Tender For Electrification Of Identified Toks In The Third & Fourth Phase Under Announcement No. 688/2024 Of The Honble Chief Minister, Government Of Uttarakhand, In District Champawat, Including Construction Of Electrical Lines And Allied Works As P
Tender Overview
Project Description
Tender for Electrification Of Identified Toks In The Third & Fourth Phase Under Announcement No. 688/2024 Of The Honble Chief Minister, Government Of Uttarakhand, In District Champawat, Including Construction Of Electrical Lines And Allied Works As Per Tender Specifications.( Rates Quoted Without Gst) (Gst Will Paid Extra)
BOQ
| Sl. No. | Item Description |
| 1 | Annexure-A (Supply of following material as per UPCL Norms.) |
| 2 | LT Shackle Clamp SP-10/21 with N&B |
| 3 | Holding Clamp J-I Hook AB Cable |
| 4 | E-Clamp |
| 5 | Top Channel clamp with N&B |
| 6 | Top Channel for SP-23 with N&B |
| 7 | Stay Clamp For SP-33 with N&B |
| 8 | Stay Clamp For SP-55 with N&B |
| 9 | Stay Clamp For SP-21 with N&B |
| 10 | Stay Clamp For SP-23 with N&B |
| 11 | Stay Clamp For SP-10 with N&B |
| 12 | Earth Wire Clamp for SP-23 with N&B |
| 13 | Earth Wire Clamp for SP-21 with N&B |
| 14 | Dead end clamp with I hook abcable SP-21 |
| 15 | Dead end clamp with I hook abcable SP-33 |
| 16 | Dead End Clamp for AB Cable |
| 17 | Stay Insualtor |
| 18 | LT Shackle Insulator |
| 19 | HT Stay Insulator |
| 20 | Bracing Clamp bottom for SP-55 with N&B |
| 21 | Bracing Clamp Top for SP-23 with N&B |
| 22 | Bracing Clamp Bottom for SP-23 with N&B |
| 23 | 11kv Fuse Set |
| 24 | LT Distribution box 3 phase |
| 25 | Off Size N&B |
| 26 | Distribution Box clamp |
| 27 | Al. Criming type Lug 70 sqmm. |
| 28 | Al. Criming type Lug 120 sqmm. |
| 29 | Top Chennel Holding Clamp for SP-23 Pole |
| 30 | Suspension Clamp With Eye Hook |
| 31 | Suspension Clamp With Eye Hook ABC for sp-21 |
| 32 | MS Clamp with n&b for suspension clamp |
| 33 | GI Strip 35x55mm |
| 34 | Annexure-B (Following work as per UPCL norms) |
| 35 | Chemical Earthing |
| 36 | Erection of Earthing Rod |
| 37 | Fabrication of Steel |
| 38 | Excavation of Pit for Stay Set |
| 39 | Erection of LT Stay Set |
| 40 | Erection of 11 KV Stay Set |
| 41 | Grouting of Stay Set |
| 42 | Excavation of Pit for Pole |
| 43 | Erection of Single SP-10 Pole |
| 44 | Erection of Single SP-21 Pole |
| 45 | Erection of Single SP-23 Pole |
| 46 | Erection of Single SP-33 Pole |
| 47 | Erection of SP-23 Double Pole |
| 48 | Erection of SP-23 Four Pole |
| 49 | Erection of SP-55 Double Pole |
| 50 | Grouting of Pole |
| 51 | Muffing of Pole |
| 52 | Inst. Of 63 KVA DTR of Pole Structure |
| 53 | Inst. Of 25 KVA DTR of Pole Structure |
| 54 | Fixing of Fuse Set |
| 55 | Fixing of Lighting Arrestor |
| 56 | Laying of Rabbit conductor in HT Line |
| 57 | Laying of 3p4w LT Line (weasel) |
| 58 | T-off Connection Complete 11 KV line |
| 59 | Const. Inst. Of Danger baord /Number Plate |
| 60 | Fixingof 11 kv xlpe jointing kit |
| 61 | Cartage SP-10 Pole, 71-100 Km |
| 62 | Cartage SP-10 Pole, 100-150 Km |
| 63 | Cartage SP-21/23 Pole, 0-20 Km |
| 64 | Cartage SP-33 Pole, 0-20 Km |
| 65 | Cartage SP-55 Pole, 0-20 Km |
| 66 | Cartage SP-21/23 Pole, 71-100 Km |
| 67 | Cartage SP-21/23 Pole, 100-150 Km |
| 68 | Cartage of Petty Material, 0-20 Km |
| 69 | Cartage of Petty Material, 71-100 Km |
| 70 | Cartage of Petty Material, 100-150 Km |
| 71 | Cartage of 63 KVA DTR, 0-20 Km |
| 72 | Cartage of 16/25 KVA DTR, 71-100 Km |
| 73 | Cartage of 16/25 KVA DTR, 100-150 Km |
| 74 | Laying of LT AB Cable 3x35+1x25 sqmm. |
| 75 | Laying of LT AB Cable 3x95+1+70 sqmm. |
| 76 | Laying of LT XLPE ABC 1x120 sqmm. |
| 77 | Headload cartage of 63 KVA DTR 0-1 Km |
| 78 | Headload cartage of 25 KVA DTR 1-3 Km |
| 79 | Headload cartage of 25 KVA DTR 6 Km |
| 80 | Headload Caratge of Petty Material 0-1 Km |
| 81 | Headload Caratge of Petty Material 1-3 Km |
| 82 | Headload Caratge of Petty Material 6 Km |
| 83 | Headload Cartage SP-10 Pole 1-3 Km |
| 84 | Headload Cartage SP-10 Pole 6 Km |
| 85 | Headload Cartage SP-21/23 Pole 0-1 Km |
| 86 | Headload Cartage SP-33 Pole 0-1 Km |
| 87 | Headload Cartage SP-55 Pole 0-1 Km |
| 88 | Headload Cartage SP-21/23 Pole 1-3 Km |
| 89 | Headload Cartage SP-23 Pole 6 Km |
| 90 | Special RCC Plint 2 Pole Structure |
| 91 | Special RCC Plint 4 Pole Structure |
| 92 | Loping and Chopping of Tree Branches |
| 93 | Erection and Laying of 11 KV Cable 3x50sq.mm. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents