Power Government Departments Closing in 18 days TDR #58501023

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - In The Area Of Eutd-2 Aligarh; Electrical System Or Installation; Buyer - Safe Carriage Of 11 Mtrs. S.T Poles/ 9 Mtrs. St Poles / 8.5 Mtrs. Pcc Pole

Issued by Government Departments · Aligarh, Uttar Pradesh
Tender Value
60 Lakhs
Estimated cost
Bid Submission
03 Dec 2026
18 days left
EMD
60000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Aligarh → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - In The Area Of Eutd-2 Aligarh; Electrical System Or Installation; Buyer - Safe Carriage Of 11 Mtrs. S.T Poles/ 9 Mtrs. St Poles / 8.5 Mtrs. Pcc Poles From Store Centre, Sarsol To The Respective Site Of Work Including The Work Of Its Loading & Unloading At The Repective Ends. , Safe Carriage Of Line Material Viz. Conductor, G.I. Earth Wire, Cross Arm, Angle, Channel, Insulators, Clamps & Other Material From Store Centre, Sarsol To The Respective Site Of Work Including The Work Of Its Loading & Unloading At The Respective Ends. , Erection Of Single Support By 11 Mtrs. S.T Poles/ 9 Mtrs. St Poles / 8.5 Mtrs. Pcc Pole Including Fixing Complete Ht/Lt Fittings As Per Resspo Munual Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Grouting Of Single Support (11 Mtrs. S.T Poles/ 9 Mtrs. St Poles / 8.5 Mtrs. Pcc Pole) As Per Resspo Manual Including Of The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand & Brick Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast Etc. , Erection & Grouting Of 11 Mtrs. St Double Pole Including Fixing Complete Ht/Lt Fitting As Per Resspo Manual Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand & Brick Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast Etc. , Laying, Sagging, Stringing, Binding & Jumpering Of Acsr Weasel Conductor / Dog Conductor On The Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. , Laying Spreading, Lifting And Final Sagging Of Aerial Bunched Cable (All Size). Including Fixing Of All Accessories As Per Resspo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. : , Erection And Grouting Of Stay Set Including The Work Of Nozzling Etc. As Per Respo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T&P Etc. Required For Proper Completion Of Work As Per Resspo Manual. , Fixing & Connecting Of Earthing Rods As Per Resspo Manual Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. , Fixing Of Lt Distribution Box Including Making Connections Of Distribution Box With Lt Mains By Piercing Clamps For Aerial Bunched Cable.The Work Will Also Include The Opening Of The Service Connection Of The Consumer And Its Connecting In Distribution Box. , Safe Carriage Of 25 Kva/ 63 Kva/ 100 Kva/250 Kva Distribution Transformer From Electricity Store Centre, Aligarh Or From Any Other Place To The Respective Site Of Work Including Loading & Unloading At The Respective Ends And Mounting On Double Pole/ Placement On Plinth Including Proper Jumpering From 11 Kv Line To The Transformer And Also Connecting The Lt Site Cables As Per Resspo Manual. , Neutral & Body Earthing At 25 Kva/ 63 Kva/ 100 Kva /250 Kva Distribution Transformer By Drilling/Boring A Hole Of Size 200 Mm Dia And 3000Mm Long In Depth And Then Inserting The Gel Earthing Electrodes Of Size 50Mm Dia And 3000 Mm Long Inside The Pit Then Mix The Back Fill Compound Nicely With The Soil And Re-Filling The Empty Space Around The Earthing Electrode Including Making Of Chamber At The Top Of The Earthing As Per Direction Of Supervising Engineer. It Includes The Cost Of All Material Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. The Aforesaid Work Shall Be Carried Out As Per Resspo Norms. Max Neutral To Earth Voltage Should Be Less Than 3 Volts And Earth Resistance Should Be Less Than 1 Ohm. , Construction Of Plinth At Various 11/0.4 Kv Sub-Station Suitable For Distribution Transformer Having Size 5X 5 X 5 Out Which 2 Below The Ground. Work Will Include Digging Of Foundation 2 Deep & Brick Work With Ist Class Bricks Having Cement And Sand Mortar Of Ratio 1:6 On All The Walls, Each Of 9 Thickness. The Area Inside The Wall Shall Be Duly Filled By Mud Up To The Height Of Appropriate Level From Ground Level And Shall Be Duly Watered & Rammed. Above The Filling C.C. Of Ration 1:6:12 (Cement Sand And Brick Ballast) Giving 4 Layer Shall Be Provided. Above C.C. Layer Rcc Layer Having 4 Thickness And With Ratio 1:2:4 Of Cement Sand And Stone Ballast Shall Be Provided Re-Enforcement Shall Be Provided By Providing Net Of (8 Nos. + 8 Nos.) M.S. Rods Of Size 10 Mm Dia And Each Of 5 Length In The Middle Of The Top Of C.C. Layer. The Plinth Shall Be Plastered With 12Mm Thick Plaster In Ratio 1:4 At All Sides. This Work Will Include Cost Of Labour, T&P And All Material Required For Construction Of Plinth Which Shall Be Provided By The Contractor As Per Resspo Norms. , Providing And Fixing Of Welded Wire Mesh Fencing Around Transformer Plinth With M.S. Angle Of Size 35X35x6 Mm. Length And 1.20 Meters Height, Such Panels Shall Be Supported On M.S. Angle From Of Size 40X40x6 Mm. Having 04 Nos. Corner Supports Of Height 1.65 Meters Including Extended Legs For Grouting Which Will Be Used As A Door For Entry Of The Personnel Or Removal/Shifting Of Transformer With Welded Hinges, Sliding Belt Etc. For Locking The Arrangement As Per Drawing And Specifications The Fencing Will Be Painted One Coat Of Red Oxide Primer And Then Two Coats Of Bus Green Synthetic Enamel Paint. The Rates Should Be Inclusive Of All Materials Required For Proper Completion Of Above Work (Length Of Each Fencing Approx. 11 Meters) , Fabrication Of T-Off Channel As Per Resspo Norms. , Fabrication Of Top Channel As Per Resspo Norms. , Fabrication Of Dropper Channel As Per Resspo Norms. , Fabrication Of T/F Base Channel/Angle As Per Resspo Norms. , Fabrication Of V-Type Cross Arm As Per Resspo Norms. , Providing/ Fixing Of Missing Nuts, Bolts & Washer. , Providing & Fixing Of All Type Lt Clmaps , Safe Carriage Of 11 Kv Xlpe Cable Upto 3X185 Sq.Mm. From Store Centre, Sarsol To The Respective Site Of Work Including The Work Of Its Loading & Unloading At The Respective Ends. , Laying Of 11 Kv Xlpe Cable Upto 3X185 Sq.Mm. (Over Or Underground) Including Making Proper Connections At Both Ends. The Work Includes The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Providing 11 Kv Cable Jointing Kit (O/D & I/D) Upto 3X185 Sq.Mm. And Its Filling As Per Resspo Norms. , Providing Hdpe Pipe Upto 140Mm. And Its Layling With 11Kv Xlpe Cable As Per Resspo Norms. , Gurading Of 11 Kv Line By Laying Two Nos. Gi Wire Paraller And Fixing Of Lacings (Tilli) At A Distance At 2-3 Mtrs. As Per Respo Norms And Also Including The Cost Of Arrangement Of Labour, T&P Etc Required For Proper Completion Of Work. , Safe Carriage Of Ct/ Pt Pole Mounting Unit And Its Proper Installation On Double Poole After Fixing Of Channel With M.S. Clamps And Nuts & Bolts For Holding The Channel Angle Etc. The Unit Body Shall Be Earthed By Connecting M.S. Strip Of Size 1/8X1 Finally Connected To Earthing Rod Of Size 20Mm.X2540 Mm. 11 Kv Line Shall Be Connected To Unit As Per Instructions Of Sdo / Ae(M). The M.S. Strip & Earth Rod Shall Be Included In The Scope Of Work. , Safe Carriage Of 11 Kv Pilfer Proof Metering Cubical 10/05 . And Its Proper Installation At Pit Site As Per Resspo Manuals

BOQ

Sl. No. Item TitleItem Description
1Safe carriage of 11 Mtrs. S.T Poles/ 9 Mtrs. ST Poles / 8.5 Mtrs. PCC Poles from Store Centre, Sarsol to the respective site of work including the work of its loading & unloading at the repective ends.Safe carriage of 11 Mtrs. S.T Poles/ 9 Mtrs. ST Poles / 8.5 Mtrs. PCC Poles from Store Centre, Sarsol to the respective site of work including the work of its loading & unloading at the repective ends.
2Safe carriage of line material viz. Conductor, G.I. Earth Wire, Cross Arm, Angle, Channel, Insulators, Clamps & other material from store Centre, Sarsol to the respective site of work including the work of its loading & unloading at the respective ends.Safe carriage of line material viz. Conductor, G.I. Earth Wire, Cross Arm, Angle, Channel, Insulators, Clamps & other material from store Centre, Sarsol to the respective site of work including the work of its loading & unloading at the respective ends.
3Erection of single support by 11 Mtrs. S.T Poles/ 9 Mtrs. ST Poles / 8.5 Mtrs. PCC Pole including fixing complete HT/LT fittings as per RESSPO Munual including the cost of labour, T&P and carrier etc. required for proper completion of work.Erection of single support by 11 Mtrs. S.T Poles/ 9 Mtrs. ST Poles / 8.5 Mtrs. PCC Pole including fixing complete HT/LT fittings as per RESSPO Munual including the cost of labour, T&P and carrier etc. required for proper completion of work.
4Grouting of single support (11 Mtrs. S.T Poles/ 9 Mtrs. ST Poles / 8.5 Mtrs. PCC Pole) as per RESSPO Manual including of the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc.Grouting of single support (11 Mtrs. S.T Poles/ 9 Mtrs. ST Poles / 8.5 Mtrs. PCC Pole) as per RESSPO Manual including of the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc.
5Erection & grouting of 11 Mtrs. ST double pole including fixing complete HT/LT fitting as per RESSPO Manual including the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc.Erection & grouting of 11 Mtrs. ST double pole including fixing complete HT/LT fitting as per RESSPO Manual including the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc.
6Laying, sagging, stringing, binding & jumpering of ACSR Weasel Conductor / Dog conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.Laying, sagging, stringing, binding & jumpering of ACSR Weasel Conductor / Dog conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
7Laying spreading, lifting and final sagging of Aerial Bunched Cable (all size). including fixing of all accessories as per RESSPO Manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. :Laying spreading, lifting and final sagging of Aerial Bunched Cable (all size). including fixing of all accessories as per RESSPO Manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. :
8Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work as per RESSPO Manual.Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work as per RESSPO Manual.
9Fixing & connecting of earthing rods as per RESSPO Manual including the cost of labour, T&P etc. required for proper completion of work.Fixing & connecting of earthing rods as per RESSPO Manual including the cost of labour, T&P etc. required for proper completion of work.
10Fixing of LT Distribution box including making connections of distribution box with LT mains by piercing clamps for Aerial Bunched Cable.The work will also include the opening of the service connection of the consumer and its connecting in distribution box.Fixing of LT Distribution box including making connections of distribution box with LT mains by piercing clamps for Aerial Bunched Cable.The work will also include the opening of the service connection of the consumer and its connecting in distribution box.
11Safe carriage of 25 KVA/ 63 KVA/ 100 KVA/250 KVA Distribution Transformer from Electricity Store Centre, Aligarh or from any other place to the respective site of work including loading & unloading at the respective ends and mounting on Double pole/ placement on plinth including proper jumpering from 11 KV line to the transformer and also connecting the LT site cables as per RESSPO Manual.Safe carriage of 25 KVA/ 63 KVA/ 100 KVA/250 KVA Distribution Transformer from Electricity Store Centre, Aligarh or from any other place to the respective site of work including loading & unloading at the respective ends and mounting on Double pole/ placement on plinth including proper jumpering from 11 KV line to the transformer and also connecting the LT site cables as per RESSPO Manual.
12Neutral & Body earthing at 25 KVA/ 63 KVA/ 100 KVA /250 KVA Distribution Transformer by drilling/boring a hole of size 200 mm dia and 3000mm long in depth and then inserting the Gel earthing electrodes of size 50mm dia and 3000 mm long inside the pit then mix the back fill compound nicely with the soil and re-filling the empty space around the earthing electrode including making of chamber at the top of the earthing as per direction of supervising engineer. It includes the cost of all material labour, T&P, carrier etc. required for proper completion of work. The aforesaid work shall be carried out as per RESSPO norms. Max neutral to earth voltage should be less than 3 volts and earth resistance should be less than 1 ohm.Neutral & Body earthing at 25 KVA/ 63 KVA/ 100 KVA /250 KVA Distribution Transformer by drilling/boring a hole of size 200 mm dia and 3000mm long in depth and then inserting the Gel earthing electrodes of size 50mm dia and 3000 mm long inside the pit then mix the back fill compound nicely with the soil and re-filling the empty space around the earthing electrode including making of chamber at the top of the earthing as per direction of supervising engineer. It includes the cost of all material labour, T&P, carrier etc. required for proper completion of work. The aforesaid work shall be carried out as per RESSPO norms. Max neutral to earth voltage should be less than 3 volts and earth resistance should be less than 1 ohm.
13Construction of plinth at various 11/0.4 KV Sub-station suitable for distribution transformer having size 5’x 5’ x 5’ out which 2’ below the ground. Work will include digging of foundation 2’ deep & brick work with Ist class bricks having cement and sand mortar of ratio 1:6 on all the walls, each of 9” thickness. The area inside the wall shall be duly filled by mud up to the height of appropriate level from ground level and shall be duly watered & rammed. Above the filling C.C. of ration 1:6:12 (Cement sand and brick ballast) giving 4” layer shall be provided. Above C.C. layer RCC layer having 4” thickness and with ratio 1:2:4 of cement sand and stone ballast shall be provided Re-enforcement shall be provided by providing net of (8 Nos. + 8 Nos.) M.S. rods of size 10 mm dia and each of 5’ length in the middle of the top of C.C. layer. The plinth shall be plastered with 12mm thick plaster in ratio 1:4 at all sides. This work will include cost of labour, T&P and all material required for construction of plinth which shall be provided by the contractor as per RESSPO Norms.Construction of plinth at various 11/0.4 KV Sub-station suitable for distribution transformer having size 5’x 5’ x 5’ out which 2’ below the ground. Work will include digging of foundation 2’ deep & brick work with Ist class bricks having cement and sand mortar of ratio 1:6 on all the walls, each of 9” thickness. The area inside the wall shall be duly filled by mud up to the height of appropriate level from ground level and shall be duly watered & rammed. Above the filling C.C. of ration 1:6:12 (Cement sand and brick ballast) giving 4” layer shall be provided. Above C.C. layer RCC layer having 4” thickness and with ratio 1:2:4 of cement sand and stone ballast shall be provided Re-enforcement shall be provided by providing net of (8 Nos. + 8 Nos.) M.S. rods of size 10 mm dia and each of 5’ length in the middle of the top of C.C. layer. The plinth shall be plastered with 12mm thick plaster in ratio 1:4 at all sides. This work will include cost of labour, T&P and all material required for construction of plinth which shall be provided by the contractor as per RESSPO Norms.
14Providing and fixing of welded wire mesh fencing around transformer plinth with M.S. Angle of size 35X35X6 mm. length and 1.20 Meters height, such panels shall be supported on M.S. Angle from of size 40X40X6 mm. having 04 Nos. corner supports of height 1.65 Meters including extended legs for grouting which will be used as a door for entry of the personnel or removal/shifting of transformer with welded hinges, sliding belt etc. for locking the arrangement as per drawing and specifications the fencing will be painted one coat of red oxide primer and then two coats of bus green synthetic enamel paint. The rates should be inclusive of all materials required for proper completion of above work (length of each fencing approx. 11 Meters)Providing and fixing of welded wire mesh fencing around transformer plinth with M.S. Angle of size 35X35X6 mm. length and 1.20 Meters height, such panels shall be supported on M.S. Angle from of size 40X40X6 mm. having 04 Nos. corner supports of height 1.65 Meters including extended legs for grouting which will be used as a door for entry of the personnel or removal/shifting of transformer with welded hinges, sliding belt etc. for locking the arrangement as per drawing and specifications the fencing will be painted one coat of red oxide primer and then two coats of bus green synthetic enamel paint. The rates should be inclusive of all materials required for proper completion of above work (length of each fencing approx. 11 Meters)
15Fabrication of T-Off Channel as per RESSPO Norms.Fabrication of T-Off Channel as per RESSPO Norms.
16Fabrication of Top Channel as per RESSPO Norms.Fabrication of Top Channel as per RESSPO Norms.
17Fabrication of Dropper Channel as per RESSPO Norms.Fabrication of Dropper Channel as per RESSPO Norms.
18Fabrication of T/F Base Channel/Angle as per RESSPO Norms.Fabrication of T/F Base Channel/Angle as per RESSPO Norms.
19Fabrication of V-Type Cross Arm as per RESSPO Norms.Fabrication of V-Type Cross Arm as per RESSPO Norms.
20Providing/ fixing of missing Nuts, Bolts & Washer.Providing/ fixing of missing Nuts, Bolts & Washer.
21Providing & fixing of all type LT ClmapsProviding & fixing of all type LT Clmaps
22Safe carriage of 11 KV XLPE Cable upto 3x185 Sq.mm. from Store Centre, Sarsol to the respective site of work including the work of its loading & unloading at the respective ends.Safe carriage of 11 KV XLPE Cable upto 3x185 Sq.mm. from Store Centre, Sarsol to the respective site of work including the work of its loading & unloading at the respective ends.
23Laying of 11 KV XLPE Cable upto 3x185 Sq.mm. (over or underground) including making proper connections at both ends. The work includes the cost of labour, T&P and carrier etc. required for proper completion of work.Laying of 11 KV XLPE Cable upto 3x185 Sq.mm. (over or underground) including making proper connections at both ends. The work includes the cost of labour, T&P and carrier etc. required for proper completion of work.
24Providing 11 KV Cable Jointing kit (O/D & I/D) upto 3x185 sq.mm. and its Filling as per RESSPO Norms.Providing 11 KV Cable Jointing kit (O/D & I/D) upto 3x185 sq.mm. and its Filling as per RESSPO Norms.
25Providing HDPE Pipe upto 140mm. and its layling with 11KV XLPE Cable as per RESSPO Norms.Providing HDPE Pipe upto 140mm. and its layling with 11KV XLPE Cable as per RESSPO Norms.
26Gurading of 11 KV line by laying two nos. GI wire paraller and fixing of lacings (tilli) at a distance at 2-3 Mtrs. As per RESPO Norms and also including the cost of arrangement of labour, T&P etc required for proper completion of work.Gurading of 11 KV line by laying two nos. GI wire paraller and fixing of lacings (tilli) at a distance at 2-3 Mtrs. As per RESPO Norms and also including the cost of arrangement of labour, T&P etc required for proper completion of work.
27Safe carriage of CT/ PT Pole Mounting Unit and its proper installation on double poole after fixing of channel with M.S. clamps and nuts & bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. Strip of size 1/8x1 finally connected to earthing rod of size 20mm.x2540 mm. 11 KV line shall be connected to unit as per instructions of SDO / AE(M). The M.S. Strip & earth rod shall be included in the scope of work.Safe carriage of CT/ PT Pole Mounting Unit and its proper installation on double poole after fixing of channel with M.S. clamps and nuts & bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. Strip of size 1/8x1 finally connected to earthing rod of size 20mm.x2540 mm. 11 KV line shall be connected to unit as per instructions of SDO / AE(M). The M.S. Strip & earth rod shall be included in the scope of work.
28Safe carriage of 11 KV Pilfer Proof Metering Cubical 10/05 Amp. and its proper installation at pit site as per RESSPO ManualsSafe carriage of 11 KV Pilfer Proof Metering Cubical 10/05 Amp. and its proper installation at pit site as per RESSPO Manuals

AI Tender Summary

OUR REF NO 58501023
AUTHORITY Government Departments
TENDER VALUE 60 Lakhs
LAST DATE 03-12-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - In The Area Of Eutd-2 Aligarh; Electrical System Or Installation; Buyer - Safe Carriage Of 11 Mtrs. S.T Poles/ 9 Mtrs. St Poles / 8.5 Mtrs. Pcc Poles From Store Centre, Sarsol To The Respective Site Of Work Including The Work Of Its Loading & Unloading At The Repective Ends. , Safe Carriage Of Line Material Viz. Conductor, G.I. Earth Wire, Cross Arm, Angle, Channel, Insulators, Clamps & Other Material From Store Centre, Sarsol To The Respective Site Of Work Including The Work Of Its Loading & Unloading At The Respective Ends. , Erection Of Single Support By 11 Mtrs. S.T Poles/ 9 Mtrs. St Poles / 8.5 Mtrs. Pcc Pole Including Fixing Complete Ht/Lt Fittings As Per Resspo Munual Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Grouting Of Single Support (11 Mtrs. S.T Poles/ 9 Mtrs. St Poles / 8.5 Mtrs. Pcc Pole) As Per Resspo Manual Including Of The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand & Brick Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast Etc. , Erection & Grouting Of 11 Mtrs. St Double Pole Including Fixing Complete Ht/Lt Fitting As Per Resspo Manual Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand & Brick Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast Etc. , Laying, Sagging, Stringing, Binding & Jumpering Of Acsr Weasel Conductor / Dog Conductor On The Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. , Laying Spreading, Lifting And Final Sagging Of Aerial Bunched Cable (All Size). Including Fixing Of All Accessories As Per Resspo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. : , Erection And Grouting Of Stay Set Including The Work Of Nozzling Etc. As Per Respo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T&P Etc. Required For Proper Completion Of Work As Per Resspo Manual. , Fixing & Connecting Of Earthing Rods As Per Resspo Manual Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. , Fixing Of Lt Distribution Box Including Making Connections Of Distribution Box With Lt Mains By Piercing Clamps For Aerial Bunched Cable.The Work Will Also Include The Opening Of The Service Connection Of The Consumer And Its Connecting In Distribution Box. , Safe Carriage Of 25 Kva/ 63 Kva/ 100 Kva/250 Kva Distribution Transformer From Electricity Store Centre, Aligarh Or From Any Other Place To The Respective Site Of Work Including Loading & Unloading At The Respective Ends And Mounting On Double Pole/ Placement On Plinth Including Proper Jumpering From 11 Kv Line To The Transformer And Also Connecting The Lt Site Cables As Per Resspo Manual. , Neutral & Body Earthing At 25 Kva/ 63 Kva/ 100 Kva /250 Kva Distribution Transformer By Drilling/Boring A Hole Of Size 200 Mm Dia And 3000Mm Long In Depth And Then Inserting The Gel Earthing Electrodes Of Size 50Mm Dia And 3000 Mm Long Inside The Pit Then Mix The Back Fill Compound Nicely With The Soil And Re-Filling The Empty Space Around The Earthing Electrode Including Making Of Chamber At The Top Of The Earthing As Per Direction Of Supervising Engineer. It Includes The Cost Of All Material Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. The Aforesaid Work Shall Be Carried Out As Per Resspo Norms. Max Neutral To Earth Voltage Should Be Less Than 3 Volts And Earth Resistance Should Be Less Than 1 Ohm. , Construction Of Plinth At Various 11/0.4 Kv Sub-Station Suitable For Distribution Transformer Having Size 5X 5 X 5 Out Which 2 Below The Ground. Work Will Include Digging Of Foundation 2 Deep & Brick Work With Ist Class Bricks Having Cement And Sand Mortar Of Ratio 1:6 On All The Walls, Each Of 9 Thickness. The Area Inside The Wall Shall Be Duly Filled By Mud Up To The Height Of Appropriate Level From Ground Level And Shall Be Duly Watered & Rammed. Above The Filling C.C. Of Ration 1:6:12 (Cement Sand And Brick Ballast) Giving 4 Layer Shall Be Provided. Above C.C. Layer Rcc Layer Having 4 Thickness And With Ratio 1:2:4 Of Cement Sand And Stone Ballast Shall Be Provided Re-Enforcement Shall Be Provided By Providing Net Of (8 Nos. + 8 Nos.) M.S. Rods Of Size 10 Mm Dia And Each Of 5 Length In The Middle Of The Top Of C.C. Layer. The Plinth Shall Be Plastered With 12Mm Thick Plaster In Ratio 1:4 At All Sides. This Work Will Include Cost Of Labour, T&P And All Material Required For Construction Of Plinth Which Shall Be Provided By The Contractor As Per Resspo Norms. , Providing And Fixing Of Welded Wire Mesh Fencing Around Transformer Plinth With M.S. Angle Of Size 35X35x6 Mm. Length And 1.20 Meters Height, Such Panels Shall Be Supported On M.S. Angle From Of Size 40X40x6 Mm. Having 04 Nos. Corner Supports Of Height 1.65 Meters Including Extended Legs For Grouting Which Will Be Used As A Door For Entry Of The Personnel Or Removal/Shifting Of Transformer With Welded Hinges, Sliding Belt Etc. For Locking The Arrangement As Per Drawing And Specifications The Fencing Will Be Painted One Coat Of Red Oxide Primer And Then Two Coats Of Bus Green Synthetic Enamel Paint. The Rates Should Be Inclusive Of All Materials Required For Proper Completion Of Above Work (Length Of Each Fencing Approx. 11 Meters) , Fabrication Of T-Off Channel As Per Resspo Norms. , Fabrication Of Top Channel As Per Resspo Norms. , Fabrication Of Dropper Channel As Per Resspo Norms. , Fabrication Of T/F Base Channel/Angle As Per Resspo Norms. , Fabrication Of V-Type Cross Arm As Per Resspo Norms. , Providing/ Fixing Of Missing Nuts, Bolts & Washer. , Providing & Fixing Of All Type Lt Clmaps , Safe Carriage Of 11 Kv Xlpe Cable Upto 3X185 Sq.Mm. From Store Centre, Sarsol To The Respective Site Of Work Including The Work Of Its Loading & Unloading At The Respective Ends. , Laying Of 11 Kv Xlpe Cable Upto 3X185 Sq.Mm. (Over Or Underground) Including Making Proper Connections At Both Ends. The Work Includes The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Providing 11 Kv Cable Jointing Kit (O/D & I/D) Upto 3X185 Sq.Mm. And Its Filling As Per Resspo Norms. , Providing Hdpe Pipe Upto 140Mm. And Its Layling With 11Kv Xlpe Cable As Per Resspo Norms. , Gurading Of 11 Kv Line By Laying Two Nos. Gi Wire Paraller And Fixing Of Lacings (Tilli) At A Distance At 2-3 Mtrs. As Per Respo Norms And Also Including The Cost Of Arrangement Of Labour, T&P Etc Required For Proper Completion Of Work. , Safe Carriage Of Ct/ Pt Pole Mounting Unit And Its Proper Installation On Double Poole After Fixing Of Channel With M.S. Clamps And Nuts & Bolts For Holding The Channel Angle Etc. The Unit Body Shall Be Earthed By Connecting M.S. Strip Of Size 1/8X1 Finally Connected To Earthing Rod Of Size 20Mm.X2540 Mm. 11 Kv Line Shall Be Connected To Unit As Per Instructions Of Sdo / Ae(M). The M.S. Strip & Earth Rod Shall Be Included In The Scope Of Work. , Safe Carriage Of 11 Kv Pilfer Proof Metering Cubical 10/05 . And Its Proper Installation At Pit Site As Per Resspo Manuals
Basic Detail
Tender No GEM/2026/B/8269258
Bidding Type Tender
Location
City Aligarh
State Uttar Pradesh
Key Dates
Publish Date 12 Nov 2026
Submission Date 03 Dec 2026
Open Date 04 Dec 2026
Finance
Tender Value 60 Lakhs
Tender Fee Ref. Documents
EMD 60000
Exemption Not Available
Document List
9f14f883-1bb8-4772-b779-8184058fda29.pdf
1794485495.xlsx
1794485504.pdf
1794485509.pdf
Tender_15b64132-76a2-43c3-b3161794485630304_BUYEREUDCALIGARH.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 12, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 03, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 18 days
Dec 04, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 19 days

Tender Documents

Download All (ZIP) ↓
pdf

9f14f883-1bb8-4772-b779-8184058fda29.pdf

xlsx

1794485495.xlsx

pdf

1794485504.pdf

pdf

1794485509.pdf

pdf

Tender_15b64132-76a2-43c3-b3161794485630304_BUYEREUDCALIGARH.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender