Bids Are invited for Custom Bid For Services - Capital Repairing Of 3 Numbers Of Furnaces At Cast Houses Rpu Inside Smelter Plant - Removal Of Left Over Metal & Skull From Inside The Furnace By Using Required Tools & Tackles Including Disposal Of Sam
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - Capital Repairing Of 3 Numbers Of Furnaces At Cast Houses Rpu Inside Smelter Plant - Removal Of Left Over Metal & Skull From Inside The Furnace By Using Required Tools & Tackles Including Disposal Of Same At Specified Location Within Plant Premises As Per Direction Of Engineer- In- Charge. , Dismantling Of Existing Refractory Lining Both Manually & Mechanical Means, Cleaning The Surface & Disposal Of Dismantled Materials Within The Periphery Of Smelter Plant Etc. Complete As Per Direction Of Engineer- In- Charge. , Laying And Fixing Of Insulating Bricks/Castable In The Furnace Including Transporting The Same From Owners Storage Yard, Sorting, Cutting If Required Etc. All Complete As Per Drawing Specification Direction Of Engineer-In-Charge. , Laying Of 45% - 60%Al2o3castable In The Furnace, Curing And Shuttering Of The Same Including Transporting Of The Material From The Owners Storage Yard All Complete As Per Drawing Specification And Direction Engineer-In-Charge. , Laying And Casting Of 90%Al2o3 Castable In The Furnace Including Shuttering And Curing , And Transporting The Same From The Owners Storage Yard, All Complete As Per Drawing Specification, Direction Of Engineer- In-Charge , Laying Of Lc - Castable In The Furnace Including Shuttering And Curing, Complete Including Transporting The Same From The Owners Storage Yard All Complete As Per Drawing Specification And Direction Engineer-In-Charge. , Laying And Fixing Of 40%Al2o3 Brick In The Furnace Including Transporting The Same From The Owners Storage Yard Including Sorting, Cutting If Required, All Complete As Per Drawing Specification And Direction Engineer-In-Charge , Laying And Fixing Of 85% Al2o3 Bricks In The Furnace Including Transporting The Same From Owner#S Storage Yard, Sorting, Cutting If Required Etc. All Complete As Per Drawing Specification Direction Of Engineer-In-Charge. , Laying Of Fibre Board & Paper In The Furnace Including Transporting The Same From The Owners Storage Yard Including Sorting, Cutting If Required, All Complete As Per Drawing Specification And Direction Engineer-In-Charge , Supply And Fixing Of Roof Anchor Clips As Per Enclosed Drawing No Ch/Sp/Civil/A4/4407And Material Confirming To Aisi-310 As Per Direction Of Engineer-In-Charge , Fixing And Welding Of Wall Anchor As Per Enclosed Drawing No Ch/ Refr/Spr/A4/1986, Ch/Sp/M/ A4/1812, Rp/Ref/Spr/A4/ 94345 And Material Confirming To Aisi-310 As Per Direction Of Engineer-In-Charge
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Removal of left over metal & skull from inside the furnace by using required tools & tackles including disposal of same at specified location within plant premises as per direction of Engineer- in- charge. | Removal of left over metal & skull from inside the furnace by using required tools & tackles including disposal of same at specified location within plant premises as per direction of Engineer- in- charge. |
| 2 | Dismantling of existing refractory lining both manually & mechanical means, cleaning the surface & disposal of dismantled materials within the periphery of smelter plant etc. complete as per direction of engineer- in- charge. | Dismantling of existing refractory lining both manually & mechanical means, cleaning the surface & disposal of dismantled materials within the periphery of smelter plant etc. complete as per direction of engineer- in- charge. |
| 3 | Laying and fixing of Insulating bricks/castable in the furnace including transporting the same from owner's storage yard, sorting, cutting if required etc. all complete as per drawing specification direction of Engineer-in-charge. | Laying and fixing of Insulating bricks/castable in the furnace including transporting the same from owner's storage yard, sorting, cutting if required etc. all complete as per drawing specification direction of Engineer-in-charge. |
| 4 | Laying of 45% - 60%Al2O3castable in the furnace, curing and shuttering of the same including transporting of the material from the owners storage yard all complete as per drawing specification and direction engineer-in-charge. | Laying of 45% - 60%Al2O3castable in the furnace, curing and shuttering of the same including transporting of the material from the owners storage yard all complete as per drawing specification and direction engineer-in-charge. |
| 5 | Laying and casting of 90%Al2o3 castable in the furnace including shuttering and curing , and transporting the same from the owners storage yard, all complete as per drawing specification, direction of engineer- in-charge | Laying and casting of 90%Al2o3 castable in the furnace including shuttering and curing , and transporting the same from the owners storage yard, all complete as per drawing specification, direction of engineer- in-charge |
| 6 | Laying of LC - castable in the furnace including shuttering and curing, complete including transporting the same from the owners storage yard all complete as per drawing specification and direction engineer-in-charge. | Laying of LC - castable in the furnace including shuttering and curing, complete including transporting the same from the owners storage yard all complete as per drawing specification and direction engineer-in-charge. |
| 7 | Laying and fixing of 40%Al2O3 brick in the furnace including transporting the same from the owners storage yard including sorting, cutting if required, all complete as per drawing specification and direction engineer-in-charge | Laying and fixing of 40%Al2O3 brick in the furnace including transporting the same from the owners storage yard including sorting, cutting if required, all complete as per drawing specification and direction engineer-in-charge |
| 8 | Laying and fixing of 85% Al2O3 bricks in the furnace including transporting the same from owner#s storage yard, sorting, cutting if required etc. all complete as per drawing specification direction of Engineer-in-charge. | Laying and fixing of 85% Al2O3 bricks in the furnace including transporting the same from owner#s storage yard, sorting, cutting if required etc. all complete as per drawing specification direction of Engineer-in-charge. |
| 9 | Laying of fibre board & paper in the furnace including transporting the same from the owners storage yard including sorting, cutting if required, all complete as per drawing specification and direction engineer-in-charge | Laying of fibre board & paper in the furnace including transporting the same from the owners storage yard including sorting, cutting if required, all complete as per drawing specification and direction engineer-in-charge |
| 10 | Supply and fixing of roof anchor clips as per enclosed drawing no CH/SP/CIVIL/A4/4407and material confirming to AISI-310 as per direction of engineer-in-charge | Supply and fixing of roof anchor clips as per enclosed drawing no CH/SP/CIVIL/A4/4407and material confirming to AISI-310 as per direction of engineer-in-charge |
| 11 | Fixing and welding of wall anchor as per enclosed Drawing no CH/ REFR/SPR/A4/1986, CH/SP/M/ A4/1812, RP/REF/SPR/A4/ 94345 and material confirming to AISI-310 as per direction of engineer-in-charge | Fixing and welding of wall anchor as per enclosed Drawing no CH/ REFR/SPR/A4/1986, CH/SP/M/ A4/1812, RP/REF/SPR/A4/ 94345 and material confirming to AISI-310 as per direction of engineer-in-charge |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 26 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 27 daysTender Documents