Tender For Nctps-I - Se/M-Ii Circle - Ahp Dn. - Daily Maintenance, Breakdown And Shutdown Maintenance Works In Ash Slurry Disposal Pump (Capacity: 930 M3/Hr.), Ash Water Pumps, Seal Water Pumps, Flushing Water Pumps, Drain Pumps, Slurry Line Valve, M
Tender Overview
Project Description
Tender for Nctps-I - Se/M-Ii Circle - Ahp Dn. - Daily Maintenance, Breakdown And Shutdown Maintenance Works In Ash Slurry Disposal Pump (Capacity: 930 M3/Hr.), Ash Water Pumps, Seal Water Pumps, Flushing Water Pumps, Drain Pumps, Slurry Line Valve, Make-Up Line Valves, Cast Basalt Pipes And Renewal Of Gland Ropes And V Belts For A Period Of 365 Days From The Date Of Handing Over The Site.
BOQ
| Sl. No. | Item Description |
| 1 | Engaging the skilled labour and skilled supervisor round the clock to attend the routine checking of pumps, valves & pipes in AHPH 1) work involves inspection for any abnormal sounds and vibrations in pumps, monitoring the gland leaks, oil levels, checking manual opening & closing of valves whenever pump start and stop. 2) picking and removing the debris and foreign materials, clinkers from trench and sump. 3) Inspection & tightens the \\"V\\" belts of slurry pumps. 4) welding and arresting of minor leaks, Greasing of bearings ASDP, AWP, Seal water pump, seal water, D.P pump and knife edge valves. 5) observed the pulley and bearing housing temperatures and collar bolts& bed bolts inspection 6) AWP storage tank levels in all the three units. |
| 2 | ASH SLURRY DISPOSAL PUMP: (i) (Dismantling): Removing the suction pipe, discharge pipes and decoupling from the motor by removing the V-belt and dismantle the pump internals then remove the bearing housing from bed, open and inspection of bearings, bearing bed, shaft, outer casing, inner casing, impeller, expeller, wear plates, gland housing, sleeve and liquid thrower including consumables and T&P’s. |
| 3 | (ii) (Assembling work): Rectification the suction side cover, bracket side cover seating area of outer casing and renew the above items and re-assemble back. Fix the suction and discharge pipe and V-belts and commissioning the pump including consumables and T&P’s. |
| 4 | SUCTION / DISCHARGE VALVE FOR ASH SLURRY DISPOSAL PUMP (Dismantling): Removal of 336 dia slurry line valve from the line, and reconditioning the worn-out portion of valve body and gate including consumables and T&P’s. |
| 5 | SUCTION / DISCHARGE VALVE: Fixing in the 336 dia slurry line valve in the line including consumables and T&P’s. |
| 6 | SUCTION / DISCHARGE LINES: Charges for Renewal of worn-out punctured cast basalt pipe end by fabricated distance piece of required length (below 6.0 mtr.) in Ash slurry disposal line 406 OD, and grinding and welding with flange and fixed including consumables and T&P’s. |
| 7 | ASH SLURRY DISPOSAL PUMP SUCTION SIDE PIPE: Removing the suction pipe and removing the outer casing and removing the foreign materials and reassembling including consumables and T&P’s. |
| 8 | ASH SLURRY DISPOSAL PUMP \\"V\\"-BELTS: Renewal of V-belts / tightening the V-belts in Ash slurry disposal pump including consumables and T&P’s. |
| 9 | ASH WATER PUMP: (i) Decoupling the Ash water pump dismantling the pump casing pump internals, inspection of impeller, shaft, wear ring shaft sleeves, bearings, lock nut and metal filling in the worn-out area of upper & lower casing and impeller hub and grinding, renew the above items and assemble back including consumables and T&P’s. |
| 10 | (ii) Align with motor and commissioning the pump including consumables and T&P’s. |
| 11 | SEALING WATER PUMP: (i) Decoupling and dismantling the pump internals (All the 11 stages) Inspection of Impellers, Diffuser with Guide vane, stage casing, wear rings, shaft, bearings and metal filling in the worn-out Hub and grinding and renew the above items and assemble back including consumables and T&P’s. |
| 12 | (ii) Aligning the pump and commissioning including consumables and T&P’s. |
| 13 | Drain pump: (i) Disconnect the discharge pipe decouple the motor, dismantle the pump and inspection/ renewal of spares and re-assemble and commissioning of pump. |
| 14 | (ii) Remove the suction and discharge and Cooling lines and renewing the damaged flanges with new one and re-fixing the line and commissioning. |
| 15 | ASH WATER TANK VALVE: Renewal of 450 dia B/F valve from the line and including attending minor repair works including consumables and T&P’s. |
| 16 | Alignment of pump: Alignment of pump with Motor in AWP / SWP / FWP / SWBP including consumables and T&P’s. |
| 17 | Renewal of gland rope in pumps: Renewal of gland rope the ASDP / AWP / SWP / FWP / SWBP / D.P including consumables and T&P’s. |
| 18 | Patch welding works: Patch welding in pumps suction discharge Patch welding over the worn-out suction & discharge pipe of ASDP / AWP / FWP / SWP / D.P. / S.W.B. pump Headers and pipe lines including consumables and T&P’s. |
| 19 | ASH WATER STRAINER: Cleaning 600mm strainer by dismantling of top cover of strainer body, removal of filter element, complete cleaning of filter element and strainer body, filter mesh and strengthening stiffener rod, re assembling the filter element, fixing the top cover, leak checking including consumables and T&P’s. |
| 20 | FLUSHING WATER PUMP: Decoupling the flushing water pump, dismantling the pump casing, pump internals inspection of impeller, shaft, wear rings, shaft sleeve bearings, locknut and metal filling in the worn-out area of upper & lower casing and impeller hub and grinding including consumables and T&P’s. |
| 21 | Renewal of worn-out spares and re-assembling the pump and aligning the pump with motor and commissioning including consumables and T&P’s. |
| 22 | ASH SLURRY SUMP: Removal the floating materials from the slurry sump and disposal the materials, transporting the floated material to low lying area dumping, dozing and leveling into dumped ash including consumables and T&P’s. |
| 23 | Charges for cut and remove the grills over the ash slurry sump and re-fixing the grills over the sump including consumables & T&P’s. |
| 24 | Picking the foreign material and clinkers from the trash screen which is located (- 6m) in the ash slurry sump and disposal the materials, transporting the material to low lying area, dumping, dozing and levelling including consumables and T&P’s. |
| 25 | ASH SLURRY DISPOSAL PUMP: Rectification of gland housing for ash slurry disposal pump including consumables and T&P’s. |
| 26 | Rectification of impeller hub for ash slurry disposal pump including consumables and T&P’s. |
| 27 | Replacement / overhauling the worn out 125 dia B/F valve / diaphragm valve from seal water line. |
| 28 | Cleaning of equipments like ash water pump, sealing water pump, flush water pump, drain pump, Ash slurry pumps and connected pipe lines and valves and maintaining the ash water pump house Unit I, II & III including arresting leak |
| 29 | Dismantling the damaged of corroded existing steel supporting structures (Material will be supplied by TNPGCL). |
| 30 | Fabrication and erection of steel structures in Ash Handling Pump House area. |
| 31 | Surface cleaning and painting of the surface with 1Coat of red oxide and two coats of enamel paint including cost of paint. |
| 32 | Special consumables such as graphite gland packing 20 mm rope champion make style 1800 mm |
| 33 | Special consumables such as graphite gland packing 16 mm rope champion make style 1800 mm |
| 34 | Special consumables such as graphite gland packing 14 mm rope champion make style 1800 mm |
| 35 | Special consumables such as graphite gland packing 12.5 mm rope champion make style 1800 mm |
| 36 | Special consumables such as graphite gland packing 10mm rope champion make style 1800 mm |
| 37 | Oil seals for ASDP Bearing housing Drive End (130X160X13) |
| 38 | Oil seals for ASDP Bearing housing Non Drive End (125X160X13) |
| 39 | Non metalic CAF Gasket Thickness 1mm |
| 40 | Non metalic CAF Gasket Thickness 1.5mm |
| 41 | Rubber cord 10mm for ASDP (Wear plate area) |
| 42 | Rubber cord 6mm for ASDP (Wear plate area, Gland housing area & SWP stage casing) |
| 43 | Basalt powder |
| 44 | 6309 Bearing for AWP (DE/NDE) |
| 45 | Poly F plus PB Wedge belt SPC 4500 for ASDP |
| 46 | Servo system 46 oil for ASDP Bearing housing |
| 47 | Servo Gem 3 Grease for ASDP, AWP, SWP, SWBP, DP Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 14 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender