Tender For Shifting, Reerection And Re Routing Of Existing 33Kv Take Off Structure And 33 Kv 1X630 Sq.Mm Ug Cable From Its Existing Location To A New Locations In Existing 33 Kv Korattur I Feeder Fed Off From 110/33 Kv Korattur
Tender Overview
Project Description
Tender for Shifting, Reerection And Re Routing Of Existing 33Kv Take Off Structure And 33 Kv 1X630 Sq.Mm Ug Cable From Its Existing Location To A New Locations In Existing 33 Kv Korattur I Feeder Fed Off From 110/33 Kv Korattur
BOQ
| Sl. No. | Item Description |
| 1 | Supply,laying and commisioning of PSC 9.0mtr 400KG WL pole including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting,laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 2 | Road B |
| 3 | Supply,laying and commisioning of Base Plate PSC including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 4 | Road B |
| 5 | Supply,laying and fixing of 33 KV Structure Materials with Clamp including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 6 | Road B |
| 7 | Supply,laying and fixing of DPDC Channel Cross Arm including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 8 | Road B |
| 9 | Supply,laying and fixing of 33 KV Tapping channel cross arm including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 10 | Road B |
| 11 | Supply,laying and fixing of 33 KV \\"V\\" cross arm including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 12 | Road B |
| 13 | Supply,laying and fixing of 33KV HT TI Fitting including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 14 | Road B |
| 15 | Supply,laying and fixing of 33KV Pin With Insulator including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 16 | Road B |
| 17 | Supply,laying and fixing of 33KV Polymer composite Disc including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 18 | Road B |
| 19 | Supply,laying and fixing of Metal parts including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 20 | Road B |
| 21 | Supply,laying and fixing of Back Clamp For PSC Pole including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 22 | Road B |
| 23 | Supply,laying and fixing of Structure Concreting including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 24 | Road B |
| 25 | Supply,laying and fixing of Structure Earthing including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 26 | Road B |
| 27 | Supply,laying and fixing of ACSR DOG Conductor for busbar & Jumpering -60m+Busbar between BS &CS Dp-40m) including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 28 | Road B |
| 29 | Supply,laying and fixing of Insulator including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 30 | Road B |
| 31 | Supply,laying and fixing of Stay Set complete including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 32 | Road B |
| 33 | Supply,laying and fixing of Bolt & Nut including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 34 | Road B |
| 35 | Supply,laying and fixing of Cross Bracing Set including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 36 | Road B |
| 37 | Supply,laying and fixing of 33 KV 1x630 sq.mm UG Cable including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 38 | Road B |
| 39 | Supply,laying and fixing of 33 KV 1x630 sq.mm Straight Joint Kit including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 40 | Road B |
| 41 | Supply,laying and fixing of 33 KV 1x630 sq.mm OD Termination Kit including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 42 | Road B |
| 43 | Supply,laying and fixing of 33 KV cover slab including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 44 | Road B |
| 45 | Supply,laying and fixing of Labour Charges by Trenchless method including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications |
| 46 | Road B |
| 47 | Calculation of SubTotal, GST and Total Amount carried out by system automatically |
| 48 | Basic cost of value put to tender as per estimate |
| 49 | Add GST at 18% |
| 50 | Total Value put to Tender |
| 51 | Quoted value |
| 52 | Final Quoted Value |
| 53 | Add GST at 18% of Final Quoted Value |
| 54 | Total Value of Contract Including 18% of GST Basic cost of value put to tender as per Estimate Please Enable Macros to View BoQ information |
| 55 | Total Value of Contract Including 18% of GST Basic cost of value put to tender as per Estimate Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender