Bids Are invited for Excavation In Trenches N Exc 1.5 M Wide N Exc 1.5 Mtr Deep In Soft Lose Soil For Taking Out Pipe Etc. - Excavation In Trenches N Exc 1.5 M Wide N Exc 1.5 Mtr Deep In Softlose Soil For Taking Out Pipe Laying Of Pipe Getting Out Fo
Tender Overview
Project Description
Bids Are invited for Excavation In Trenches N Exc 1.5 M Wide N Exc 1.5 Mtr Deep In Soft Lose Soil For Taking Out Pipe Etc. - Excavation In Trenches N Exc 1.5 M Wide N Exc 1.5 Mtr Deep In Softlose Soil For Taking Out Pipe Laying Of Pipe Getting Out For Diverting Of Ci Pipe Line Complete All As Directed. , Returning Filling In Including Spreading Leveling Watering Well Ramming In Layers Etc. - Returning Filling In Including Spreading Leveling Watering Well Ramming In Layers N. Exc 25 Cm Thick Complete All As Directed. , Removal Of Excavated Soil To A Distance Not Exc 50 M Depositing Where Directed Etc. - Removal Of Excavated Soil To A Distance Not Exc 50 M And Depositing Where Directed At A Level Not Exc 1.5 Mtr Above The Starting Point Complete All As Directed. , Taking Up Ci Di Water Main Incl All Fitting With Spigot Socket Ends Lead Joints Etc. - Taking Up Cidi Water Main (Incl All Fitting) With Spigot Socket Ends And Lead Joints Incl Burning Out Recovering Lead From Pipe Of 100 Mm Bore For Relaying Rerouting Of Serviceable Pipe After Cleaning Complete All As Directed. , All As Per Herein Above But 150 Mm Bore. , Relaying Of Di Ci Gi Pipe 100 Mm Bore In Trenches Over The Masonry Etc. - Relaying Of Dicigi Pipe 100 Mm Bore In Trenches Over The Masonry Pillars After Cleaning Thoroughly Including Fittings Complete All As Directed. , All As Per Hereinabove But 150 Mm Bore.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Excavation in trenches n exc 1.5 m wide n exc 1.5 mtr deep in soft lose soil for taking out pipe etc. | Excavation in trenches n exc 1.5 m wide n exc 1.5 mtr deep in softlose soil for taking out pipe laying of pipe getting out for diverting of CI pipe line complete all as directed. |
| 2 | Returning filling in including spreading leveling watering well ramming in layers etc. | Returning filling in including spreading leveling watering well ramming in layers n. exc 25 cm thick complete all as directed. |
| 3 | Removal of excavated soil to a distance not exc 50 m depositing where directed etc. | Removal of excavated soil to a distance not exc 50 m and depositing where directed at a level not exc 1.5 mtr above the starting point complete all as directed. |
| 4 | Taking up CI DI water main incl all fitting with spigot socket ends lead joints etc. | Taking up CIDI water main (incl all fitting) with spigot socket ends and lead joints incl burning out recovering lead from pipe of 100 mm bore for relaying rerouting of serviceable pipe after cleaning complete all as directed. |
| 5 | All as per herein above but 150 mm bore. | All as per herein above but 150 mm bore. |
| 6 | Relaying of DI CI GI pipe 100 mm bore in trenches over the masonry etc. | Relaying of DICIGI pipe 100 mm bore in trenches over the masonry pillars after cleaning thoroughly including fittings complete all as directed. |
| 7 | All as per hereinabove but 150 mm bore. | All as per hereinabove but 150 mm bore. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender