Tender For Preparing detail project report For Construction Of Bocharo To Pahadiya Main Road Via Bocharo ,Sarwahi Khurd, Bhamarha First, Raspur,Uksa Khadda,Dandi Tola Dhodha,Kudara, Belha,Palha, Jamudi Khadgadi & Other Various Roads In Sub Division B
Tender Overview
Project Description
Tender for Preparing detail project report For Construction Of Bocharo To Pahadiya Main Road Via Bocharo ,Sarwahi Khurd, Bhamarha First, Raspur,Uksa Khadda,Dandi Tola Dhodha,Kudara, Belha,Palha, Jamudi Khadgadi & Other Various Roads In Sub Division Beohari Division Shahdol Length 55.00 Km(Sor Date- 11.04.2025) Pac Rs-16.94 Lacs
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 13-Nov-2026 | ADESH | Technical Bid | 24-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Survey and investigation for road work with chain and compass, auto level, theodolite or total station i/c fixing of permanent benchmark and also fixing of bench mark on all the permanent structures, along the alignment, like boundary wall, electrical poles etc. Also marking of locations of boundary wall, electric poles, telephone poles, trees etc. in the road plan, collection and submission of existing inventory of the road all along the alignment conducting survey@20 metre interval for Lsection and for single lane X-section interval will be @ 0.75, 1.25, 1.875, 2.60, 3.75, 4.50, 5.50 and 6.50 metre on both side of centre line for two lane/ four lane interval for x-section shall be as specified in MORT&H Specifications. Data collected as specified above are required to be submitted in both hard and soft copies, L-section, X-section and plan is required to be submitted in the shape of drawing sheets drawn with the help of auto plotter. Soil samples @ every 500 metre or wherever soil appears to change its properties are required to be collected and soil investigation for LL, PL, swelling index and CBR are to be conducted and result too be submitted along with the project report. Job also includes collection of data for traffic census, fixing of RTL, getting it approved from Engineer-in-Charge and accordingly submission of pavement design in accordance with relevant clauses of IRC. Preparation of estimate complete and submission of same in eight copies duly spiral binded.ii) For single lane road |
| 2 | Carrying out catchment area traverse survey of minor stream (not traceable in toposheet) below 100 acres |
| 3 | Survey of C.D. works including taking L-Section of road, catchment area plan by Traverse method and taking trial pits of size 1.50M x 1.50M x 1.50M including preparation of detailed plans and estimates in 5 copies and all types of compliance if required from the department |
| 4 | Survey of Minor bridge including taking L section of existing road upto 500 m both side and two defined cross sections, one of 300 m U/s and one of 300 m D/s at the bridge site, one vergin cross section on alternate proposed cross sections and bed slope of stream upto sufficient long distance as required with chain and compass. Taking three trial pits of size 1.00x1.00x3.0 m and collecting samples of materials at site for ascertaining the silt factor, unit weight test, specific gravity from Govt.approved laboratories (testing charges to be borne by the agency) and preparation of detailed survey data, submission of the project duly typed,site plan and other drawings etc. complete as required by the Department. |
| 5 | Preparation of initial drawing of Bridge/ ROB/Fly Over with preparing General Arrangement drawing with dimensions etc. complete and preparation of rough estimate for all components of bridge. Including supplying four copies of coloured drawings and copy of drawing on C.D. (excluding geotechnical and structural design part.)(i) Slab Culvert |
| 6 | (ii) Minor Bridge |
| 7 | Preparation of roadway, drawing (Plan and Profile) on computer by using Autocad of required scale showing all topo feature and proposed construction details such as carriage way, median service road, toe line, retaining walls, cross drainage works, major structures, etc. complete. Including indexing, level tables, legend, basic information of project and design details etc. |
| 8 | Preparation of Land Acquisition proposal including collection of 7/12 and 8/A documents marking alignment on village maps, area calculation, preparation of proposal, printing, binding, etc. complete and submission of 5 sets more ever liasoning and coordination with revenue authorities with compliance if any until finalisation of award including Joint measurement of the alignment. For new alignment Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 10 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender