Housing Urban and Rular Development Government Departments Closing in 2 days TDR #58508934

Tender For Construction & Maintenance Of Mrl03-Rajiv Nagar To Khantlang (0.000-8.320) Kmp (Technologies: Flexible Pavement)

Issued by Government Departments · Mamit, Mizoram
Tender Value
10.41 Crore
Estimated cost
Bid Submission
23 Nov 2026
2 days left
EMD
10.41 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mamit → Mizoram
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Construction & Maintenance Of Mrl03-Rajiv Nagar To Khantlang (0.000-8.320) Kmp (Technologies: Flexible Pavement)

BOQ

Name of Work:- Package No: MZ0694 1. MRL03-Rajiv Nagar to Khantlang
Sl. No. Item Description
1Pavement Works ➤ CC Pavement
2Construction of Panel concrete, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixture as approved, curing of concrete slabs for 14 days. Curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification Clause 1501. PCC Grade M-30 Each Panel (0.50 x 0.50) thickness 100 mm.
3Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 ➤ I.P.C.C grade M 10 ➤ [11.4] (i)Nominal mix 1:3:6
4Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 ➤ II.Coursed Rubble masonry (2nd sort) ➤ [12.4] (i)In cement mortar (1:3)
5Pavement Works ➤ Clearing & Grubbing
6Clearing and Grubbing Road Land ➤ Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. ➤ (I)By Manual Means ➤ [2.2] (B)In area of thorny jungle
7Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps ➤ Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. ➤ A.Lead upto 100 m ➤ [2.3] (i)Girth above 300 mm to 600 mm
8Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps ➤ Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. ➤ A.Lead upto 100 m ➤ [2.3] (ii)Girth above 600 mm to 900 mm
9Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps ➤ Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. ➤ A.Lead upto 100 m ➤ [2.3] (iii)Girth above 900 mm to 1800 mm
10Setting Out ➤ The analysis of rate per km shall account for the following: ➤ (3) Construction of job pillars as per Fig. 1600.1 (d) ➤ [8.2] (1)Construction of reference pillars as per Fig. 1600.1 (b) as per drawing and Technical Specification Clause 1602.1
11Setting Out ➤ The analysis of rate per km shall account for the following: ➤ (3) Construction of job pillars as per Fig. 1600.1 (d) ➤ [8.2] (2)Construction of back piller as per Fig. 1600.1( c) as per drawing and Technical Specification Clause 1602.3
12Setting Out ➤ The analysis of rate per km shall account for the following: ➤ (3) Construction of job pillars as per Fig. 1600.1 (d) ➤ [8.2] (3)Construction of Job pillers as per Fig. 1600.1 (d) and Technical Specification Clause 1602.4
13Pavement Works ➤ Earthwork in Excavation
14Construction of Embankment with Material Obtained from Roadway Cutting ➤ [3.3] Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5
15Earthwork in Hill Road ➤ (ii)Excavation in Hilly Areas in Soil by mechanical means ➤ [8.3] A)Excavation in soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1
16Earthwork in Hill Road ➤ [8.3] (iv) Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2.
17Earthwork in Hill Road ➤ (v)Excavation in Hilly Areas in Hard Rock requiring blasting ➤ [8.3] A)Excavation in hilly areas in hard rock requiring blasting, by mechanical means, lift upto 1.5 m and disposal of excavated rock upto a lead of 20 m as per Clause 1603.2.
18Pavement Works ➤ Earthwork in Filling
19Construction of Subgrade and Earthen Shoulders ➤ [3.14] Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
20Pavement Works ➤ Compacting Original Ground
21Compacting Original Ground ➤ (ii) Compacting original ground supporting subgrade ➤ [3.15] Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.
22Pavement Works ➤ Granular Sub-Base
23Granular Sub-base with Well Graded Material (Table 400.1) ➤ (A) By Mix in Place Method ➤ Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. ➤ [4.1] (i)For Grading I Material
24Pavement Works ➤ WBM Grade-II
25Water Bound Macadam with Crushable Screenings ➤ 2) WBM Grading 2 ➤ Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. ➤ [4.8] (A)By Manual Means
26Pavement Works ➤ WBM Grade-III
27Water Bound Macadam with Crushable Screenings ➤ 3) WBM Grading 3 ➤ Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. ➤ [4.8] (A)By Manual Means
28Pavement Works ➤ Prime Coat
29Prime Coat ➤ (i) Low porosity ➤ [5.1] Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
30Pavement Works ➤ Tack Coat
31Tack Coat ➤ [5.2] (iii)Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
32Pavement Works ➤ OGPC
3320mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder ➤ Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508. ➤ Case - I By Manual Means ➤ [5.9] (III) Polymer Modified Bitumen
34Pavement Works ➤ SEAL COAT
35Seal Coat ➤ Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 ➤ A.By Manual Means - Case - II : Type B ➤ [5.12] (III)Polymer Modified Bitumen
36Road Furniture & Safety ➤ Traffic Signs
37PMGSY informatory sign board with Logo as per MORD specifications and drawing
38Citizen's Information Board with Logo of PMGSY as per MoRD Specifications
39Traffic Signs ➤ A.Retro-reflectorised Traffic Signs ➤ [10.2] -1Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801
40Direction and Place Identification signs upto 0.9 sqm size board ➤ A.Retro-reflectorised Traffic Signs ➤ [10.3] (i)Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701
41Painting Two Coats on New Concrete Surfaces ➤ [10.5] Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701
42Kilometre Stone ➤ Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 ➤ [10.10] i)5th Kilometre Stone (precast)
43Kilometre Stone ➤ Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 ➤ [10.10] ii)Ordinary Kilometer Stone (Precast)
44Kilometre Stone ➤ Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 ➤ [10.10] iii) 200 m stone (precast)
45Boundary Pillar ➤ [10.11] Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704
46Road Furniture & Safety ➤ Road Safety
47Excavation for Structures ➤ Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. ➤ [11.1] II.Ordinary rock (not requiring blasting) - Upto 3 m depth
48[13.19] Plastering with cement mortar (1:3) 15 mm thick on brickwork in parapet as per technical specifications Clauses 613.4 and 1208.4. - Rate same as in item 12.3
49Providing and laying parapet with PCC M 15 as per drawing & technical specifications Clauses 800 and 1208.4. ➤ [13.20] I. Nominal mix 1:2.5:5 (Hand mixing) - Rate same as in item 12.5 I (ii)
50Drainage Works ➤ Unlined Drain
51Excavation for Structures ➤ Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. ➤ I.Ordinary soil ➤ [11.1] (i)Upto 3 m depth
52Excavation for Structures ➤ Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. ➤ [11.1] II.Ordinary rock (not requiring blasting) - Upto 3 m depth
53Excavation for Structures ➤ Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. ➤ [11.1] III. Hard rock (requiring blasting) - Upto 3 m depth including 1.5 m depth in hard rock
54Drainage Works ➤ Lined Drain
55Excavation for Structures ➤ Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. ➤ I.Ordinary soil ➤ [11.1] (i)Upto 3 m depth
56Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. ➤ II. Coursed rubble masonry (2nd sort) ➤ [11.6] (ii)In 1:4 cement mortar
57Protection Works ➤ Breast Wall
58Excavation for Structures ➤ Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. ➤ I.Ordinary soil ➤ [11.1] (i)Upto 3 m depth
59Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 ➤ I.P.C.C grade M 10 ➤ [11.4] (ii)Nominal mix 1:3.6 (Hand mixing)
60Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. ➤ II. Coursed rubble masonry (2nd sort) ➤ [11.6] (i) In 1:3 cement mortar
61[12.11] Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
62[12.13] Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11
63Protection Works ➤ Retaining Wall
64Excavation for Structures ➤ Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. ➤ I.Ordinary soil ➤ [11.1] (i)Upto 3 m depth
65Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 ➤ I.P.C.C grade M 10 ➤ [11.4] (ii)Nominal mix 1:3.6 (Hand mixing)
66Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. ➤ II. Coursed rubble masonry (2nd sort) ➤ [11.6] (iii)In cement-lime-mortar (1:0.5:4.5)
67[12.3] Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
68[12.11] Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
69[12.13] Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11
70Stone masonry in cement mortar 1:3 for parapet complete as per drawing and technical specifications Clauses 700 and 1208.4 ➤ [13.17] I. Random rubble masonry - Rate same as in item 12.4 III (i)
71CD Works ➤ 2.0m Span
72Excavation for Structures ➤ Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. ➤ I.Ordinary soil ➤ [11.1] (i)Upto 3 m depth
73Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 ➤ II.P.C.C grade M 15 ➤ [11.4] (ii)Nominal mix 1:2.5:5 (Hand mixing)
74[12.3] Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
75Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 ➤ II.Coursed Rubble masonry (2nd sort) ➤ [12.4] (ii) In 1:4 cement mortar
76Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 ➤ [12.10] I)Granular material
77[12.13] Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11
78Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 ➤ [13.1] II.R.C.C M 25
79[13.2] Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
80Stone masonry in cement mortar 1:3 for parapet complete as per drawing and technical specifications Clauses 700 and 1208.4 ➤ [13.17] I. Random rubble masonry - Rate same as in item 12.4 III (i)
81CD Works ➤ 1.5m Span
82Excavation for Structures ➤ Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. ➤ I.Ordinary soil ➤ [11.1] (i)Upto 3 m depth
83Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 ➤ II.P.C.C grade M 15 ➤ [11.4] (ii)Nominal mix 1:2.5:5 (Hand mixing)
84[12.3] Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
85Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 ➤ II.Coursed Rubble masonry (2nd sort) ➤ [12.4] (ii) In 1:4 cement mortar
86Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 ➤ [12.10] I)Granular material
87[12.13] Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11
88Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 ➤ [13.1] II.R.C.C M 25
89[13.2] Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
90Stone masonry in cement mortar 1:3 for parapet complete as per drawing and technical specifications Clauses 700 and 1208.4 ➤ [13.17] I. Random rubble masonry - Rate same as in item 12.4 III (i)
91CD Works ➤ Hume Pipe
92Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 ➤ [11.2] II.Earth filling (For marshy soil)
93Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 ➤ I.P.C.C grade M 10 ➤ [11.4] (ii)Nominal mix 1:3.6 (Hand mixing)
94Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. ➤ I. Coursed rubble masonry (1st sort) ➤ [11.6] (ii)In 1:4 cement mortar
95[12.3] Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
96Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 ➤ [12.10] I)Granular material
97[12.13] Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11
98Stone masonry in cement mortar 1:3 for parapet complete as per drawing and technical specifications Clauses 700 and 1208.4 ➤ [13.17] I. Random rubble masonry - Rate same as in item 12.4 III (i)
99Excavation for Structures ➤ [9.1] Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
100Bedding for Pipe ➤ [9.2] (ii)Type B (First Class) Bedding - Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii)
101Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row ➤ Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. ➤ [9.3] (B)1000 mm dia Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 58508934
AUTHORITY Government Departments
TENDER VALUE 10.41 Crore
LAST DATE 23-11-2026
Authority
Authority Name Public Works Department
Work Description Tender For Construction & Maintenance Of Mrl03-Rajiv Nagar To Khantlang (0.000-8.320) Kmp (Technologies: Flexible Pavement)
Basic Detail
Tender No MZ0694
Bidding Type Tender
Location
City Mamit
State Mizoram
Key Dates
Publish Date 12 Nov 2026
Submission Date 23 Nov 2026
Open Date 23 Nov 2026
Finance
Tender Value 10.41 Crore
Tender Fee 10000
EMD 10.41 Lakhs
Exemption Not Available
Document List
e02e7798-8275-4db1-952e-c6263c9d86dc.html
T-81.pdf
Tendernotice_1.pdf
BOQ_236756.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 12, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 23, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 2 days
Nov 23, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 2 days

Tender Documents

Download All (ZIP) ↓
html

e02e7798-8275-4db1-952e-c6263c9d86dc.html

pdf

T-81.pdf

pdf

Tendernotice_1.pdf

xls

BOQ_236756.xls

Disclaimer