Tender For Mtps-I - Tm -Stage-I & Ii Units - I, Ii, Iii & Iv - Bfps, Bfbps, Ceps, Voith Hydraulic Couplings And Hdps -Preventive / Break Down Maintenance For A Period Of One Year From The Date Of Commencement Of Work.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
26 Nov 2026
5 days left
EMD
14800
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Salem → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Mtps-I - Tm -Stage-I & Ii Units - I, Ii, Iii & Iv - Bfps, Bfbps, Ceps, Voith Hydraulic Couplings And Hdps -Preventive / Break Down Maintenance For A Period Of One Year From The Date Of Commencement Of Work.
BOQ
| Sl. No. | Item Description |
| 1 | Renewal / Replacement / Servicing of DE/NDE Mechanical seals & renewal of CW Jacket ‘O’ rings of BFP.a) De-coupling the feed pump, dismantling the oil and water lines, dismantling the DE / NDE side bearing assembly,mechanical seals etc. |
| 2 | b) Renewal of Cooling water jacket “O” rings by removing cooling water jacket from DE/NDE side of BFP using puller arrangement. |
| 3 | c) Re-assembling the bearing housing, journal bearing &Mechanical Seals after servicing and assembling, renewal ofgaskets for oil lines, checking oil clearance and other allied works |
| 4 | Renewal of Suction Guide ‘O’ Ring of Boiler Feed PumpRenewal of suction Guide ‘O’ Ring of Boiler Feed Pumps. De-coupling the feed pump, dismantling the suction guide cover flange, cleaning and renewal of suction guide ‘O’ ring and reassembling the cover flange and coupling of the pump with Voith. |
| 5 | Renewal of Discharge Cover ‘O’ Ring of Boiler Feed Pumpa) Decoupling the Feed pump from hydraulic coupling dismantling all the oil &water lines, removing the drive end and non drive end side studs withdrawing the pump cartridge. |
| 6 | b) Dismantling the DE&NDE side bearing assemblies,mechanical seals, removing the HP end cover after supporting cartridge. |
| 7 | c) Renewing the discharge cover O ring, reassembling the cartridge into the barrel and positioning the discharge cover,tightening the studs using hydraulic torque tensioner on both the sides. Assembling of the mechanical seals, bearings and checking clearances of the bearings. |
| 8 | d) Aligning the pump with the hydraulic coupling, reassembling the cooling water lines & oil lines and successful commissioning of the pump. |
| 9 | Inspection of DE / NDE Bearings of BFP a)Inspection of DE / NDE Bearings of BFP and Replacing/servicing if required. De-coupling the feed pump, dismantling the oil and waterlines, dismantling the DE / NDE side bearing assembly etc., |
| 10 | b)Checking of DE/NDE Bearings, taking measurements, blue matching, servicing/ replacing if necessary and re-assembling of the Bearing Housings and commissioning of the pump. |
| 11 | Renewal / Repairing of DE/NDE Bearing Housings/Bearing carrier Assemblies, Centering, Providing Guide pins/dowel pins according to the alignment and allied works.a)De-coupling the feed pump, dismantling the oil and waterlines, dismantling the DE / NDE side bearing assembly, bearing housings and bearing brackets etc. |
| 12 | b)Checking of bearings, taking measurements, repairing/servicing/renewing the bearing housings/bearing carrier assemblies and replacement of worn out parts etc., matching with the bearings and allied works assembly from the barrel using fixture. |
| 13 | c)Re-assembling the bearing housing/carrier assemblies, journal bearings & other parts after servicing and assembling, centering the bearing housings with respect to the cartridge & barrel assembly, checking for free rotation of the pump, renewal of gaskets for oil lines, checking oil clearance and other allied works. |
| 14 | Labour charges for IBR welding for Replacement of Valves, Pipes, Stubs, Bends and Reducers by Non IBR Welding Works. |
| 15 | Labour charges for IBR welding for cutting and welding of GLV 1\\"/1500/2500 class valves AS or equivalent joints by IBR welder |
| 16 | Boiler Feed Booster Pumps.Renewal / Replacement / Servicing of DE/NDE Mechanical seals & renewal of CW Jacket ‘O’ rings of BFBP.a) De-coupling the feed pump, dismantling the oil and water lines, dismantling the DE / NDE side bearing assembly,mechanical seals etc. |
| 17 | b) Renewal of Cooling water jacket “O” rings by removing cooling water jacket from DE/NDE side of BFP using puller arrangement. |
| 18 | c) Re-assembling the bearing housing, journal bearing &Mechanical Seals after servicing and assembling, renewal of gaskets for oil lines, checking oil clearance and other allied works. |
| 19 | Inspection of bearings and Renewal Replacement /Servicing of DE/NDE Bearings / Oil Guards / Thrust pads of Boiler Feed Booster Pump.a) De-coupling the Booster pump, dismantling the oil and water lines, dismantling the DE / NDE side bearing assembly etc., |
| 20 | b) Checking of DE/NDE Bearings, taking measurements, bluematching, servicing/ replacing if necessary and re-assembling of the Bearing Housings and commissioning of the pump. |
| 21 | Renewal / Repairing of DE/NDE Bearing Housings /Bearing carrier Assemblies, Centering, Providing Guidepins/dowel pins according to the alignment and allied worksA) De-coupling the booster pump, dismantling the oil and water lines, dismantling the DE / NDE side bearing assembly, bearing housings and bearing brackets etc. |
| 22 | B) Checking of bearings, taking measurements,repairing/servicing/renewing the bearing housings/bearing carrier assemblies and replacement of wornout parts etc.,matching with the bearings and allied works. |
| 23 | C) Re-assembling the bearing housing/carrier assemblies, journal bearings & other parts after servicing and assembling, centering the bearing housings with respect to the cartridge & barrel assembly, checking for free rotation of the pump, renewal of gaskets for oil lines, checking oil clearance and other allied works. |
| 24 | Inspection and Hydraulic Testing of BFP Lub oil/ Working oil cooler Assembly.Disconnecting the Lub oil / Working Oil lines from the Cooler after draining the sump oil, dismantling the water boxes, separation of tube nest from the cooler and cleaning the inner surface of shells, tube nest and conducting the hydraulic test to the rated pressure, reconditioning of shell outer surface by welding if necessary, plugging the tubes if puncture deducted and reassembling of cooler and the connected parts with the renewed gaskets & ‘O’ rings. |
| 25 | Condensate Extraction PumpsInspection / Replacement of Coupling / Bearings of CEP Lifting of Motor from its bed and remounting the motor with CEP and carrying out alignment. |
| 26 | HEATER DRIP PUMPReplacement of defective Heater Drip Pump with Spare pump, and commissioning.a) Decoupling and removing the defective pump & motor from the bed and Dismantling the DE & NDE bearing housings of pump. |
| 27 | b) Transporting the Spare pump from Repair Bay area to the Pump Bed and Transporting the released pump to the repair bay area for overhauling including leading and lifting charges. |
| 28 | c) Cleaning the Suction line, suction filter and Discharge lineflanges, CW line flanges and renewal of gaskets and connecting suction and discharge lines with the pump, connecting and welding of the leakoff line with the pump and other connected CW lines for the commissioning of the pump. |
| 29 | d) Dismantling and cleaning of oil coolers & cooling water lines and changing gaskets and assembling with the pump. |
| 30 | e) Shifting the motor to plinth place, aligning & coupling of the spare pump with motor and Commissioning of spare pump in HDP. |
| 31 | Attending replacement of defective Bearings in Non-Drive End of Heater Drip Pump and Commissioning of pump.a) Decoupling of pump with motor and Dismantling the DE & NDE side Cooling water lines of pump. |
| 32 | b)Dismantling and cleaning of oil chambers and changing gaskets at both the ends. |
| 33 | c)Removal of NDE side seized bearings by Gas Cutting and Heating the bearing housing, cleaning the shaft bearing seating area and checking measurements, Cleaning the bearing housing and Renewal of required NDE bearings, sleeves, “O” rings, Gland ropes & gaskets and assembling suitably with pump shaft. |
| 34 | d)Alignment of pump with motor & coupling of the pump with motor, assembling of oil chambers at both the ends and connecting all cooling water lines and Commissioning of pump. |
| 35 | Attending Renewal of sleeve “O” ring/ DE bearing at -Drive End side of Heater Drip Pump and Commissioning of pump.a) Decoupling of pump with motor and Dismantling the DE side Cooling water lines of pump. |
| 36 | b) Dismantling and cleaning of oil chambers and changing gaskets at DE side |
| 37 | c) Removal of DE side bearing by mechanical puller arrangements, cleaning the shaft bearing seating area, Cleaning the bearing housing and Renewal of sleeve “O” ring, bearing if necessary, assembling the bearing arrangements, Gland ropes & gaskets suitably with pump shaft |
| 38 | d) Alignment of pump with motor & coupling of the pump with motor, assembling of oil chambers at both the ends andconnecting all cooling water lines and Commissioning of pump. |
| 39 | Complete Overhauling Of Voith Hydrualic Coupling.Inspection and Overhauling of Voith Hydraulic Coupling of Boiler Feed pump. Draining the operating fluid from the oil sump & oil filters, dismantling the connecting coupling between voith/motor and voith/BFP, checking the radial run out of the input and output shafts. |
| 40 | Removing the actuator, cam control system, dismantling the auxiliary LOP motor from housing and removing the top cover of the coupling after dismantling the temperature probe according to the arrangements. |
| 41 | Removing the fusible plugs, dismantling the input shaft, rotating parts, filling pump, auxiliary LOP and scoop tube mechanism. |
| 42 | Inspecting the bladed wheel, bearings for their clearances, inspecting the bearing portion in the shaft and polishing, inspecting the scoop tube mechanism for wear and replacing if necessary for the all above. |
| 43 | Inspection of toothed gears, overhauling of auxiliary LOP and filling pump. |
| 44 | Removing the old sealing compound and any sludge’s from the sump, Voith bottom casing etc, and then, re-coating with sealing compound{Hylomer, Paul seal (or) equivalent} to all sealing surfaces. Inspection, renewal of gaskets if required reassembling. |
| 45 | Reassembling the rotating parts, filling pump, auxiliary LOP and reinstalling the input/output shaft rotating parts, filling pump and auxiliary. LOP. |
| 46 | Assembling the cam control and actuator, scoop tube mechanism, greasing them and assembling the top cover of the coupling and assembling the temperature probes. |
| 47 | Checking of alignment between the voith couplings & Feed pump and correcting, filling of oil to the sump and carrying out trial run of auxiliary LOP and finally commissioning of the coupling. |
| 48 | Complete Overhauling Of Boiler Feed Booster PumpsDecoupling the pump, dismantling CW lines & oil lines, dismantling of bearings, mechanical seal at both DE & NDE and inspection, reassembling of seal cartridges with renewed sealing elements. |
| 49 | Opening of top cover of split casing dismantling of rotor, inspection and measurement of wear rings, renewal of parts if required. Reassembling and positioning of the rotor and closing of top casing. |
| 50 | Mounting of mechanical seals and bearings housing at DE & NDE, checking of various clearances of the bearings and restoring the oil lines and CW lines. |
| 51 | Reconditioning of Pump Top, Bottom Casing & Casing Rings etc. Grinding the eroded portions of the casing ring assembly seating areas and other eroded areas in the top & Bottom casings, and casing wear rings and Welding with suitable special electrodes after preheating the casing, and rings as per requirement. |
| 52 | Checking and Correcting the alignment between Booster Pump Coupling to Motor Coupling. Drive End/Heater Drip Pump/ Model: NU 411 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Nov 12, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 26, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysNov 27, 2026
Bid Opening Date
Technical bids will be opened and evaluated.