Tender For Maintenance Contract Of Preventive, Routine, Breakdown Maintenance Of Plant Lighting, Ht&Lt Switchgear, Transformers, Motors, Esp, Motorized Actuator And Cables Connected With The Same For 2X600 Mw Rgtpp, Khedar, Hisar For A Period Of 2 Ye
Tender Overview
Project Description
Tender for Maintenance Contract Of Preventive, Routine, Breakdown Maintenance Of Plant Lighting, Ht&Lt Switchgear, Transformers, Motors, Esp, Motorized Actuator And Cables Connected With The Same For 2X600 Mw Rgtpp, Khedar, Hisar For A Period Of 2 Years Extendable Further Up To 3 Months
BOQ
| Sl. No. | Item Description |
| 1 | For Scope of work under Part-A, for First Year :Lump Sum Monthly Charges for both Units-I&II for Main Scope of work under Part-A (As per Annexure-VI) |
| 2 | For Scope of work under Part-B, for First Year (from 1.02 to 1.22) |
| 3 | Opening of foundation bolts and shifting/replacement of 11 KV new and damaged HT motor within the Plant & Placing it on its proper position. |
| 4 | Opening of foundation bolts and shifting/replacement of 3.3 KV new and damaged HT motor within the Plant & placing it on its proper position. |
| 5 | Replacement of DE /NDE bearing of 11 KV HT Motor (Grease type only) |
| 6 | Replacement of DE / NDE bearing of 3.3 KV HT Motor. |
| 7 | Complete Cleaning of ESP Rectifier transformer, its terminal insulator, marshalling boxes, setting of Damping resistance & handle mechanism and tightening of all connection and testing if required. |
| 8 | Opening of foundation bolts & shifting/replacement of new and damaged LT motor within the plant for 30.1 KW to 75 KW motor. |
| 9 | Opening of foundation bolts & shifting/replacement of new and damaged LT motor within the plant for 75.1 KW to 160 KW motor. |
| 10 | Replacement of bearing of LT motors of 30.1 to 75 KW motors |
| 11 | Replacement of bearing of LT motors of 75.1 to 160 KW motors |
| 12 | Overhead Laying of HT cable 1CX 630/500 mm2 / Meter |
| 13 | Overhead Laying of HT cable 3CX 400/300 mm2 / Meter |
| 14 | Overhead Laying of HT cable 3CX 185/150 mm2 / Meter |
| 15 | Overhead Laying of LT cable 1CX 630 mm2 / Meter |
| 16 | Overhead Laying of LT cable 3CX 185/240 mm2 / Meter |
| 17 | Overhead Laying of LT cable 3CX 150 mm2 / Meter |
| 18 | Overhead Laying of LT cable 3CX 300/400 mm2 / Meter |
| 19 | Generator adaptor box opening and connection tightening of the generator flexible and cleaning of the support insulator of adaptor box. |
| 20 | Maintenance of SPBD i.e. cleaning of insulators, tightening of connection, replacement of insulator and rubber bellows. |
| 21 | Maintenance of PT Cubicle and outdoor cleaning. |
| 22 | Maintenance of street lighting pole and complete fixture including circuit from JB to luminary fixture and LED. |
| 23 | Removal of old grease from bearing housing hub and greasing of NDE side bearing of CEP motors. |
| 24 | For Scope of work under Part-A, for Second Year :Lump Sum Monthly Charges for both Units-I&II for Main Scope of work under Part-A (As per Annexure-VI) |
| 25 | For Scope of work under Part-B, for Second Year (from 2.02 to 2.22) |
| 26 | Opening of foundation bolts and shifting/replacement of 11 KV new and damaged HT motor within the Plant & Placing it on its proper position. |
| 27 | Opening of foundation bolts and shifting/replacement of 3.3 KV new and damaged HT motor within the Plant & placing it on its proper position. |
| 28 | Replacement of DE /NDE bearing of 11 KV HT Motor (Grease type only) |
| 29 | Replacement of DE / NDE bearing of 3.3 KV HT Motor. |
| 30 | Complete Cleaning of ESP Rectifier transformer, its terminal insulator, marshalling boxes, setting of Damping resistance & handle mechanism and tightening of all connection and testing if required. |
| 31 | Opening of foundation bolts & shifting/replacement of new and damaged LT motor within the plant for 30.1 KW to 75 KW motor. |
| 32 | Opening of foundation bolts & shifting/replacement of new and damaged LT motor within the plant for 75.1 KW to 160 KW motor. |
| 33 | Replacement of bearing of LT motors of 30.1 to 75 KW motors |
| 34 | Replacement of bearing of LT motors of 75.1 to 160 KW motors |
| 35 | Overhead Laying of HT cable 1CX 630/500 mm2 / Meter |
| 36 | Overhead Laying of HT cable 3CX 400/300 mm2 / Meter |
| 37 | Overhead Laying of HT cable 3CX 185/150 mm2 / Meter |
| 38 | Overhead Laying of LT cable 1CX 630 mm2 / Meter |
| 39 | Overhead Laying of LT cable 3CX 185/240 mm2 / Meter |
| 40 | Overhead Laying of LT cable 3CX 150 mm2 / Meter |
| 41 | Overhead Laying of LT cable 3CX 300/400 mm2 / Meter |
| 42 | Generator adaptor box opening and connection tightening of the generator flexible and cleaning of the support insulator of adaptor box. |
| 43 | Maintenance of SPBD i.e. cleaning of insulators, tightening of connection, replacement of insulator and rubber bellows. |
| 44 | Maintenance of PT Cubicle and outdoor cleaning. |
| 45 | Maintenance of street lighting pole and complete fixture including circuit from JB to luminary fixture and LED. |
| 46 | Removal of old grease from bearing housing hub and greasing of NDE side bearing of CEP motors. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 21 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 24 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender