Tender For Tender For Supply Of Material, Transportation ,Design, Erection, Testing, Commissioning For Sop To The Project Providing functional house hold tap connection Under Lwss Kon, Pihri, Duhak, Dhaniyara, Bheri, Paprola, Tina Jhametar, Lahru Sad
Tender Overview
Project Description
Tender for Tender For Supply Of Material, Transportation ,Design, Erection, Testing, Commissioning For Sop To The Project Providing functional house hold tap connection Under Lwss Kon, Pihri, Duhak, Dhaniyara, Bheri, Paprola, Tina Jhametar, Lahru Sadda Etc Under Jjm Tehsil Jaisinghpur/Thural Distt Kangra H.P.Under Esd Jaisinghpur. (Seop-17/2026-27)
BOQ
| Sl. No. | Item Description |
| 1 | 11KV HT LINE |
| 2 | Prov.AAAC 7/3.81 mm sq. (80 mm sq.) {Includes 3 conductor lengths for 3 phase and additional 1% (sag,Jumpering wastage} |
| 3 | Steel Tubular Poles (11 m, Working Load > 227 kgf/m²) (with Ruling Span 90 m, 3 No. Run thro' 2 No. Double Pole Dead End Structures and 2 No. 4 Pole structure River Crossing) ) |
| 4 | Prov. RCC Muff with concrete filling |
| 5 | Four Pole Structures: on Four Pole (Prefer along river side) |
| 6 | Cross Arm: [Channel Iron (100x50x5 mm), (Length 2400+200 mm) |
| 7 | Set of jumpers with PG clamps (each of 3 nos.) |
| 8 | Dead End Structures: on Double Pole and Four Pole |
| 9 | Belt Set - MS Angle Iron: 50x50x6, Length :1800 mm x 2 No. |
| 10 | X-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm x 2 No. |
| 11 | X-Arm (Horizontal) - MS Channel Iron: 100X50x5, Length [2340mm x 2 No.] |
| 12 | Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides) |
| 13 | HT Stay/ Guy Arrangement |
| 14 | Prov. Stay set complete in all respect (1 No/ single pole, 4 no/ double pole structure and 5 No./ 4pole) PROVIDED BY HPSEBL |
| 15 | Prov. Stay Wire (7/3.15 mm) (@ 9.0 Kg. Per Stay Set) |
| 16 | Earthing |
| 17 | Prov. HT earthing set complete |
| 18 | Single continuous earth wire (GI 8 SWG) {a/w 1 wire lengths for avg. one road crossing @ 20 mtr and additional 1% (sag and wastage )} @ 0.102 kg/mtr with cross lacing |
| 19 | Eye Hook for earth wire |
| 20 | Earth wire clamp |
| 21 | MS Channel Iron:75*40*6, length: 2400 mm |
| 22 | Single Pole Struture |
| 23 | CI(100x50x6) 1270mm |
| 24 | A.I Bracing Set 2(50x50x6) 750mm |
| 25 | Pole Top Bracket [MSCI:100x50x6 mm- 100 mm] PROVIDED BY HPSEBL |
| 26 | 11 kV Pin Insulators (Porcelain, 12 kV, 10 kN) |
| 27 | Prov. 11 KV Danger Plate (250x200x1.60 mm) |
| 28 | Full Clamps with nuts & bolts |
| 29 | Half Clamps with nuts & bolts PROVIDED BY HPSEBL |
| 30 | Prov.M.S. Nuts & Bolts of various sizes (Gulvanised/ coated) [Preferably 16 mm Dia or more (with flat and spring washers)] |
| 31 | Prov. Barbed Wire |
| 32 | Red Oxide |
| 33 | Prov. Alluminium Paint . |
| 34 | Protection : 2400x50x50x6 angle for Guard wire |
| 35 | GO AB Switch Unit (11kV, 800A, 25 KA ) Tripple pole O/D type |
| 36 | Prov. DO Fuse |
| 37 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
| 38 | Centering and shuttering including strutting, propping etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 39 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) |
| 40 | Add Transportation Charges i/c manual carriage complete in all respest |
| 41 | Add Erection Charges complete in all respest |
| 42 | 11/0.4 KV, 630 KVA Distribution Sub Station |
| 43 | Distribution Transformer (Ordinary), 11/0.4 kV, 630 KVA |
| 44 | Steel Tubular Poles (11 m) |
| 45 | Muffs (2000mm) with concerete filling |
| 46 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line PROVIDED BY HPSEBL |
| 47 | MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA's |
| 48 | X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 49 | Transformer Bed, CT-PT Unit, Belting & Knee Bracing. |
| 50 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for for CT-PT Unit PROVIDED BY HPSEBL. |
| 51 | X-Arm: [Channel Iron (100x50x6 mm), Length : 460 mm X 2 Nos] for supporting Main Channel of CT-PT] |
| 52 | MS Angle Iron (50X50x6 mm), Length: (2800 mm) x 2 No's Belt for CT-PT |
| 53 | MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos |
| 54 | MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing |
| 55 | Transformer LT Distribution Box and G.O Switch fixing Assembly. |
| 56 | MS Angle Iron (50X50x6 mm), Length: (2800 mm) x 2 No's |
| 57 | MS Angle Iron (50X50x6 mm), Length: (450 mm) x 1 No's |
| 58 | GO AB Handle Supporting [ Channel Iron (75x40x6 mm), Length = 460 mm |
| 59 | GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type |
| 60 | D.O Fuse Unit |
| 61 | Surge Arrester, 9 kV Station Class (Porcelain Type) |
| 62 | Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) |
| 63 | HT Stay Set complete (i/c Stay Clamp) PROVIDED BY HPSEBL |
| 64 | Stay Wire(7/8SWG ) ( 7kg per Stay Set) |
| 65 | Pipe Earthing Set |
| 66 | 6 SWG GI Wire for earthing |
| 67 | LT Distribution Panel Box with MCCB (1000A, 50 kA, 4P,1 No) for 630 KVA DTR |
| 68 | Half Clamp (M.S. Flat 50X6 mm) PROVIDED BY HPSEBL |
| 69 | Full Clamps (M.S. Flat 50X6 mm) |
| 70 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 71 | Aluminium Thimble 300 sq mm PROVIDED BY HPSEBL |
| 72 | Copper Thimble 95 sq mm PROVIDED BY HPSEBL |
| 73 | Danger Plate PROVIDED BY HPSEBL |
| 74 | Barbed Wire |
| 75 | LT Cable (3.5 Core) 630 mm² |
| 76 | Energy Meter (3-Phase, 4-Wire) DLMS compliant 1000/5 A CT Type for 630 KVA Transformer |
| 77 | CT PT Unit 400/5A |
| 78 | PVC multistrand 4mm2 copper wire with 1 inch GI pipe for concelling |
| 79 | Aluminium Paint. |
| 80 | Red oxide |
| 81 | AAAC 7/3.81mm Conductor |
| 82 | Civil Work: |
| 83 | Transformer Bed (Civil Work) |
| 84 | Chain Link fencing , Angle Iron ,Gate etc for transformer Fencing |
| 85 | Prov. & Fixing of 11KV Isolator set complete in all respect |
| 86 | Erection Charges complete in all respest |
| 87 | Add Transportation Charges complete in all respest |
| 88 | LT Line |
| 89 | Prov.AAAC 7/3.15 mm sq. (50 mm sq.) {Includes 4 conductor lengths for 3 phase and neutral , additional 1% (sag,Jumpering wastage} |
| 90 | Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) |
| 91 | Prov. RCC Muff with concrete filling |
| 92 | Channel Iron (75x40x4.8) [Length- 1.50 Mtr + 0.2 Mtr] |
| 93 | Shackle Insulator (16 kN) |
| 94 | D-Iron (U- Clamps) with nut and bolts |
| 95 | Earth Knob |
| 96 | LT Stay Set (i/c Stay clamp) |
| 97 | Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set) |
| 98 | Full Clamps ( 1 No for Stay Set) |
| 99 | Half Clamp for X-arm PROVIDED BY HPSEBL |
| 100 | Earthing Set complete |
| 101 | Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 3%} for 3%Sag, Wastage & Cross Lacing @ 0.102 kg/m |
| 102 | Prov.M.S. Nuts & Bolts of various sizes (Gulvanised/ coated) [Preferably 16 mm Dia or more (with flat and spring washers)] |
| 103 | Red Oxide |
| 104 | Prov. Alluminium Paint . |
| 105 | LT Cable (3.5 Core) 630 mm² |
| 106 | Add Transportation Charges i/c manual carriage complete in all respest |
| 107 | Add Erection Charges complete in all respest Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender