Power Government Departments Closing in 9 days TDR #58500506

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Deposit Scheme Under Eudd, Etawah; Electrical System Or Installation; Buyer - Carriage Of 9 Mtr. Long Pcc Pole From Store Center Kunera Etawah To Si

Issued by Government Departments · Etawah, Uttar Pradesh
Tender Value
8.12 Lakhs
Estimated cost
Bid Submission
28 Nov 2026
9 days left
EMD
8120
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Etawah → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Deposit Scheme Under Eudd, Etawah; Electrical System Or Installation; Buyer - Carriage Of 9 Mtr. Long Pcc Pole From Store Center Kunera Etawah To Site Of Work Under Jurisdiction Of Eudd, Etawah Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Carriage Of Line Materials I.E. 33 Kv / 11 Kv Cable, Stay Rod, Pin Insulator / Disc Insulator, 33/11 Kv Cross Arm, Dropper Channel, Top / T-Off Channel, Cable Jointing Kit And Etc.Other Required For Lt/11Kv/33 Kv Lines, If Any From Store Center Kunera Etawah To Site Of Work Under Jurisdiction Of Eudd, Etawah Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Erection And Grouting Of Single Pole Structure By Pcc Pole 9 Mtr. Long Duly Grouted Including Necessories Clamps, Accessories Required Fixing Of Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. The Support Shall Be Grouted In Cement, Sand And Brick Ballast. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Erection And Grouting Of Double Pole Structure By Pcc Pole 9 Mtr. Long Duly Grouted Including Necessories Clamps, Accessories Required Fixing Of Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. The Support Shall Be Grouted In Cement, Sand And Brick Ballast. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Installation Of Stay Set Complete With Grouting And Nuzzling Etc. As Per Resspo Drawing /Norms Along With All Routine Material To Be Used For Such Works. , Earthing Of Poles By Fixing Earthing Rods And Binding With Earth Wire As Per Standard Norms Including Cost Of Labour T&P And Required Material For Such Work. , Carriage And Digging, Laying And Back Filling Of Lt Xlpe 3.5X400 Sqmm Cable Including The Cost Of Cable Hoisting And Making Loops/Hdpe Pipe/Gi Pipe 6 Dai /Clamps Etc. Required For Proper Completion Of The Work As Per Resspo Manual And As Per Direction Of Engineer Incharge. Including The Cost Of Arrangement Of Brick, Sand, Labour And T&P Etc. , Carriage And Fixing Of Following Ancillary Equipment, Accessories Along With Nut & Bolt On Pole Also By Making Connections As Per Resspo Norms. Including The Cost Of Labour, T&P And Carrier Etc. Required For Completion Of Work. , 11 Kv Top Channel 100X50x5x2240 Mm , Dropper Channel 100X50x5x2028 Mm , Bracing Complete , Nut & Bolt , Clamp With Nut & Bolt , Hdpe Pipe 120 Mm , Gi Pipe 6 Dai , Dismantling And Removal Of Existing Line (Conductor/Pole) From The Various Area Preparing Their Coils And Then Stacking In The Respective Jes (Store) Direction Of Engineer Incharge. It Includes The Work Of Cartage, Cost Of Labour, T&P Carrier Etc.Required For Proper Completion Of Work.

BOQ

Sl. No. Item TitleItem Description
1Carriage of 9 Mtr. Long PCC Pole from Store Center Kunera Etawah to site of work Under Jurisdiction of EUDD, Etawah through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Carriage of 9 Mtr. Long PCC Pole from Store Center Kunera Etawah to site of work Under Jurisdiction of EUDD, Etawah through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
2Carriage of line materials i.e. 33 Kv / 11 Kv Cable, stay rod, pin insulator / disc insulator, 33/11 Kv cross arm, Dropper Channel, Top / T-Off Channel, cable jointing kit and etc.other required for LT/11KV/33 KV lines, if any from Store Center Kunera Etawah to site of work under Jurisdiction of EUDD, Etawah Including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Carriage of line materials i.e. 33 Kv / 11 Kv Cable, stay rod, pin insulator / disc insulator, 33/11 Kv cross arm, Dropper Channel, Top / T-Off Channel, cable jointing kit and etc.other required for LT/11KV/33 KV lines, if any from Store Center Kunera Etawah to site of work under Jurisdiction of EUDD, Etawah Including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
3Erection and grouting of Single Pole Structure by PCC Pole 9 Mtr. long duly grouted including necessories clamps, accessories required fixing of HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. The support shall be grouted in cement, sand and brick ballast. It including the cost of all labour, T&P etc. required for proper completion of work.Erection and grouting of Single Pole Structure by PCC Pole 9 Mtr. long duly grouted including necessories clamps, accessories required fixing of HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. The support shall be grouted in cement, sand and brick ballast. It including the cost of all labour, T&P etc. required for proper completion of work.
4Erection and grouting of Double Pole Structure by PCC Pole 9 Mtr. long duly grouted including necessories clamps, accessories required fixing of HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. The support shall be grouted in cement, sand and brick ballast. It including the cost of all labour, T&P etc. required for proper completion of work.Erection and grouting of Double Pole Structure by PCC Pole 9 Mtr. long duly grouted including necessories clamps, accessories required fixing of HT/LT fittings as per RESSPO manual and as per direction of Engineer Incharge. The support shall be grouted in cement, sand and brick ballast. It including the cost of all labour, T&P etc. required for proper completion of work.
5Installation of stay set complete with grouting and Nuzzling etc. as per RESSPO drawing /norms along with all routine material to be used for such works.Installation of stay set complete with grouting and Nuzzling etc. as per RESSPO drawing /norms along with all routine material to be used for such works.
6Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
7Carriage and Digging, laying and back filling of LT XLPE 3.5x400 Sqmm Cable including the cost of cable hoisting and making loops/HDPE pipe/GI pipe 6 Dai /clamps Etc. required for proper completion of the work as per RESSPO manual and as per direction of Engineer Incharge. including the cost of arrangement of brick, sand, labour and T&P etc.Carriage and Digging, laying and back filling of LT XLPE 3.5x400 Sqmm Cable including the cost of cable hoisting and making loops/HDPE pipe/GI pipe 6 Dai /clamps Etc. required for proper completion of the work as per RESSPO manual and as per direction of Engineer Incharge. including the cost of arrangement of brick, sand, labour and T&P etc.
8Carriage and Fixing of following ancillary equipment, accessories along with nut & bolt on pole also by making connections as per RESSPO norms. Including the cost of labour, T&P and carrier etc. required for completion of work.Carriage and Fixing of following ancillary equipment, accessories along with nut & bolt on pole also by making connections as per RESSPO norms. Including the cost of labour, T&P and carrier etc. required for completion of work.
911 KV Top Channel 100x50x5x2240 mm11 KV Top Channel 100x50x5x2240 mm
10Dropper Channel 100x50x5x2028 mmDropper Channel 100x50x5x2028 mm
11Bracing CompleteBracing Complete
12Nut & BoltNut & Bolt
13Clamp with nut & boltClamp with nut & bolt
14HDPE Pipe 120 MMHDPE Pipe 120 MM
15GI Pipe 6 DaiGI Pipe 6 Dai
16Dismantling and removal of existing line (conductor/pole) from the various area preparing their coils and then stacking in the respective JE's (Store) direction of Engineer Incharge. It includes the work of cartage, cost of labour, T&P carrier etc.required for proper completion of work.Dismantling and removal of existing line (conductor/pole) from the various area preparing their coils and then stacking in the respective JE's (Store) direction of Engineer Incharge. It includes the work of cartage, cost of labour, T&P carrier etc.required for proper completion of work.

AI Tender Summary

OUR REF NO 58500506
AUTHORITY Government Departments
TENDER VALUE 8.12 Lakhs
LAST DATE 28-11-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Deposit Scheme Under Eudd, Etawah; Electrical System Or Installation; Buyer - Carriage Of 9 Mtr. Long Pcc Pole From Store Center Kunera Etawah To Site Of Work Under Jurisdiction Of Eudd, Etawah Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Carriage Of Line Materials I.E. 33 Kv / 11 Kv Cable, Stay Rod, Pin Insulator / Disc Insulator, 33/11 Kv Cross Arm, Dropper Channel, Top / T-Off Channel, Cable Jointing Kit And Etc.Other Required For Lt/11Kv/33 Kv Lines, If Any From Store Center Kunera Etawah To Site Of Work Under Jurisdiction Of Eudd, Etawah Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Erection And Grouting Of Single Pole Structure By Pcc Pole 9 Mtr. Long Duly Grouted Including Necessories Clamps, Accessories Required Fixing Of Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. The Support Shall Be Grouted In Cement, Sand And Brick Ballast. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Erection And Grouting Of Double Pole Structure By Pcc Pole 9 Mtr. Long Duly Grouted Including Necessories Clamps, Accessories Required Fixing Of Ht/Lt Fittings As Per Resspo Manual And As Per Direction Of Engineer Incharge. The Support Shall Be Grouted In Cement, Sand And Brick Ballast. It Including The Cost Of All Labour, T&P Etc. Required For Proper Completion Of Work. , Installation Of Stay Set Complete With Grouting And Nuzzling Etc. As Per Resspo Drawing /Norms Along With All Routine Material To Be Used For Such Works. , Earthing Of Poles By Fixing Earthing Rods And Binding With Earth Wire As Per Standard Norms Including Cost Of Labour T&P And Required Material For Such Work. , Carriage And Digging, Laying And Back Filling Of Lt Xlpe 3.5X400 Sqmm Cable Including The Cost Of Cable Hoisting And Making Loops/Hdpe Pipe/Gi Pipe 6 Dai /Clamps Etc. Required For Proper Completion Of The Work As Per Resspo Manual And As Per Direction Of Engineer Incharge. Including The Cost Of Arrangement Of Brick, Sand, Labour And T&P Etc. , Carriage And Fixing Of Following Ancillary Equipment, Accessories Along With Nut & Bolt On Pole Also By Making Connections As Per Resspo Norms. Including The Cost Of Labour, T&P And Carrier Etc. Required For Completion Of Work. , 11 Kv Top Channel 100X50x5x2240 Mm , Dropper Channel 100X50x5x2028 Mm , Bracing Complete , Nut & Bolt , Clamp With Nut & Bolt , Hdpe Pipe 120 Mm , Gi Pipe 6 Dai , Dismantling And Removal Of Existing Line (Conductor/Pole) From The Various Area Preparing Their Coils And Then Stacking In The Respective Jes (Store) Direction Of Engineer Incharge. It Includes The Work Of Cartage, Cost Of Labour, T&P Carrier Etc.Required For Proper Completion Of Work.
Basic Detail
Tender No GEM/2026/B/8268631
Bidding Type Tender
Location
City Etawah
State Uttar Pradesh
Key Dates
Publish Date 12 Nov 2026
Submission Date 28 Nov 2026
Open Date 29 Nov 2026
Finance
Tender Value 8.12 Lakhs
Tender Fee Ref. Documents
EMD 8120
Exemption Not Available
Document List
a741a0e1-8e04-42c3-9c6e-e2c132e91097.pdf
1794481017.xlsx
1794481043.pdf
1794481046.pdf
1794481049.pdf
1794481053.pdf
Tenderform_d6052837-ff59-43d6-82201794481302828_EDCETAWAHSE.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 12, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 28, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 9 days
Nov 29, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 10 days

Tender Documents

Download All (ZIP) ↓
pdf

a741a0e1-8e04-42c3-9c6e-e2c132e91097.pdf

xlsx

1794481017.xlsx

pdf

1794481043.pdf

pdf

1794481046.pdf

pdf

1794481049.pdf

pdf

1794481053.pdf

pdf

Tenderform_d6052837-ff59-43d6-82201794481302828_EDCETAWAHSE.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender