Tender For Construction Of Multipurpose Hall Near Chc(Rajib Gandhi Market Complex) In Ward-26
Tender Value
83.75 Lakhs
Estimated cost
Bid Submission
30 Nov 2026
8 days left
EMD
83752
Bank guarantee accepted
Document Fee
11800
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Ganjam → Odisha
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Multipurpose Hall Near Chc(Rajib Gandhi Market Complex) In Ward-26
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation IN ALL KINDS OF SOILS by manual means overareas (exceeding 30 cm in depth, 1.5 m in width as well as 10sqm on plan) inculding disposal of excavated earth up to 50 m and lift upto 1.5m Amount with all lead and lift including shoring, shuttering & dewatering (if required) with cost of all Labour, Labour cess ,Hire & Running charges of the water pumps, Sundries, T & P required for the work complete as directed by the Engineer- in- charge. Isolated FootingF1 |
| 2 | Supply and filling the F & P with filling sand of approved quality with well watered & rammed including cost, conveyance, royalty & all taxes, etc., complete. |
| 3 | Filling foundation trenches and plinth with excavated earth including laying the earth in layers not exceeding 23.5cm (9”) thick ramming and watering with all leads and lifts including cost of all labour, T&P etc. complete as directed by the Engineer-in-charge. |
| 4 | Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. In depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work etc. complete in all respect as directed by the Engineer-in-Charge. Measurement will be taken on finished compacted section only). |
| 5 | Providing and laying Plain cement concrete of proportion(1:3:6) in foundation and floors(i.e. below the base course of the flooring) using cement, 40mm. Size crusher broken H.G.Metal and screened and washed sharp river sand for mortar of approved quality and from approved quarry inclduign hoisting, lowering and laying concrete to the required level, ramming,watering and curing etc. completek to required levels, laid in layers not exceeding 15cm thick in each layer including cost, conveyance, loading, unloading,royalities and taxes of all materials, cost of all labour,T&P required for the work including shoring,shuttering anddewatering(if required)including hire and running charges of water pump required for the work etc. complete in all respect as directed by the Engineer-in-charge. |
| 6 | Providing and laying in position ready mixed M-25 grade concrete having compressive strength at 28 days test not less than 300 kg/ sq.cm for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying , including the cost of centering, shuttering finishing and excluding reinforcement including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, and hoisting, lowering, laying and compacting concrete, watering and curing and finishing the exposed surfaces smooth with cost, conveyance, royalties, taxes of all materials with all labour,Labour cess and T&P required for the work improve workability without impairing strength and durability as per direction of the Engineer - in - charge. |
| 7 | open footing |
| 8 | column up to plinth |
| 9 | RCC in Plinth beam |
| 10 | Ground floor RCC in column |
| 11 | RCC in Roof beam |
| 12 | Stair case |
| 13 | Lintel |
| 14 | RCC in Sill |
| 15 | RCC chajja |
| 16 | First floor RCC in column |
| 17 | RCC in roof beam |
| 18 | RCC in roof slab |
| 19 | Cutting,straightening coiled or bent up HYSD/TMT Reinfocement Bars welding or jointing if necessary ,bending, binding,tying the grills as required for R.C.C. works,providing Fan Hooks where necessary and hoising,lowering and placing the same tin proper position according to the approved eesigns and drawings in all floors including cost, conveyance, loading, unloading and taxes or HYSD/TMT Reinforcement Bars and Binding wieres of 18 to 20 gauge required for the work cost of all labour,T&P and scaffolding complete in all respect as directed by the Engineer-in-charge(Payment will be made according to the actual/proper weight of HYSD/TMT Reinforcement Bars and Binding wires consumed in the particular work only) fe 550 |
| 20 | Foundation |
| 21 | ground floor Column |
| 22 | First Floor Column |
| 23 | Fly ash brick masonry using fly ash bricks of size 23 cm. x 11 cm. x 8 cm. having crushing strength not less than 75 kg. Per Sqr. Cm. in cement mortar of mix (1:6) with cement after immersing the bricks for 6 (Six) hours in water before use in superstructure including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, coveyance, loading and unloading, royalties and taxes of all materials and cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge |
| 24 | Providing 12mm. Thick cement plaster in cement mortar or mix(1:6) in all floors at all height with cement & screened and washed sharp river sand for mortar and finished smooth to the rough surface of the brick masonary walls after racking out the joints (alongwith providing grooves wherever necessary) including watering and curing,rounding of corners etc. complete with cost, conveyance, loading, unloading, royalities and taxes of all materials,cost of all labour,T&P, and scaffolding required for the work etc. as directed by the Engineer-in-charge. (Outer side |
| 25 | Providing 16mm. Thick cement plaster in cement mortar or mix(1:6) in all floors at all height with cement & screened and washed sharp river sand for mortar and finished smooth to the rough surface of the brick masonary walls after racking out the joints (alongwith providing grooves wherever necessary) including watering and curing,rounding of corners etc. complete with cost, conveyance, loading, unloading, royalities and taxes of all materials,cost of all labour,T&P, and scaffolding required for the work etc. as directed by the Engineer-in-charge. (Inside) |
| 26 | Supplying and Fixing of M.S. Window Grill made out of M.S Flat conforming to IS 2062/2006 painted with Red Oxide Primer as per the design approve by E.I.C including cost,conveyance of all materials, priming,and labour for fitting fixing etc.complete as per the instruction of Engineer-in-Charge |
| 27 | Painting two coat with approved synthetic enamel paint to new wood & iron work including cost, conveyances, royalties of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer in charge. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 13, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 30, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysDec 01, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender