tank Tops (C) Refitting Firm To Chip Clean All Tank Tops, Bilges Of Machinery Spaces,Cofferdams, Shaft Recess And Other Accessible Internal Surfaces Of Underwater Hull Up To And Including Area 500 Mm Above Boot Top Line For Hull Survey Inspection , 00017Fresh Water Tankvisual Survey And Usg Survey Of Fw Tanks(A) Carry Out 100% Visual Survey Of Tank Internally And Tank Tops For Corrosion/ Rust. Carry Out 100% Ultrasonic Thickness Gauging Of Structure, Repair/ Refit As Necessary And Carry Out Pressure Teesting On Completion Of Repairs.Note: - Usg Of Tank Tops May Be Undertaken From Inside The Tank In Case Of Degutting Constraints, If Any. , 00017Fresh Water Tankfw Tank Paint Inspection(B) Examine All Fw Tanks Paying Particular Attention To The Paint Coating Specially Areas Not Readily Visible Such As The Underside Of Framing Flanges For Pitting, Corrosion And Otherstructural Defects And Damage. Note Specific Defects To Yard For Rectification. Restore / Renew Paint Scheme In Accordance With Ncd 1491, No 53/16 And Policy Directive Issued By Ihq/Dna As Applicable. , 00017Fresh Water Tankwashing Of Fw Tank(C) Wash Down Completely Interior Paint Layers Of All Fresh Water Tank Including Pipes And Other Fittings With Fresh Water.Remove Dirt, Sludge, Debris And Loose Paint. Scrap Clean Corroded/ Rusted Areas To Bare Metal And Prepare Structure For Survey/ Inspection By Yard/ Trial Agency.Note:- Ss To Obtain Gas Free Certificate Prior To Entry In Tanks As Confined Spaces Iaw Br 3000. , 00017Fresh Water Tankgas Free Certificate(D) Obtain Gas Free Certificate Prior To Entry In Tanks As Confined Spaces Iaw Br 3000. , 00017Fresh Water Tankfw Pipe Line And Fittings Inside Tank(E) Check The Material Condition Of Fw System Pipe Lines Fitted Inside Tanks, Bell Mouths, Sounding Pipe Including Deck Piece And Brackets Housing The Fw System Pipe Lines. Raise Specific Defects To Yard For Rectification. , 00017Fresh Water Tankfw Tank Manhole Cover/ Coamings And Securing Arrangement(F) Examine Manhole Covers/ Coamings, Including Securing Arrangements And Gaskets. All Securing Studs/ Fasteners Are To Examine For Their Intactness And Soundness. Projectspecific Defects To Yard For Rectification , 00017Fresh Water Tankfw Tank Ladders/ Rungs And Brackets(G) Check The Material Condition Of Ladders/ Rungs Fitted Inside The Tanks Including Their Brackets For Intactness/ Welding. Raise Specific Defects To Yard For Rectification , 00017Fresh Water Tankfw Tank Vent/ Breather Pipe Lines(H) Breather Of Fw Tank Corroded And Perished. Repair/ Renewal To Be Carried Out , 00017Fresh Water Tankair Pressure Testing Of Fw Tanks(J) Undertake Pressure Testing Of Fw Tanks Which Are Repaired By Build-Up/ Renewal Iaw Para 47 Of No 01/15. The Pressure Testing Is To Be Carried Out By Refitting Authorities In The Presence Of Ship Staff And Quality Control Inspectors Of The Refitting Authority. Under No Circumstance, The Procedure Of Running Pressure Test Is To Be Used To Confirm The Structural Integrity Of These Spaces , 00017Fresh Water Tankfw Tank Ps Renewal And Restoration(K) Restore / Renew Paint Scheme In Accordance With Ncd 1491, No 53/16 And Policy Directive Issued By Ihq/Dna As Applicable.Note: (A) Inspection Of Paint Oem Be Carried Out Wherever Applicable.(B) Galvanised Ladders Are Not To Be Painted. Ensure That Suction Strainer Boxes Are Clear.(C) The Surface Preparation Work And Painting Interiors Of Fresh Water And Distilled Water Tanks Is Required To Be Undertaken By Healthy Personnel, Wearing Clean Outfits. On Completion, Of Painting, Each Tank Should Be Inspected To Ensure That The Coating/ Paint Film Completely Covers The Surface, With Particular Attention To Parts Of The Structures Which Are Not Readily Visible.(D) The Minimum Time For Filling The Fresh Water Tank If Freshly Coated Should Be 7 Days. The Tanks Should Be Washed Out With Fresh Water And Any Sediment Or Dirt Present Should Be Removed And The Covers Are Closed Before The Tanks Are Brought Into Use.(E) The Water Sample From The Tank After 72 Hours Of Immersion Should Be Sent To Nmrl Or The Naval Dockyard Laboratories For Potability Test Prior To Use Of Water For Drinking Purpose , 00018Fuel Tanks/ Lub Oil Tanksmechanical Cleaning(A) Clean Following Fuel/Lub Oil Tanks To Remove Dirt, Sludge, Debris And Loose Paint. Scrap Chip Clean Corroded/ Rusted Areas To Bare Metal And Prepare Structure For Survey/ Inspection By Yard/ Trial Agency And Ventilate.(I) Fo Tank No. 1: (Sq Mtrs - 110)(Ii) Fo Tank No. 2: (Sq Mtrs - 125)(Iii) Dirty Oil Tank (Sq Mtrs - 65)(Iv) Ru Fo Tank (P): (Sq Mtrs - 70)(V) Ru Fo Tank (S): (Sq Mtrs - 70)(Vi) Dirt Water Tank (Sq Mtrs - 40)(Vii) Lub Oil Tank Port & Stbd (Sq Mtrs - 70) , 00018Fuel Tanks/ Lub Oil Tanks(B) Prove And Provide Gas Free Certificate For All Fuel Tanks For Survey And Maintenance , 00018Fuel Tanks/ Lub Oil Tanks(C) Preserve The Surfaces By Application Of 01 Coat Of Heavy Filtered Mineral Oil (Om750) In 03 Nos Fuel Oil Storage Tanks. Provide Oem Certificate Of Om 750 To Ss On Completion Of Application , 00018Fuel Tanks/ Lub Oil Tanksvisual Survey And Usg Survey Of Fw Tanks(D) Survey The Fuel/ Lub Oil Tanks/ Tank Tops In Accordance With No 01/15 And Ihq Mod (N)/ Dna Letter Nc/7631 Dated 01 Nov 22 As Mentioned:-(I) 100% Visual And 100% Usg Survey Of All Tanks (For Group D Ships)Note:- Usg Of Tank Tops May Be Undertaken From Inside The Tank In Case Of Degutting Constraints, If Any. , 00018Fuel Tanks/ Lub Oil Tanksspecific Defects (Visual)(E) Examine & Repair The Structure Of All Fuel/Lub Oil Tanks Including Tank Tops For Pitting, Corrosion And Other Structural Defects And Damage. , 00018Fuel Tanks/ Lub Oil Tankspaint Restoration And Renewal(F) Examine Preservative Coatings Of Tanks. Restore / Renew Paint Scheme In Accordance With Ncd 1491, No 53/16 And Policy Directive Issued By Ihq/Dna As Applicable.Note:- (I) Inspection Of Paint Oem Be Carried Out Wherever Applicable. (Ii) All Precautions Against Fire Explosion, Toxic And Obnoxious Fumes Are To Be Taken In Accordance With B.R. 1754.Note: Inspection Of Paint Oem Be Carried Out Wherever Applicable. , 00018Fuel Tanks/ Lub Oil Tanksair Pressure Testing Of Fuel/ Lub Oil Tanks(G) Undertake Pressure Testing Of Fuel/Lub Oil Tanks Which Are Repaired By Build-Up/ Renewal Iaw Para 47 Of No 01/15. The Pressure Testing Is To Be Carried Out In The Presence Of Ship Staff And Quality Control Inspectors Of The Refitting Authority. Under No Circumstance, The Procedure Of Running Pressure Test Is To Be Used To Confirm The Structural Integrity Of These Spaces. , 00019Misc. Tankscleaning(A) Clean All Sludge And Bilge Tanks To Remove All Accumulated Water, Sludge, Debris And Loose Paint. Scrape/ Clean Corroded/Rusted Areas To Bare Metal And Prepare Structure For Survey/ Inspection By Yard/ Trial Agency. , 00019Misc. Tanksgas Free Certificate(B) Obtain Gas Free Certificate Prior Entry Of Personnel Into Enclosed Tanks Iaw Br 3000. , 00019Misc. Tanksoffering Of Uw Compartments (C) Ss Is Required To Offer All U/W Shell Touching Compartments And Tanks In Dry Dock For Inspection (For All Refits) Of Preservation Standards To Hitu Prior Final Undocking. , 00019Misc. Tanksstructural Examination(D) Undertake Survey Of All Sludge And Bilge Tanks Iaw No 01/15 And Ihq Mod (N)/ Dna Letter Nc/7631 Dated 01 Nov 22 As Mentioned:-Tanks(I) 100% Visual And 100% Usg Survey Of All Sludge And Bilge Water Tanks. (For Group D Ships).Tank Tops.(I) 100% Visual Survey Of Accessible Area.(Ii) Usg Of Areas Found Corroded During Visual Survey.(Iii) Structure Covered With Underlay/ Insulation - Survey Of The Condition Of Underlay / Insulation Is To Be Carried Out. The Deck Covering Is To Be Inspected For Cracks, Bulging/ Undulation, Mechanical Damage, Discoloration Etc. In Case Of Damage Observed, The Structure Underneath To Be Visually Surveyed Post Removal Of Underlay/ Insulation Of Affected Area.(Iv) Special Emphasis Is To Be Given To Inspection Of Manhole Covers/ Coamings, Including Securing Arrangements. All Securing Studs And Hinges Are To Examine For Their Intactness And Soundness.(Manholes Of Following Tanks:1. Fuel Tank 1 - 02 Nos.2. Fuel Tank 2 - 02 Nos.3. P & S Ru Tanks - 02 Nos.4. P&S Lub Tanks - 02 Nos.5. Dirty Water Tank - 01 Nos.6. Dirty Oil Tanks - 01 Nos. , 00019Misc. Tanksair Pressure Testing Of Tanks(E) Undertake Air Pressure Testing Of All Miscellaneous Tanks Such As Sludge And Bilge Tanks Which Are Repaired By Build Up/Renewal Iaw Para 47 Of No 01/15.Note: - The Pressure Testing Is To Be Carried Out By Refitting Authorities In The Presence Of Ship Staff And Qc Inspectors Of The Refitting Authority. Under No Circumstance, The Procedure Of Running Pressure Test Is To Be Used To Confirmthe Structural Integrity Of These Spaces. , 00019Misc. Tankspaint Scheme Renewal And Restoration(F) Carry Out Visual Survey Of All Miscellaneous Tanks Such As Sludge And Bilge Tanks And Undertake The Paint Renewal/ Restoration Of Paint Scheme Of All Misc Tanks Such As Sludge And Bilge Tanks, Affected Due To Hotwork /Plate Renewal/ Mechanical Damage Or Any Other Defects In Accordance With No 53/16. , 00020Cofferdam & Void Spacesmechanical Cleaning(A) Clean All Cofferdams And Void Spaces To Remove Dirt, Sludge,Debris And Loose Paint. Scrap Clean Corroded Rusted Areas To Bare Metal And Prepare Structure For Survey/ Inspection By Yard/ Trial Agency.Note:- Ss Is Required To Offer All U/W Shell Touching Compart-Ments/ Tanks/ Void Spaces/ Cofferdams In Dry Dock Forinspection (For All Refits) Of Preservation Standards To Hitu Prior Final Undocking(Void Space - 02 Nos. ( Area - 40 Sqm)Cofferdam - 01 Nos. 20 Sqm) , 00020Cofferdam & Void Spacesgas Free Certificate(B) Obtain Gas Free Certificate Prior To Entry In Cofferdams And Void Spaces As Confined Spaces Iaw Br3000. , 00020Cofferdam & Void Spacesspecific Defects ( Visual)(C) Exterior Surfaces Of Cofferdam/ Void Spaces Surveyed Internally, During Periodical Survey Of Structure To Be Included In Defect List Together With A List Of Items / Fittings Of Machinery And Equipment Which Will Be Required To Be Lifted To Facilitate Survey. , 00020Cofferdam & Void Spacesvisual Survey And Usg Survey Of Cofferdams & Void Spaces(D) Survey All Cofferdam And Void Spaces In Accordance With No 01/15 And Ihq Mod (N)/ Dna Letter Nc/7631 Dated 01 Nov 22 As Mentioned:-(I) Tank Tops - 100% Visual Survey Of Accessible Area. (For All Ships)..(Ii) Tanks- 100% Visual Survey Of All Cofferdam And Void Spaces. Usg Of Areas Found Corroded During Visual Survey. (For All Ships).Note: - Usg Of Tank Tops May Be Undertaken From Inside The Tank In Case Of Degutting Constraints, If Any. , 00020Cofferdam & Void Spacessacrificial Anodes In Cofferdams And Void Spaces(F) Examine The Condition Of Sacrificial Anode Fitted Inside The Cofferdams/ Void Spaces, Renew Sacrificial Anode Consumed Beyond 50%, If Any(M/S Akzo Nobel (Llps)Intergard 269Intershield 300 Aluminiumintershield 300 Bronze , 00020Cofferdam & Void Spacespaint Scheme Renewal And Restoration(G) Restore / Renew Complete Paint Scheme Of Cofferdams And Void Spaces Post Survey And Renewal Iaw No 53/16/ Ncd 1491 /Policy Directives Issued By Ihq/Dna As Applicable.Note: Inspection Of Paint Oem Be Carried Out Wherever Applicable In Accordance With Relevant No And Ncd.Note: Oem Certificate Of Paint Be Provided Post Completion Of Painting. , 00020Cofferdam & Void Spacesair Pressure Testing Of Cofferdams And Void Spaces(H) Undertake Pressure Testing Of All Cofferdams And Voidspaces Which Are Repaired By Build-Up/ Renewal Iaw Para 47 Of Nos. 01/15. The Pressure Testing Is To Be Carried Out By Refitting Authorities In The Presence Of Ship Staff And Quality Control Inspectors Of The Refitting Authority. Under Nos. Circumstance, The Procedure Of Running Pressure Test Is To Be Used To Confirm The Structural Integrity Of These Spacesbilges Area (Approx)1. Asp - 35 Sq Mtr2. Aer - 49 Sq Mtr3. Mcr &Mcr Lobby - 21 Sq Mtr4. Mer - 74 Sq Mtr5. Port & Stbd Void Space - 40 Sq Mtr6. Pump Room-20 Sq Mtr7. Rope And Canvas Store - 21 Sq Mtr.8. Ammo Locker - 18 Sq Mtr9.Baggage Store - 54 Sq Mtr , 00021Machinery Compartment Bilgestanks/Tank Tops Survey(A) Visual Survey Of All Accessible Areas(B) Usg Of All Internal Accessible Area Of Machinery Compt Bilges (For Group D Ships) , 00021Machinery Compartment Bilgeshydroblasting/ Grit Blasting(C) Entire Underwater Areas Including Boot Topping Area Are To Be Blasted To Sa 2.5 Standard By Hydrojet Blasting/ Grit Blasting As Per Instructions Contained In No 1/15 . Renewal Of Paint To Be Carried Out As Per No 53/16. , 00022Decks, Above Water Area & Super Structurehydroblasting/ Grit Blastingentire Decks, Deck Fittings, Above Water Area & Super Structure Are To Be Blasted To Sa 2.5 Standard By Hydrojet Blasting To Faciliate Survey Of The Structure For Renewals. , 00022Decks, Above Water Area & Super Structureentire Decks, Deck Fittings, Above Water Area & Super Structure Area Are To Be Blasted To Sa 2.5 Standard By Hydrojet Blasting As Per Instructions Contained In No 01/15 And Prepare Surfaces For Paint Scheme Renewal. , 00023Weather Decks & Platformsstructural Examination(A) Examine Deck Structure Paying Particular Attention To Deck Boundaries, Expansion Joints, Bimetallic Joints, Deck Areas Near Foundation Of Eqpt./Fittings For Pitting, Excessive Corrosion And Blistering/Cracking For Peeling Of Paint. Prepare Surface And Restore Paint In Accordance With No 53/16 And Policy Issued By Ihq/Dna From Time To Time. Raise Specific Defects To Dockyard For Survey And Repairs , 00023Weather Decks & Platformsdeck Examination(B) Carry Out Surface Preparation Of Steel Decks By Abrasive Blasting & Aluminium Deck, As Per Instruction Contained In Para 11 Of Appendix B Of No 53/16. Restore Paint Scheme In Accordance With No 53/16 And Policy Issued By Ihq/Dna , 00023Weather Decks & Platformsload Testing(C) Carry Out Load Testing Of All Deck Rings, Time Frame Not Exceeding More Than 27 Months(For Carriers Class) , 00023Weather Decks & Platformscompartment Inspection(D) Dry Compartments Without Deck Covering: - To Be Subjected To Visual Survey. , 00023Weather Decks & Platformscompartment Inspection(E) Dry Compartments With Deck Covering: - The Survey Of The Condition Of The Deck Covering Is To Be Carried Out. The Deck Covering Be Inspected For Cracks, Bulging/Undulations, Mechanical Damage Etc. In Case Of Damage Observed, The Deck Underneath To Be Visually Surveyed Post Renewal Of Affected Area.Note: Permissible Limits Of Deformation For Underwater External Hull: - Three Times Thickness Of Plate (3T). Permissible Limits Of Deformation For External Hull Above Water, Boot Top And Wind/Water Area, Primary Decks And Bulkheads: - Five Times Thickness Of Plate (5T) , 00023Weather Decks & Platformscompartment Inspection(F) Scrap Clean To Bare Metal On Areas Of Loose Paint, Rust Markscorrosion Using Hard Wood Or Plastic Scraper. Clean With Detergent Solution Labolene And Rinse With Fresh Water And Preserve Deck With Adequate Paint Scheme.( M/S Akzo Nobel (Llps)1.Intergard 2692.Intershield 300(Aluminum)3.Non Slip Epoxy D.A. Grey With Hardener – Grey) , 00024Upper Deck (No 1, 01 & 02)Preservation/ Paintingcarryout Painting Of Main Deck, 01 And 02 Deck With M/S Akzo Nobel Paint Scheme I.A.W No 53/16. Provide Oem Certificate Of Paint To Ss On Completion Of Painting. Job Involves , 00024Upper Deck (No 1, 01 & 02)Preservation/ Painting(A) Main Deck (Ms) (I) Application Of 01 Coat Of Epoxy Red Oxide Primer Dft 40 Microns On Blasting(Ii) Application Of 03 Successive Coats Of Epoxy Red Oxide Primer Dft 40 Microns Each(Iii) Application Of 02 Successive Coats Of Epoxy Heavy Duty Non Skid Paint(Dark Grey) Dft 300 Microns Each , 00024Upper Deck (No 1, 01 & 02)Preservation/ Painting(B) Aluminum Deck (No 01 And 02)(I) 01 Coat Of Epoxy Primer Dft 75 Microns On Blasting(Ii) 01 Coat Of Epoxy Primer Dft 75 Microns(Iii) 02 Successive Coats Of Epoxy Heavy Duty Non Skid(Dark Grey) Dft 300 Microns Eachnote : The Interval Between Application Of Each Coat Of Primer And Epoxy Heavy Duty Non Skid Is Not To Be Less Than 16 Hrs And Not To Exceed 72 Hrs , 00025Superstructure And Fittingspreservation/ Painting(A) Carryout 100% Visual And Usg Survey Prior Painting Of Superstructure, Mast, Deck Fittings, Soft Patches, Mushroom Heads After Blasting And Completion Of Hot Works With High Performance Paint Scheme Under Supervision Of Paint Manufacturer. Provide Oem Certificate Of Paint To Ss On Completion Of Painting. Job Involves , 00025Superstructure And Fittingspreservation/ Painting(A) Carryout 100% Visual And Usg Survey Prior Painting Of Superstructure, Mast, Deck Fittings, Soft Patches, Mushroom Heads After Blasting And Completion Of Hot Works With High Performance Paint Scheme Under Supervision Of Paint Manufacturer. Provide Oem Certificate Of Paint To Ss On Completion Of Painting. Job Involves(I) Application Of 01 Coat Of Intergard 269 Primer To Dft 40 Microns On Blasting , 00025Superstructure And Fittingspreservation/ Painting(A) Carryout 100% Visual And Usg Survey Prior Painting Of Superstructure, Mast, Deck Fittings, Soft Patches, Mushroom Heads After Blasting And Completion Of Hot Works With High Performance Paint Scheme Under Supervision Of Paint Manufacturer. Provide Oem Certificate Of Paint To Ss On Completion Of Painting. Job Involves(Ii) Application Of 01 Coat Of Intergard 269 Primer To Dft 40 Microns , 00025Superstructure And Fittingspreservation/ Painting(A) Carryout 100% Visual And Usg Survey Prior Painting Of Superstructure, Mast, Deck Fittings, Soft Patches, Mushroom Heads After Blasting And Completion Of Hot Works With High Performance Paint Scheme Under Supervision Of Paint Manufacturer. Provide Oem Certificate Of Paint To Ss On Completion Of Painting. Job Involves(Iii) Application Of 02 Coats Of Interlac 846 Color Ral 7040(Light Grey) To Dft 40 Microns Each. , 00026Superstructure (Aluminium)Structural Examination And Repairs(A) Examine Complete Superstructure For Structural Defects Paying Particular Attention To Inaccessible Areas, Bimetallic Joints And Dadoes Area.Usg Of Areas Found Corroded During Visual Survey To Be Undertaken, If Required , 00026Preservation/ Painting(B) On Completion Of Structural Repairs, Undertake Application Of Full Paint Scheme, With Requisite Surface Preparation As Per No 53/16. , 00026Modificationmodification Of Yardarms Of Mast Structure For Resiting Of Cots Radar , 00027Mast And Riggingsstructural Examination(A) Examine Mast Structure, Whip Aerial Platforms And The Surrounding Structure On Deck, Eye Plates, Load Carrying Members For Signs Of Corrosion. Examine Bolted, Riveted And Intermittent Welded Structure Connections For Signs Of Fracture. Portable And Semi Portable Fittings To Be Removed For Closer Examination Of Structure Underneath. 9Lattice Mastapprox. Area - 35 Sqm.) , 00027Mast And Riggingspainting Of Mast(B) Carry Out Complete Survey Of Structure As Per No 19/06 And Repair/Renew As Necessary. Paint The Mast In Accordance With No 53/16, Ncd 1493 And Policy Directives Issued By Ihq/Dna From Time To Time.(M/S Akzo Nobel (Llps)1. Intergard 2692.Anticorrosive Paint Intergard 5600 (Grey / Red)3.Interthane 990 Polyurethane (Pu) (Grey-Ral 7040)) , 00027Mast And Riggings(C) Damaged Paint To Be Restored As Per Paint Scheme. Prepare Surface And Preserve In Accordance With No 53/16, , 00027Mast And Riggingssurey And Testing Of Running Riggings(D) Survey And Test All Standing & Running Riggings Fitted On Mast Structure Along With Associated Fittings. Renew Wire Ropes And Associated Fittings As Necessary , 00028Guard Rail And Stanchionspvc Guardrails(A) Slack Off Guard Rail Wires. Clean, Lubricate And Work Through Full Limit Of All Bottle Screw And Shackles. Clean And Lubricate All Stanchion Stays And Heel Fitting. Check For Correct Positioning Of Stanchion And Drop Nose Pins. Clean And Lubricate Vice Headed Bolts. Examine Pvc Coated Steel Wires For Damage, Wear Or Corrosion. Renew If Necessary. Clean And Recoat With Boiled Linseed Oil. , 00028Guard Rail And Stanchionspvc Guardrails(I) Tulips , 00028Guard Rail And Stanchionspvc Guardrails(Ii) Bottle Screw Slips , 00028Guard Rail And Stanchionspvc Guardrails(Iii) D Shackles , 00028Guard Rail And Stanchionspvc Guardrails(Iv) Guard Rails (Wire Rope) , 00028Guard Rail And Stanchionspvc Guardrails(V) Load Testing Of Guard Rail With 750 Kg Iaw Inbr 1552 Randomly. , 00028Guard Rail And Stanchionsfixed/ Portable Guardrail Stanchion(B) Visual Survey/ Hammer Surve Of Portable And Fixed Guardrail Stanchions. Following Job Involves: , 00028Guard Rail And Stanchions(C) Checks/ Replacement, If Any Defect, The Condition Of Eyes For Guardrails , 00028Guard Rail And Stanchions(D) Replacement Of Stanchion Shoes With Securing Nuts & Bolts, If Any Defect , 00028Guard Rail And Stanchions(E) Replacement Of Portable Stanchion, If Any Defect , 00028Guard Rail And Stanchions(F) Repalcement Of Fixed Guardrail Stanchion, If Any Defect , 00028Guard Rail And Stanchions(G) Replacement Of Supporting Pipes Of Fixed Guardrail On Brigde Top, If Any Defect , 00028Guard Rail And Stanchionsstanchions (H) Apply Lightly Grease On Stanchion Sockets, Boom Heel Fittings And Screwed Connectors. Grease To Be Used:- Xg- 274 , 00028Guard Rail And Stanchionsearthing Connections(J) Replace/Renew Defective/ Broken/ Corroded Earthing Connections As Projected By Ss , 00028Guard Rail And Stanchionsmisc. Fittings (K) Examine Entire Guard Rail Assembly Viz Guard Rail Stanchions, Pvc Coated Wire, Ss Fittings, Eye Plates And Guard Rail Stanchion Heel Fittings . Raise Specific Defects To Yard Forrectifications. , 00028Guard Rail And Stanchionsbottle Screw Slip And Stanchions(L) Check That Pins Are Fitted To Tongues Of Bottle Screw Slips And That Pins Are Housed. Clean Anodised Aluminium Guard Stanchions, Tubular Guard Rails And Pvc Coated Guard Wireswith A Weak Detergent Solution. Use No Abrasive.Oil And Grease, Stains To Be Removed With A Clean Rag Dipped In White Spirit , 00028Guard Rail And Stanchionstubular Guard Rails(M) Inspect Tubular Guard Rails And Stanchions For Corrosion And Distortion, Paying Particular Attention To Welded Joints And Heel Fittings. Repair/ Renew As Necessary. , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(A) Carry Out Pre-Refit Trials And Project Specific Defects To Dockyard For The Following:(I) Slippage Of Brake(Ii) Noise In Drive.(Iii) Leakage Of Oil From Gear Box.(Iv) Overheating Of Gear Box/Bearing.(V) Gear Box Vibrations.(Vi) Spm Checks Of Motor , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(B) Strip And Inspect Cable Holder Brake Mechanism, Paying Particular Attention To The Trunnion Nut And Bevel Gears Of Hand Wheel Unit.(I) Examine Brake Linings, Pins And Bushes For Wear.(Ii) Drain Oil From Hand Wheel Unit Oil Bath And Refill With Fresh Oil.(Iii) Examine Ferrodo Linings, Pins And Bushes For Wear.Renew As Necessary , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(C) Carry Out The Following Inspection On Brake: - , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(I) Strip, Inspect And Overhaul Cable Holder Manual Brake Mechanism Paying Particular Attention To The Trunnion Nut And Bevel Gears Of Hand Wheel Unit. , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(Ii) Renew Ferrodo Brake Linings, Pins And Bushes As Per Sample. Material Specs Of Brake Lining - Length: 1 Mtr., Width- 50 Mm , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(Iii) Drain Oil From Hand Wheel Unit Oil Bath And Refill With Clean Oil Servo System 320 , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(D) Examine The Windlass/ Cable Holder Gear And Its Fittings. Check The Oil Seals For Leakage. Specific Defects If Any, To Be Rectified. Job Includes Following Also:- , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(I) Dismantle The Capstan Drum, Cable Holder And Its Fittings. , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(Ii) Check The Oil Seals For Leakages, Bush Bearings For Wear And Increased Clearances. Renew Deefctive Components As Necesasry. , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(Iii) Check The Extent Of Wear Of Snugs Of Cable Holder. Renew The Cable Holder If The Snugs Are Found Excessively Worn Causing Slippage Of Cable. , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(Iv) Spares Not Held With Ships Staff And All Necessary Spares For Repair/ Overhaul Of Equipment Are To Be Catered By The Repairing Firm. , 00029Anchor Windlass And Cable Holderanchor Windlass And Cable Holder(E) Remove Gear Cases And Examine Secondary & Primary Worm And Worm Wheel Drive. Strip And Examine All Thrust And Roller Bearings. Examine Slipping Clutch And Magnetic Brakes. Examine Flexible Couplings Between Motor And Clutches. Adjust The Slipping Clutch As Necessary. Rectify The Defects, Renew As Required. , 00030Capstan And Cable Holderspre Refit Trials (A) Carry Out Pre-Refit Trials And Project Specific Defects To Dockyard For The Following: -(I) Slippage Of Brake.(Ii) Noise In Drive.(Iii) Leakage Of Oil From Gear Box.(Iv) Overheating Of Gear Box/ Bearing.(V) Gearbox Vibrations.(Vi) Spm Checks Of Motor. , 00030Capstan And Cable Holderschecks(B) Strip And Inspect Cable Holder Brake Mechanism, Paying Particular Attention To The Trunnion Nut And Bevel Gears Of Hand Wheel Unit.(C) Examine Brake Linings, Pins And Bushes For Wear.(D) Examine Ferrodo Linings, Pins And Bushes For Wear. Renew As Necessary , 00030Capstan And Cable Holdersfull Load Trials(E) Carry Out Full Load Trials And Observe For Any Abnormal Noise. Defect To Be Rectified If Any. , 00030Capstan And Cable Holdersworm Gears And Wheels(F) Remove Gear Cases And Examine Secondary And Primary Worm And Worm Wheel Drive. Strip And Examine All Thrust And Roller Bearings. Examine Slipping Clutch And Magnetic Brakes. Examine Flexible Couplings Between Motor And Clutches. Adjust The Slipping Clutch As Necessary. Rectify The Defects, Renew As Required. , 00030Capstan And Cable Holderselectromagnetic Break(G) Adjust The Electromagnetic Brake In Accordance With Equipment Manual. Adjust Clutch And Air Gap Of Electromagnetic Brake (Air Gap Should Be 0.5 Mm - 1 Mm). Renew Friction Disc If Lines Are Worn Out. Examine Ferrodo Brake Lining. Renew If Worn Out. , 00030Capstan And Cable Holdersoverhauling(H) Overhaul Capstan Motor, Subject To Spm Checks. Renew Bearings And Apply Fresh Grease. , 00031Under Slung Electric Mooring Capstanmooring Capstanmake : M/S Cyclo Transmissions, Pune Qty Fitted - 01 Nos , 00031Under Slung Electric Mooring Capstanmooring Capstanmake : M/S Cyclo Transmissions, Pune Qty Fitted - 01 Nosdismantle The Capstan Assembly And Carry Out Complete Overhauling Of The Capstan And Prove For Satisfactory Operation. Carryout Load Testing Of Capstan To 1.5 Tonnes And Issue Necessary Certificate.Note - Spares Not Held With Ship Staff. All Necessary Spares Renewed During Overhauling To Be Catered By Firm , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davitmake : Deck Machinery Department, Grseqty Fitted - 01 No(A) Dismantle Complete Structure And Carry Out Complete Overhauling Of Davit Assembly And Its Sub-Components . Renew Worn Out Parts/ Defective Components. The Work Involves The Following: - , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davit(I) Dismantle And Strip Open Hoist & Slewing Gear Box Assemblies. Open The Bearing Housings And Inspect Bearings For Play And Wear. Inspect The Shafts, Worm Wheel Assembly For Any Wear And Presence Of Metallic Particles. Check Oil In Gear Case And Examine Gear Teeth For Breakage And Presence Of Foreign Matter. Check Bearings For Collapse And Shaft For Rust And Corrosion. , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davit(Ii) Overhaul Slew And Hoist Motors. Check Wear Of Rotor Friction Linings. Measure The Rotor Thicknesses And Compare To The Minimum Permissible Limits. If Necessary Replace The Rotor. Measure And Adjust The Air Gap Between The Armature Plate And Stator To Permissible Limits. Hoist Motor: 1.5 Hp,415 V, 50 Hz, 3 Ph, 132S Frame Marine Duty Motor; Slew Motor:3 Hp,415 V, 50 Hz, 3 Ph, 100L Frame Marine Duty Motor; Degree Of Protection: Ip56 , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davit(Iii) Overhaul Electromagnetic Release Spring-Applied Brake Fitted On Hoist Motor. Inspect The Worn Wheel Assembly For Any Wear And Presence Of Metallic Particles. , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davit(Iv) Inspect The Friction Linings Of The Brake On Hoist Winch Motor And Renew If Worn Out , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davit(V) On Completion Of Overhauling, Carry Out Load Testing Of The Equipment. Swl: 1.2 T, Running Load: 1.8 T, Static Load: 2.4 T , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davit(Vi) Pre-Refit And Post Refit Trials To Be Carried Out. , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davit(Vii) Check Oil In Gear Case And Examine Gear Teeth For Breakage And Presence Of Forgien Matter. , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davit(Viii) After Completion Of Load Test, Examine The Complete Davit Structure And Associated Lifting Gears For Flaws Distortion, Defecaution Etc. Flaws Must Be Examined By Ndt Techniques And Carry Out Repairs If Necessary And Retest. Record Results Of Test And Examination , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davit(Ix) Carryout Annual Servicing Of Arh (Auto Release Hook) As Per Standard Speciications.Note - Arh To Be Serviced And Certification To Be Provided By M/S Vanson Engg Pvt Ltd (Oem And Navy Authorised Supplier Of The Equipment) , 000321.2 T Single Arm Radial Davit1.2 T Single Arm Radial Davit(X) Undertake Replacement Of Boat Davit Falls.Note:- All Necessary Spares For Repair/ Overhaul Of Equipment Are To Be Catered By The Repairing Firm. , 000321.2 T Single Arm Radial Davitefswr Renewal(B) Renew The Extra Flexible Steel Wire Rope (Efswr) Of Boat Davit From End To End As Per Sample After Visual Survey And The Same To Be Rigged Up On Boat Davit. Wire Rope Dia: 12 Mm. Job Involves Following :- , 000321.2 T Single Arm Radial Davit(I) Removal Of Efswr From The Davit , 000321.2 T Single Arm Radial Davit(Ii) Connection Of Thimnle And Splicing Of The New Efswr On To The Thimble At Standing End. , 000321.2 T Single Arm Radial Davit(Iii) Rigging Up Of New Efswr On To The Davit. , 000321.2 T Single Arm Radial Davit(Iv) Calibrate The Over-Load Mechanism Of Starter , 000321.2 T Single Arm Radial Davit(V) Examine Entire Assembly Including Brake Lining ,Brake Shoe,Brake Disc And Associated Fittings. Renew Brake Lining And Shoe Of Excessively Worn Down , 000321.2 T Single Arm Radial Davit(Vi) Survey All Wire Ropes, Spare Gear And Other Associated Lifting Gears. Renew As Necessary. , 000321.2 T Single Arm Radial Davit(Vii) Carry Out Spm Checks On Electrical Motor. Lubricate/Replace Bearing As Necessary. , 000321.2 T Single Arm Radial Davit(Viii) Overhaul Electric Motor Subject To Qc Check.Carry Out Trials On Completion Of Repairs. , 000321.2 T Single Arm Radial Davit(Ix) Open Slewing Assembly Bearing Housing And Inspect Bearing For Play. Renew Components Viz Gears Bearings If Necessary. Renew O Rings And Oil Seals , 000321.2 T Single Arm Radial Davit(X) Inspect The Worm Wheel Assembly For Any Wear And Presence Of Metallic Particles. , 000321.2 T Single Arm Radial Davit(Xi) Check Oil In Gear Case And Examine Gear Teeth For Breakage And Presence Of Foreign Matter.Check Bearings For Collapse And Shaft For Rust And Corrosion.Renew/Repair As Necessary. , 000321.2 T Single Arm Radial Davit(Xii) Record Volt/Amps/Speed Parameters Of Davit And Associated Systems During Load Test. Record Load Test Details. , 000321.2 T Single Arm Radial Davit(Xiii) Check Brake Lining On Winch And Change Liner If Damaged. , 000321.2 T Single Arm Radial Davit(Xiv) Check All Rotating Parts, Lever Etc For Free Movement. , 00033Anchor Windlassanchor Windlass(A) Strip And Examine Shaft For Wear And Alignment Check And Clear Lubrication Point And Reassemble The Fittings , 00033Anchor Windlassanchor Windlass(B) Hand Wheel And Warping Drums To Be Removed. Examine Slit Keep Plate And Screw For Wear And Deterioration. Cable Holder Spinders, Bushes And Shafts To Be Examined For War And Defects. , 00033Anchor Windlassanchor Windlass(C) Dismantle Brakes, Examine Conditions Of Brake Linings. Renew Linings , Brakes Is To Be Ajustable On Completion. , 00033Anchor Windlassanchor Windlass(D) Examine Slipping Cluth, Magnectic Brakes And Couplings Renew Id Necessary. Replenmish System With New Clean Oil Oc 300. , 00033Anchor Windlassanchor Windlass(E) Inspect The Condition Of Deck Plating Under Windlass Foundation. Repair If Necessary. Preserve In Accordance With No 53/16. , 00033Anchor Windlassanchor Windlass(F) Carry Out Complete Overhaul Of Anchor Windlass And Carry Out Trails To Ensure Correct Performance On Completion Of Overhaul. , 00034Anchor And Cable / Lockerschain Cable/ Lockersmake : Chakravorty Traders Engg, Kolkata , 00034Anchor And Cable / Lockerschain Cable/ Lockers(A) Anchor Chain Cable And Accessories To Be Hydrojet Blasted To Bare Metal Surface So As To Facilitate Survey By Dockyard. Mechanical Chipping, Scrapping, Wire Brushing Etc In Inaccessible Areas, If Additionally Required By Dyd. 02 Half Shackles, 12 Full Shackles, 02 Anchor, 02 Bottle Screw Slip, 04 Swivel Adaptors , 00034Anchor And Cable / Lockerschain Cable/ Lockers(I) Stud Link Chain Cable Half Shackles- 13.25 Mtrs Each , 00034Anchor And Cable / Lockerschain Cable/ Lockers(Ii) Stud Link Chain Cable Full Shackles- 27.5 Mtrs Each , 00034Anchor And Cable / Lockerschain Cable/ Lockers(Iii) Us Danforth Anchor , 00034Anchor And Cable / Lockerschain Cable/ Lockers(Iv) Blake Slip , 00034Anchor And Cable / Lockerschain Cable/ Lockers(V) Bottle Screw Slip , 00034Anchor And Cable / Lockerschain Cable/ Lockers(Vi) Swivel Adapters , 00034Anchor Chain Cable & Accessoriesanchor Chain Cable & Accessories Make : Indian Chain Pvt Ltd(B) Carry Out Survey Of Anchor Chain Cable Accessories As Per No 02/21 , 00034Anchor Chain Cable & Accessoriesanchor Chain Cable & Accessories (I) Stud Link Chain Cable Half Shackles- 17.25 Mtrs Each , 00034Anchor Chain Cable & Accessoriesanchor Chain Cable & Accessories (Ii) Stud Link Chain Cable Full Shackles- 27.5 Mtrs Each , 00034Anchor Chain Cable & Accessoriesanchor Chain Cable & Accessories (Iii) Anchor , 00034Anchor Chain Cable & Accessoriesanchor Chain Cable & Accessories (Iv) D Shackle , 00034Anchor Chain Cable & Accessoriesanchor Chain Cable & Accessories (V) Bottle Screw Slip , 00034Anchor Chain Cable & Accessoriesanchor Chain Cable & Accessories (Vi) Swivel Adapters , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (C) All Lugless Joining Shackles, Anchor Shackles, Locker Lugged Shackles And Swivel Pieces Are To Be Disconnected Before Cleaning/Chipping To Remove All Paint And Rust. . Clean And Grease Trunnion Pin And Ho Using. Grease To Be Used:- Lg-280 Patt No 0474/910-0502 Note:- If There Is Likelihood Of The Twelve Month Period Being Exceeded, The Machined Surfaces Of The Joints Of Lugless Joining Shackles Are To Be Examined For Corrosion, All Such Shackles Being Stripped, Greased And Re-Assembled By Ship Staff. , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (D) Cleaning/Chipping To Remove All Paint And Rust From All Disconnected Parts. , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (E) Lay Out All Cables/ Anchor Ropes. Break, Clean And Grease All Joining Shackles. Strip And Grease Slip In Cable Locker. Re-Arrange Cable Length To Ensure Equality Of Wear.Re-Mark Cable Length. , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (F) Examine Hull Associated Fittings.Examine All Spare Chain Cable And Fittings, Clean And Coat With Cold Bituminous Paint.Dismantle Anchor , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (G) Unscrew Bottle Slip/ Compressor Whereas Fitted To Its Fullest Extent And Thoroughly Clean And Grease Threads Before Assembly. , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (H) Undertake Survey Of Adapter Piece For Cracks Or Wear And Undertake Repair As Per No 02/21 , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (J) Undertake Survey Of Adapter Piece For Cracks Or Wear And Undertake Repair As Per No 02/21 , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (K) Survey All Deck Fittings Associated With Anchor Chain Cable Arrangement Ie Deck Eyes/ Eye Plates Including Gulletine/ Gulletine Roller, Compressor With Complete Structure Whereas Fitted Paying Particular Attention Eye Plates/ Eye Bolts Etc For Wear, Corrosion/ Deterioration And Ovality Of Hole. Undertake Repair/ Renewal Iaw No 02/2 , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (L) Survey Anchor, Chain Cable, Swivel Adaptor, Shackles And All Associated Fittings (An Experienced Dockyard Blacksmith Is To Assist The Survey).Break, Clean And Grease All Joining Shackles. Undertake Repair/ Renewal As Applicable Iaw No 02/21. Forward A Report On In 305/ Nso 269(B) To Authorities As Mentioned In Para 15 Of No 02/21. , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (M) Check Original Dia Of Each Parts Of Anchor , Chain Cable And Accessories From Rigging Warrant & Offer Them Survey To Dyd Along With In 305 & Anchor Test Certificate. , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (N) Undertake Survey And Load Test Of All Steel Wire Rope Associated With Stern Anchor. Survey And Load Test Of Steel Wire Ropes Associated With Stern Anchor Are To Be In Accordance With Para 13 (C)- (H) Of No 02/21. Unwind The Steel Wire Rope From The Windlass Drum And Range On The Area Designated By The Refitting Authority. Prior To Restoring, Entire Steel Wire Rope Is To Be Cleaned, Dried And Lubricated. , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (P) Retest And Examination Of Cable In Accordance With Br 367, Article 13 And No 02/21. , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (Q) Examine The Condition Of Paint Of Cable Lockers For Sign Of Any Deterioration/ Damage Of Paint. Clean, Remove Damaged Paint And Rust Using Mechanical Chipping Or Scraping Or Wire Brush Tools. Paint The Cable Locker Iaw No 53/16 And Policy Directive Issued By Ihq/Dna From Time To Tim , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (R) Undertake Preservation Of The Anchor Chain Cable And Accessories Held Onboard, By Application Of Cold Bituminous/ Ps60 Paint Iaw Appendix ‘E Of No 53/16 , 00034Anchor And Cable / Lockersanchor And Cable / Lockers (S) Assistance Required For Dismantling Of 12 No. Lugless Joining Shackles, 04 Lugged Shackles, 04 D-Shackles Of Slips. , 00035Stpoperational Checks(A) Undertake Complete Functional And Operational Checks Of Entire Sewage Treatment Plants And Check Specific Defects For Yard For Rectification. , 00035Stppvc Lines And Plug(B) Undertake Renewal Of All Pvc Pipelines And Pvc Plug Cock Valves , 00035Stpsystem Lines(C) Overhaul/ Chemical Clean All Sewage/ System Pipelines. , 00035Stpvisual Survey Sewage Tanks(D) Undertake Visual Survey Of V1 & V2 Tanks. If The Corrosion Is Found To Be Excessive,Undertake Usg Survey Of Tanks. Undertake Repairs As Necessary , 00035Stpsoil Pipes(E) Undertake Chemical Cleaning Of Soil Pipes. , 00035Stpmotors And Starters(F) Overhauling Of All Motors And Starters , 00035Stpsurvey And Painting Of Sewage Tanks(G) Carry Out Cleaning / Survey Of V1 And V2 Tanks And Repair As Necessary. Inspect The Internal And External Paint Coating And Recoat With Appropriate Paint Scheme After Completion Of Repairs And Surfacepreparation , 00035Stplevel Indicator Checks(H) Check Function Of Control Panel And Carryout Out Calibration Of Level Switches Of V1 And V2 Tanks. Replace If Necessary , 00035Stpoverhauling(J) Overhaul / Repair The Following :(I) Overboard Pump(Ii) Discharge Pump(Iii) Macerator Pump(Iv) Imo Pump (If Fitted)(V) Rotary Air Compressor , 00035Stpsystem Lines(K) Undertake Over Haul / Repair Of 100% Of System Valves (Non-Pvc) Fitted In The System. , 00035Stpv1 And V2 Tanks(L) Inspect Freeness Of Vent Line Of V1 And V2 Tanks By Blowing Throughwith Air. Project Defects If Any , 00035Stpispp Certificate(M) If Renewal Of Certificate Is Due, Obtain International Sewage Pollution Prevention Certificate Valid For Duration Of Five Years From A State Authorised Accredited Agencies As Specified In Mepc 115(51) And 227(64) For The Ship Adopted On 01 Apr 04 As Per Regulation 5 Of Revised Annex Iv Of Marpol 73/78 (Ncd 3930, Issue 3, Sep 16 Isrelevant) , 00035Stpeffluent Test(N) Carry Out Effluent Test Of Sewage Discharge. , 00036Sewage Treatment Plantsewage Treatment Plantmake : M/S Hi Point Pvt Ltd, Mumbai, Model : Omnipure 6 Mcqty Fitted - 01 , 00036Sewage Treatment Plantsewage Treatment Plantmake : M/S Hi Point Pvt Ltd, Mumbai, Model : Omnipure 6 Mcqty Fitted - 01 (A) Open, Examine And Overhaul Macerator And Obd Pump And Prove For Satisfactory Operation Post Overhaul. Examine For Wear And Clogging. Clean Clogged Parts. Check Proper Face Clearance Between Axial And Cutter. Carry Out Cutter Adjustment. Check Sleeve Bearing And Shaft For Wear. Examine Ball Bearings For Rust And Wear And Mechanical Seal Of Pump For Damage. Replace Worn Out Cutters, Bearings, O-Rings, Mechanical Seal And Other Sub-Components. Spares Not Held With Ships Staff. , 00036Sewage Treatment Plantsewage Treatment Plantmake : M/S Hi Point Pvt Ltd, Mumbai, Model : Omnipure 6 Mcqty Fitted - 01 (B) All Necessary Spares For Repair/ Overhaul Of Equipment Are To Be Catered By The Repairing Firm Through Oem (M/S Hi Point Services Pvt Ltd, Mumbai) , 00036Sewage Treatment Plantsewage Treatment Plantmake : M/S Hi Point Pvt Ltd, Mumbai, Model : Omnipure 6 Mcqty Fitted - 01 (C) Undertake Renewal Of All Pvc Pipelines And Pvc Plug Cock Valves. Overhauling Of All Sewage System Pipeslines. , 00036Sewage Treatment Plantsewage Treatment Plantmake : M/S Hi Point Pvt Ltd, Mumbai, Model : Omnipure 6 Mcqty Fitted - 01 (D) Undertake Chemical Claning Of Soil Pipes. , 00036Sewage Treatment Plantsewage Treatment Plantmake : M/S Hi Point Pvt Ltd, Mumbai, Model : Omnipure 6 Mcqty Fitted - 01 (E) Overhauling Of All Motors And Starters. And Pipe Lines. , 00036Sewage Treatment Plantsewage Treatment Plantmake : M/S Hi Point Pvt Ltd, Mumbai, Model : Omnipure 6 Mcqty Fitted - 01 (F) Overhaul / Repair The Follwing:- (I) Overboard Pump- 1 No, (Ii) Discharge Pump - 1 No, (Iii) Macerator Pump - 1 No , 00036Sewage Treatment Plantv1 And V1 Tanksmake : M/S Hi Point Pvt Ltd, Mumbai, Model : Omnipure 6 Mcqty Fitted - 01 (F) Carryout Cleaning/ Survey Of V1 And V2 Tanks And Repair As Necessary. Inspect The Internal And External Paint Coating And Recoat With Appropiate Paint Scheme After Completion Of Repairs And Surface Preparation.With. Area - 10 Sq.Mtrs , 00036Sewage Treatment Plantmake : M/S Hi Point Pvt Ltd, Mumbai, Model : Omnipure 6 Mcqty Fitted - 01 (G) Check Function Of Control Panel And Carryout Calibration Of Level Switches Of V1 And V2 Tanks. Replace If Necessary , 00036Sewage Treatment Plantforce Ehaust Blower Motormake : M/S Hi Point Pvt Ltd, Mumbai, Model : Omnipure 6 Mcqty Fitted - 01 (H) Dismantle And Overhaul Exhaust Blower Motor . Examine The Bearings And Seals And Renew If Necessary. Spares Not Held With Ships Staff. All Necessary Spares For Repair/ Overhaul Of Equipment Are To Be Catered By The Repairing Firm. , 00037Sanitary Systemsanitary System(A) Dismantle All Soil And Urinal Drain Pipe An Undertake Re-Galvanizing. , 00037Sanitary Systemsanitary System(B) Strip, Clean And Overhauling Of 100% Wc And Urinal Flushing Valves, Reducing Valves And Reducer. , 00037Sanitary Systemsanitary System(C) Strip And Clean 100% Of Soil And Urinal Drain Pipe. Re- Galvanise Where Required. , 00038Sewage Systemstorm Valvesdismantle And Overhaul Storm Valves Of Galley Drain And Stp Drain. Rectify The Defects And Pressure Test To 2 Kg Pressure On Completion Of Repairs. Valve Size: 65 Mm Nb , 00039Drainage Systemstorm Valvesdismantle And Overhaul Storm Valves Of Deck Drains In Mess Decks Drain. Rectify The Defects And Pressure Test To 2 Kg Pressure On Completion Of Repairs, If Any. Work Involves Removal& Refitment Of Lagging & Panneling On Ship Side In Sr.Sls Mess And Wash Spaces. Valve Size: 65 Mm Nb , 00039Drainage Systemdrain Pipes(A) Dismantle The Entire Stretch Of Drain Pipes From Deck Drains. Chemically Clean The Pipings Free Of Solid Deposits And Refit The Same On Completion. Material: Gi, 2 1/2 , 00039Drainage Systemdrain Pipes(B) Also Quote For Renewal Of Above Pipe Line At Damaged Locations. Material: Gi , Dia: 2 1/2 , 00040Ventilation Systematu 2 - 6 Tr(A) Degutting/ Regutting Of Air Treatment Units 2 (Fcu)To Be Undertaken. Following Job Involved:- , 00040Ventilation Systematu 2 - 6 Tr(A) Degutting/ Regutting Of Air Treatment Units 2 (Fcu)To Be Undertaken. Following Job Involved:-(I) Degutting/ Dismantling Of 01 Nos Air Treatment Units 01 No In Mer - 6 Tr ( For Mcr Only) , 00040Ventilation Systematu 2 - 6 Tr(A) Degutting/ Regutting Of Air Treatment Units 2 (Fcu)To Be Undertaken. Following Job Involved:-(Ii) Regutting/ Fitment Of Below Mentioned Parts Of Atus (Fcu ) To Be Undertaken: , 00040Ventilation Systematu 2 - 6 Tr(A) Degutting/ Regutting Of Air Treatment Units 2 (Fcu)To Be Undertaken. Following Job Involved:-(Iii) Degutting And Regutting Of Adjacent Fittings And Pumps : Power Panel, Da Panel No. 3, Fot 1 & 2 Pump , Centrifuge (1 &2 ) And Accessories. , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:- , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(I) Ahu Frame - Ss316l , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Ii) Ahu Base Frame - Stainless Steel Gr - 316 1 Mm , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Iii) Motor/ Blower Base Frame - Ss , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Iv) Vibration Pad - Neoprene Rubber , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(V) Frame Corners - Ss , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Vi) Ahu Panel Outer - Ss316 L , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Vii) Ahu Panel Inner - Ss 316L , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Viii) Insulation - Puf42 Kg /M3 , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Ix) Drain Tray - Ss316l , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(X) Blower - Kruger : Model Bdb 250 , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Xi) Motor - Megha Rototech : 0.75 Kw , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Xii) Drive Belt - Spb 1210 , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Xiii) Fan Pulley - Spb 158/ 25 , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Xiv) Motor Pulley - Spb 146/20 , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Xv) Cooling Coil (Dx) - Tubes - Copper, Fins - Copper , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Xvi) Filter Frame - Ss316 L , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Xvii) Filter Media - Hdpe , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Xviii) Gasket - Rubber , 00040Ventilation Systematu 2 - 6 Tr(B) Fitment Of Following Parts Of Atu 2 (Fcu) To Be Undertaken:-(Xix) Flexible Connection - Woven Fiber Glass With Neoprene Coating , 00040Ventilation System Galley Exhaustmake : Heinen And Hopeman Engg , 00040Ventilation System Galley Exhaustmake : Heinen And Hopeman Engg (C) Exhaust Trunking: Internal Surfaces Of The Galley Chimney And Trunking Are To Be Thoroughly Degreased And Cleaned. Work Involves Removal Of Mushroom Head-Blower Assembly And Refitment On Completion Of Cleaning , 00040Make : Heinen And Hopeman Engg (E) Carryout Trials Of A/C & Ventilation System To Ensure Saticfactory Performance. Examine And Test One Way, Two Way, Recirculation Flaps Whereas Applicable To Ship. Defects To Be Rectified. Renew Rubber Seatings And Carryout Chalk Test For Air Tightness , 00040Ventilation System Air Handling Units(F) Chemically Clean Heat Exchanger Fins And Coils. Job Includes Following :- , 00040Ventilation System Air Handling Units(G) Dismantling Of Heat Exchanger Units Of 02 Nos Atus (I) 01 No In Stp Lobby Cap - Stp Lobby Atu- 22 Tr (Main Atu No 1) (Ii) 01 No In Mer Capacity Atu- 8 Tr (Mcr Atu No 2) , 00040Ventilation System Air Handling Units(H) Chemical Cleaning Of Heat Exchanger Fins And Coils And Renewal Of 50% Damaged Copper Tubes Of Atus , 00040Ventilation System Air Handling Units(J) Survey And Renewal Of Atu Casing Structure And Heat Exchanger Structure(Bottom Plates And Body Casing Plates) Of Main Ahu Mat - Moulded Zn Sheets Thickness 2Mm(For Main Atu Only) , 00040Ventilation System Air Handling Units(K) Renew 02 In Nos Fan Bearings As Per Sample In Blower Fan Of Main Ahu , 00040Ventilation System Air Handling Units(L) Pressure Test The Heat Exchanger Units To 12 Kg Pr For Ahu 1 And 2. , 00040Ventilation System Air Handling Units(M) Job Involves Degutting And Regutting Of Following : (6 Tr Atu) (I) Atu Casing Box(Ii) Ventilation Blower - 01 Nos(Iii) Ventilation Dampers - 02 Nos(Iv) Chilled Gas Line - 5 Rmt (V) Cold Lagging - 06 Sqm(Vi) Mfmb Lagging - 10 Sqm , 00040Ventilation System Air Handling Units(N) Degutting/ Regutting Of Existing 6 Tr Atu , 00040Ventilation System Air Handling Units(P) Work Involves Removal Of Mer Soft Patch During Docking For Removal Of 6 Tr Atu And Refitment : Job To Be Undertaken During Docking Period , 00040Ventilation System Ventilation System(Q) Check Air Pressure Drop Through The Atu Using Manometer Connection. , 00040Ventilation System Ventilation System(R) Overhaul Motors And Blowers As Indicated By Ship. Grease Filters Of Exhaust Trunking In Galley To Be Cleaned And Preserved. Ecamine And Carry Out Overhauling Of Rod Gearing Connected With Associatedd Ventilations Valves, Also Replace Glands As Necessary And Survey The Area In Vivinity. , 00040Ventilation System Ventilation System(S) Chalk Test Of Wt Covers Seals. Packs/ Renew Seals As Necessary. Nwt Cover Seals And Hinges Louvers To Be Examined Tested. Raise Specfic Defects To Dockyard For Repairs. , 00040Ventilation System Ventilation System(T) Modification Of Ventilaltion Trunking To Cater For Ac Replacement View Increase In Air Flow Capacity And Cooling Capacity. Dimension 180Mm To 200Mm Thickness Throught The Ship , 00040Ventilation System Ventilation System(U) Pre Refit And Post Refit Ventilation Trials Be Undertaken As Part Of Refit Routines( Maintops) , 00041Ventilation Flapsrenewals(A) Ventilation Flaps Along With Frame And Grills Corroded And Perished Near Mer Soft Patch To Be Manufactured And Replaced. Qty- 10, Mat. - Ms. , 00041Ventilation Flapsrubber Beading(B) Rubber Beading Of Ventilation Flap Damaged And Perished To Be Renewed. Qty - 35 Rmt. , 00041Ventilation Flapsbutterfly Nuts(C) Butterfly Nuts Of Various Vent Flaps Damaged To Be Renewed. Mat - Ss, , 00042Wire Meshrenewalswire Mesh Of Various Supply And Exhaust Trunkings Corroded And Damaged To Be Manufactured As Per Sample. Mat - Gi, Qty - .5 Sqm. , 00043Ac Trunkingrepair(A) Air Leakage Observed From Ac Trunkings Near Atu Compartment And Main Alleyway (Feeding To Bridge And Radio Room) To Be Repaired/ Renewed. Work Involves - Removal Of Lagging, Repair/ Renewal Of Trunking, Refitment Of Lagging. Qty- 10 Rmt, Mat. - Gi. , 00043Ac Trunkinglagging(B) Chilled Lagging Of Ac Trunking Damaged/ Perished At Atu Compartment, Main Alleyway, Lower Deck Lobby And Galley. Lagging To Be Undertaken With 1 Inch Of Chilled Lagging To Avoid Condensation And To Be Coated With White Canvas Cloth. Qty. - 20 Sqm , 00043Ac Trunkingexhaust Trunking(C) Exhaust Trunking In Stp Compartment, Rope And Canvas Store, Js Bathroom And Asp Corroded And Holed At Indicated Location To Be Repaired/ Renewed. Mat. - Al/Gi, Qty. - 15 Rmt , 00044Towing Hookoverhaulingmake : India Nets, Indore Qty Fitted - 01 Nos , 00044Towing Hookoverhaulingmake : India Nets, Indore Qty Fitted - 01 Nos(A) 7.5 Tonne Swl Towing Hook To Be Dismantled And Thorougly Overhauled. Replace, Defective Components And Refit The Towing Hook On Completion. Note: The Lock Plate Securing The Towing Hook Swivel To The Foundation Bracket Is Not To Be Welded And Is To Be Fastened With The Bolts Screwed On To The Threaded Holes To Be Drilled On Foundation Bracket. , 00044Towing Hookload Testingmake : India Nets, Indore Qty Fitted - 01 Nos(B) Towing Hook To Be Load Tested To A Proof Load Of 7.5 Ton On Completion Of Overhauling. Previous Load Test Certificate And Load Test Proforma Will Be Submitted By The Ships Staff. , 00044Wt Hatchessupporting Bracketsmake : Eastern Enterprise , 00045Wt Hatchessupporting Bracketsmake : Eastern Enterprisesupporting Brackets Onto Which Retaining Catches Of Hatches Are Secured To Be Renewed In Main Deck Hatches. Mat: I Section (Fabricated) 10 Mm Thick, Web: 3 Wide, Rider: 3 Wide & Length Of Bracket: 1 Mtr , 00046Deck Fittingshull Surveythe Following Deck Fittings To Be Visually Surveyed And Areas Found Excessivey Deteriorated Are To Be Ultrasonically Guaged: Area To Be Renewed As Per Survey Reports. Survey Report Post Completeion Of Hull Survey Be Provided To Ss.Note: Steel Renewal To Be Undertaken , 00046Deck Fittingshull Survey(A) Twin Bollards - 08 Nos , 00046Deck Fittingshull Survey(B) Fair Leads- 08 Nos , 00046Deck Fittingshull Survey(C) Bull Rings - 02 Nos , 00046Deck Fittingshull Survey(D) Cleats- 12 Nos , 00046Deck Fittingshull Survey(E) Towing Bolard- 01 No , 00046Deck Fittingshull Survey(F) Cable Clench- 01 No , 00046Deck Fittingshull Survey(G) Towing Hook Foundation Bracket- 01 No , 00046Deck Fittingshull Survey(H) Brows - Nos -01 , 00046Deck Fittingshull Survey(J) Deck Eyes Blake And Screwslips- 02 Nos , 00046Deck Fittingshull Survey(K) Deck Eyes Of Anchor Strop- 02 Nos , 00046Deck Fittingshull Survey(L) Miscellaneous Deck Eyes - 08 Nos , 00047Watertight Scuttleswatertight Scuttlesmake : D S Engg Worksqty Fitted - 13 Nos , 00047Watertight Scuttleswatertight Scuttlesmake : D S Engg Worksqty Fitted - 13 Noswt Scuttles On Superstructure To Be Checked With Hose Test For Intact Watertight Integrity. Following Jobs To Be Carried Out In 13 In Nos Scuttles:- , 00047Watertight Scuttleswatertight Scuttlesmake : D S Engg Worksqty Fitted - 13 Nos(A) Manufacture And Fitment Of Locking Rings As Per Sample. Ring Outer Dia: 12 Inches; Mat: Gunmetal , 00047Watertight Scuttleswatertight Scuttlesmake : D S Engg Worksqty Fitted - 13 Nos(B) Illuminator Frames To Be Manufactured And Renewed As Per Sample. Frame Outer Dia: 14 Inches; Mat: Brass , 00047Watertight Scuttleswatertight Scuttlesmake : D S Engg Worksqty Fitted - 13 Nos(C) Renewal Of Gaskets As Per Sample. Mat: Silicon Rubber 1.5 Mm Thk , 00047Watertight Scuttleswatertight Scuttlesmake : D S Engg Worksqty Fitted - 13 Nos(D) Boxing Up Of Illuminator Assembly After Renewal Of The Above. , 00047Watertight Scuttleswatertight Scuttlesmake : D S Engg Worksqty Fitted - 13 Nos(E) Rain Coaming For All Scuttles To Be Manufactured And Welded On Bulkhead. Mat - Al , 00047Watertight Scuttleswatertight Scuttlesmake : D S Engg Worksqty Fitted - 13 Nos(F ) Lubricate And Carry Out Chalk Test Of All Watertight Scuttles , 00048Ships Side Scupper Ships Side Scupper 06 Pairs Of Scupper Lips On Weather Decks/ Ships Side At Indicated Locations Be Cropped And Renewed And Fitted With Ms Plate And Rubber Lips. , 00049Ventilation System Mushroom Headsspindles Of 08 In No Mushroom Heads On Weather Decks To Be Surveyed And Checked For Free Operation. Carryout Renewal Of Screw Shafts, Wire Mesh (18 Guage) And Rubber Beading And Refitment In Situ. The Details Are As Follows , 00049Ventilation System Mushroom Heads(A) Dismantling Of Mushroom Heads, Overhauling And Refitment On Completion , 00049Ventilation System Mushroom Heads(B) Renewal Of Screw Shafts As Per Sample. Mat: En8. Dim: 25 Mm Dia, 18 Inches Long And Square Threads On It. , 00049Ventilation System Mushroom Heads(C) Renewal Of Wire Mesh Guards On The Mushroom Heads , 00049Ventilation System Mushroom Heads(D) Renewal Of Rubber Beading On The Wt Flaps Of Mushroom Head As Per Sample , 00050Wcs And Wash Placesmodular Panellingsfollwing Jobs Be Undertaken : (A) Modular Ss Panneling In Jr & Sr Sailors Wc And Bathrooms And Officers Bathroom/ Wc To Be Renewed, Fitted And Sealed Water Tight In Situ. Mat: Ss Sheet, 18 Guage, Moulded To Shape; Silicon Sealing Compound And Ss Moulded Beadings. (B) Provisioning Of Inspection Window For Every 1 Mtr Iaw Ihq Mod (N) Directives Along With Locking Mechanism. Qty - 10 , 00051Ventilation Systemrobotic/ Chemical Cleaning(A) Carry Out Robotic Cleaning Of Entire Length Of Trunkings In Mess Decks, Office Spaces, Alleways, Galley And Stores. Work Involves Regutting And Degutting Of Modular Ss Pannelings. Panelling Damaged During Degutting Are To Be Renewed. , 00051Ventilation Systempanelling (B) Paneling To Be Degutted And Regutted As Envisaged, Approx 200 Sqm , 00051Ventilation Systemchemical Cleaning(C)Removal/ Refitment And Chemical Cleaning Of Galley Grease Filters Be Undertaken , 00051Ventilation Systemventilation Diffusers(D) Carryout Cleaning/ Overhauling Of All Ventilation Diffusers In Mess Decks, Dining Hall, Officerss Cabins, Offices And Wardroom.Job Involves Renewal Of Defective Diffusers As Per Existing Ones. Material Of Knob : Plastic Moulded , 00051Ventilation Systemventilation Diffusers(E) Carryout Cleaning/ Overhauling Of All Ventilation Diffusers In Bridge, Ger, Mcr And Galley.Job Involves Renewal Of Defective Diffusers As Per Existing Ones As Per Sample , 00052Wt Structurerubber Beadingsrubber Gaskets (Beadings) Of Following Watertight Structure To Be Renewed As Per Sample: , 00052Wt Structurerubber Beadings(A) Mer Soft Patch , 00052Wt Structurerubber Beadings(B) Aer Soft Patch , 00052Wt Structurerubber Beadings(C) Circular/ Rectangular Flaps On Super Structure , 00053Wt Hatcheswt Hatches(A) Visual Survey Of Structure Of Wt Hatch Sills And Wt Hatch Covers On Weather Decks To Be Carried Out Paying Particular Attention To The Region Adjoining The Rubber Beading And Hatch Hinges. Areas Found Deteriorated Are To Be Cropped And Renewed. , 00053Wt Hatcheschalk Test(B) Carry Out Chalk Test Of All Wt Hatches. , 00053Wt Hatchesretainer Clips/ Securing Arragament(C) Retainer Clips/ Securing Arragement Of Wt Hatches Of Weather Deck Jammed. To Be Replaced With New Spring Assisted Retainer Clips As Per Sample. , 00054Nwt Metallic Dorslocks And Door Closures23 In No 7-Lever Double Locking Godrej Mortise Locks Of Modular Ss Door Panels To Be Renewed And Fitted Onto Doors. Locks Not Incatted And Not Available With Ships Staff.Hydraulic Door Closures (Make - Godrej) To Be Renewed In 23 In Nos Doors.Make - Godrej , 00054Nwt Metallic Dorslocks And Door Closures(A) Rh Locks- 08 Lh Locks- 15 , 00054Nwt Metallic Dorslocks And Door Closures(B) Door Closures - 23 , 00055Apt Apt (A) All Tanks, Sea Atubes And Cofferdams Are To Be Air Pressure Tested.14 Sea Tubes. 25 Obds, 04 Iccp Cofferdam, 01 Tank Cofferdam, 02 Void Space (Port & Stbd)09 Tanks , 00055Apt Apt (B) Carry Out Pressure Testing Of Tanks And Sea Tubes To 0.2 Kg/Cm2 Which Are Repaired 14 Sea Tubes. 25 Obds, 04 Iccp Cofferdam, 01 Tank Cofferdam, 02 Void Space (Port & Stbd)09 Tanks , 00055Apt Apt (C) Undertake Apt Of All Water Tight Clusters View Ihq Fac Nc/5173/Fac Dated 19 Jun 14. , 00056Standing Rigging And Lifting Appliancesload Testing(A) The Following Standing Rigging, Seamanship Equipment And Lifting Appliances Are To Be Load Tested As Per Specifications Given By Ships Staff: , 00056Standing Rigging And Lifting Appliancesload Testing(I) Anchor Strops , 00056Standing Rigging And Lifting Appliancesload Testing(Ii) Deck Eyes Of Blake And Bottle Screw Slips , 00056Standing Rigging And Lifting Appliancesload Testing(Iii) Deck Eyes Of Anchor Strops , 00056Standing Rigging And Lifting Appliancesload Testing(Iv) Leadsman Platform , 00056Standing Rigging And Lifting Appliancesload Testing(V) Preventer Safety Chain Hook , 00056Standing Rigging And Lifting Appliancesload Testing(Vi) Towing Pendant Dia 24 Mm Fswr, 7.5 Mtr , 00056Standing Rigging And Lifting Appliancesload Testing(Vii) Bollard Strop 24 Mm Dia Fswr 2 Mtr , 00056Standing Rigging And Lifting Appliancesload Testing(Viii) Towing Shackles (Straight Shackle With Screw Bolt) , 00056Standing Rigging And Lifting Appliancesload Testing(Ix) Bow Shackles , 00056Standing Rigging And Lifting Appliancesload Testing(X) Senhouse Slip For Towinng , 00056Standing Rigging And Lifting Appliancesload Testing(Xi) Senhouse Slip General Purpose , 00056Standing Rigging And Lifting Appliancesload Testing(Xii) Straight Shackle , 00056Standing Rigging And Lifting Appliancesload Testing(Xiii) Bow Shackle , 00056Standing Rigging And Lifting Appliancesload Testing(Xiv) Eye Plates Of Light Jackstay On Bulkhead , 00056Standing Rigging And Lifting Appliancesload Testing(Xv) Deck Eyes For Light Jackstay , 00056Standing Rigging And Lifting Appliancesload Testing(Xvi) Ships Brow , 00056Standing Rigging And Lifting Appliancesload Testing(Xvii) Deck Eyes For Ras Points , 00056Standing Rigging And Lifting Appliancesload Testing(Xviii) Arh , 00056Standing Rigging And Lifting Appliancesload Testing(Xix) Snatch Block & Towing Pendant , 00056Standing Rigging And Lifting Appliancesload Testing(Xx) Ib Block , 00056Standing Rigging And Lifting Appliancesload Testing(Xxi) Guardrails Of Different Length With 10 Mm Dia , 00056Standing Rigging And Lifting Appliancesload Testing(Xxii) Crimping Of Guardrails , 00056Standing Rigging And Lifting Appliancesload Testing(Xxiii) Boat Slings , 00056Standing Rigging And Lifting Appliancesload Testing(Xxiv) Bradle Ring Of Sea Boat Rope , 00056Standing Rigging And Lifting Appliancesvisual Inspection(B) Easing Out Recovery Rope 24 Mm Pp Rope , 00056Standing Rigging And Lifting Appliancesvisual Inspection(C) Life Line 24 Mm Pp Rope , 00056Standing Rigging And Lifting Appliancesvisual Inspection(D) Llt Line 16 Mm Pp Rope , 00056Standing Rigging And Lifting Appliancesvisual Inspection(E) Recovery Line 16 Mm Pp Rope , 00056Standing Rigging And Lifting Appliancesvisual Inspection(F) Skbdl Line 12 Mm Rope , 00056Standing Rigging And Lifting Appliancesvisual Inspection(G) Berthing Houser 32 Mm , 00056Standing Rigging And Lifting Appliancesvisual Inspection(H) Towing Houser 48 Mm Pp , 00056Standing Rigging And Lifting Appliancesvisual Inspection(J) Towing Pendant 16 Mm , 00056Standing Rigging And Lifting Appliancesvisual Inspection(K) Larne Target Rope 32 Mm , 00056Standing Rigging And Lifting Appliancesvisual Inspection(L) Sea Boat Rope 32 Mm , 00057Draught Marksdraught Marksships Draught Marks To Be Build Up/ Renewed As Per Existing Dimentions At Fwd, Mid And Aft Sections Of Ship. Countor Of All Letters And Numbers To Be Welded Intermittently. All Figures Are Contained In An 80 Mm Width X 100 Mm High Rectangle. Letter M Is Contained In An 90 Mm Width X 100 Mm High Rectangle. Horizontal Separations Between Letters And Numerals Is To Be 20 Mm. Ss Will Provide Drawings. , 00058Wt Doors And Hatches Rubber Beadings(A) Rubber Beading Of 14 In Nos Wt Doors And 14 Wt Hatches To Be Renewed As Per Standardised Specifications. Mat: Silicon Rubber. Carryout Chalk Test Of All Beadings Post Renewal. , 00058Wt Doors And Hatches Wt Doors(B) Thoroughly Survey Of 15 Wt Doors And Coaming, If Required Requisite Plate Renewal/ Buildup Of The Same Be Undertaken. Mat - Ms , 00058Wt Doors And Hatches Securing Handles/ Clips(C) Following Jobs Be Undertaken:- (I) Survey Of Securing Handles/ Clips (12 Handles Each Doors) (Ii) Overhauling And Replacement Of Securing Handle/ Clips Of 15 Wt Doors Be Undertaken. , 00058Wt Doors And Hatches Hinges (D) Overhauling And Replacement Of Washers For 14 Wt Doors Hinges As Per Sample View Damaged/ Broken. Mat - Ss, Teflon. , 00058Wt Doors And Hatches Spring Mechanism(E) Replacement Of Spring Mechanism Along With Shaft Spindle Of 14 Wt Hatches View Corroded. Refitment The Spring Iaw Fost Safety Guidelines. Mat - Ms , 00059Lifebuoy Standlifebuoy Standcarryout Manufacturing Of 02 In Nos Ceremonial Lifebouys As Per Sample. Mat: Teak Wood With Perpex Sheet. , 00060Ventilation Systemair And Grease Filters(A) Wire Meshes Of The Following Air Filters Of Atus And Grease Filters Of Galley Chimney Perished. To Be Renewed As Per Sample. , 00060Ventilation Systemventilation System(I) 2 Ft X 2Ft Filters For Atu No.1 - 08 Nos, Mat: Gi Frame With Fine Wire Mesh Grid , 00060Ventilation Systemventilation System(Ii) 4 X 12 Filters- 04 Nos For Atu-2 Recirculated Air Suction Duct, Mat: Gi Frame With Fine Wire Mesh Grid , 00060Ventilation Systemventilation System(Iii) 4 X 8 Filters- 04 Nos For Atu-2 Fresh Air Suction Duct, Mat: Gi Frame With Fine Wire Mesh Grid , 00060Ventilation Systemventilation System(B) Carry Out Trails Of A/C & Ventilation System To Ensure Satisffactory Performance , 00060Ventilation Systemventilation System(C) Carryout Overhauling Of 100% Wtsvs / Wtbvs Or Any Other Ventilation Valves. , 00060Ventilation Systemventilation System(D) Examine And Test Recirculation Flaps , Defects To Be Rectified. New Rubber Seatings And Carry Out Chalk Test For Air Tightness. , 00060Ventilation Systemventilation System(E) Carry Out Internal Cleaning Of 100% Ventilation Trunking And 100% Trunking Of Galley Exhaust Trunking As Per Br 2203And Check Watertight Sluice Valves For Air Tightness As Per Br 2170. , 00061Gangway Apronsgangway Aprons02 Pairs Of Gangway Aprons Torn And Perished. To Be Renewed As Per Sample And Aprons To Be Painted With Name And Ships Crest. Details As Follows:- , 00061Gangway Apronsgangway Aprons(A) Stitching Of Aprons As Per Sample Provided By Ships Staff. Mat: White Synthetic Canvas, Size: 3 Mtr X 1 Mtr , 00061Gangway Apronsgangway Aprons(B) Fitment Of Brass Securing Eyes On The Apron , 00061Gangway Apronsgangway Aprons(C) Painting Of Ships Name And Crest On The Aprons , 000624.7 M Rib4.7 M Ribmake : Poly Glass Fibre Industriesqty Held - 01 Nos , 000624.7 M Rib4.7 M Rib(A) Test Disengaging Gear/ Boats Falls. Period Of Test Should Not Exceed 27 Months. (I) Examine All Equipment And Associated Fitting Including Polyester Webbings Slings And Gemini Slings And Eye Plates. (Ii) Any Part Affecting The Strength Of The Equipmewnt Becoms Defective And Is To Be Renewed Or Repaired/ Repainted, Ship Staff To Test Before Further Use And Arrange For Standard Dockyard Test At The First Opportunity. , 000624.7 M Rib4.7 M Rib(B) Survey Of Four Point Lifting Plates Fitted On Deck (Including Backup Plates, Nut, Bolts) As Per Para 5 Of Appendix B Of No 03/18. , 000624.7 M Rib4.7 M Rib(C) All External Surface Of Boat Be Coated With Gel Coat Pigented With Light Grey Shade To Ral 7040 To Priovide Smooth Finish To The Rib. , 000624.7 M Rib4.7 M Rib(D) Weigh The Rib And Compare With Ideal Weight. Record The Same In Boat Log Book. Undue Increase Of Weight, If Any Be Reported For Detailed Examination. Carry Out Leak Test Of Fuel Tank By Lp Air With Assistance From Repair Yards. , 000624.7 M Rib4.7 M Rib(E) Carryout Inspection Of Grp Hull For Chipping, Delamination, Cracks Etc. Carryout Repairs As Necessary , 000624.7 M Rib4.7 M Rib(F) All External Surface Of Boat Be Coated With Gel Coat Pigmented With Light Grey Shade To Ral 7040 To Provide Smooth Finish To The Rib. , 00063Furnituredining Hall(A) Carryout Renewal Of 02 In Nos Dining Tables And 02 In Nos Benches In Jr Sailors Dining Hall As Per Existing Sample , 00063Furniture(I) Table - 6 X 1 1/2 Crca Steel Iaw Ihq Directives - 02 Nos. , 00063Furniture(Ii) Benches - 6 X 1 1/2 Crca Steel Iaw Ihq Directives , 00063Furniture(B) Carryout Renewal Of Securing Arragement Of Micro Oven, Bread Toaster, Water Cooler And Wash Bashin As Per Dimension. Mat - Ms , 00063Furnitureoffices (C) Carry Out Renewal Of Pc Table Along With Porvisioning Of Racks For Stowage As Reference Of Existing Sample With Crca Steel Iaw Extant Policy. , 00063Furniture(D) Replacement/ Repair Of Existing Lockers With Crca Approved Materials As Per Sample Of Existing One Iaw Extant Ihq Policy. , 00063Furniturejs Mess And Ss Mess(E) Cutting And Welding Of Existing Bunks Ti Increase Height From Base Plate. , 00063Furnituress Mess(F) Carryout Renewal Of Dining Table (Size - 4 X 3 ) And Table (Size - 4 X 2.5) As Per Sample. Mat - Crca Steel. , 00063Furniturewardroom(G) Carryout Renewal Of Wooden Table With Crca Steel As Per Existing Dimension. , 00064Bonding Strapsscattered Locationsthe Bonding Straps At Several Locations To Be Renewed And Welded In Situ. Details Are As Follows:- , 00064Bonding Strapsscattered Locations(A) Welding Of Bonding Straps At Indicated Locations , 00064Bonding Strapsscattered Locations(I) Ms-Ms Bonding Straps On No.1 Deck- 70 Nos , 00064Bonding Strapsscattered Locations (Ii) Ms- Al Bonding Straps On No.1 Deck- 40 Nos , 00064Bonding Strapsscattered Locations(Iii) Al-Al Bonding Straps On Superstructure- 40 Nosnote: Aluminium Straps Are To Be Welded By Tig Welding Process. The Drilled End Is To Be Fastened With Nut And Bolt Arrangement( Firm Supply) Wherein The Bolt Will Be Welded On The Removable Part Of Structure. Bonding Straps Will Be Supplied By Ship Staff. , 00065Deck Talliesmain Deckthe Following Brass Deck Tallies Are To Be Renewed As Per Details Provided By Ships Staff And Fitted In Situ.The Work Involves Manufacture & Welding Of 05 Mm Thick Ms Pad Pieces With 02 Threaded Holes For Securing Tallies On Deck And Manufacture Of Brass Tallies With Details Engraved On Them. , 00065Deck Talliesmain Deck(A) 4 X 1 X 1.5 Mm Thk Tallies- 18 Nos , 00065Deck Talliesmain Deck(B) 2 1/2 X 8 X 1.5 Mm Thk Tallies- 08 Nos , 00065Deck Talliesmain Deck(C) 3 X 1 X 1.5 Mm Thk Tallies- 12 Nos , 00065Deck Talliesmain Deck(D) Manufacture Of 06 Mm Thick Pad Pieces As Per Dimensions Of Talleys Mentioned Above And Welding Them At Indicated Locations. Mat: Ms , 00065Deck Talliesmain Deck(E) Drilling Of Holes On Either Ends Of Plates And Tapping Of The Threads Inside The Holes For Screwing In The Bolts Securing The Talleys Onto Deck. , 00065Deck Talliesmain Deck(F) Fabrication Of Brass Talleys As Per Dimensions Mentioned Above , 00065Deck Talliesmain Deck(G) Engraving Of Details On The Talleys As Given By Ships Staff And Securing Them In Situ By Bolts. , 00066Air Hose Testingmachinery Spacesassistance Required For Surface Preparation Of All Welded Joints On Shell Plating And Wt Bulkheads To Bare Metal Surface By Mechanical Methods For Conduct Of Air Hose Testing. Portable And Semi Portable Fittings Obscuring The Accessibility To The Welded Joints To Be Degutted And Regutted On Completion Of The Testing. , 00067Furniturewooden Gratings(A) Wooden Gratings Of 02 Hmg, 02 Mmg And 01 Repeater And 02 Bathrooms Post At Bridge Top Deteriorated. To Be Renewed As Per Sample. Mat: Teak Wood , 00067Furnitureqtr Master State Boards(B) Sunmica And Beading Of 02 Duty State Board And 02 Officers State Board Cracked And Uprooted. Engraving Faded/ Worn Sliders Cracked/ Uprooted And Ply Delaminated. To Be Manufactured As Per Sample. Size: 1Mtr X 0.8 Mtr , 00068Modular Accommodationmetallic Lockers(A) Locking Arrangements Of 40 In Nos Lockers In Mess Decks (Jr Slr And Sr Slr) Defective. All Lockers Damaged And Found Deteriorated At Scattered Areas View Prolonged Usage. Lockers To Be Renewed As Per Specific Standards And Fitted At Mess Decks. Mat - High Grade Aluminum With Extra Tensile Strengthmake - Godrej , 00068Modular Accommodationshoe Racks(B) Carryout Fitment Of New Wall Mounted Enclosed Shoe Racks In Js Mess, Ss Mess, Captains Cabin And 04 Officers Cabins6 X 12 X 3 Mm Al Sheetmake - Godrej , 00068Modular Accommodationmetal Panelling(C) Metal Panelling Deteriorated/ Damaged At Dining Hall, Main Alley Way And Scattered Locations In Mess Decks To Be Renewed And Fitted Insitu. Mat - Al Modular Panels 18 Guage. , 00069Modular Accommodationbathroom Fittingscarryout Renewal Of Following Sanitary Fittings In Bathrooms And Wcs Make - Jaguar , 00069Modular Accommodationbathroom Fittings(A) Shower Mixer Valve , 00069Modular Accommodationbathroom Fittings(B) Wall Mounted Screw Down Cock , 00069Modular Accommodationbathroom Fittings(C ) Wash Basin (Ss) , 00069Modular Accommodationbathroom Fittings(D) Hand Shower In Wcs , 00069Modular Accommodationbathroom Fittings(E) Cock Tap Fittings , 00069Modular Accommodationbathroom Fittings(F) Flexible Hoses For Hot Water Connections (1.5 Mtr) Crimped At Either Ends , 00069Modular Accommodationbathroom Fittings(G) Shower Unit(H) Soap Stand(J) Curtain Rods(K) Soap Dispensar(L) Cloth Hanging Hooks(5 Each) , 00070Furnitureships Name Boardships Name Board To Be Manufactured As Per Sample And Fitted On Both Sides As Indicated By Ship Staff. Letters Are To Be Made In Both Hindi And English (Hindi Above Eng) From 2 Mm Thick Ss Plate And To Be Ni-Chrome Coated.Letters To Be Fixed On Good Commercial Teak Wood Board By M4 Csk Ss/ Wood Screws. Ss Will Provide Drawings , 00071Deck Fittingsrope Reels(A) Flange Plates Of 04 No Rope Reels Of Foxle/ Quarter Deck Deformed Heavily, Pawl And Ratchet Arrangement Broken And Plummer Bearings Jammed. To Be Repaired. Work Involves Renewal Of Plummer Bearings, Mfg & Fitment Of Pawl And Ratchet Arrangement As Per Sample And Removal Of Setting Of Deformed Flanges. Mat: Aluminium. Details Are As Follows:- , 00071Deck Fittingsrope Reels(B) Straightening/ Removal Of Deformation In Flanges Of Rope Reels , 00071Deck Fittingsrope Reels(C) Manufacture And Fitment Of Pawl And Ratchet Arrangement As Per Sample. Mat: Ms , 00071Deck Fittingsrope Reels(D) Renewal And Fitment Of Plummer Bearings Of Rope Reels , 00072Liferafttliferafttinspect And Test For Weigh Test, Flotaton Test, Drop Test, Lifting Test. Demand From Dockyard Replacement For Liferats Which Have A Balance Further Expected Life Of Less Than One Year, Stating In The Demand The Priority Of Supply. , 00073Habitabilityhabitabilitythoroughly Survey Of 40 Bunks Of Mess Decks/ Officer Cabins/ Captain Cabin. Jobs Invloves , 00073Habitabilityhabitability(A) Replacement/ Fitment Of Guard Rails Of Bunks Of All Bunks , 00073Habitabilityhabitability(B) Repair Of Steel Plates Of Bunks , 00073Habitabilityhabitability(C)Repair/ Replacement Of Bunks Supporting Structure , 00073Habitabilityhabitability(D) Relocation And Modification Of Bunks, Lockers, And Shoe Rack Dinning Table For Extra Space. , 00074Nwt Doorsnwt Door Mettalic Coating (A) Survey Door Structure/Door Frame For Deterioration/ Damage. Inspect Door Gaskets, Hinges, Locking Arrangements , Sliding Ways & Runners For Correctness. Repair/ Renew Asa Necessary. Check Clips And Hings For Looseness And Signs Of Wear. Renew Worn Out Parts As Necessay. , 00074Nwt Doors (Sliding)Nwt Doors (Sliding)(B) Sliding Channels Of Sliding Nwt Door Of Galley. Damaged. To Be Repaired/ Replaced. , 00074(C) Door Handles Of Galley And Ships Office Door Damaged. To Be Replaced , 00074Nwt Doors(D) Provision Store Door Handles Damaged. To Be Replaced. , 00075Portable H2s Gas Sensorportable H2s Gas Sensor Serviceability Checks/ Calibration Of Portable H2s Sensor Be Undertaken. , 00076Fixed H2s Gas Detection Systemfixed H2s Gas Detection System(A) Serviceability Checks/ Calibration Of Fixed H2s Gas Sensors Be Undertaken. , 00076Fixed H2s Gas Detection Systemfixed H2s Gas Detection System(B) Serviceability Checks Of Fixed H2s Gas Detection System Be Undertaken. Rectify If Any Defect , 00076Fixed H2s Gas Detection Systemfixed H2s Gas Detection System(C) Provisioning Of Back Up Supply Of Fixed H2s Gas Detection System Fitted In Stp And Mcr. , 00077Jack Staff/ Aft Staffjack Staff And Aft Staffthoroughly Hull Survey Of Jack Staff And Aft Staff Top Be Undertaken. Repair/ Renewal Of Pipes Be Undertaken If Any Defect Observed. Paint Renewal Be Undertaken After Hydroblasting Cleaning. , 00078Mfmb Laggingmfmb Laggingdegutting Of Mfmb Lagging For Hot Work/ Hull Survey And Regutting Post Completion Of Hot Work & Survey Be Undertaken At Indicated Location By Ss. , 00079Fairleadfairleadthoroughly Visual Survey Of Single Fairlead Of Both Port And Stbd Quaterdeck And Foxle To Be Undertaken. Necessary Defect Rectification Be Carried Out, If Any Defect , 00080Vertical Laddervertical Ladderthoroughly Visual Survey Of Vertical Ladder Of All The Compartment Be Undertaken. Following Job Involves: , 00080Vertical Laddervertical Ladder(A) Replacement Of Foot Steps, If Any Defect .Replacement Of Ladder Structure, If Any Defect , 00080Vertical Laddervertical Ladder(B) Inspect And Renew Treads- Deck Ladders. Inspect And Renew As Necessary, Poratable Alluminium Treads Of Between Deck Ladders. , 00080Vertical Laddervertical Ladder(C) Replacement Of Securing Eye And Deck Eye, Nuts & Bolt, If Any , 00081Vertical Ladderregalvanise Ladders Ladder Treads Of Galavanised Between Deck Laddrs To Be Rewelded And Ladders Regalvanished , 00082Between Deck Ladder Inclined Between Deck Ladder Thoroughly Visual Survey Of All The Inclined Between Deck Ladder Be Undertaken. Following Jobs Invloves: , 00082Between Deck Ladder Inclined Between Deck Ladder (A) Replacement Of Foot Steps With Provision Of Non-Skid, If Any Defect , 00082Between Deck Ladder Inclined Between Deck Ladder (B) Replacement Of Non-Skid Rubber Steps, If Any Defect , 00082Between Deck Ladder Inclined Between Deck Ladder (C) Replacement Of Securing Eye And Deck Eye, Nuts & Bolt, If Any Defect , 00082Between Deck Ladder Inclined Between Deck Ladder (D) Replacement Of Supporting Railing And Securing Arrangement, If Any Defect , 00083Supporting Rails Weather Deck Supporting Railthoroughly Visual/ Hammer Survey Of Weather Deck Support/ Guide Rails On Both Port & Stbd Catwalk Superstructure Plating Be Carried Out. Jobs Involve: , 00083Supporting Rails Weather Deck Supporting Rail(A) Replacement Of Supporting Pipes/ Rails On Both Port & Stbd Side, If Any Defect , 00083Supporting Rails Weather Deck Supporting Rail(B) Replacement Of Supporting Rail Bracket On Both Port And Stbd Side , 00084Naval Pipe Naval Pipe Thoroughly Visual/ Hammer Survey Of Naval Pipe Be Carried Out. Jobs Involve:(A) Cutting/ Welding/ Replacement Of Plates, If Any Defect , 00085House Pipe Hawse Pipe Thoroughly Visual/ Hammer Survey Of House Pipe Be Carried Out. Jobs Involve:(A) Cutting/ Welding/ Replacement Of Plates, If Any Defect , 00085House Pipe Hawse Pipe (B) Replacement Of House Pipe Cover, If Any Defect , 00086Gerracksmanufacturing Of Crca Racks In Ger Compartment For Securing Of Divator Sets. , 00087Crn 91Crn 91Repair/ Renewal Of Gunner Chair In Crn 91. Installtion Of Securing Arrangement Of Co2 Bottle In Crn 91. , 00088Miscmisc(A) Repair Of Windsoaks Stand . Nos 2(B) Replacement Of Captain Chair. Nos 1(C) Electroplating Of Emblem. Nos 03(D) Ships Bell Nos 01(E) Grse Board Nos 01 , 00089Misc Fittingsinstruction Talleydescription Plates And Instruction Talleys Of Following Equipments Damaged And Uprooted: (A) Single Arm Boat Davit. (B) Anchor Windlass. (C) Warping Capstan. (D) Iccp System. (E) Sewage Treatment Plant. (F) 4.7 M Rib. (G) Anchor Chain Cable. (Tallies To Be Manufactured As Per Sample. Mat- Brass). , 00090Wt Doorsrubber Beading(A) Rubber Beading Of Watertight Doors Damaged And Perished To Be Replaced With New Rubber Beading. Qty. - 100 Rmt. Mat. Silicon Rubber Beading. C418 , 00090Wt Doorsrenewals(B) Door Coaming Of Wt Doors On Upper Deck Corroded And Deformed. Renewal Of Doors To Be Carried Out Post Survey Of Structure. Mat - Ms/ Al, Qty-08 . , 00090Wt Doorsstructural Coaming(C) Structural Coaming Of Wt Door Corroded And Holed To Be Repaired/ Renewed. Mat. - Ms, Qty. - 06 , 00091Wt Hatchesretaining Springretaining Springs Of Wt Hatch Corroded And Broken To Be Repaired/ Renewed. Calibration Of Spring To Be Undertaken Post Repairs. Mat- Ms , Qty-12Nos. , 00092Scuttlesrenewals(A) Structure Coaming Of Scuttles Fitted On Superstructure Cracked/ Broken. Renewal Of Scuttles To Be Carried Out Post Survey. Mat - Brass, Qty. - 13 , 00092Scuttlesrubber Beading(B) Rubber Beading Of Scuttles Damaged And Perished To Be Replaced With New Rubber Beading. Qty. - 50 Rmt. Mat. Silicon Rubber Beading. , 00093Indicator Test Plugmanufacturing Indicator Test Plugs Of Wt Hatches And Doors Corroded And Damaged To Be Manufactured As Per Sample. Mat- Ss, Qty - 16. , 00094Bridge Windowsrenewals(A) Water Leakage Observed From Bridge Windows. Rubber Beading Damaged/ Perished. To Be Renewed. Qty. 40 Rmt. , 00094Bridge Windowsstructure Coaming(B) Structure Coaming Of Bridge Windows Corroded And Thinned To Be Repaired/ Renewed. Mat. - Al, Qty.- 07 , 00094Bridge Windowstoughened Glass(C) Bridge Window Glass Faded And Cracked To Be Renewed. Mat. - Toughened Glass. Qty. - 07. , 00095Window Wiperfresh Water Lineextension Of Fresh Water Line Of Window Wiper Over Bridge Windows On Both Port And Stbd Side. Material - Copper Lines. , 00096Bonding Strapsrenewalsbonding Straps Fitted On Weather Deck Fittings Damaged And Broken To Be Renewed Along With Securing Eye. Qty. - 200. Bonding Straps Will Be Provided By Ss. Mat- Ms & Al. , 00097Rope Reelrenewalsrope Reel Flange Fitted On Upper Deck Corroded And Perished To Be Repaired/ Renewed. Mat. - Ms, Qty. - 04 Nos. , 00098Air Treatment Unitatu Casing(A) Air Leakage Observed From Atu Casing And Body At Indicated Locations Needs To Be Arrested. Job Involves Repair Of Atu Casing And Renewal Of Rubber Coaming. , 00098Air Treatment Unitatu Filter(B) Atu Filters Corroded/ Damaged To Be Manufactured As Per Sample. Mat:- Frame-Gi, Wire Mesh-Copper. Qty - 02 , 00099Mushroom Headoverhauling(A) Spindle And Diaphram Of Mushroom Heads Jammed,Corroded, And Thinned. Work Involves Overhauling Of Mechanism And Renewal Of Rubber Beading. Mat- Ms, Qty - 09. , 00099Mushroom Headrenewals(B) Wire Mesh Of Mushroom Head Corroded And Broken. Wire Mesh To Be Renewed. Mat- Ms, Qty - 09. , 00099Mushroom Headrepair(C) Mushroom Head Cover Along With Foundation Thinned And Holed To Be Renewed. Mat- Ms, Qty - 09. , 00100Misc Fittingscupper Draindeck Drain Strainer Fitted On Upper Deck Corroded, Thinned And Broken To Be Manufactured And Welded Back In Situ. Mat - Ms, Qty - 10 Nos. , 00101Galley Drainage Pipe Lineoverhaulingdeck Drain Inside Ships Galley Covered With Deck Covering. Drain To Be Cleared. Work Involves De-Gutting Of Adjcent Area , Clearing Of Deck Covering And Application Of Deck Covering Post Repairs. Qty 05 Rmt. , 00102Deck Drainoverhaulingdeck Drain Line Of Junior Sailor Bathroom Clogged To Be Overhauled. Work Involves Removal, Cleaning And Refitment Of Pipe. Qty- 15 Rmt, Mat. - Ms. , 00103Wcrenewals Wcs Cracked/ Damaged To Be Renwed With New Wc Iaw Latest Guidelines. Qty. - 05 Nos. Mat- Ceramic/ Stainless Steel. , 00104Mirrorrenewalsmirrors Fitted In Bathroom Faded And Damaged To Be Renewed. Mat. - Ss 304 (0.9Mm Thick) Sheet, Qty -05 Nos. , 00105Wash Basinsecuring Bracketswash Basin And Securing Arrangement In Captain Cabin Bathroom, Dining Hall, Officers Bathroom, Junior Sailor Bathroom, Senior Sailor Bathroom And Ships Galley Damaged To Be Repaired. Mat - Ms. Qty- 06. , 00106Mfmb Laggingrenewalsmfmb Lagging At Indicated Locations(Bridge Near Window Glass, Radio Room And No Cabin, Dining Hall, Rope & Canvas Store And Messes) Perished To Be Renewed In Situ. Area - 100 Sqm , 00107Deck Coveringrenewalsdeck Covering Along With Dadoe Casting Cracked And Broken At Atu Compt, Stp, Officer Bath And Wc, Sr Sailor Bath And Wc Junior Sailor Bath And Wc, Ships Galley And Co Bathroom. Deck Covering To Be Renewed In Accordance With Ncd 3717 Issue 3. Area - 50 Sqm. , 00108Ss Paneling Renewalsss Paneling In Wet Compartment Damaged/ Perished To Be Repaired/ Renewed. Mat. Ss, Area- 50 Sqm. , 00109Crca Shoe Lockerrepairscrca Shoe Locker Fitted Below Bunks In Junior Sailor, Senior Sailor Mess And Officers Cabin Damaged/ Broken To Be Repaired/ Renewed. Work Involves Renewal Of Sliding Channel And Locking Mechanism. Qty. - 36 , 00110Chart Tablechart Tableexisting Chart Table Damaged And Corroded. Drawer Channel Damaged. Modification/ Renewal To Be Carried Out As Per Extra Space Available. Exiting Dimension - . Proposed Dimension - , 00111Habitability Gunnery Officeexisting Wooden Locker To Be Replaced With Crca Steel Iaw Nc/Policy/ H-121/ Equipment Dated 05 Apr 17. Size - 900X 1000X600mm, Qty - 01 , 00112Misc Furniturecrca Locker(A) Doors Of Crca Locker Fitted In Sailors Mess Uprooted From Hinges To Be Repaired/ Renewed. Qty. - 30. Size - 900X 1000 X 600Mm , 00112Misc Furnituremcr(B) Fixed Wooden Locker In Mer Broken And Perished To Be Repaierd/Renewed Along With Locking Arrangement In Situ. Mat - Crca, Qty- 02 Nos. , 00113Mortise Lockrenewalsmortise Locks Of Various Non Watertight Door Broken/ Damaged To Be Renewed. Make - Godrej, Qty. - 22 Nos. , 00114Hydraulic Door Closerrenewalshydraulic Door Closer Of Various Non Watertight Door Broken/ Damaged To Be Renewed. Make - Godrej, Qty. - 22 Nos. , 00115Kickout Panelrenewalskick Out Panels Of Nwt Door Damaged/ Perished To Be Manufactured And Fitted. Mat. - Crca, Qty. -22 Nos. , 00116Bathroom Doorrenewalsfour In No. Bathroom Door Alongwith Locking Mechanism Damaged And Not Closing Properly To Be Repaired/ Renewed. Mat. Crca (B15 And Equivalent), Qty - 02 Nos. , 00117Alleyway Doorrenewalsdoors In Main Alleyway, Gunnery Office And Mcr Along With Locking Mechanism Damaged And Not Closing Properly To Be Renewed. Mat. Crca (B15 And Equivalent). Qty - 05 , 00118Bridge Wing Doorrenewalsthree In No. Nwt Door Fitted In Bridge Alongwith Locking Mechanism Damaged And Not Closing Properly To Be Repaired/ Renewed. Mat. - Crca (B15 And Equivalent), Qty- 02 Nos. , 00119Ribrepair(A) Increase In Weight Of Rib Observed. Suspect Water Ingress From Bottom Hull. To Be Repaired. Work Involves Removal Of Collar And Deck Floor, Identify The Source Of Leakage And Defect Rectification.. , 00119Ribseating Arrangement(B) Seating Arrangement Along With Foundation Uprooted From Base To Be Renewed. Mat. Grp. Work Involves: - (I) Crop And Remove Old Seating (Ii) Eraction Of Grp Foundation (Iii) Install New Seating Arragngement As Per Exisiting Arrangement.(Iii) Renew Covers Provided For Stowage Along With Hinges. , 00119Ribrib Cradle(C) Seating Of Rib Cradle Damaged/ Perished To Be Renewed. Mat. Soft Wood With Sponge And Canvas Cover. , 00120Rope Reelrenewals(A) Rope Reel Flange Fitted On Upper Deck Corroded And Perished To Be Repaired/ Renewed. Mat. - Ms, Qty. - 04 Nos. , 00120Rope Reelrenewals(B) Rope Reel Foundation Structure Corroded Thinned And Holed To Be Repaired / Renewed. Mat. - Ms, Qty. - 04 Nos. , 00121Pvc Guard Railsrenewals10 Mm Pvc Guard Rails Near Gangway And Quarter Deck Damaged And Broken. Assistance Required For Crimping Of Pvc Guard Rails With Tulips. Qty-54 Nos. , 00122Bonding Strapsrenewalsbonding Straps Fitted On Weather Deck Fittings Damaged And Broken To Be Renewed Along With Securing Eye. Qty. - 200. Bonding Straps Will Be Provided By Ss. Mat- Ms & Al. , 00123Deck Eyesrenewalsdeck Eyes Fitted On Weather Deck Thinned And Perished To Be Renewed. Mat - Ms, Qty. - 20 , 00124Electroplatingelectroplatingthe Following Ceremonial Fittings To Be Electroplated: - , 00124Electroplatingelectroplatingthe Following Ceremonial Fittings To Be Electroplated: - (A) Ships Bell - 02 Nos. , 00124Electroplatingelectroplatingthe Following Ceremonial Fittings To Be Electroplated: - (B) Cremonial Dice Stanchions - 08 Nos. , 00124Electroplatingelectroplatingthe Following Ceremonial Fittings To Be Electroplated: - (C) Ceremonial Stanchion Securing Chain - 12 Nos , 00124Electroplatingelectroplatingthe Following Ceremonial Fittings To Be Electroplated: - (D) Emblem- 03 Nos. , 00124Electroplatingelectroplatingthe Following Ceremonial Fittings To Be Electroplated: - (E) Ships Name Plate- 02. , 00124Electroplatingelectroplatingthe Following Ceremonial Fittings To Be Electroplated: - . (G) Ships Commisioning Plate- 01. , 00125Brass Talleyframe Station Frame Station Tallies Fitted On Weather Deck Corroded And Thinned To Be Manufactured And Fitted. Qty - 44 Nos. , 00126Small Arms Postoverhauling And Renewalsrotating Mechanism Of Lmg At Quarterdeck To Be Renewed. Qty- 01. , 00127Minor Platformrenewalscat Walk Structure And Railing To Be Erected On Superstructure In Front Of Bridge For Accessing Windows From Superstructure. Work Involves:- Manufacture Of Metallic Grating Of Width 400 Mm Covering Entire Bridge Window. Length- 10 M(40 Rungs) , 00128Towing Hookoverhaulingtowing Hook Assembly On Quarter Deck Corroded And Jammed. Heating Assisstance Required. Mat. - Ms, Qty. - 01 No. , 00129Grenade Ru Lockerrenewalsru Locker Fitted On Weather Deck Corroded/ Thinned. To Be Manufactured As Per Specifications In Art 1209 Inmer Vol I. Work Involves Manufacturing Of Ru Locker With Lagging Internally And Have Sheet Metal Cladding Fitted Over The Tops And Sides To Form A 25 Mm Air Gap For Full Circulation Of Air. Qty One. Auth Ihq Mod (N) Letter Wp/2664 Dated 08 Jul 15. , 00130Watertight / Gt Control Marking Paintingpainting Of Watertight And Gas Tight Markings ( Alphabets) Namely X/Y/Z And A/M/R On All Wt Doors, Wt Hatches, Mushroom Head And Vent Flaps To Be Undertaken As Per Existing Policy. Qty - 100 Nos. , 00131Key Boardrepairrepair Of Existing Keyboards To Be Undertaken. Qty Required - 04 Nos. Defects Are - Locking Arrangement And Faded Sunmica Duplicate Key Board In Main Alleyway, Electrical Key Board, Engine Room Key Board, Exo Cabin , 00132Gangway Apronrenewals02 Sets Gangway Apron Damaged/ Perished. Length 09 Mtr, Width -01 Mtr. Material : Synthetic With Screen Printing. , 00133Wooden Gratingsrenewalswooden Gratings For Securing Of Hawsers, Larne Target Rope And Shore Supply Cable Damaged To Be Maunfactured. Mat. - Wood With Grp Coating, Qty. - 08. Size 1000Mm X 1000Mm , 00134Penant Nopaintingpainting Of Penant No. To Be Carried Out As Specified By Ship Staff As Per Existing Policy. , 00135Flag Lockerrenewalsdoors Of Flag Locker Fitted In Flag Deck Corroded And Holed To Be Renewed Along With Locking Mechanism As Per Drawing. Mat - Aluminium. , 00136Fresh Water Linerenewalsfresh Water Pipe Line In Bridge And Bridge Wing Along With Securing Brackets Corroded And Thinned. To Be Renewed. Mat. - Cu-Ni, Qty. - 10 Rmt , 00137Gangway State Boardrepairswooden Gangway Stateboard Damaged And Broken To Be Repaired Along With Stand. Mat - Wood, Qty - 04. , 00138Portable Ff Extinguishersecuring Bracketssecuring Brackets Of Following Portable Extinguisher Corroded And Perished To Be Manufactured And Fitted. Mat. - Ms, (A) 9 Ltr Afff - 20 Nos. (B) 2 Kg. Co2 - 15 Nos. (C) 10 Kg. Dcp - 02 Nos. , 00139Ba Controller Boardrenewalsba Controller Board Of Ship Damaged/ Broken To Be Manufactured As Per Specifications. Mat. Wood. , 00140Load Testingmisc Structure And Fittings(A) Bollards (16 Nos.) , 00140Load Testingmisc Structure And Fittings(B) Towing Bollard (01 No.) , 00140Load Testingmisc Structure And Fittings(C) Cleats (12 Nos.) , 00140Load Testingmisc Structure And Fittings(D) Fairleads (10 Nos.) , 00140Load Testingmisc Structure And Fittings(E) Bullring (02 Nos.) , 00140Load Testingmisc Structure And Fittings(F) Deck Clenches ( 02 Nos) , 00140Load Testingmisc Structure And Fittings(G) Cable Clench (02 Nos.) , 00140Load Testingmisc Structure And Fittings(H) Towing Hook (01 No.) , 00140Load Testingmisc Structure And Fittings(J) Towing Pendant (02 No.) , 00140Load Testingmisc Structure And Fittings(K) Towing Shackle (01 No.) , 00140Load Testingmisc Structure And Fittings(L) Bottle Screw Slip Deck Eye (02 No.) , 00140Load Testingmisc Structure And Fittings(M) Bottle Screw Slipd Shackles (02 Nos.) , 00140Load Testingmisc Structure And Fittings(N) Anchor Strop (02 Nos.) , 00140Load Testingmisc Structure And Fittings(P) Deck Eyes Of Anchor Strop (04 Nos.) , 00140Load Testingmisc Structure And Fittings(Q) D Shackle For Anchor Strop (04 Nos.) , 00140Load Testingmisc Structure And Fittings(R) Deck Eye(Foxle) (04 Nos.) , 00140Load Testingmisc Structure And Fittings(S) Deck Head Eye (Stp Lobby) (01 No.) , 00140Load Testingmisc Structure And Fittings(T) Ships Brow Aluminium (Small & Large) , 00140Load Testingmisc Structure And Fittings(U) Towing Hawser 48 Mm Pp Rope , 00140Load Testingmisc Structure And Fittings(V) Berthing Hawser Pp Rope , 00140Load Testingmisc Structure And Fittings(W) Larne Target Pp Rope , 00140Load Testingmisc Structure And Fittings(X) Pvc Coated Wire Rope (Guard Rail) (54 Nos.) , 00140Load Testingmisc Structure And Fittings(Y) Snatch Block (02 Nos) , 00140Load Testingmisc Structure And Fittings(Z) Llt Line (150 Mtr) , 00140Load Testingmisc Structure And Fittings(Aa) Messenger Line (110 Mtr) , 00140Load Testingmisc Structure And Fittings(Ab) Easing Out Recovery Rope (80 Mtr) , 00140Load Testingmisc Structure And Fittings(Ac) Distance Line (66 Mtr) , 00140Load Testingmisc Structure And Fittings(Ad) Life Line (36 Mtr) , 00141Canvas Coverrenewalscanvas Covers Of Crn 91 Gun, Lrad, Mushroom Heads, Anchor Windlass, Boat Davit Motors Perished. To Be Renewed. Mat- Canvas. Qty-09. , 00142Sea Boat Roperenewalsthimble Of Sea Boat Rope Of 4.7 Mtr Rib Corroded And Thinned. To Be Manufactured. Mat- Ms. Qty- 01. , 00143Wt Bulkheadrepairscorrosion And Pitting Observed Near Bimetallic Joint Of Port Side Bulkhead Of Stp Lobby. To Be Renewed. Mat- Ms. , 00144Misc Structrucal Fittingsrenewalsmanufacturing And Fitment Of Lockers In Electrical Office, Junior Sailor Mess, Senior Sailor Mess, Ships Office, Mcr And Dining Hall. Mat- Crca. Qty- 25. Wooden Table Tops To Be Changed With Crca. Qty- 05. , 00145Metallic Coversrenewalsmetallic Covers Of Anchor Windlas Motor, Capstan, Boat Davit Motors Corroded/ Holed/ Damaged. To Be Manufactured As Per Sample. Mat- Ms/ Gi Sheet. Qty-05. , 00146Securing Clampsrenewalssecuring Clamp Of Drain Lines Corroded/ Thinned. To Be Manufactured. Mat- Ms/ Al. Qty- 25 , 00147Wt Bulkheadsrepairspiercing Observed On Wt Bulkhead Of Stp Compartment And Dining Hall. To Be Repaired. , 00148Single Arm Boat Davitrepairsstructure Of Boat Davit Corroded/ Thinned And Holed. To Be Repaired. Mat- Ms. , 00149Fisherman Platesrenewalsmanufacturing Of 02 In No Fisherman Plates As Per Sample. Mat- Ms. Qty- 02. , 00150Partition Bulkheadsrenewalsgaps Between Partition Bulkheads To Be Covered. Job Involves Manufacturing And Fitment Of Frames. Qty- 20 Sqm. , 00151Inclining Laddersrenewalsrenewal Of Wooden Back Of Dining Hall Ladder. To Be Replaced With Metallic Sheet.Qty- 2 Sqm , 00152Habitability Repairsremoval Of Old Panel Supporting Brackets In Mcr And Fitment Of New Clamps For Securing Of Trunking. Qty- 04. , 00153Ventillation Arrangementgrease Filters02 In Nos Grease Filters Of Galley Damaged . To Be Manufactured As Per Sample. Mat- Frame- Gi, Wiremesh- Copper. , 00154Nwt Doorsrubber Beadingrubber Beading Of 05 In Nos Nwt Doors Perished. To Be Renewed. , 00155Garbage Disposal Unitrenewalsreplace Pulveriser Cutter Blades And Strainer Of Garbage Disposal Unit In Ships Galley Washbasin , 00156Misc Fittingsdining Hall Tabledining Hall Table In Dining Hall Damaged. To Be Renewed. Mat- Ss , 00157Fixed Shoring Arrangementrenewalsfixed Shoring Arangement At 11 Location Damaged/Perished. To Be Renewed. Mat- Ms. Qty- 11. , 00158Misc Fittingsmagazinemanufacturing And Fitment Of Additional Small Arm Racks On Port Side And Detonator Locker. Qty- 04. , 00159Igla Lockerrepairsigla Lockers Corroded/ Thinned And Holed. To Be Repaired . Mat- Ms , 00160Crn 91 Gunrepairsturret Platform Corroded, Thinned And Holed. To Be Repaired/ Renewed. Mat- Al , 00161Misc Fittingsgermanufacturing And Fitment Of Small Arms Racks For Lmg, Mmg, Hmg, 716 Sig Rifle And Securing Arrangement For Boxes With Butterfly Nuts. Qty- 22. , 00162Mosum Postchange Of Locationlocation Of Mosum Post To Be Changed. Mat- Ms. Qty- 02. , 00163Rollersrenewalsrollers For Guiding Anchor Chain Cable And Rope Corroded .To Be Renewed. Qty- 06. , 00164Fairleadrenewalsfairleads To Be Renewed As Per New Dimensions, Diameter Of Fairlead At Quarterdeck For Towing To Be Increased. Qty- 11. , 00165Misc Fittingssecuring Arrangementboxes In Rope And Canvas Store And Deck Store To Be Manufactured Andsecured With Butterfly Nuts.. Qty-10. Mat- Gi Sheet. , 00166Cable Lockerswoodenwood Of Cable Lockers Damaged. To Be Renewed. Area- 3 Sqm , 00167Misc Fittingsbridgewooden Furniture In Bridge Is To Be Replaced With Crca As Per Change Management Policy. , 00168Quartermaster Tablerenewalsgangway Quartermaster Table Broken. To Be Renewed.Mat- Wood. Qty- 01. , 00169Bridge Wing Pilorousheight Extensionheight Of Bridge Wing Pilorous Sight To Be Increased. Qty- 02. , 00170Gyrogyro Standlocation Of Gyro Stand To Be Changed Towards Aft Part Of Bridge. Job Involves Removal Of Existing Post And Fitment Aft Part Of Bridge As Observed During Ost 22. , 00171Bunksrenewalsbunks In Accomodation Spaces To Be Replaced With New Bunks. Mat- Crca. Qty-34 , 00172Wardroomrenewalsrenewal Of Sofa Set And Table In Wardroom. Mat- Crca/ Wood. Qty- 02 , 00173Co Cabinrenewalsrenewal Of Lockers And Table In Co Cabin. Mat- Wood. Qty- 04. , 00174Officers Cabinrenewalsrenewal Of Lockers And Table In Exo Cabin, Eo Cabin And No Cabin. Mat- Crca. Qty- 08. , 00175Notice Boardrenewals02 In Nos Notice Boards In Junior Sailor Dining Hall And Main Alleyway Damaged. To Be Renewed. Mat- Teak Ply. Qty- 02 , 00176Garbage Disposal Unitgarbage Disposal Unitgarbage Disposal Unit In Galley Not Working And Leakage Observed From Joints. Repair Of Gdu And Leakage Cheks And Repair To Be Carried Out. Qty - 01 Nos. , 00177Crca Lockercrca Locker1. Glass Of Crca Lockers Brokent. To Be Replaced. Location - Galley. Qty Of Glass - 04 Nos. , 00178Qtr Master State Boardsrenewalsrenewal Of Qtr Master State Boards And Stands As Per Sample. Material - Wood. Qty - 02 Nos. , 00179Ships Browrepairrepair Of Ships Brow. Material - Aluminium. Qty - 02 Nos. , 00180Stp Tank Exhaust Pipestp Tank Exhaust Pipe Corroded And Thinned. Repair/ Renewal To Be Carried Out. Location - Port Catwalk , 00181Wind Socs Baserenewalswind Socs Base Heavily Corroded And Thinned. Repair/ Renewal To Be Carried Out. , 00182Search Lightrenewalssearch Light Base Heavily Corroded And Thinned. Renewal To Be Carried Out. Location - Bridge Top. , 00183Quartermaster Chairrenewalsexisting Quartermaster Chair Damaged.Quartermaster Master Chair In Bridge To Be Renewed As Per Dimension/ Sample. Dimensions - , 00184Miscellaneousmiscellaneousassistance For Cutting Redundant Fittings At Various Locations. Bridge, Stbd & Port Bridge Wing. , 00185Magnetic Compassmagnetic Compassvibrations Observed On Magnetic Compass. Modification/ Repair Of Securing Arrangment Of Magnetic Compass Base. Welding Required. Location - Bridge , 00186Met Instrument Boxrenewalsrenewal Of Met Instrument Box As Per Dimensions - . Material - Aluminium , 00187Co Chairrenewalsrenewal Of Commanding Officers Chair In Bridge. , 00188Bridge Electrical Panelrenewalsrenewal Of Cover Plate Of Bridge Console Panels. , 00189Misc.Main Broadcast Boxassistance For Securing Of Main Broadcast Con Box In Bridge. , 00190Crcacrca Lockerfabrication Of Door Below Throttle Console And Nlcb Panel. Location - Bridge. , 00191Misc.Supporting Rod(A) Welding Of Supporting Rod Near Chart Table. Locaiton - Bridge , 00191Misc.Transformer Box(B) Renewal Of Transformer Box In Port Bridge Wing. Material - Ms. Dimensions - , 00191Weather Deck Lockers And Boxes(C) Fitment Of Flat Rubber Beading In Weather Deck Lockers And Boxes Including Pol Locker , 00192Paintingships Browpainting Of The Following : - (A) Ships Brow. , 00192Paintingships Brow(B) Ceremonial Life Buoy , 00193Ceremonial Lifebuoyceremonial Lifebuoyrope Renewal And Cloth Change Of Ships Ceremonial Lifebuoy , 00194Wooden Boardswooden Boardsmanufacturing Of Following Boards To Be Undertaken - , 00194Wooden Boardswooden Boardsmanufacturing Of Following Boards To Be Undertaken -(A) Machinery State Board , 00194Wooden Boardswooden Boardsmanufacturing Of Following Boards To Be Undertaken - (B) Met State Board , 00194Wooden Boardswooden Boardsmanufacturing Of Following Boards To Be Undertaken - (C) Locflot State Board , 00195Serviceability Checksserviceability Checksserviceability Checks Of The Following Equipments To Be Undertaken. , 00195Serviceability Checksserviceability Checksserviceability Checks Of The Following Equipments To Be Undertaken.(A) Roll And Pitch Indicator , 00195Serviceability Checksserviceability Checksserviceability Checks Of The Following Equipments To Be Undertaken.(B) Inclinometer , 00195Serviceability Checksserviceability Checksserviceability Checks Of The Following Equipments To Be Undertaken.(C) Batton Buoy , 00195Serviceability Checksserviceability Checksserviceability Checks Of The Following Equipments To Be Undertaken.(D) Sextent , 00195Serviceability Checksserviceability Checksserviceability Checks Of The Following Equipments To Be Undertaken.(E) Lrf , 00195Serviceability Checksserviceability Checksserviceability Checks Of The Following Equipments To Be Undertaken.(F) Binoculars , 00195Serviceability Checksserviceability Checksserviceability Checks Of The Following Equipments To Be Undertaken.(G) Nvd , 00195Serviceability Checksserviceability Checksserviceability Checks Of The Following Equipments To Be Undertaken.(H) Bearing Sight , 00195Serviceability Checksserviceability Checksserviceability Checks Of The Following Equipments To Be Undertaken.(J) Distance Meter , 00196Misc.Metallic Lockers(A) Equipment Rack Modification In Radio Room , 00196Misc.Metallic Lockers(B) File Rack Modification In Radio Room , 00196Misc.Metallic Lockers(C) Ncn (Tmfoc) Rack Modification On Flag Deck , 00196Misc.Metallic Lockers(D) Egg Locker Modification On Flag Deck , 00196Misc.Metallic Lockers(E) Ru Locker Modification On Flag Deck , 00196Misc.Metallic Lockers(F) Ru Locker Manufacture As Per Sample , 00196Misc.Metallic Lockers(G) Flag Locker Modification On Flag Deck , 00196Misc.Metallic Lockers(H) Alteration Of Racks In Radio Room , 00196Misc.Racks(J) Racks Modification In Deck Store , 00196Misc.Racks(K) Gun / Ammunition & Vbss Racks Alteration In Ger , 00196Misc.Racks(L) 51 Mm Mortar Foundation Degutting From Port & Stbd Catwalk And Rewelding On Bridge Top Port & Stbd , 00196Misc.Racks(M) Ru Locker Wooden Batten Modification As Per Inmer And Replacement Of Rubber Beading , 00196Misc.Racks(N) Modification And Relocation Of Mmg Post On Flag Deck Work Involves Degutting And Welding Of The Same , 00196Misc.Racks(P) Manufacture Of Wooden Gratings As Per Sample , 00197Machinery Spaces And Workshopsstructural Examination Of Compt.Examine Structure Not Covered By Lagging Or Deck Coverings, Paying Particular Attention To Decks, Deck Boundaries And Lower Areas Of Ships Side, Bulkheads (Ensuring All Limber Holes Are Clear) And Areasaround Side Scuttles. Portable Or Semi Portable Fittings That Obscure Structure Are To Be Removed For Examination Of Structure Behind. Structure Revealed By The Removal Of Semi -Portable Fittings Is To Berecoated As Per Approved Paint Scheme Before The Fittings Are Replaced , 00198Ventilation Systemventilation System Checksthoroughly Examine Exhaust Ventilation Trunking And Any Areas Liable To Be In Contact With Acid. Where Acid Resisting Composition On Structure Has Deteriorated, Clean By Hard Scraping And Wire Brushingfollowed By Washing With Dilute Caustic Soda Solution And Then Fresh Water. Thoroughly Dry These Exposed Surfaces And Recoat.Thoroughly Examine Lead Lined Sinks And Bench Tops For Fracture Or Wear.Note: - Caustic Soda Is On No Account To Be Used For Cleaning Intact Paint Surfaces. , 00199Funnelfunnelexamine Funnel Casing Both Internal And External, Paying Particular Attention. Examine Eye Plates And Surroundings Structure For Evidence Of Corrosion/ Pitting.Examine Funnel Structure And Semi Portable Fittings That Obscure Structure Are To Be Removed And To Be Recoated Before The Fittings Are Replaced In Accordance With Ncd, No 53/16 And Policy Directives. , 00200Electrical Compt.Structural Surveysurvey The Structure Including Dadoes,Decks, Deck Boundries, Lower Portion Of Bulkhead Ship Side For The Trace Of Corrosion And Flaking Of Paint. Carry Out Rectification Accordingly. , 00201Apt Clustersconduct Of Apt(A) Conduct Apt And Identify The Defects (Apt )May Be Carried Out Either By Vacuum Or Pressure Method Iaw Para 44 Of No 01/15. Note: All Outstanding Defects Affecting Water Tight Integrity Of W/T Compartments/ Clusters/ Tanks, Are To Be Projected In Defect List , 00201Tanks, Cofferdams , Seatubes(B) All Tanks, Cofferdams And Sea Tubes Which Are Repaired By Build-Up/Renewal Or Are Subjected To Hot Work For Welding Of Pad Piece/ Foundation On Any Of Their Boundaries Are To Be Air Pressure Tested. The Pressure Applied Should Never Exceed That Which Corresponds To A Pressure Of 0.2 Kg/Sq Cm (2Meters Of Water Or 0.20 Bars Or 2.1/2 Ibf/ Sq In). (14 Sea Tubes, 25 Obds, 04 Iccp Cofferdam, 01 Tank Cofferdam, 02 Void Space (Port & Stbd) & 09 Tanks , 00202Gduoverhaul And Repairoverhaul Complete Garbage Disposal Unit Including Pump And Pulveriser Motors. Renew All Gland Packings Seals, Pulveriser Cutter Blades,Strainers And All Worn Out Parts. Location - Galley , 00203Wt Doorsstructural Examination And Repair(A) Examine All Wt/Doors And Check Their Clips/Clips Mechanism For Looseness, Hinges For Excessive Play And Wedge Pieces For Sign Of Wear. Also Check Locking Arrangement Teflon/Neoprene Washer Washers, Toroidal Sealing Rings And Rubber Sealings For Warrant/Defects. Raise Specific Defects To Dockyard For Repairs. Wt Hatch - 12, Ees - 02, Wt Door - 12, Manholes - 12 , 00203Integrity Test(B) Carry Out Watertight Integrity Test Of All W.T. Doors Using Ultrasonic Leak Detector (Uld) Device. Identify The Leakages Through Watertight Seals With The Help Of Ultrasonic Leak Detecor And Raise Specific Defects To Yard For Rectification, If Any. Wt Hatch - 12, Ees - 02, Wt Door - 12, Manholes - 12 , 00204Nwt Doorsinspection And Repaircheck Clips, Hinges For Looseness, Locking Arrangement And Any Other Components For Wear And Damage. Examine Condition Of Rubber Gaskets, Door Structure And Kick Out Panel. Renew Worn Out/ Damaged Parts As Necessary , 00205Hatches & Manholeshatches & Manholes(A) Examine All Hatches And Check Their Clips, Closing Mechanism, Hinges For Looseness, Spring Mechanism, Hatch Holding Sliding Mechanism/ Retaining Clip And Wedge Pieces For Signs Of Wear And Worn Out. Check Neoprene/ Teflon Washers, Toroidal Sealing Rings, Rubber Sealings And Other Structural Damage/ Defects. Renew All Worn Out Parts As Necessary. Wt Hatch - 12, Ees - 02, Wt Door - 12, Manholes - 12 , 00205Hatches & Manholeshatches & Manholes(B) Carry Out Watertight Integrity Test Of All W.T. Hatches Using Ultrasonic Leak Detector (Uld) Device Post Rectification Of All Defects In The Presence Of Ss/Trial Agency. Wt Hatch - 12, Ees - 02, Wt Door - 12, Manholes - 12 , 00206Furnitureupholstery And Matteresses(A) Replace All Partition, Furniture Upholstery, Matteresses, Awnings Etc. And Repair/ Replace.Bunks - 39 & Awnings - 8 , 00206Furnituremess Furnitures(B) Survey The Following And Repair:(I) Bunks - Nos. 39(Ii) Lockers - 90(Iii) Chairs - 20(Iv) Stools - 10(V) Tables - 8(Vi) Ladders - 8Note:- Wood And Fabrics To Be Treated With Fire Retardant Chemicals Fr 881 And Fr 891 Respectively. , 00206Furniturecrca Locker(C) Renewal Of All Cupboards. Mat - Crca , 00207Laddersvertical Laddersregalvanise Ladders. Treads Of Galvanised Between Deck Ladders To Be Rewelded And Ladders Regalvanised , 00208Misc. Fittingsbrows Structural Survey And Repairbrows Are To Be Examined, Repaired As Necessary. Dockyard Testing Not More Than 16 Months.Note: Brows Are To Be Tested At The First Opportunity After Any Repairs Carried. , 00209Accomodatoin Spacesinspection Of Structure(A) Examine Structure Paying Particular Attention To Deck Boundaries, Lower Areas Of Ship-Sides/ Bulkheads (Dadoes) And Area Around Side Scuttles For Sign Of Corrosion, Pitting And Structural Weakness. Raise Specific Defect To Dockyard For Repairs And Renewal. Yard To Undertake Defect Rectification Of Projected Areas.List Of Compartments.Note:- Structural Defects Observed During Periodical Internal Survey Of Structure To Be Included In Defect List Together With A List Of Items, Fittings, Equipment And Lagging Which Will Be Required To Be De-Gutted/ Remove By Yard To Facilitate Survey. , 00209Accomodatoin Spacesstructure Covered With Underlay/ Insulation(B) Undertake Survey Of Mess Decks, Cabins And Offices In Accordance With No 01/15 And Ihq Mod (N)/ Dna Letter Nc/7631 Dated 01 Nov 22 As Mentioned:-Structure Covered With Underlay/ Insulation - Survey Of The Condition Of Underlay / Insulation Is To Be Carried Out. The Deck Covering Be Inspected For Cracks, Bulging/ Undulation, Mechanical Damage, Discoloration Etc. In Case Of Damage Observed, The Structure Underneath To Be Visually Surveyed Post Removal Of Underlay/ Insulation Of Affected Area. , 00209Accomodatoin Spaces(D) Usg Of Areas Found Corroded During Visual Survey, If Required. , 00209Accomodatoin Spacesunderlay And Without Underlay Compt. Inspection(E) 100% Visual And Usg Survey Of Dadoe Areas Of Wt Bulkheads At Each Deck Below Waterline , 00210Galley & Dining Hallgalley & Dining Hallsample Visual Survey Of Decks And Bulkhead Dadoes To Be Carried Out To Ascertain The Material State. Work Involves Degutting/ Removal Of Microtek Underlay At Indicated Locations And Relaying The Same On Completion Of Survey. Size Of Sample Microtek Underlay:2 Ft X 1Ft; No Of Samples: 02 Samples Each. Work Involves Removal Of And Refitment On Completion Of Survey/ Repairs. Ss Panneling , 00210Galley & Dining Hallgalley & Dining Hall(A) Visual And Hammer Survey Of Decks And Bulkhead Dadoes In Galley And Dining Hall At Indicated Sample Locations. , 00210Galley & Dining Hallgalley & Dining Hall(B) Renewal Of Defective Areas:- Areas Found Weak/ Degraded/ Deteriorated During The Structural Survey Are To Be Cropped By Approppriate Methods And Renewed. Material: Ms , 00210Galley & Dining Hallgalley & Dining Hall(C)Provisioning Of Inspection Window Along With Locking Mechanism Iaw Ihq Mod(N) Directives On Paneling. , 00210Galley & Dining Hallgalley & Dining Hall(D) Application Of Deck Covering In Dining Hall Iaw Ihq Directives , 00210Galley & Dining Hallgalley & Dining Hall(E) Provisioning Of Inspection Window Along With Locking Mechanism In Ward Room Iaw Ihq Directives On Paneling Note 1:- Job Includes Degutting And Regutting Of Lagging, Ss Panneling, Garbage Diposal Unit, Deep Freezer, Cooking Range And Other Portable/ Semi-Portable Fittings Etc. In Way Of Sample Areas Of Survey And In Way Of Structural Repairs. Fittings That Are Damaged During The De-Gutting Are To Be Renewed And Refitted In Situ Note 2:- Testing Of All Weld Joints By Dye Penetrant Test Once After Completion Of Root Run And Finally On Completion Of All Weld Runs Followed By Water Hose Test (3 Kg Pr)Note 3:- A Detailed Survey Report Of Structure Along With Recommendations For Repair/ Renewal Is To Be Prepared And Submitted For Necessary Action. The Structural Renewals Are To Be Marked On Deck Plans For Information And Record.
Basic Detail
Tender No GEM/2026/B/8252412
Bidding Type Tender
Location
City Visakhapatnam
State Andhra Pradesh
Key Dates
Publish Date 13 Nov 2026
Submission Date 14 Dec 2026
Open Date 15 Dec 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 1.03 Crore
Exemption Not Available
Document List
d3f5ccbf-efae-4514-b9c6-5edabd3e3c5c.pdf
1794026640.xlsx
1794026666.pdf
1794026670.pdf
1794557717.pdf
1794557742.pdf
1794557768.pdf
1794557785.pdf
1794558734.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 13, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 14, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 30 days
Dec 15, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 31 days

Tender Documents

Download All (ZIP) ↓
pdf

d3f5ccbf-efae-4514-b9c6-5edabd3e3c5c.pdf

xlsx

1794026640.xlsx

pdf

1794026666.pdf

pdf

1794026670.pdf

pdf

1794557717.pdf

pdf

1794557742.pdf

pdf

1794557768.pdf

pdf

1794557785.pdf

pdf

1794558734.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender